CN110472796A - Sponge urban construction pilot area's water quantity and quality monitoring location method and early warning system - Google Patents
Sponge urban construction pilot area's water quantity and quality monitoring location method and early warning system Download PDFInfo
- Publication number
- CN110472796A CN110472796A CN201910773846.1A CN201910773846A CN110472796A CN 110472796 A CN110472796 A CN 110472796A CN 201910773846 A CN201910773846 A CN 201910773846A CN 110472796 A CN110472796 A CN 110472796A
- Authority
- CN
- China
- Prior art keywords
- water
- measuring point
- quality monitoring
- urban construction
- sponge urban
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 209
- 238000012544 monitoring process Methods 0.000 title claims abstract description 96
- 238000010276 construction Methods 0.000 title claims abstract description 57
- 238000000034 method Methods 0.000 title claims abstract description 21
- 238000004458 analytical method Methods 0.000 claims abstract description 20
- 239000010865 sewage Substances 0.000 claims description 19
- 230000008676 import Effects 0.000 claims description 9
- 238000005259 measurement Methods 0.000 claims description 4
- 238000010079 rubber tapping Methods 0.000 claims description 4
- 239000003344 environmental pollutant Substances 0.000 claims description 3
- 231100000719 pollutant Toxicity 0.000 claims description 3
- 229920000742 Cotton Polymers 0.000 description 5
- 230000000694 effects Effects 0.000 description 4
- 239000007788 liquid Substances 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 2
- 241001672694 Citrus reticulata Species 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 241001269238 Data Species 0.000 description 1
- OAICVXFJPJFONN-UHFFFAOYSA-N Phosphorus Chemical compound [P] OAICVXFJPJFONN-UHFFFAOYSA-N 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- XKMRRTOUMJRJIA-UHFFFAOYSA-N ammonia nh3 Chemical compound N.N XKMRRTOUMJRJIA-UHFFFAOYSA-N 0.000 description 1
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000011109 contamination Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 239000003657 drainage water Substances 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 229910052757 nitrogen Inorganic materials 0.000 description 1
- 229910052760 oxygen Inorganic materials 0.000 description 1
- 239000001301 oxygen Substances 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 229910052698 phosphorus Inorganic materials 0.000 description 1
- 239000011574 phosphorus Substances 0.000 description 1
- 238000012913 prioritisation Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000007115 recruitment Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 210000003296 saliva Anatomy 0.000 description 1
- 238000012216 screening Methods 0.000 description 1
- 239000013049 sediment Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000002352 surface water Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 239000002351 wastewater Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D21/00—Measuring or testing not otherwise provided for
- G01D21/02—Measuring two or more variables by means not covered by a single other subclass
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/152—Water filtration
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Development Economics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Entrepreneurship & Innovation (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Sewage (AREA)
Abstract
The invention discloses a kind of sponge urban construction pilot area water quantity and quality monitoring location method and monitoring early-warning systems.It includes pilot area water system, the water of disposal precinct and representative items, water quality measuring point that the monitoring site of multi-layer, which is laid,.Sponge urban construction pilot area water quantity and quality monitoring early-warning system, including measuring point data acquisition subsystem and analysis and early warning subsystem are established, is respectively used to acquire and analyze measuring point data.The present invention is based on sponge urban construction pilot area construction objects, it establishes from " source " to the plant quarantine system of the multi-layer of " remittance ", comprehensively and objectively reflect the water quantity and quality situation of pilot area entirety, pass through monitoring early-warning system simultaneously, identification in time, record and the early warning problem, to take targetedly measure to provide effective information, have many advantages, such as that monitoring efficiency is high, monitoring result is reliable.
Description
Technical field
The present invention relates to a kind of sponge urban construction pilot area water quantity and quality monitoring location method and early warning systems, belong to ring
Border technical field.
Background technique
With gradually going deep into for each city sponge urban construction work, the performance assessment job in sponge city is gradually carried out.
A large amount of water quantity and quality data will be based on to the examination of pilot area sponge urban construction effect and the operation and maintenance of relevant item, passed through
Scientific and rational monitoring scheme is formulated, the important point in pilot area is monitored, the related datas such as accumulation water quantity and quality are convenient for
The operational effect for examining every sponge functional facilities, finds operation risk and relevant issues in time, and makes corresponding effective
Corrigendum.
