CN110428347A - A kind of high-building construction matches feeding system and method with intelligent-tracking - Google Patents

A kind of high-building construction matches feeding system and method with intelligent-tracking Download PDF

Info

Publication number
CN110428347A
CN110428347A CN201910718448.XA CN201910718448A CN110428347A CN 110428347 A CN110428347 A CN 110428347A CN 201910718448 A CN201910718448 A CN 201910718448A CN 110428347 A CN110428347 A CN 110428347A
Authority
CN
China
Prior art keywords
module
color difference
building
construction
construction material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910718448.XA
Other languages
Chinese (zh)
Inventor
赵质彬
庞有源
柯麟质
蒋勇
唐明锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
Chongqing Construction Engineering Group Co Ltd
No 3 Construction Co Ltd of Chongqing Construction Engineering Group
Original Assignee
CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
Chongqing Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd, Chongqing Construction Engineering Group Co Ltd filed Critical CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
Priority to CN201910718448.XA priority Critical patent/CN110428347A/en
Publication of CN110428347A publication Critical patent/CN110428347A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/30Arrangements for executing machine instructions, e.g. instruction decode
    • G06F9/32Address formation of the next instruction, e.g. by incrementing the instruction counter
    • G06F9/321Program or instruction counter, e.g. incrementing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T1/00General purpose image data processing
    • G06T1/20Processor architectures; Processor configuration, e.g. pipelining
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T7/00Image analysis
    • G06T7/0002Inspection of images, e.g. flaw detection
    • G06T7/0004Industrial image inspection
    • G06T7/001Industrial image inspection using an image reference approach
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T2207/00Indexing scheme for image analysis or image enhancement
    • G06T2207/30Subject of image; Context of image processing
    • G06T2207/30108Industrial image inspection
    • G06T2207/30132Masonry; Concrete
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T2210/00Indexing scheme for image generation or computer graphics
    • G06T2210/04Architectural design, interior design

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Software Systems (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Strategic Management (AREA)
  • Marketing (AREA)
  • Computer Graphics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Geometry (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Image Analysis (AREA)

Abstract

The invention belongs to high-building construction technical field, a kind of high-building construction intelligent-tracking is disclosed with feeding system and method, matches feeding process video data using image pick-up device monitoring high-building construction intelligent-tracking;Select high-building construction material;Building facing material color difference is analyzed using analysis program;Construction material quantity, ingredient are calculated using calculation procedure;Using mixing machine according to calculating data configuration construction materials;It is transported using labor and materials of the means of transport to configuration.The present invention avoids incidental mistake when architect by virtue of experience selects construction material by material selecting module, avoids the waste for separately setting template wall bring man power and material;Human eye is reduced by material analysis module to distinguish between colors bring measurement error, further through brightness adjustment, human eye is reduced and distinguishes light and shade bring measurement error, so that optical colorimetry analysis color difference is become more reliable, detection data has more comparativity.

Description

A kind of high-building construction matches feeding system and method with intelligent-tracking
Technical field
The invention belongs to high-building construction technical fields more particularly to a kind of high-building construction to be dispensed with intelligent-tracking Expect system and method.
Background technique
Construction is people using various construction materials, mechanical equipment according to specifically devising and drawing the blueprint in certain sky Between, carry out in the time being that the production words building miscellaneous building products and carry out are dynamic.It includes from preparation of construction, breaks ground It starts building to the overall production process of completion of works examination.Preparation of construction, Design of Construction Organization and pipe will be carried out during this Reason, earth work, blasting engineering, foundation engineering, reinforced bar engineering, form work engineering, scaffolding work, concrete works, prestressing force The work such as concrete works, masonry project, structural steelwork, timber engineering, structure installing engineering.However, existing high level is built Construction work is built, generally can be practical to construction material scene to carry out than choosing in such a way that template wall is set, but this mode wastes A large amount of man power and material;Meanwhile colorimetric method often results in the discoloration ranking that different testing staff obtain by visual observation As a result difference influences the accuracy and comparability of the evaluation of finishing material color difference.
