CN110439341A - A kind of stereoscopic garage structure and application method of the intelligent parking maintenance of train - Google Patents
A kind of stereoscopic garage structure and application method of the intelligent parking maintenance of train Download PDFInfo
- Publication number
- CN110439341A CN110439341A CN201910830685.5A CN201910830685A CN110439341A CN 110439341 A CN110439341 A CN 110439341A CN 201910830685 A CN201910830685 A CN 201910830685A CN 110439341 A CN110439341 A CN 110439341A
- Authority
- CN
- China
- Prior art keywords
- parking
- track
- allocation
- transportation
- train
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012423 maintenance Methods 0.000 title claims abstract description 38
- 238000000034 method Methods 0.000 title claims abstract description 20
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 42
- 230000008439 repair process Effects 0.000 claims description 14
- 238000003032 molecular docking Methods 0.000 claims description 9
- 238000007689 inspection Methods 0.000 claims 1
- 230000032258 transport Effects 0.000 description 23
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 230000005012 migration Effects 0.000 description 2
- 238000013508 migration Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000001771 impaired effect Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H6/00—Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H6/00—Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
- E04H6/08—Garages for many vehicles
- E04H6/12—Garages for many vehicles with mechanical means for shifting or lifting vehicles
- E04H6/18—Garages for many vehicles with mechanical means for shifting or lifting vehicles with means for transport in vertical direction only or independently in vertical and horizontal directions
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Abstract
The invention discloses the stereoscopic garage structures and application method of a kind of maintenance of the intelligent parking of train, comprising: scheduling interval interconnected and maintenance shut-downs section, scheduling interval includes allocation and transportation pedestal, train to be stopped, allocate and transport crane, allocate and transport cross track, allocate and transport vertical track, allocate and transport parking track and lifting device, maintenance shut-downs section includes parking unit, train is stopped, parking track and parking factory are fluffy, scheduling interval and maintenance shut-downs section are connected with each other by allocation and transportation parking track and parking track, after train drives into scheduling interval from track, train enters to maintenance shut-downs section from scheduling interval again, after parking or maintenance, train is driven out to from maintenance shut-downs section again and enters scheduling interval;The structure is able to solve the larger problem of parking lot occupied area of current high-speed railway and subway train, improves land utilization ratio, and parking and maintenance are integrated in one, work is simplified, improves work efficiency.
Description
Technical field
The present invention relates to the technical fields of subway or high-speed rail train, tie up in particular to a kind of intelligent parking of train
The stereoscopic garage structure and application method repaired.
Background technique
Currently, subway or high-speed rail train parking at night in the way of outdoor single track tiling as major way, show
The scene of " Ten thousand arrows shot at once ".This scheme requires to rearrange maintenance workshop not only in terms of parking, occupies since then big
Valuable land resource is measured, solid space is not made full use of, the waste of resource is caused;In addition outdoor placement, by warm round the clock
Difference and the influence Train surface of weather are easy impaired.
Summary of the invention
The stereoscopic garage structure and application method repaired the purpose of the present invention is to provide a kind of intelligent parking of train,
It is able to solve the larger problem of the parking lot occupied area of current high-speed railway and subway train, improves land utilization ratio, it will
Parking and maintenance are integrated in one, and simplify work, improve work efficiency.
The embodiment of the present invention is achieved in that
The stereoscopic garage structure and application method, stereoscopic garage structure of a kind of intelligent parking maintenance of train include: mutual
The scheduling interval of connection and maintenance shut-downs section, scheduling interval include allocation and transportation pedestal, train to be stopped, allocation and transportation crane, allocation and transportation cross
To track, the vertical track of allocation and transportation, allocation and transportation parking track and lifting device, maintenance shut-downs section includes parking unit, has stopped train
And parking track, allocation and transportation parking track are fixed on allocation and transportation base top, train to be stopped is parked in allocation and transportation parking track, allocates and transports pedestal
Two sides are caught in the vertical track of allocation and transportation, allocate and transport the top connection allocation and transportation crane of vertical track, allocate and transport the bottom end connection of vertical track
In allocation and transportation cross track, the top and bottom ends of lifting device are separately connected allocation and transportation pedestal and allocation and transportation cross track, lifting device setting
For telescopic structure, parking track is connected at the top of parking unit, has been stopped train and has been parked in parking track, allocation and transportation pedestal passes through allocation and transportation
Cross track adjusts lateral position, and allocation and transportation pedestal is adjusted by lifting device in the height for allocating and transporting vertical track, so that allocation and transportation stop
It is docked respectively with multiple parking tracks and carries out allocation and transportation operation in track road.