China not yet forms technical system, sponge city in terms of the area's water quantity and quality monitoring of sponge urban construction pilot at present
The point arrangement of construct effects of biology examination monitoring scheme mainly carries out artificial screening according to existing experience and simplifies, and has no basis
Pilot area on-site actual situations targetedly carry out genealogical classification to monitoring situation.And in fact, sponge Process of Urban Development
In, the difference of the features such as mining inetesity, ratio of green space and hydrogeology of each child partition (as usual changing area, newly-built area) makes each son point
The control target of the low influence exploitation storm-water system building in area is also different, and monitoring site does not make comprehensively can not be to pilot area
The construct effects of biology of different scale targetedly assessed, the water quantity and quality situation in pilot area cannot be objectively responded comprehensively,
Seriously affect the reliability of monitoring efficiency and monitoring result.Therefore, to sponge urban construction pilot area establish it is a set of from " source " to
The monitoring technology system of " remittance " has become the urgent need that scientific and rational examination is carried out to sponge urban construction pilot area.
Summary of the invention
The present invention is intended to provide a kind of sponge urban construction pilot area water quantity and quality monitoring location method and early warning system, lead to
Identification sponge urban construction pilot area water, the important point of water quality are crossed, and establishes early warning system and forms unified monitoring system, it is right
Realize that sponge urban construction pilot area's water quality objective provides early warning and goal of regulation and control.
The invention is realized by the following technical scheme:
Sponge urban construction pilot area water quantity and quality monitoring location method, which comprises
Based on sponge urban construction pilot area boundary, identification flows into and out all of the sponge urban construction pilot area
Water system delineates corresponding river in each water system and enters flow section and river outlet section, and it is disconnected to become a mandarin in the water-based river
Face and river outlet section lay corresponding river and enter flow section measuring point and river outlet section measuring point, obtain and water system pair respectively
The river answered enters flow section measuring point and river outlet section measuring point and its water and water quality monitoring value;
The drainage pipeline networks status for obtaining the sponge urban construction pilot area, according to rainwater and sewage collect and discharge region
Domain sets several disposal precincts, and imports water system according to the end discharge outlet of the disposal precinct, by the disposal precinct by remittance
Enter water system identification and record, and set disposal precinct measuring point in the end discharge outlet of the disposal precinct, obtains corresponding with water system
Disposal precinct measuring point and its water and water quality monitoring value;
Sponge urban construction pilot area's representative items and its discharge outlet status are obtained, and imports water system by its discharge outlet
It identifies and records respectively, representative items measuring point is set in the representative items discharge outlet, obtains representative items corresponding with water system
Measuring point and its water and water quality monitoring value;
Sponge urban construction pilot area monitoring water quality early warning system is established, the regulator control system includes measuring point data acquisition
System and analysis and early warning subsystem are respectively used to acquire and analyze measuring point data;The measuring point data includes water system and its correspondence
River enters flow section measuring point, river outlet section measuring point, disposal precinct measuring point and representative items measuring point and its water and water quality prison
Measured value;River outlet section measuring point water quality objective value is set, by the river outlet section measuring point water quality monitoring value and its target
Value comparison provides early warning by the analysis and early warning subsystem when river outlet section measuring point water quality monitoring value is exceeded
Signal.
In above-mentioned technical proposal, the method also includes:
The water system for analyzing the sponge urban construction pilot area, crosses according to water system and/or tapping condition is by the water system
Divide several sections, and the starting point in section, intersection point, terminal arrange corresponding water system section starting point measuring point, intersection point measuring point and terminal
Measuring point obtains its corresponding water and water quality monitoring value;
Pass through the water and water quality monitoring value ratio of starting point measuring points in section several in the water system, intersection point measuring point and terminal measuring point
Compared with the acquisition water-based key monitoring section and its key pollutants.
In above-mentioned technical proposal, the method also includes:
When setting disposal precinct, according to the confluence state that rain pipe and sewage pipe collaborate or shunt, the disposal precinct phase
That answers is divided into drainage system subregion or combined flow system subregion;The drainage system subregion measuring point includes the combined system row
The corresponding combined system pipe end discharge outlet in moisture area;The combined flow system subregion measuring point includes the combined flow system subregion
Corresponding separate system pipe end discharge outlet;
Obtain the water and water quality monitoring value of the drainage system subregion measuring point or combined flow system subregion measuring point;
Drainage system subregion measuring point and combined flow system subregion measuring point water quality objective value is set separately, when any combined system
When disposal precinct measuring point or exceeded combined flow system subregion measuring point water quality monitoring value, provided by the analysis and early warning subsystem pre-
Alert signal.