In conclusion problem of the existing technology is:
Existing high-building construction engineering, generally can in such a way that template wall is set, it is practical to construction material scene into Row is than choosing, but this mode wastes a large amount of man power and material.
Meanwhile colorimetric method often results in the difference for the discoloration ranking results that different testing staff obtain by visual observation, Influence the accuracy and comparability of the evaluation of finishing material color difference.
Summary of the invention
In view of the problems of the existing technology, the present invention provides a kind of high-building construction intelligent-trackings to match feeding system System and its method.
The invention is realized in this way a kind of high-building construction matches feeding method with intelligent-tracking, comprising the following steps:
Step 1 monitors high-building construction intelligent-tracking using image pick-up device by video monitoring module and matches feeding process Video data.
Step 2, main control module dispatch material selecting module and select high-building construction material.
Step 3 analyzes building facing material color difference using analysis program by material analysis module.Analyze mould During block analyzes building facing material color difference, by color difference time-sequence control module by cyclelog acquisition instruction, according to Described instruction generates instruction execution cycle, and described instruction is executed the period to the transmission of color difference status signal module.
Color difference status signal module receives the instruction execution cycle that the color difference time-sequence control module is sent, according to the finger It enables and executes the clock cycle locating when period instruction described instruction executes, the described instruction execution period includes at least two clocks week Phase.
When the described instruction that color difference time-sequence control module is indicated according to the color difference status signal module is locating when executing In the clock period, when described instruction executes, locating penultimate clock cycle sends to described program memory and reads next The control signal of instruction, and the last one clock cycle locating when described instruction executes read from described program controller Next instruction.
Step 4 calculates construction material quantity, ingredient using calculation procedure by labor and materials computing module.
Step 5, by batching modes using mixing machine according to calculating data configuration construction materials.By transporting mould Block is transported using labor and materials of the means of transport to configuration.
Step 6 positions labor and materials transporting position using locator by locating module.
The labor and materials of transport are carried out discharging operations using delivery device by inversion module by step 7.
Step 8 matches feeding using display module display monitoring high-building construction intelligent-tracking by display module Journey video data, location data.
Further, color difference time-sequence control module generates timing control signal according to described instruction, and the timing control is believed Number reading control module and color difference computing module to color difference sends.
The color difference reads control module according to the timing control signal, reads data from data storage or to number Data are written according to memory.
The color difference computing module according to the timing control signal, the data read from data storage are carried out from Reason.
Further, the color difference time-sequence control module first clock cycle locating in the next instruction execution Timing control signal is generated, the timing control signal is read into control module to the color difference and color difference computing module is sent.
Further, color difference interrupt timing module executes when institute according to the described instruction that the color difference status signal module indicates The clock cycle at place, when described instruction executes, the last one locating clock cycle carries out interrupt arbitrage, is responded when having Interruption when, the locating penultimate clock cycle in the next instruction execution controls the color difference timing control Module pause is read from described program controller to be instructed.
The described instruction execution period is set as including two clock weeks by the color difference time-sequence control module during reset Phase.
Further, the material selecting module selection method includes:
1) it by determining program according to one building threedimensional model of building scheme building, and is selected for the building threedimensional model One construction material.And the feature of the construction material is compared with the data in a database, judge the construction material Feature whether matched with the data in the database.
If so, judging that the database has included the construction material, and execute step 3.
If it is not, then judging that the database does not include the construction material, and execute step 2.
2) digitlization of mathematical model corresponding true effect under the conditions of a particular sample of the construction material is obtained Information, and the digital information corresponding to the mathematical model of the construction material is saved to database.
3) database is accessed, by the digital information corresponding to the mathematical model of the selected construction material It is applied to the building threedimensional model.