In preferred embodiments of the present invention, above-mentioned parking unit is provided with multi-layer multi-row, by allocation and transportation parking track with
Different layers and the docking of the parking track of different rows, form the channel that train enters and sail out of parking track.
In preferred embodiments of the present invention, above-mentioned maintenance shut-downs section further includes that parking factory is fluffy, and parking factory is fluffy by multilayer
Parking unit and parking track are covered to provide and block place.
In preferred embodiments of the present invention, above-mentioned parking unit along straight line be arranged in parking factory it is fluffy in, stop unit
Bottom is provided with access path in order to repair and stopped train, and access path is arranged along one end of parking unit to the other end.
In preferred embodiments of the present invention, above-mentioned application method include: S1, by allocate and transport pedestal will allocate and transport parking track
With the normal operation orbital docking of train to be stopped, train to be stopped drives into scheduling interval;S2, allocation and transportation crane are according to parking and maintenance
The Parking situation in section adjusts the position of scheduling pedestal by dispatching vertical track and scheduling cross track;S3, will train be stopped
It is transported to parking position, and to allocate and transport parking track and parking track docking, train to be stopped drives into from allocation and transportation parking track to stop
Track road;S4, staff are overhauled by access path to train has been stopped, and after maintenance, train is opposite with S1~S3
Sequence be driven out to stereoscopic garage structure.
In preferred embodiments of the present invention, above-mentioned allocation and transportation cross track is provided with horizontal concrete chute, lifting device and allocation and transportation
The bottom end of vertical track is caught in horizontal concrete chute and moves back and forth along allocation and transportation cross track.
In preferred embodiments of the present invention, there are two the above-mentioned vertical track settings of allocation and transportation, and two are allocated and transported vertical track
Inside is respectively arranged with the vertical chute, allocates and transports the side projection of pedestal and is caught in the vertical chute.
In preferred embodiments of the present invention, it is provided with idler wheel at the lateral projections of above-mentioned allocation and transportation pedestal, idler wheel is caught in perpendicular
It is slided up and down into sliding slot and in sliding slot.
In preferred embodiments of the present invention, above-mentioned laterally allocation and transportation track is provided at least two, multiple laterally allocation and transportation rails
Road is arranged at below allocation and transportation pedestal.
The beneficial effects of the present invention are:
The present invention stops more trains by the scheduling interval of stereo garage and the docking in maintenance shut-downs section, passes through tune
Pedestal is transported relative to vertical track and allocation and transportation cross track sliding is allocated and transported, the position of allocation and transportation pedestal is adjusted, completes train and stop
Track and allocation and transportation parking track migration, thus complete the entire allocation and transportation operation of train to be stopped, more trains are allocated and transported more to multilayer
The parking unit of row;The present invention is able to solve the larger problem of parking lot occupied area of current high-speed railway and subway train,
Land utilization ratio is improved, parking and maintenance are integrated in one, work is simplified, improves work efficiency.
It also have the advantage that
1, subway train stereo garage multilayer stop solve the problems, such as current High Speed Railway Trains parking lot take up an area it is wide,
The utilization rate for substantially increasing State owned land resource reduces the waste of resource.
2, subway train stereo garage integrates maintenance and parking, simplifies the progress of work, improves work efficiency.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached
Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair
The restriction of range.
