CN110519900A CN201910884874.0A CN201910884874A CN110519900A CN 110519900 A CN110519900 A CN 110519900A CN 201910884874 A CN201910884874 A CN 201910884874A CN 110519900 A CN110519900 A CN 110519900A
Authority
CN
China
Prior art keywords
node computer
broadcast
central server
lanterns
lamps
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910884874.0A
Other languages
Chinese (zh)
Inventor
徐嘉豪
林世文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Ex Lighting Technology Holdings Co Ltd
Original Assignee
Shenzhen Ex Lighting Technology Holdings Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Ex Lighting Technology Holdings Co Ltd filed Critical Shenzhen Ex Lighting Technology Holdings Co Ltd
Priority to CN201910884874.0A priority Critical patent/CN110519900A/en
Publication of CN110519900A publication Critical patent/CN110519900A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N21/00Selective content distribution, e.g. interactive television or video on demand [VOD]
    • H04N21/20Servers specifically adapted for the distribution of content, e.g. VOD servers; Operations thereof
    • H04N21/23Processing of content or additional data; Elementary server operations; Server middleware
    • H04N21/242Synchronization processes, e.g. processing of PCR [Program Clock References]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B20/00Energy efficient lighting technologies, e.g. halogen lamps or gas discharge lamps
    • Y02B20/40Control techniques providing energy savings, e.g. smart controller or presence detection

Landscapes

  • Engineering & Computer Science (AREA)
  • Multimedia (AREA)
  • Signal Processing (AREA)
  • Circuit Arrangement For Electric Light Sources In General (AREA)

Abstract

The embodiment of the present invention provides a kind of lamp control system and control method, the system comprises: central server for human-computer interaction and issues broadcast strategy;The more node computers for being connected with each other and being connected with central server, every node computer is also connected with the lamps and lanterns of corresponding control, every node computer receives the fault data of the controller upload of the corresponding lamps and lanterns controlled and is analyzed, determined and handled for fault data, and every node computer controls the corresponding lamps and lanterns controlled also according to the broadcast strategy that central server issues respectively and the video frame to be broadcast that node computer obtains in advance is played simultaneously.The embodiment of the present invention can solve most of failure without central server;Every node computer, which receives the broadcast strategy that central server issues, to synchronize broadcasting control to the lamps and lanterns of corresponding control, and the communication data amount of central server busy is greatly reduced, effectively reduces central server operating pressure.