In above-mentioned technical proposal, when the combined flow system subregion is equipped with intercepting sewer and Vatch basin, the combined flow system
Subregion measuring point further includes the Vatch basin measuring point in the combined flow system subregion, obtains the combined flow system subregion measuring point and cuts
Flow the water and water quality monitoring value of well measuring point.
In above-mentioned technical proposal, the end discharge outlet of the disposal precinct passes through setting flowmeter and/or liquidometer measurement
Its water.
In above-mentioned technical proposal, the water quality monitoring value is the real time measurement of water quality indicator, and the water quality indicator includes
NH3- N, COD, TN, TP, TSS, pH, DO, T, conductivity.
A kind of sponge urban construction pilot area water quantity and quality monitoring early-warning system, including measuring point data acquisition subsystem and point
Early warning subsystem is analysed, is respectively used to acquire and analyze measuring point data;The measuring point data includes above-mentioned water system and its corresponding river
Road enters flow section measuring point, river outlet section measuring point, disposal precinct measuring point and representative items measuring point and its water and water quality monitoring
Value;River outlet section measuring point water quality objective value is set by the analysis and early warning subsystem, the river outlet section is surveyed
Point water quality monitoring value and its target value pass through described point when river outlet section measuring point water quality monitoring value is exceeded
Analysis early warning subsystem provides pre-warning signal.
In above-mentioned technical proposal, the disposal precinct includes drainage system subregion and/or combined flow system subregion, described
Drainage system subregion measuring point includes the corresponding combined system pipe end discharge outlet of the drainage system subregion, the separate system
Disposal precinct measuring point includes the corresponding separate system pipe end discharge outlet of the combined flow system subregion, is acquired by measuring point data
Subsystem obtains the water and water quality monitoring value of the drainage system subregion measuring point and/or combined flow system subregion measuring point;And
Drainage system subregion measuring point and/or combined flow system subregion measuring point water quality mesh is set separately by the analysis and early warning subsystem
Scale value passes through described point when any drainage system subregion measuring point or exceeded combined flow system subregion measuring point water quality monitoring value
Analysis early warning subsystem provides pre-warning signal.
The present invention has the following advantages and beneficial effects: fully consider the actual conditions of monitoring field, establish it is a set of from
" source " arrives the monitoring technology system of the multi-layer of " remittance " --- and " representative items → disposal precinct → end water system " overcome monitoring
It cannot achieve caused by point arrangement is not comprehensive and lacking for recruitment evaluation carried out to the different scale in sponge urban construction pilot area
Fall into, comprehensively and objectively reflect pilot area entirety water quantity and quality situation, and pass through monitoring early-warning system identify in real time, record and
The problem of early warning is run improves monitoring efficiency and monitoring result to propose targeted solution in time
Reliability.
Detailed description of the invention
Fig. 1 is that sponge urban construction pilot area according to the present invention water quantity and quality monitoring location and monitoring and early warning method are shown
It is intended to.
Fig. 2 is embodiment water system measuring point schematic diagram in sponge urban construction pilot area according to the present invention.
Fig. 3 is embodiment disposal precinct measuring point schematic diagram in sponge urban construction pilot area according to the present invention.
Fig. 4 is embodiment representative items measuring point schematic diagram in sponge urban construction pilot area according to the present invention.
Specific embodiment
A specific embodiment of the invention and the course of work are further described with reference to the accompanying drawing.
The positional terms such as the upper, lower, left, right, front and rear in present specification be positional relationship based on the figure and
It establishes.Attached drawing is different, then corresponding positional relationship is also possible to change therewith, therefore cannot be interpreted as with this to protection model
The restriction enclosed.