Fig. 1 is the stereoscopic garage structure figure that the intelligent parking of train of the present invention repairs;
Fig. 2 is the figure of scheduling interval of the present invention;
Fig. 3 is the figure in maintenance shut-downs section of the present invention;
Icon: 1- allocates and transports pedestal;2- train to be stopped;3- allocates and transports crane;4- allocates and transports cross track;5- allocates and transports vertical rail
Road;6- parking unit;7- has stopped train;8- parking factory is fluffy;9- allocates and transports parking track;10- parking track;11- access path;
12- lifting device.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is
A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented
The component of example can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiment of the present invention provided in the accompanying drawings is not intended to limit below claimed
The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiments of the present invention, this field is common
Technical staff's every other embodiment obtained without creative efforts belongs to the model that the present invention protects
It encloses.
First embodiment
Fig. 1 is please referred to, the stereoscopic garage structure and application method repaired the present embodiment provides a kind of intelligent parking of train,
Comprising: scheduling interval interconnected and maintenance shut-downs section, scheduling interval includes allocation and transportation pedestal 1, train to be stopped 2, allocation and transportation
Crane 3, allocation and transportation cross track 4, the vertical track 5 of allocation and transportation, allocation and transportation parking track 9 and lifting device 12, maintenance shut-downs section packet
It including parking unit 6, has stopped train 7, parking track 10 and parking factory fluffy 8,6 length of parking unit of the present embodiment is 215.35m,
Wide 3.38m, high 6.17m, side by side for double-deck five trains, the size of whole stereo garage is long 430.8m to parking unit 6, wide
34.35m, high 24m, scheduling interval and maintenance shut-downs section are connected with each other by allocation and transportation parking track 9 and parking track 10, train
After scheduling interval is driven into from track, train enters to maintenance shut-downs section from scheduling interval again, after parking or maintenance, train again from
Maintenance shut-downs section is driven out to and enters scheduling interval, and train is transferred to track by scheduling interval and is operated normally.
Referring to figure 2., allocation and transportation parking track 9 is fixed on 1 top of allocation and transportation pedestal, and allocation and transportation parking track 9 is the prior art
I-steel train rail, after allocation and transportation parking track 9 is docked with common rail, train 2 to be stopped drives into and is parked in allocation and transportation parking track
9, allocation and transportation pedestal 1 is in long strip and extend with train, allocates and transports the two sides of pedestal 1 and outwardly convex and is provided with idler wheel respectively, idler wheel
Rolling surface be set as allocation and transportation pedestal 1 along the direction allocating and transporting vertical track 5 and moving up and down, the protrusion of idler wheel insertion allocation and transportation pedestal 1
Locate to fix in the slot of setting and using pin shaft, two vertical tracks 5 of allocation and transportation are a pair, and two vertical 5 positions of track of allocation and transportation are opposite
Inside be provided with the vertical chute along the vertical direction, idler wheel is caught in the vertical chute and moves down along vertical track 5 along allocating and transporting
It is dynamic;The present embodiment is provided with three pairs of vertical tracks 5 of allocation and transportation and three allocation and transportation cross tracks 4 altogether, and each pair of vertical track 5 of allocation and transportation is distinguished
Positioned at the two sides of allocation and transportation pedestal 1, three allocation and transportation cross tracks 4 are spaced apart from each other and parallel respectively, three lateral allocation and transportation orbital spacings
It is arranged in 1 lower section of allocation and transportation pedestal, the top of allocation and transportation cross track 4 is provided with horizontal concrete chute, horizontal concrete chute connection allocation and transportation transverse rails
The both ends in road 4, the bottom end for allocating and transporting vertical track 5 are caught in horizontal concrete chute and are built in allocation and transportation cross track 4, allocate and transport vertical track 5
It can move back and forth in horizontal concrete chute relative to allocation and transportation cross track 4, allocate and transport the top connection allocation and transportation crane 3 of vertical track 5,
Allocation and transportation crane 3 is located at the top of train 2 to be stopped, and three pairs of vertical tracks 5 of allocation and transportation are connected and fixed, connect by allocation and transportation crane 3
Mode is to be welded and fixed;The top and bottom ends of lifting device 12 are separately connected allocation and transportation pedestal 1 and allocation and transportation cross track 4, lifting device
12 are caught in horizontal concrete chute with the bottom end for allocating and transporting vertical track 5 and move back and forth along allocation and transportation cross track 4, and lifting device 12 is arranged
For telescopic structure, telescopic structure includes the connecting rod that multistage is successively arranged, and the connecting rod positioned at 12 top of lifting device is set
It is equipped with connecting plate and is fixed to the bottom of allocation and transportation pedestal 1 by lock-screw, the connecting rod positioned at the bottom end of lifting device 12 is set
It is equipped with connecting plate, which is welded and fixed with connecting rod, which is caught in the horizontal concrete chute of allocation and transportation cross track 4 and edge
Allocation and transportation cross track 4 slidably reciprocates;It allocates and transports pedestal 1 and lateral position is adjusted by allocation and transportation cross track 4, allocation and transportation pedestal 1 passes through act
Device 12 is risen to adjust in the height for allocating and transporting vertical track 5 so that allocation and transportation parking track 9 docked respectively with multiple parking tracks 10 and
Carry out allocation and transportation operation.