Description

Lamp control system and control method
Technical field
The present embodiments relate to houselights control technology field more particularly to a kind of lamp control system and controlling parties Method.
Background technique
Existing outdoor scene illuminator mostly uses greatly the control system of centralization framework.Its by one it is high performance in terms of Server centered on calculation machine, other node computers depend on central server.Central server and node computer are more With long connection maintenance, the most processing/calculating of functions such as fault warning, multinode broadcasting synchronize all are on central server It executes.When progress multinode is played simultaneously, needs to issue video name to node computer by central server and currently broadcast Frame number is put, node computer carries out video playing by the frame received.Existing this centralized system framework can be with node meter Calculation machine number increases, node side fault warning, and multinode broadcasting, which synchronizes, waits key functions due to needing between central server It frequently to communicate, huge load can be caused to central server, the data processing pressure for also causing central server to be carried It is multiplied, causes the processing capacity of central server to become the bottleneck of entire control system, and work as central server delay machine, it is whole A control system all can be in paralyzed state.
Summary of the invention
The technical problem to be solved by the embodiment of the invention is that provide a kind of lamp control system, can effectively mitigate pair The dependence of central server.
The further technical problems to be solved of the embodiment of the present invention are, provide a kind of method for controlling lamp, can effectively subtract Gently to the dependence of central server.
In order to solve the above-mentioned technical problem, the embodiment of the present invention is first the following technical schemes are provided: a kind of lamps and lanterns control system System, comprising:
Central server for human-computer interaction and issues broadcast strategy;
The more node computers being connected with the central server, every node computer also with the lamp of corresponding control Tool is connected, every node computer receive the fault data that the corresponding lamps and lanterns controlled upload and for the fault data into Row analysis, judgement and processing, every node computer control institute also according to the broadcast strategy that the central server issues respectively The video frame to be broadcast that the node computer obtains in advance is played simultaneously in the lamps and lanterns of corresponding control.
Further, the node computer will be also judged as on the fault data for the significant trouble that can not be settled a dispute by the parties concerned themselves Reach central server.
Further, the central server is also used to show the number of faults for the significant trouble that the node computer uploads According to and system for prompting administrator publication and execute work order and during idle time section issue video frame to be broadcast to node computer into Row prestores.
On the other hand, the embodiment of the present invention also provides a kind of lamps and lanterns based on lamp control system described in any of the above item Control method, comprising:
The failure that the lamps and lanterns of corresponding control are occurred independently is analyzed and handled to each node computer;And
It is synchronous that the broadcast strategy that each node computer is issued according to central server controls the corresponding lamps and lanterns controlled respectively The video frame to be broadcast that broadcast nodes computer obtains in advance.
Further, the failure packet that the lamps and lanterns of corresponding control are occurred independently is analyzed and handled to each node computer Include: each node computer receives the fault data that the controller of the corresponding lamps and lanterns controlled uploads, and analyzes and determines the failure Data, when being judged as the insignificant failure that can be settled a dispute by the parties concerned themselves, the failure of settling a dispute by the parties concerned themselves is being judged to not settling a dispute by the parties concerned themselves Significant trouble when fault data is uploaded to central server.
Further, the central server shows fault data and the system for prompting management of received significant trouble Member's publication and execution work order.
Further, the broadcast strategy that each node computer is issued according to central server controls corresponding control respectively The video frame to be broadcast that node computer obtains in advance is played simultaneously in the lamps and lanterns of system
Each node computer obtains video frame to be broadcast in advance;
Each node computer elects a determining wherein node computer as clock source service by being randomly assigned mechanism Device;
Each node computer is voluntarily established with the clock source server and communicates and keep the synchronous of system time;
Each node computer receives the broadcast strategy that central server issues;
Each node computer controls the corresponding lamps and lanterns controlled according to the broadcast strategy and each node computer is played simultaneously The video frame to be broadcast obtained in advance.
Further, it is synchronous to control the corresponding lamps and lanterns controlled according to the broadcast strategy respectively for each node computer Playing the video frame to be broadcast that each node computer obtains in advance includes:
Each node computer is voluntarily believed by the broadcast strategy on the basis of the time got from clock source server Breath, which calculates, obtains the corresponding currently playing video frame number of lamps and lanterns controlled;
The lamps and lanterns controlled corresponding to the currently playing video frame number control of lamps and lanterns of each node computer according to corresponding control Synchronize broadcasting.
Further, the broadcast strategy is to be issued by the central server with form of scripts.
Further, each node computer obtains video frame to be broadcast in advance and includes:
It receives the server video frame to be broadcast that section issues during idle time and stores the hard disk to node computer and deposit Reservoir;Or
Data connection is established with the External memory equipment for having video frame to be broadcast and from External memory equipment described in reading Video frame to be broadcast simultaneously is transferred to the harddisk memory inside node computer or reading and caches the video frame to be broadcast.