Sponge city is new generation of city storm water man- agement concept, refers to that city can become as sponge adapting to environment
Change and cope with rainwater bring natural calamity etc. has good elasticity, also referred to as " water elasticity city ".And to reality
For existing " waterlogging, water body be not not black smelly for ponding, heavy rain for light rain " sponge urban construction pilot area, the river and lake in the region Yao Shixian
Drainage Water Quality class index is not less than " water environment quality standard GB3838-2002 " IV class standard, and builds better than sponge city
If preceding water quality, downstream section main indicator must not be lower than the construction object of water index, therefore a point section monitors, find out including
It monitors each starting point, intersection point, terminal section independently or the water quality and quantity situation of interaction is most important.Meanwhile being with pilot region
Boundary, by monitoring into pilot area, pilot area section can judge that water quality and water of the pilot zone convection through river influence out,
And counted by monitoring and warning and early warning, major polluting sources are identified, so as to further to sponge urban construction pilot area
Interior Drainage System Construction or transformation proposes prioritization scheme.
For a sponge urban construction pilot area, it is most important obtain region in rainwater, sewage discharge situation with
And its water system sediments situation.It followed by analyzed, monitored according to acquired data, and it is further proposed that modification scheme.Its
Workflow is as shown in Figure 1.
Based on sponge urban construction pilot area boundary, identification flows into and out all of the sponge urban construction pilot area
Water system delineates corresponding river in each water system and enters flow section and river outlet section, and it is disconnected to become a mandarin in the water-based river
Face and river outlet section lay corresponding river and enter flow section measuring point and river outlet section measuring point, obtain and water system pair respectively
The river answered enters flow section measuring point and river outlet section measuring point and its water and water quality monitoring value.
During this, especially to investigate and analyze and understand that the water-based of sponge urban construction pilot area crosses or diverge point
Situation is flowed, is crossed according to water system and/or tapping condition is by corresponding water system point several sections, and the starting point in section, intersection point, terminal
It arranges corresponding water system section starting point measuring point, intersection point measuring point and terminal measuring point, obtains its corresponding water and water quality monitoring value.
The monitoring section of water system section starting point measuring point, intersection point measuring point and terminal measuring point must can totally and macroscopically reflect water
The quality of water environment situation of system or region.The specific location of each section must can reflect the contamination characteristics of region environment;
Enough representational environmental informations are obtained with least section as far as possible;Feasibility when actual samples must also be considered simultaneously
And convenience.In addition, control monitoring section should also be arranged according to function of water body area, same function of water body area will at least be arranged 1
Monitoring section.Generally, cross section place should avoid slough, backwater zone, at sewage draining exit, and selection straight chanel, riverbed are steady as far as possible
Fixed, water flow stationary, the water surface be broad, without torrent, without shoal at.And make every effort to consistent with hydrology gaging section, to utilize its hydrology
Parameter realizes the combination of water quality monitoring and water quantity monitoring.
Compared by the water and water quality monitoring value of section starting point measuring points several in water system, intersection point measuring point and terminal measuring point,
Obtain corresponding water-based key monitoring section and its key pollutants.
The drainage pipeline networks status for obtaining the sponge urban construction pilot area, according to rainwater and sewage collect and discharge region
Domain sets several disposal precincts, and imports water system according to the end discharge outlet of disposal precinct, and disposal precinct is known by water system is imported
It not and records, and sets disposal precinct measuring point in the end discharge outlet of disposal precinct, obtain disposal precinct corresponding with water system and survey
Point and its water and water quality monitoring value.The end discharge outlet of disposal precinct measures its water by setting flowmeter and/or liquidometer
Amount.Disposal precinct measuring point is practical, and obtain is that rainwater and sewage discharge situation summarize in pilot area.
Sponge urban construction pilot area's representative items and its discharge outlet status are obtained, and imports water system difference by its discharge outlet
Representative items measuring point is arranged in representative items discharge outlet in identification and record, obtain corresponding with water system representative items measuring point and its
Water and water quality monitoring value.
Establish sponge urban construction pilot area water quantity and quality monitoring early-warning system, including measuring point data acquisition subsystem and point
Early warning subsystem is analysed, is respectively used to acquire and analyze measuring point data;The measuring point data includes above-mentioned water system and its corresponding river
Road enters flow section measuring point, river outlet section measuring point, disposal precinct measuring point and representative items measuring point and its water and water quality monitoring
Value;River outlet section measuring point water quality objective value is set by analysis and early warning subsystem, river outlet section measuring point water quality is supervised
Measured value and its target value are provided when outlet section measuring point water quality monitoring value in river is exceeded by analysis and early warning subsystem
Pre-warning signal.