4) judge the number corresponding to the mathematical model of the applied construction material on the building threedimensional model Whether the simulation effect of word information meets preset requirement.
If so, configuring the construction material currently selected for the building threedimensional model.
If it is not, be then another construction material of building threedimensional model selection, and by the feature of another construction material It is compared with the data in the database, judges that the feature of another construction material and the data in the database are No matching.
If so, repeating step 3).
If it is not, then repeating step 2).
Until choosing the construction material for meeting the preset requirement for the building threedimensional model.
Further, the mathematical model for obtaining several construction materials corresponding true effect under the conditions of a particular sample Digital information the step of include:
The three-dimensional virtual scene with a particular sample condition is established using a three-dimensional software.
The mathematical model of a construction material is created in the three-dimensional virtual scene.
According to the construction material with the true effect data in the real scene under same sampling condition, institute is obtained The mathematical model for stating construction material corresponds to the digital information of the true effect under the conditions of particular sample.
Further, the material analysis module analysis method includes:
(1) it is taken pictures by picture pick-up device to construction material and standard grey scale.It will be electric using image processing software Sub- photo is converted to gray scale picture.
(2) by cutting, the split of test plate (panel) gray scale picture to be compared, the split gray scale with obvious central breaks is obtained Picture.Brightness adjustment is carried out to split gray scale picture, split gray scale picture dark color side color and standard grey scale is made to get the bid Quasi- ash lattice are dark consistent.The standard of the later split gray scale picture of brightness from color difference grades different in standard grey scale will be adjusted Grey lattice comparison.
(3) selection color difference grade the most similar, as the color difference grade for evaluating construction material to be compared.
(4) construction material to be compared and standard grey scale are placed under standard sources and are taken pictures, obtain to than To the electronic photo of template and standard gray colour atla.
(5) gray proces are done to above-mentioned electronic photo using photo handling software, is converted to gray scale picture.
(6) the gray scale picture of different construction materials to be compared is cut using photo handling software and is stitched to one It rises, obtains the split gray scale picture with obvious central breaks.
(7) using photo handling software the above-mentioned split gray scale picture with obvious central breaks cut or Amplification is contracted to be less than standard grey scale Plays ash lattice area, and by the central breaks and mark of split gray scale picture The central breaks of quasi- gray scale Plays ash lattice are aligned, make the depth of split gray scale picture, light colour direction respectively with standard Deep, the light direction of gray scale Plays ash lattice is corresponding.
(8) brightness that split gray scale picture is adjusted using photo handling software, makes split gray scale picture dark color side color It is dark consistent with standard grey scale Plays ash lattice.It will adjust in the later split gray scale picture of brightness and standard grey scale The standard gray lattice of different color difference grades compare, selection color difference grade the most similar, the construction material to be compared as evaluation Color difference grade.
Another object of the present invention is to provide a kind of high-building construction intelligent-tracking with feed system, comprising:
Video monitoring module is connect with main control module, for monitoring high-building construction intelligent-tracking by image pick-up device With feeding process video data.
Main control module, with video monitoring module, material selecting module, material analysis module, labor and materials computing module, ingredient mould Block, transportation module, locating module, inversion module, display module connection, for controlling the normal work of modules by single-chip microcontroller Make.
Material selecting module, connect with main control module, for selecting high-building construction material.
Material analysis module, connect with main control module, for being divided by analyzing program building facing material color difference Analysis.
Labor and materials computing module, connect with main control module, for being carried out by calculation procedure to construction material quantity, ingredient It calculates.
Batching modes are connect with main control module, for passing through mixing machine according to calculating data configuration construction materials.
Transportation module is connect with main control module, for being transported by labor and materials of the means of transport to configuration.
Locating module is connect with main control module, for being positioned by locator to labor and materials transporting position.
Inversion module is connect with main control module, for the labor and materials of transport to be carried out discharging operations by delivery device.