Referring to figure 3., parking factory fluffy 8 covers Multilayer parking unit 6 and parking track 10 to provide and block place, parking
Track 10 is connected to 6 top of parking unit, and parking track 10 is the I-steel train rail of the prior art, has stopped train 7 and has been parked in
Parking track 10, parking unit 6 are provided with two layers of five rows, and two layers of parking unit 6 is located at one layer of building in parking factory fluffy 8
With two layers of building, every row's parking unit 6 is parallel to each other and is arranged in parking factory fluffy 8 along straight line, the bottom setting of parking unit 6
There is access path 11 in order to repair and stopped train 7, access path 11 is the recessed formation in bottom of parking unit 6, access path
11 are arranged to the other end along one end of parking unit 6 and are connected to the both ends for the unit 6 that stops, by allocating and transporting parking track 9 and two
The parking tracks 10 of the different rows of layer dock, and form the channel that train enters and sail out of parking track 10, and train 2 to be stopped is from allocation and transportation
Parking track 9 enters parking track 10 and is stopped and overhauled, and has stopped train 7 from parking track 10 and has entered allocation and transportation parking track
9 and start set out, then by allocation and transportation pedestal 1 change in location adjust alignment train rail.
1- allocates and transports pedestal;2- train to be stopped;3- allocates and transports crane;4- allocates and transports cross track;5- allocates and transports vertical track;6- stops
Vehicle unit;7- has stopped train;8- parking factory is fluffy;9- allocates and transports parking track;10- parking track;11- access path;12- lifting dress
It sets
Application method include: S1, by allocation and transportation pedestal 1 will allocate and transport parking track 9 and train 2 to be stopped normal operation track
Docking, train 2 to be stopped drive into scheduling interval;S2, allocation and transportation crane 3 pass through tune according to the Parking situation of parking and maintenance section
It spends vertical track 5 and scheduling cross track 4 adjusts the position of scheduling pedestal 1;S3, train 2 to be stopped is transported to parking position, and
So that allocation and transportation parking track 9 and parking track 10 dock, train 2 to be stopped drives into parking track 10 from allocation and transportation parking track 9;S4,
Staff is realized by access path 11 and other equipment to the 7 comprehensive maintenance in outside of train has been stopped, and guarantees train driving
After safety traffic maintenance, train is driven out to stereoscopic garage structure with the opposite sequence of S1~S3.
In conclusion present example stopped by the scheduling interval of stereo garage and the docking in maintenance shut-downs section it is more
Train adjusts the position of allocation and transportation pedestal by allocation and transportation pedestal relative to vertical track and allocation and transportation cross track sliding is allocated and transported, complete
At train in parking track and allocation and transportation parking track migration, the entire allocation and transportation operation of train to be stopped thus is completed, by more trains
It allocates and transports to the plurality of rows of parking unit of multilayer;The present invention is able to solve the parking lot occupied area of current high-speed railway and subway train
Larger problem, improves land utilization ratio, and parking and maintenance are integrated in one, work is simplified, improves work efficiency.