When setting disposal precinct, according to the confluence state that rain pipe and sewage pipe collaborate or shunt, the disposal precinct phase
That answers is divided into drainage system subregion or combined flow system subregion.The drainage system subregion measuring point includes the combined system row
The corresponding combined system pipe end discharge outlet in moisture area.The combined flow system subregion measuring point includes the combined flow system subregion
Corresponding separate system pipe end discharge outlet.Obtain drainage system subregion measuring point or combined flow system subregion measuring point water and
Water quality monitoring value.
At this point, drainage system subregion measuring point and/or separate system row further is set separately by analysis and early warning subsystem
Moisture area measuring point water quality objective value, when any drainage system subregion measuring point or combined flow system subregion measuring point water quality monitoring value are super
When mark, pre-warning signal is provided by analysis and early warning subsystem.
For combined flow system subregion, pipeline includes rain pipe and sewage pipe, is respectively formed Storm Sewer Network and sewage
Pipe network.Its subregion rainwater pipe end discharge outlet and sewage pipe end discharge outlet is set separately in combined flow system subregion, also that is, dividing
The corresponding separate system pipe end discharge outlet of stream disposal precinct includes rainwater pipe end discharge outlet and sewage pipe end discharge outlet.
If all separate systems of sponge urban construction pilot area's inner water drainage system, pass through the water of monitoring rainwater pipe end discharge outlet
Amount, can collect to obtain corresponding rainfall;By monitoring the water of sewage pipe end discharge outlet, can collect to obtain corresponding
Blowdown flow rate.And if when sponge urban construction pilot area inner water drainage system includes separate system and combined system, not only to monitor and
The water of Accumulated Rainwater pipe end discharge outlet, it is also contemplated that when rainfall and non-rainfall sewage pipe end discharge outlet water difference.
When combined flow system subregion is equipped with intercepting sewer and Vatch basin, combined flow system subregion measuring point further includes in combined flow system subregion
Vatch basin measuring point obtains the water and water quality monitoring value of combined flow system subregion measuring point and Vatch basin measuring point.
Storm Sewer Network must not have sewage to be directly discharged into water body;Non- duration of raining, combined system pipe duct must not have the in line water of sewage
Body.Further, the water of rainwater pipe end discharge outlet and sewage pipe end discharge outlet is monitored respectively by analysis and early warning subsystem
Amount, and non-duration of raining rainwater pipe end discharge outlet water is set as zero, when non-duration of raining monitors that rainwater pipe end is discharged
When saliva amount, pre-warning signal is provided by analysis and early warning subsystem.Rather than whether the sewage of duration of raining combined system pipe duct is in line
Then judged by water quality monitoring value.
It can also be by analysis and early warning subsystem according to all disposal precinct measuring point water of non-duration of raining and duration of raining
Amount statistics obtains rainwater and quantity of wastewater effluent.Further, since when lower than rainfall corresponding to annual flow overall control rate, sea
Continuous urban construction region is there is not allowed that rainwater outlet phenomenon, amount of rainfall are also used as early-warning parameters.
Using Hebi City sponge urban construction pilot area as embodiment.The sponge urban construction is flowed into and out by identification
All water systems in pilot area, and analyze it is water-based cross or the tapping condition that diverges, laid at water system integration measuring point 10 altogether (as schemed
Shown in 2).All water systems include the Qihe River, cotton Feng Qu, two branch canal, day Lai Qu and moat, wherein cotton Feng Qu, two branch canal, Tian Laiqu
Moat is imported after the Qihe River diversion.Measuring point S-0 indicates that moat enters measuring point before pilot area, while indicating rising for moat section
Point measuring point;S-1 indicates measuring point at the Qihe River diversion, while indicating that cotton Feng Qu, two branch canal, the starting point measuring point of day Lai Qu and the Qihe River enter examination
Measuring point before point area;S-2 indicates that cotton Feng Qu imports measuring point before moat, while indicating Mian Fengquchu pilot area measuring point;S-3 indicates shield
Fosse measuring point after cotton Feng Qu remittance, while indicating that moat enters measuring point before pilot area;Before S-4 indicates that two branch canal import moat
Measuring point;S-5 indicates moat measuring point after the remittance of two branch canal;S-6 indicates that day Lai Qu imports measuring point before moat;S-7 indicates shield
Fosse measuring point after day Lai Qu remittance;S-8 indicates that moat goes out pilot area measuring point;S-9 indicates that the Qihe River is surveyed after moat imports
Point.