After adopting the above technical scheme, the embodiment of the present invention at least has the following beneficial effects: that the embodiment of the present invention passes through The fault data that each node computer voluntarily uploads the lamps and lanterns of corresponding control is analyzed, determined and is handled, and can be It can solve most of failure in the case where without central server;Moreover, every node computer receives the center The i.e. controllable corresponding lamps and lanterns controlled of the broadcast strategy that server issues are played simultaneously each node computer and are obtained in advance wait broadcast The communication data amount of central server busy is greatly reduced in video frame, effectively reduces central server operating pressure.Locating In terms of managing lamp failure, each node computer can realize that Autonomy is run to a certain extent.
Detailed description of the invention
Fig. 1 is the system architecture functional block diagram of one alternative embodiment of lamp control system of the present invention.
Specific embodiment
The application is described in further detail in the following with reference to the drawings and specific embodiments.It should be appreciated that signal below Property embodiment and explanation be only used to explain the present invention, it is not as a limitation of the invention, moreover, in the absence of conflict, The features in the embodiments and the embodiments of the present application can be combined with each other.
As shown in Figure 1, the embodiment of the present invention provides a kind of lamp control system, comprising:
Central server 1 for human-computer interaction and issues broadcast strategy;
The more node computers 3 for being connected with each other and being connected with the central server 1, every node computer 3 is also It is connected with the lamps and lanterns 5 of corresponding control, every node computer 3 receives the fault data of the corresponding lamps and lanterns 5 controlled and is directed to The fault data is analyzed, judged and is handled, and every node computer 3 is broadcast also according to what the central server 1 issued Putting strategy, the video to be broadcast that the control node computer 3 obtains in advance is played simultaneously in the corresponding lamps and lanterns 5 controlled of control respectively Frame.
The fault data that the embodiment of the present invention voluntarily uploads the lamps and lanterns 5 of corresponding control by each node computer 3 It analyzed, judged and is handled, and can solve most of failure without central server 1;Moreover, every It is synchronous that platform node computer 3 receives the i.e. controllable corresponding lamps and lanterns 5 controlled of broadcast strategy that the central server 1 issues It plays each node computer and obtains video frame to be broadcast in advance, the communication data amount of 1 busy of central server is greatly reduced, effectively Reduce 1 operating pressure of central server.In terms of handling lamp failure, each node computer 3 can be realized to a certain extent Autonomy operation.
In another embodiment of the present invention, the node computer 3 will also be judged as the weight that can not be settled a dispute by the parties concerned themselves The fault data of major break down is uploaded to central server 1.In the present embodiment, node computer 3 is by the fault data of significant trouble It is uploaded to central server 1, and central server 1 can be efficiently used to solve failure.
In yet another embodiment of the present invention, the central server 1 is also used to show that the node computer 3 uploads Significant trouble fault data and system for prompting administrator publication and execute work order and during idle time section issue wait broadcast view Frequency frame is prestored to node computer.In the present embodiment, central server 1 shows the fault data of significant trouble, and corresponding System for prompting administrator, and system manager can be allowed faster to notice significant trouble occurred, acceleration disturbance solves.And center Server 1 also issues video frame to be broadcast by section during idle time and is prestored to node computer 3, when rationally utilizing idle Communication resources are also effectively reduced the communication data amount of 1 busy of central server.Certainly, the video frame to be broadcast can also be with It is supplied to node computer by other means, such as: the external memory for having video frame to be broadcast is connected to node meter Calculation machine 3 is read by node computer 3 and is dumped in the harddisk memory of node computer 3, or is existed by node computer 3 It is read when needing to play video frame from external memory and caches the video frame to be broadcast.
On the other hand, the embodiment of the present invention also provides a kind of method for controlling lamp based on above-mentioned lamp control system, packet It includes:
Each node computer 3 failure that independently lamps and lanterns 5 of analysis and the corresponding control of processing are occurred;And
It is same that the broadcast strategy that each node computer 3 is issued according to central server 1 controls the corresponding lamps and lanterns 5 controlled respectively The video frame to be broadcast that step broadcast nodes computer 3 obtains in advance.
The fault data that the embodiment of the present invention voluntarily uploads the lamps and lanterns 5 of corresponding control by each node computer 3 It analyzed, judged and is handled, and can solve most of failure without central server 1;Moreover, every It is synchronous that platform node computer 3 receives the i.e. controllable corresponding lamps and lanterns 5 controlled of broadcast strategy that the central server 1 issues The video frame to be broadcast that broadcast nodes computer 3 obtains in advance, is greatly reduced the communication data amount of 1 busy of central server, has Effect reduces 1 operating pressure of central server.In terms of handling 5 failure of lamps and lanterns, each node computer 3 can be real to a certain extent Existing Autonomy operation.