Present specification describes the example of the embodiment of the present invention, it is not meant to that these embodiments illustrate and describe this
All possible forms of invention.Those of ordinary skill in the art will understand that the embodiments described herein is to help
Reader understands the principle of the present invention, it should be understood that protection scope of the present invention is not limited to such special statement and implementation
Example.Those skilled in the art can according to the present invention disclosed the technical disclosures make it is various do not depart from it is of the invention real
Various other specific variations and combinations of matter, these variations and combinations are still within the scope of the present invention.
Claims (9)
1. stereoscopic garage structure and application method that a kind of intelligent parking of train repairs, which is characterized in that stereoscopic garage structure
It include: scheduling interval and maintenance shut-downs interconnected section, the scheduling interval includes allocation and transportation pedestal, train to be stopped, allocation and transportation
Crane, allocation and transportation cross track, the vertical track of allocation and transportation, allocation and transportation parking track and lifting device, the maintenance shut-downs section include
Parking unit has stopped train and parking track, and the allocation and transportation parking track is fixed on allocation and transportation base top, and the train to be stopped stops
In allocation and transportation parking track, the two sides of the allocation and transportation pedestal are caught in the vertical track of allocation and transportation, the top connection of the vertical track of allocation and transportation
Crane is allocated and transported, the bottom end of the vertical track of allocation and transportation is connected to allocation and transportation cross track, the top and bottom ends point of the lifting device
Pedestal and allocation and transportation cross track Lian Jie not be allocated and transported, the lifting device is set as telescopic structure, and the parking track is connected to
It stops at the top of unit, the train that stopped is parked in parking track, and the allocation and transportation pedestal adjusts lateral position by allocation and transportation cross track
Set, the allocation and transportation pedestal is adjusted by lifting device in the height for allocating and transporting vertical track so that allocate and transport parking track respectively with it is more
A parking track docks and carries out allocation and transportation operation.
2. stereoscopic garage structure and application method that a kind of intelligent parking of train according to claim 1 repairs, special
Sign is that the parking unit is provided with multi-layer multi-row, by the parking track for allocating and transporting parking track and different layers and different rows
Docking forms the channel that train enters and sail out of parking track.
3. stereoscopic garage structure and application method that a kind of intelligent parking of train according to claim 2 repairs, special
Sign is that the maintenance shut-downs section further includes that parking factory is fluffy, and the parking factory is fluffy by Multilayer parking unit and parking track cover
Firmly place is blocked to provide.
4. stereoscopic garage structure and application method that a kind of intelligent parking of train according to claim 3 repairs, special
Sign is, the parking unit along straight line be arranged in parking factory it is fluffy in, the bottom of the parking unit be provided with access path with
Easy to repair to have stopped train, the access path is arranged along one end of parking unit to the other end.
5. stereoscopic garage structure and application method that a kind of intelligent parking of train according to claim 4 repairs, special
Sign is, the application method includes: S1, the normal operation track that will allocate and transport by allocation and transportation pedestal parking track and train to be stopped
Docking, train to be stopped drive into scheduling interval;S2, allocation and transportation crane pass through scheduling according to the Parking situation of parking and maintenance section
Vertical track and scheduling cross track adjust the position of scheduling pedestal;S3, train to be stopped is transported to parking position, and to adjust
Parking track and parking track docking are transported, train to be stopped drives into parking track from allocation and transportation parking track;S4, staff pass through inspection
It repairs channel and is overhauled to train has been stopped, after maintenance, train is driven out to stereoscopic garage structure with the opposite sequence of S1~S3.
6. stereoscopic garage structure and application method that a kind of intelligent parking of train according to claim 5 repairs, special
Sign is that the allocation and transportation cross track is provided with horizontal concrete chute, and the lifting device and the bottom end for allocating and transporting vertical track are caught in cross
Move back and forth into sliding slot and along allocation and transportation cross track.
7. stereoscopic garage structure and application method that a kind of intelligent parking of train according to claim 5 repairs, special
Sign is that there are two the vertical track settings of allocation and transportation, is respectively arranged with the vertical chute on the inside of two vertical tracks of allocation and transportation, institute
It states the side projection of allocation and transportation pedestal and is caught in the vertical chute.