By identification drainage system subregion or the end discharge outlet of combined flow system subregion, and combine manually reconnoitre early period
And investigation, enter river mouth/Vatch basin in disposal precinct and lays at measuring point 33 (as shown in Figure 3) altogether.Monitoring project includes flow, liquid level
And water quality, wherein flow measuring point is the measuring point at combined system subregion Vatch basin at totally 11;Liquid level measuring point is at totally 22, including interflow
It makes at the measuring point 5 at into river mouth and separate system subregion enters at measuring point 17 at river mouth;Water quality measuring point is separate system water quality at totally 22
Measuring point.
Mouth is arranged by identification representative items, is laid at measuring point 23 (Fig. 4) altogether in key project outlet.Monitoring project includes stream
Amount, liquid level and water quality, wherein flow measuring point is combined system stream of items measuring point at totally 15;Liquid level measuring point is separate system at totally 8
Project exports catch-basin measuring point;At water quality measuring point 8, catch-basin measuring point is exported for separate system project.
Water quality monitoring value is the real time measurement of water quality indicator, and index and monitoring method refer to " surface water environment quality mark
It is quasi- " (GB3838-2002) etc., water quality indicator includes NH3- N (ammonia nitrogen), COD (COD), TN (total nitrogen), TP (total phosphorus),
TSS (total suspended solid), pH, DO (dissolved oxygen), T (temperature), conductivity.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair
Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (8)
1. sponge urban construction pilot area water quantity and quality monitoring location method, which is characterized in that the described method includes:
Based on sponge urban construction pilot area boundary, identification flows into and out all water in the sponge urban construction pilot area
System delineates corresponding river in each water system and enters flow section and river outlet section, and enters flow section in the water-based river
Corresponding river is laid with river outlet section and enters flow section measuring point and river outlet section measuring point, is obtained respectively corresponding with water system
River enter flow section measuring point and river outlet section measuring point and its water and water quality monitoring value;
The drainage pipeline networks status for obtaining the sponge urban construction pilot area, sets according to rainwater and collecting for sewage with discharge areas
Fixed several disposal precincts, and water system is imported according to the end discharge outlet of the disposal precinct, by the disposal precinct by remittance water
System's identification and record, and disposal precinct measuring point is set in the end discharge outlet of the disposal precinct, obtain row corresponding with water system
Moisture area measuring point and its water and water quality monitoring value;
Sponge urban construction pilot area's representative items and its discharge outlet status are obtained, and imports water system difference by its discharge outlet
Identification and record are arranged representative items measuring point in the representative items discharge outlet, obtain representative items measuring point corresponding with water system
And its water and water quality monitoring value.
2. sponge urban construction pilot area water quantity and quality monitoring location method according to claim 1, which is characterized in that institute
State method further include:
The water system in the sponge urban construction pilot area is analyzed, if crossing according to water system and/or tapping condition is by the water system point
Dry river section, and the starting point in section, intersection point, terminal arrange corresponding water system section starting point measuring point, intersection point measuring point and terminal measuring point,
Obtain its corresponding water and water quality monitoring value;
Compared by the water and water quality monitoring value of starting point measuring points in section several in the water system, intersection point measuring point and terminal measuring point,
Obtain the water-based key monitoring section and its key pollutants.
3. sponge urban construction pilot area water quantity and quality monitoring location method according to claim 1, which is characterized in that institute
State method further include:
When setting disposal precinct, according to the confluence state that rain pipe and sewage pipe collaborate or shunt, the disposal precinct is corresponding
It is divided into drainage system subregion or combined flow system subregion;The drainage system subregion measuring point includes the drainage system point
The corresponding combined system pipe end discharge outlet in area;The combined flow system subregion measuring point includes that the combined flow system subregion is corresponding
Separate system pipe end discharge outlet;
Obtain the water and water quality monitoring value of the drainage system subregion measuring point or combined flow system subregion measuring point.