In another embodiment of the present invention, independently analysis and processing correspond to the lamp controlled to each node computer 3 The failure that tool 5 is occurred includes: that each node computer 3 receives the number of faults that the controller 50 of the corresponding lamps and lanterns 5 controlled uploads According to, and analyze and determine the fault data, and when being judged as the insignificant failure that can be settled a dispute by the parties concerned themselves, the event of settling a dispute by the parties concerned themselves Barrier, is uploaded to central server 1 for fault data when being determined as the significant trouble that can not be settled a dispute by the parties concerned themselves.The present embodiment passes through section Point computer 3 analyzes failure, and can settle a dispute by the parties concerned themselves when being determined as insignificant failure, and the fault data of significant trouble is uploaded To central server 1, and central server 1 can be efficiently used and quickly solve significant trouble.
In yet another embodiment of the present invention, the central server 1 shows the failure of received significant trouble Data and system for prompting administrator publication and execution work order.In the present embodiment, the event of significant trouble is shown by central server 1 Hinder data, and corresponding system for prompting administrator, and system manager can be allowed faster to notice significant trouble occurred, accelerates event Barrier solves.
In yet another embodiment of the present invention, broadcasting plan that each node computer 3 is issued according to central server 1 The lamps and lanterns 5 slightly controlled corresponding to control respectively are played simultaneously the video frame to be broadcast that node computer 3 obtains in advance and include:
Each node computer 3 obtains video frame to be broadcast in advance;
Each node computer 3 elects a determining wherein node computer 3 as clock source clothes by being randomly assigned mechanism Business device;
Each node computer 3 is voluntarily established with the clock source server and communicates and keep the synchronous of system time;
Each node computer 3 receives the broadcast strategy that central server 1 issues;
Each node computer 3 controls the corresponding lamps and lanterns 5 controlled respectively according to the broadcast strategy and each node is played simultaneously The video frame to be broadcast that computer 3 obtains in advance.
By first determining, wherein a node computer 3 is clock source server to the present embodiment, so as to facilitate each section Point computer 3 keeps the synchronous of system time with the clock source server, and each node computer 3 has been effectively ensured and has been controlled Lamps and lanterns 5 broadcasting synchronism, and provide clock source without reliance server, independence is more preferable.
In one embodiment of the invention, it is right to control institute according to the broadcast strategy respectively for each node computer 3 The video frame to be broadcast that each node computer 3 obtains in advance is played simultaneously in the lamps and lanterns 5 that should be controlled
Each node computer 3 voluntarily passes through the broadcast strategy on the basis of the time got from clock source server Information, which calculates, obtains the corresponding currently playing video frame number of lamps and lanterns 5 controlled;
Each node computer 3 controls the corresponding lamp controlled according to the currently playing video frame number of lamps and lanterns 5 of corresponding control Tool 5 synchronizes broadcasting.
The present embodiment is by that can effectively obtain corresponding control on the basis of the time got from clock source server The currently playing video frame number of lamps and lanterns 5 of system, then broadcasting is synchronized to control the corresponding lamps and lanterns 5 controlled.So that each lamps and lanterns are broadcast It is good to put synchronism.
In one embodiment of the invention, the broadcast strategy is to be issued by the central server 1 with form of scripts. For the present embodiment by being set to be issued broadcast strategy with form of scripts by central server 1, data volume is small, can mitigate in it is genuinely convinced Be engaged in 1 pressure communication of device, moreover it is possible to facilitate user for script progress voluntarily compilation and design come promoted each lamps and lanterns 5 be played simultaneously it is controllable Property processed.
In one embodiment of the invention, each node computer 3 obtains video frame to be broadcast in advance and includes:
It receives the video frame to be broadcast that section issues during idle time of central server 1 and stores to node computer 3 Harddisk memory;Or
Data connection is established with the External memory equipment for having video frame to be broadcast and from External memory equipment described in reading Video frame to be broadcast and the harddisk memory being transferred to inside node computer 3 or reading simultaneously cache the video frame to be broadcast.
The mode that a variety of node computers 3 obtain video frame to be broadcast in advance is present embodiments provided, it can be according to practical feelings Condition flexibly determines that node computer 3 obtains the mode of video frame to be broadcast in advance, more flexible in control.
If function described in the embodiment of the present invention is realized in the form of software function module or unit and as independent Product when selling or using, can store in a storage medium readable by a compute device.Based on this understanding, of the invention The part of embodiment the part that contributes to existing technology or the technical solution can embody in the form of software products Come, which is stored in a storage medium, including some instructions are used so that a calculating equipment (can be individual Computer, server, mobile computing device or network equipment etc.) execute each embodiment the method for the present invention whole or Part steps.And storage medium above-mentioned include: USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), Random access memory (RAM, Random Access Memory), magnetic or disk etc. be various to can store program code Medium.Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other realities The difference of example is applied, same or similar part may refer to each other between each embodiment.
The embodiment of the present invention is described with above attached drawing, but the invention is not limited to above-mentioned specific Embodiment, the above mentioned embodiment is only schematical, rather than restrictive, those skilled in the art Under the inspiration of the present invention, without breaking away from the scope protected by the purposes and claims of the present invention, it can also make very much Form, within these are all belonged to the scope of protection of the present invention.