8. stereoscopic garage structure and application method that a kind of intelligent parking of train according to claim 5 repairs, special
Sign is, idler wheel is provided at the lateral projections of the allocation and transportation pedestal, idler wheel is caught in the vertical chute and the upper downslide in sliding slot
It is dynamic.
9. stereoscopic garage structure and application method that a kind of intelligent parking of train according to claim 5 repairs, special
Sign is that the laterally allocation and transportation track is provided at least two, and multiple laterally allocation and transportation orbital spacings are arranged in allocation and transportation pedestal
Lower section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910830685.5A CN110439341A (en) | 2019-09-04 | 2019-09-04 | A kind of stereoscopic garage structure and application method of the intelligent parking maintenance of train |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910830685.5A CN110439341A (en) | 2019-09-04 | 2019-09-04 | A kind of stereoscopic garage structure and application method of the intelligent parking maintenance of train |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110439341A true CN110439341A (en) | 2019-11-12 |
Family
ID=68439077
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910830685.5A Pending CN110439341A (en) | 2019-09-04 | 2019-09-04 | A kind of stereoscopic garage structure and application method of the intelligent parking maintenance of train |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110439341A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111273602A (en) * | 2020-01-22 | 2020-06-12 | 四川新筑智能工程装备制造有限公司 | Circuit control system of embedded medium-low speed maglev train maintenance platform |
CN112319508A (en) * | 2020-10-30 | 2021-02-05 | 山西省交通规划勘察设计院有限公司 | Underground automatic parking lot for rail transit |
CN113356651A (en) * | 2021-06-28 | 2021-09-07 | 西南交通大学 | Rotary four-channel super high-speed rail station structure |
CN114016781A (en) * | 2021-10-25 | 2022-02-08 | 中铁第五勘察设计院集团有限公司 | Vertical take-off and landing system of subway train and subway train parking garage |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006022599A (en) * | 2004-07-09 | 2006-01-26 | Ishikawajima Harima Heavy Ind Co Ltd | Train housing system for new traffic system |
CN2934471Y (en) * | 2006-07-26 | 2007-08-15 | 吴炳发 | Multistoried full-automatic stereo garage |
CN205400161U (en) * | 2016-02-28 | 2016-07-27 | 大洋泊车股份有限公司 | Motor chain hoisting device |
CN106437227A (en) * | 2016-05-11 | 2017-02-22 | 上海涂思机电技术有限公司 | Parking device, system and method |
CN107975278A (en) * | 2017-12-29 | 2018-05-01 | 南京工程学院 | Suspension lifting formula rotary parking device |
CN108301658A (en) * | 2018-04-04 | 2018-07-20 | 中唐空铁集团有限公司 | A kind of composite type stereo garage |
CN108466624A (en) * | 2018-06-01 | 2018-08-31 | 中铁工程机械研究设计院有限公司 | A kind of suspension type rail transit system vehicle goes out to be put in storage system and method |
CN109083467A (en) * | 2018-09-17 | 2018-12-25 | 中唐空铁工程设计研究院有限公司 | A kind of suspension type monorail vehicle is without track switch solid parking system |
CN109403696A (en) * | 2018-12-10 | 2019-03-01 | 金华市西比特立体车库有限公司 | A kind of interdigitated electrode structure Multilayer parking equipment and Vehicular charging method |
CN110043087A (en) * | 2019-05-17 | 2019-07-23 | 中唐空铁科技有限公司 | Empty iron solid tune library system |
CN210659444U (en) * | 2019-09-04 | 2020-06-02 | 西南交通大学 | Stereo garage structure of intelligent parking maintenance of train |
-
2019
- 2019-09-04 CN CN201910830685.5A patent/CN110439341A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006022599A (en) * | 2004-07-09 | 2006-01-26 | Ishikawajima Harima Heavy Ind Co Ltd | Train housing system for new traffic system |
CN2934471Y (en) * | 2006-07-26 | 2007-08-15 | 吴炳发 | Multistoried full-automatic stereo garage |