4. sponge urban construction pilot area water quantity and quality monitoring location method according to claim 3, which is characterized in that institute
When stating combined flow system subregion equipped with intercepting sewer and Vatch basin, the combined flow system subregion measuring point further includes the separate system row
Vatch basin measuring point in moisture area obtains the water and water quality monitoring of the combined flow system subregion measuring point and Vatch basin measuring point
Value.
5. sponge urban construction pilot area water quantity and quality monitoring location method according to claim 1, which is characterized in that institute
The end discharge outlet for stating disposal precinct measures its water by setting flowmeter and/or liquidometer.
6. sponge urban construction pilot area water quantity and quality monitoring location method according to any one of claims 1 to 4, special
Sign is that the water quality monitoring value is the real time measurement of water quality indicator, and the water quality indicator includes NH3-N、COD、TN、TP、
TSS, pH, DO, T, conductivity.
7. a kind of sponge urban construction pilot area water quantity and quality monitoring early-warning system, which is characterized in that the system comprises measuring points
Data acquisition subsystem and analysis and early warning subsystem are respectively used to acquire and analyze measuring point data;The measuring point data includes such as
Water system described in claim 1 and its corresponding river enter flow section measuring point, river outlet section measuring point, disposal precinct measuring point and allusion quotation
Type project measuring point and its water and water quality monitoring value;River outlet section measuring point water quality is set by the analysis and early warning subsystem
Target value, by the river outlet section measuring point water quality monitoring value and its target value, when the river outlet section measuring point
When water quality monitoring value is exceeded, pre-warning signal is provided by the analysis and early warning subsystem.
8. sponge urban construction pilot area according to claim 7 water quantity and quality monitoring early-warning system, which is characterized in that institute
Stating disposal precinct includes drainage system subregion and/or combined flow system subregion, and the drainage system subregion measuring point includes institute
The corresponding combined system pipe end discharge outlet of drainage system subregion is stated, the combined flow system subregion measuring point includes the shunting
The corresponding separate system pipe end discharge outlet of disposal precinct processed passes through measuring point data acquisition subsystem and obtains the drainage system
The water and water quality monitoring value of subregion measuring point and/or combined flow system subregion measuring point;And it is set by the analysis and early warning subsystem
Drainage system subregion measuring point and/or combined flow system subregion measuring point water quality objective value are determined, when any drainage system subregion is surveyed
When point and/or exceeded combined flow system subregion measuring point water quality monitoring value, pre-warning signal is provided by the analysis and early warning subsystem.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910773846.1A CN110472796A (en) | 2019-08-21 | 2019-08-21 | Sponge urban construction pilot area's water quantity and quality monitoring location method and early warning system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910773846.1A CN110472796A (en) | 2019-08-21 | 2019-08-21 | Sponge urban construction pilot area's water quantity and quality monitoring location method and early warning system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110472796A true CN110472796A (en) | 2019-11-19 |
Family
ID=68513179
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910773846.1A Pending CN110472796A (en) | 2019-08-21 | 2019-08-21 | Sponge urban construction pilot area's water quantity and quality monitoring location method and early warning system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110472796A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111811580A (en) * | 2020-07-24 | 2020-10-23 | 重庆华悦生态环境工程研究院有限公司 | Water quantity/water quality monitoring and point distribution method and early warning response system |
CN112304656A (en) * | 2020-10-12 | 2021-02-02 | 江苏瀚能智慧科技有限公司 | Detection method of sponge urban seepage and drainage system |
CN112683334A (en) * | 2020-12-29 | 2021-04-20 | 兴合环保科技(山东)有限公司 | Sponge urban seepage and drainage monitoring system and monitoring method |
CN112905721A (en) * | 2019-12-03 | 2021-06-04 | 中国电建集团西北勘测设计研究院有限公司 | Database system for sponge city construction projects |