Claims (10)

1. a kind of lamp control system, which is characterized in that including,
Central server for human-computer interaction and issues broadcast strategy;
The more node computers for being connected with each other and being connected with the central server, every node computer are also controlled with corresponding The lamps and lanterns of system are connected, and every node computer receives the fault data that the corresponding lamps and lanterns controlled upload and is directed to the failure Data are analyzed, judged and are handled, and every node computer is distinguished also according to the broadcast strategy that the central server issues The video frame to be broadcast that the node computer obtains in advance is played simultaneously in the corresponding lamps and lanterns controlled of control.
2. lamp control system as described in claim 1, which is characterized in that the node computer will be also judged as can not The fault data for the significant trouble settled a dispute by the parties concerned themselves is uploaded to central server.
3. lamp control system as claimed in claim 2, which is characterized in that the central server is also used to show the section The fault data of the significant trouble that point computer uploads and system for prompting administrator publication and execute work order and during idle time Section issues video frame to be broadcast and is prestored to node computer.
4. a kind of method for controlling lamp based on the described in any item lamp control systems of claims 1 to 3, which is characterized in that Include:
The failure that the lamps and lanterns of corresponding control are occurred independently is analyzed and handled to each node computer;And
The broadcast strategy that each node computer is issued according to central server controls the corresponding lamps and lanterns controlled respectively and is played simultaneously The video frame to be broadcast that node computer obtains in advance.
5. method for controlling lamp as claimed in claim 4, which is characterized in that each node computer is independently analyzed and handled The failure that the lamps and lanterns of corresponding control are occurred includes: that the controller for the lamps and lanterns that each node computer receives corresponding control uploads Fault data, and analyze and determine the fault data, when being judged as the insignificant failure that can be settled a dispute by the parties concerned themselves, institute of settling a dispute by the parties concerned themselves Failure is stated, fault data is uploaded to central server when being determined as the significant trouble that can not be settled a dispute by the parties concerned themselves.
6. method for controlling lamp as claimed in claim 5, which is characterized in that the central server shows received weight Simultaneously system for prompting administrator issues and executes work order to the fault data of major break down.
7. method for controlling lamp as claimed in claim 4, which is characterized in that each node computer is according to central server The broadcast strategy issued controls the corresponding lamps and lanterns controlled respectively and the video frame to be broadcast that node computer obtains in advance is played simultaneously Include:
Each node computer obtains video frame to be broadcast in advance;
Each node computer elects a determining wherein node computer as clock source server by being randomly assigned mechanism;
Each node computer is voluntarily established with the clock source server and communicates and keep the synchronous of system time;
Each node computer receives the broadcast strategy that central server issues;
Each node computer controls the corresponding lamps and lanterns controlled respectively according to the broadcast strategy and each node computer is played simultaneously The video frame to be broadcast obtained in advance.
8. method for controlling lamp as claimed in claim 7, which is characterized in that each node computer is according to the broadcasting plan The lamps and lanterns slightly controlled corresponding to control respectively are played simultaneously the video frame to be broadcast that each node computer obtains in advance and include:
Each node computer voluntarily passes through the broadcast strategy information meter on the basis of the time got from clock source server It calculates and obtains the corresponding currently playing video frame number of lamps and lanterns controlled;
Each node computer is carried out according to the currently playing corresponding lamps and lanterns controlled of video frame number control of lamps and lanterns of corresponding control It is played simultaneously.
9. method for controlling lamp as claimed in claim 7 or 8, which is characterized in that the broadcast strategy is by genuinely convinced in described Business device is issued with form of scripts.
10. method for controlling lamp as claimed in claim 7, which is characterized in that each node computer is obtained in advance wait broadcast Video frame includes:
It receives the central server video frame to be broadcast that section issues during idle time and stores the hard disk to node computer and deposit Reservoir;Or
Data connection is established with the External memory equipment for having video frame to be broadcast and is read from External memory equipment described wait broadcast Video frame is simultaneously transferred to the harddisk memory inside node computer or reading and caches the video frame to be broadcast.
CN201910884874.0A 2019-09-19 2019-09-19 Lamp control system and control method Pending CN110519900A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910884874.0A CN110519900A (en) 2019-09-19 2019-09-19 Lamp control system and control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910884874.0A CN110519900A (en) 2019-09-19 2019-09-19 Lamp control system and control method