CN205400161U (en) * | 2016-02-28 | 2016-07-27 | 大洋泊车股份有限公司 | Motor chain hoisting device |
CN106437227A (en) * | 2016-05-11 | 2017-02-22 | 上海涂思机电技术有限公司 | Parking device, system and method |
CN107975278A (en) * | 2017-12-29 | 2018-05-01 | 南京工程学院 | Suspension lifting formula rotary parking device |
CN108301658A (en) * | 2018-04-04 | 2018-07-20 | 中唐空铁集团有限公司 | A kind of composite type stereo garage |
CN108466624A (en) * | 2018-06-01 | 2018-08-31 | 中铁工程机械研究设计院有限公司 | A kind of suspension type rail transit system vehicle goes out to be put in storage system and method |
CN109083467A (en) * | 2018-09-17 | 2018-12-25 | 中唐空铁工程设计研究院有限公司 | A kind of suspension type monorail vehicle is without track switch solid parking system |
CN109403696A (en) * | 2018-12-10 | 2019-03-01 | 金华市西比特立体车库有限公司 | A kind of interdigitated electrode structure Multilayer parking equipment and Vehicular charging method |
CN110043087A (en) * | 2019-05-17 | 2019-07-23 | 中唐空铁科技有限公司 | Empty iron solid tune library system |
CN210659444U (en) * | 2019-09-04 | 2020-06-02 | 西南交通大学 | Stereo garage structure of intelligent parking maintenance of train |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111273602A (en) * | 2020-01-22 | 2020-06-12 | 四川新筑智能工程装备制造有限公司 | Circuit control system of embedded medium-low speed maglev train maintenance platform |
CN112319508A (en) * | 2020-10-30 | 2021-02-05 | 山西省交通规划勘察设计院有限公司 | Underground automatic parking lot for rail transit |
CN113356651A (en) * | 2021-06-28 | 2021-09-07 | 西南交通大学 | Rotary four-channel super high-speed rail station structure |
CN114016781A (en) * | 2021-10-25 | 2022-02-08 | 中铁第五勘察设计院集团有限公司 | Vertical take-off and landing system of subway train and subway train parking garage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110439341A (en) | A kind of stereoscopic garage structure and application method of the intelligent parking maintenance of train | |
RU2321510C2 (en) | Transport system | |
CN108625637B (en) | The space car parking system and parking pick-up method being located above cell runway | |
US20180215586A1 (en) | Intermediate transfer station | |
CN104477170A (en) | Standard bridge type elevated station | |
CN209290386U (en) | A kind of transfer structure of subway station | |
CN108301658A (en) | A kind of composite type stereo garage | |
CN110043087A (en) | Empty iron solid tune library system | |
CN107060390B (en) | Rail vehicle stop station | |
CN211839093U (en) | High-speed rail sleeper sorting system | |
CN210659444U (en) | Stereo garage structure of intelligent parking maintenance of train | |
CN112031490A (en) | Vehicle base structure of moving platform of suspended monorail train and process flow | |
CN100458087C (en) | Double-deck stereo parking method | |
CN206290048U (en) | A kind of multi-storied garage PLC serial link control systems | |
CN107217888A (en) | A kind of transverse direction is traversing, broach exchanges the Multilayer parking equipment lifted | |
CN202954599U (en) | Stereoscopic garage | |
CN110130697A (en) | A kind of layer comb formula stereo garage | |
CN110485776A (en) | The multiple rows of lifting shuttle type shutdown system of one kind and its method | |
CN212507607U (en) | Vehicle base structure of moving platform of suspension type monorail train | |
CN107858868A (en) | A kind of railcar track plates | |
CN212249395U (en) | Cross-row vehicle base structure of suspension type monorail train | |
CN210939224U (en) | Single-column bilateral type power-concentrated motor train unit head train maintenance operation platform | |
CN208363732U (en) | False ceiling at the top of elevator | |
CN107878469A (en) | A kind of motor-car uses institute's system | |
CN207553694U (en) | A kind of three-dimensional combination garage frame-type parking unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20191112 |