CN113221440A (en) * | 2021-04-07 | 2021-08-06 | 浙江大学 | Optimal arrangement and real-time global inversion method for monitoring points of drainage system |
CN116091035A (en) * | 2022-12-21 | 2023-05-09 | 合肥中科国禹智能工程有限公司 | Intelligent monitoring and point distribution system and method for urban drainage |
-
2019
- 2019-08-21 CN CN201910773846.1A patent/CN110472796A/en active Pending
Non-Patent Citations (3)
Title |
---|
佟举钢等: "南宁市城市内河管理处内河防汛监测预警系统", 《中国建设信息化》 * |
王泽阳等: "基于效果评价的海绵城市监测体系构建――以厦门海绵城市试点区为例", 《给水排水》 * |
郭效琛等: "海绵城市"源头-过程-末端"在线监测体系构建――以青岛市李沧区海绵试点区为例", 《给水排水》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112905721A (en) * | 2019-12-03 | 2021-06-04 | 中国电建集团西北勘测设计研究院有限公司 | Database system for sponge city construction projects |
CN111811580A (en) * | 2020-07-24 | 2020-10-23 | 重庆华悦生态环境工程研究院有限公司 | Water quantity/water quality monitoring and point distribution method and early warning response system |
CN112304656A (en) * | 2020-10-12 | 2021-02-02 | 江苏瀚能智慧科技有限公司 | Detection method of sponge urban seepage and drainage system |
CN112683334A (en) * | 2020-12-29 | 2021-04-20 | 兴合环保科技(山东)有限公司 | Sponge urban seepage and drainage monitoring system and monitoring method |
CN113221440A (en) * | 2021-04-07 | 2021-08-06 | 浙江大学 | Optimal arrangement and real-time global inversion method for monitoring points of drainage system |
CN113221440B (en) * | 2021-04-07 | 2022-05-20 | 浙江大学 | Optimal arrangement and real-time global inversion method for monitoring points of drainage system |
CN116091035A (en) * | 2022-12-21 | 2023-05-09 | 合肥中科国禹智能工程有限公司 | Intelligent monitoring and point distribution system and method for urban drainage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110472796A (en) | Sponge urban construction pilot area's water quantity and quality monitoring location method and early warning system | |
CN110533885A (en) | Urban waterlogging monitoring and warning system and method for early warning | |
CN108376318B (en) | Inflow infiltration evaluation method and system for drainage pipe network | |
Benedetti et al. | Modelling and monitoring of integrated urban wastewater systems: review on status and perspectives | |
CN115545678A (en) | Water quality monitoring method based on water environment portrait and pollutant traceability | |
CN112417788A (en) | Water environment pollution analysis system and method based on big data | |
CN110196083A (en) | Monitoring recognition methods, device and the electronic equipment in drainage pipeline networks pollution path | |
CN114723179A (en) | Water environment early warning traceability system and method based on water yield and water quality combined control | |
CN111199341A (en) | Small and medium basin pollution source analysis method based on multi-drainage-port inspection and monitoring | |
CN109242367B (en) | Urban sewage treatment rate evaluation and calculation method | |
CN112345722A (en) | Water quality monitoring analysis processing system based on big data analysis | |
CN106650044B (en) | Method for determining surface runoff pollutant parameter W in SWMM software | |
CN113505471A (en) | River section pollutant concentration prediction calculation method | |
CN115577506A (en) | Method for pre-diagnosing and accurately troubleshooting problems of sewage pipe network | |
CN117113038B (en) | Urban water and soil loss Huang Nishui event tracing method and system | |
CN111810849A (en) | Rain and sewage pipe network zero-direct-emission traceability monitoring method | |
KR101185543B1 (en) | Ubiquitous based management system forurban river and ecological lake using wide area reclaimed water network and method for managing water usage index using the same | |
CN115789527A (en) | Analysis system and method based on water environment informatization treatment | |
CN114997555B (en) | Technical method for diagnosing and repairing sewage collection efficiency problem of urban drainage pipe network system | |
CN113792367B (en) | PySWMM-based drainage system multi-source inflow infiltration and outflow dynamic estimation method | |
KR100353391B1 (en) | An integrated method for providing monitoring/management data of a sewer system and a system thereof | |
CN117807392A (en) | Rainwater pipe network rainwater and sewage hybrid degree evaluation method, system and storage medium | |
CN117934212A (en) | Construction process monitoring method based on IOT technology digital visualization platform | |
CN116126963B (en) | Inflow infiltration diagnosis method for nonlinear multi-source heterogeneous drainage model | |
CN117233342A (en) | Accurate monitoring method and system for river sewage outlet based on confidence interval algorithm |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191119 |
|
RJ01 | Rejection of invention patent application after publication |