Display module is connect with main control module, for by display module display monitoring high-building construction intelligently with Track matches feeding process video data, location data.
Another object of the present invention, which is to provide, a kind of realizes the high-building construction intelligent-tracking with feeding method Information data processing terminal.
Another object of the present invention is to provide a kind of computer readable storage medium, including instruction, when its on computers When operation, so that computer, which executes the high-building construction, matches feeding method with intelligent-tracking.
Advantages of the present invention and good effect are as follows: the present invention establishes the number of several construction materials by material selecting module The digital information of model corresponding true effect under the conditions of a particular weather, and these digital informations are saved to data Library enables the application of the construction material in the database in the conceptual level of architectural design in building In threedimensional model, and the VR system true effect than selecting various construction materials to be presented under the conditions of particular weather in real time can be passed through The preset requirement for whether meeting building scheme, incidental mistake when by virtue of experience selecting construction material this avoid architect Accidentally, the waste for separately setting man power and material brought by template wall is also avoided.Meanwhile by material analysis module by imaging device It is combined with photo handling software applied to the color difference analysis before and after building facing material aging, considerably reduces eye recognition Difference is influenced to testing result bring, both that the color of assorted finishing material is unified using photo handling software in test process Grey reduces human eye and distinguishes between colors bring measurement error, further through brightness adjustment, reduces human eye and distinguishes that light and shade bring is surveyed Error is measured, so that optical colorimetry analysis color difference is become more reliable, detection data has more comparativity.
During analysis module analyzes building facing material color difference, by color difference time-sequence control module by cyclelog Acquisition instruction generates instruction execution cycle according to described instruction, and described instruction is executed the period to color difference status signal module hair It send.
Color difference status signal module of the present invention receives the instruction execution cycle that the color difference time-sequence control module is sent, according to Described instruction executes the clock cycle locating when period instruction described instruction executes, and the described instruction execution period includes at least two Clock cycle.When the described instruction that color difference time-sequence control module is indicated according to the color difference status signal module is locating when executing In the clock period, when described instruction executes, locating penultimate clock cycle sends to described program memory and reads next The control signal of instruction, and the last one clock cycle locating when described instruction executes read from described program controller Next instruction.It can get accurate colour difference information.
Detailed description of the invention
Fig. 1 is high-building construction intelligent-tracking provided in an embodiment of the present invention with feeding method flow diagram.
Fig. 2 is high-building construction intelligent-tracking provided in an embodiment of the present invention with feeding system structure diagram.
In figure: 1, video monitoring module.2, main control module.3, material selecting module.4, material analysis module.5, labor and materials meter Calculate module.6, batching modes.7, transportation module.8, locating module.9, inversion module.10, display module.
Specific embodiment
In order to further understand the content, features and effects of the present invention, the following examples are hereby given, and cooperate attached drawing Detailed description includes.
Existing high-building construction engineering, generally can in such a way that template wall is set, it is practical to construction material scene into Row is than choosing, but this mode wastes a large amount of man power and material.Meanwhile colorimetric method often results in different testing staff by visual observation The difference of obtained discoloration ranking results, influences the accuracy and comparability of the evaluation of finishing material color difference
To solve the above problems, being explained in detail with reference to the accompanying drawing to structure of the invention.
As shown in Figure 1, high-building construction provided by the invention with intelligent-tracking match feeding method the following steps are included:
S101 monitors high-building construction using image pick-up device by video monitoring module and is regarded with intelligent-tracking with feeding process Frequency evidence.
S102, main control module dispatch material selecting module and select high-building construction material.
S103 analyzes building facing material color difference using analysis program by material analysis module.
S104 calculates construction material quantity, ingredient using calculation procedure by labor and materials computing module.
S105, by batching modes using mixing machine according to calculating data configuration construction materials.Pass through transportation module It is transported using labor and materials of the means of transport to configuration.
S106 positions labor and materials transporting position using locator by locating module.