Publications (1)

Publication Number Publication Date
CN110519900A true CN110519900A (en) 2019-11-29

Family

ID=68632789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910884874.0A Pending CN110519900A (en) 2019-09-19 2019-09-19 Lamp control system and control method

Country Status (1)

Country Link
CN (1) CN110519900A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103200461A (en) * 2013-01-14 2013-07-10 易程(苏州)智能系统有限公司 Multiple-player-terminal synchronized playing system and playing method
CN104811752A (en) * 2015-04-24 2015-07-29 上海智物信息技术有限公司 Multi-screen synchronization method and playing system for the same local area network
US20170273165A1 (en) * 2014-10-01 2017-09-21 Kmw Inc. Street light management method and apparatus
CN107360475A (en) * 2017-08-18 2017-11-17 苏州科可瑞尔航空技术有限公司 Audio video synchronization plays and control method, control terminal and playback terminal
CN107959607A (en) * 2017-12-15 2018-04-24 四川长虹电器股份有限公司 The monitoring system of smart home

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103200461A (en) * 2013-01-14 2013-07-10 易程(苏州)智能系统有限公司 Multiple-player-terminal synchronized playing system and playing method
US20170273165A1 (en) * 2014-10-01 2017-09-21 Kmw Inc. Street light management method and apparatus
CN104811752A (en) * 2015-04-24 2015-07-29 上海智物信息技术有限公司 Multi-screen synchronization method and playing system for the same local area network
CN107360475A (en) * 2017-08-18 2017-11-17 苏州科可瑞尔航空技术有限公司 Audio video synchronization plays and control method, control terminal and playback terminal
CN107959607A (en) * 2017-12-15 2018-04-24 四川长虹电器股份有限公司 The monitoring system of smart home

Similar Documents

Publication Publication Date Title
US11115466B2 (en) Distributed network services
EP2614436B1 (en) Controlled automatic healing of data-center services
CN103873279B (en) Server management method and server management device
CN103731295B (en) Method and system for running virtual integration equipment
CN103226493B (en) The dispositions method and system of multi-operation system service
CN107092522B (en) Real-time data calculation method and device
CN105183554B (en) High-performance calculation and cloud computing hybrid system and its method for managing resource
CN109716729A (en) The dynamically auto zoom network security micro services framework based on load
CN106790694A (en) The dispatching method of destination object in distributed system and distributed system
CN110807064A (en) Data recovery device in RAC distributed database cluster system
CN108270726A (en) Application example dispositions method and device
CN107171870A (en) A kind of two-node cluster hot backup method and device
CN104580194B (en) Towards the virtual resources management method and device of Video Applications
CN112948063A (en) Cloud platform creation method and device, cloud platform and cloud platform implementation system
CN105657067A (en) Game verification method and device, game server and verification server
US9417909B2 (en) Scheduling work in a multi-node computer system based on checkpoint characteristics
CN107368324A (en) A kind of component upgrade methods, devices and systems
CN109799998A (en) OpenStack cluster configuration and batch dispositions method and system
EP3301576A1 (en) Method and apparatus for monitoring logs of multi-tenant systems
CN107357800A (en) A kind of database High Availabitity zero loses solution method
CN117130730A (en) Metadata management method for federal Kubernetes cluster
CN107197002A (en) Cloud computing system and cloud data processing method
CN101467132A (en) Method and system for distributing data processing units in a communication network
US11037297B2 (en) Image analysis method and device
US11750635B2 (en) Minimizing production disruption through a scan rule engine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191129