The labor and materials of transport are carried out discharging operations using delivery device by inversion module by S107.
S108 matches feeding process using display module display monitoring high-building construction intelligent-tracking by display module Video data, location data.
As shown in Fig. 2, high-building construction intelligent-tracking provided in an embodiment of the present invention includes: video with feed system Monitoring module 1, main control module 2, material selecting module 3, material analysis module 4, labor and materials computing module 5, batching modes 6, transport Module 7, locating module 8, inversion module 9, display module 10.
Video monitoring module 1 is connect with main control module 2, for by image pick-up device monitor high-building construction intelligently with Track matches feeding process video data.
Main control module 2, with video monitoring module 1, material selecting module 3, material analysis module 4, labor and materials computing module 5, Batching modes 6, transportation module 7, locating module 8, inversion module 9, display module 10 connect, each for being controlled by single-chip microcontroller Module works normally.
Material selecting module 3 is connect with main control module 2, for selecting high-building construction material.
Material analysis module 4 is connect with main control module 2, for being carried out by analysis program to building facing material color difference Analysis.
Labor and materials computing module 5 is connect with main control module 2, for by calculation procedure to construction material quantity, ingredient into Row calculates.
Batching modes 6 are connect with main control module 2, for passing through mixing machine according to calculating data configuration construction materials.
Transportation module 7 is connect with main control module 2, for being transported by labor and materials of the means of transport to configuration.
Locating module 8 is connect with main control module 2, for being positioned by locator to labor and materials transporting position.
Inversion module 9 is connect with main control module 2, for the labor and materials of transport to be carried out discharging operations by delivery device.
Display module 10 is connect with main control module 2, for showing monitoring high-building construction intelligence by display module Feeding process video data, location data are matched in tracking.
The invention will be further described combined with specific embodiments below.
Embodiment 1
3 selection method of material selecting module provided by the invention includes:
1) it by determining program according to one building threedimensional model of building scheme building, and is selected for the building threedimensional model One construction material.And the feature of the construction material is compared with the data in a database, judge the construction material Feature whether matched with the data in the database.
If so, judging that the database has included the construction material, and execute step 3.
If it is not, then judging that the database does not include the construction material, and execute step 2.
2) digitlization of mathematical model corresponding true effect under the conditions of a particular sample of the construction material is obtained Information, and the digital information corresponding to the mathematical model of the construction material is saved to database.
3) database is accessed, by the digital information corresponding to the mathematical model of the selected construction material It is applied to the building threedimensional model.
4) judge the number corresponding to the mathematical model of the applied construction material on the building threedimensional model Whether the simulation effect of word information meets preset requirement.
If so, configuring the construction material currently selected for the building threedimensional model.
If it is not, be then another construction material of building threedimensional model selection, and by the feature of another construction material It is compared with the data in the database, judges that the feature of another construction material and the data in the database are No matching.
If so, repeating step 3).
If it is not, then repeating step 2).
Until choosing the construction material for meeting the preset requirement for the building threedimensional model.
The mathematical model for obtaining several construction materials corresponding true effect under the conditions of a particular sample provided by the invention The step of digital information of fruit includes:
The three-dimensional virtual scene with a particular sample condition is established using a three-dimensional software.
The mathematical model of a construction material is created in the three-dimensional virtual scene.
According to the construction material with the true effect data in the real scene under same sampling condition, institute is obtained The mathematical model for stating construction material corresponds to the digital information of the true effect under the conditions of particular sample.
Embodiment 2
4 analysis method of material analysis module provided by the invention includes:
(1) it is taken pictures by picture pick-up device to construction material and standard grey scale.It will be electric using image processing software Sub- photo is converted to gray scale picture.
(2) by cutting, the split of test plate (panel) gray scale picture to be compared, the split gray scale with obvious central breaks is obtained Picture.Brightness adjustment is carried out to split gray scale picture, split gray scale picture dark color side color and standard grey scale is made to get the bid Quasi- ash lattice are dark consistent.The standard of the later split gray scale picture of brightness from color difference grades different in standard grey scale will be adjusted Grey lattice comparison.
(3) selection color difference grade the most similar, as the color difference grade for evaluating construction material to be compared.
(4) construction material to be compared and standard grey scale are placed under standard sources and are taken pictures, obtain to than To the electronic photo of template and standard gray colour atla.
(5) gray proces are done to above-mentioned electronic photo using photo handling software, is converted to gray scale picture.
(6) the gray scale picture of different construction materials to be compared is cut using photo handling software and is stitched to one It rises, obtains the split gray scale picture with obvious central breaks.
(7) using photo handling software the above-mentioned split gray scale picture with obvious central breaks cut or Amplification is contracted to be less than standard grey scale Plays ash lattice area, and by the central breaks and mark of split gray scale picture The central breaks of quasi- gray scale Plays ash lattice are aligned, make the depth of split gray scale picture, light colour direction respectively with standard Deep, the light direction of gray scale Plays ash lattice is corresponding.
(8) brightness that split gray scale picture is adjusted using photo handling software, makes split gray scale picture dark color side color It is dark consistent with standard grey scale Plays ash lattice.It will adjust in the later split gray scale picture of brightness and standard grey scale The standard gray lattice of different color difference grades compare, selection color difference grade the most similar, the construction material to be compared as evaluation Color difference grade.
Embodiment 3
Color difference status signal module of the present invention receives the instruction execution cycle that the color difference time-sequence control module is sent, according to Described instruction executes the clock cycle locating when period instruction described instruction executes, and the described instruction execution period includes at least two Clock cycle.When the described instruction that color difference time-sequence control module is indicated according to the color difference status signal module is locating when executing In the clock period, when described instruction executes, locating penultimate clock cycle sends to described program memory and reads next The control signal of instruction, and the last one clock cycle locating when described instruction executes read from described program controller Next instruction.
Color difference time-sequence control module generates timing control signal according to described instruction, by the timing control signal to color difference It reads control module and color difference computing module is sent.
The color difference reads control module according to the timing control signal, reads data from data storage or to number Data are written according to memory.
The color difference computing module according to the timing control signal, the data read from data storage are carried out from Reason.
When the color difference time-sequence control module first clock cycle locating in the next instruction execution generates The timing control signal is read control module to the color difference and color difference computing module is sent by sequence control signal.
When the described instruction that color difference interrupt timing module is indicated according to the color difference status signal module is locating when executing In the clock period, when described instruction executes, the last one locating clock cycle carries out interrupt arbitrage, when with responded interruption When, it is temporary to control the color difference time-sequence control module for the locating penultimate clock cycle in the next instruction execution Stop reading from described program controller and instruct.
The described instruction execution period is set as including two clock weeks by the color difference time-sequence control module during reset Phase.
In the above-described embodiments, can come wholly or partly by software, hardware, firmware or any combination thereof real It is existing.When using entirely or partly realizing in the form of a computer program product, the computer program product include one or Multiple computer instructions.When loading on computers or executing the computer program instructions, entirely or partly generate according to Process described in the embodiment of the present invention or function.The computer can be general purpose computer, special purpose computer, computer network Network or other programmable devices.The computer instruction may be stored in a computer readable storage medium, or from one Computer readable storage medium is transmitted to another computer readable storage medium, for example, the computer instruction can be from one A web-site, computer, server or data center pass through wired (such as coaxial cable, optical fiber, Digital Subscriber Line (DSL) Or wireless (such as infrared, wireless, microwave etc.) mode is carried out to another web-site, computer, server or data center Transmission).The computer-readable storage medium can be any usable medium or include one that computer can access The data storage devices such as a or multiple usable mediums integrated server, data center.The usable medium can be magnetic Jie Matter, (for example, floppy disk, hard disk, tape), optical medium (for example, DVD) or semiconductor medium (such as solid state hard disk Solid State Disk (SSD)) etc..
The above is only the preferred embodiments of the present invention, and is not intended to limit the present invention in any form, Any simple modification made to the above embodiment according to the technical essence of the invention, equivalent variations and modification, belong to In the range of technical solution of the present invention.

Claims (10)

1. a kind of high-building construction matches feeding method with intelligent-tracking, which is characterized in that the high-building construction intelligence Tracking with feeding method the following steps are included:
Step 1 monitors high-building construction intelligent-tracking using image pick-up device by video monitoring module and matches feeding process video Data;
Step 2, main control module dispatch material selecting module and select high-building construction material;
Step 3 analyzes building facing material color difference using analysis program by material analysis module;Analysis module pair During building facing material color difference is analyzed, by color difference time-sequence control module by cyclelog acquisition instruction, according to described Instruction generates instruction execution cycle, and described instruction is executed the period to the transmission of color difference status signal module;
Color difference status signal module receives the instruction execution cycle that the color difference time-sequence control module is sent, and is held according to described instruction The row period indicates that clock cycle locating when described instruction executes, described instruction execution period included at least two clock cycle;
Color difference time-sequence control module clock week locating when being executed according to the described instruction that the color difference status signal module indicates Phase, when described instruction executes, locating penultimate clock cycle is sent to described program memory reads next instruction Control signal, and when described instruction executes locating the last one clock cycle read from described program controller it is next Item instruction;
Step 4 calculates construction material quantity, ingredient using calculation procedure by labor and materials computing module;
Step 5, by batching modes using mixing machine according to calculating data configuration construction materials;Pass through transportation module benefit It is transported with labor and materials of the means of transport to configuration;
Step 6 positions labor and materials transporting position using locator by locating module;
The labor and materials of transport are carried out discharging operations using delivery device by inversion module by step 7;
Step 8 is regarded with intelligent-tracking with feeding process by display module using display module display monitoring high-building construction Frequency evidence, location data.
2. high-building construction as described in claim 1 matches feeding method with intelligent-tracking, which is characterized in that
Color difference time-sequence control module generates timing control signal according to described instruction, and the timing control signal is read to color difference Control module and color difference computing module are sent;
The color difference reads control module according to the timing control signal, reads data from data storage or deposits to data Data are written in reservoir;
The color difference computing module is handled the data read from data storage according to the timing control signal.
3. high-building construction as described in claim 1 matches feeding method with intelligent-tracking, which is characterized in that
The color difference time-sequence control module first clock cycle locating in the next instruction execution generates timing control The timing control signal is read control module to the color difference and color difference computing module is sent by signal processed.
4. high-building construction as described in claim 1 matches feeding method with intelligent-tracking, which is characterized in that
Color difference interrupt timing module clock week locating when being executed according to the described instruction that the color difference status signal module indicates Phase, when described instruction executes, the last one locating clock cycle carries out interrupt arbitrage, when having responded interruption, In Locating penultimate clock cycle when the next instruction execution controls the color difference time-sequence control module pause from institute It states cyclelog and reads instruction;
The described instruction execution period is set as including two clock cycle by the color difference time-sequence control module during reset.
5. high-building construction as described in claim 1 matches feeding method with intelligent-tracking, which is characterized in that the material selection Module selection method includes:
1) it by determining program according to one building threedimensional model of building scheme building, and is built for building threedimensional model selection one Build material;And the feature of the construction material is compared with the data in a database, judge the spy of the construction material Whether sign matches with the data in the database;
If so, judging that the database has included the construction material, and execute step 3;
If it is not, then judging that the database does not include the construction material, and execute step 2;
2) digital information of mathematical model corresponding true effect under the conditions of a particular sample of the construction material is obtained, And the digital information corresponding to the mathematical model of the construction material is saved to database;
3) database is accessed, by the application corresponding to the mathematical model of the selected construction material To the building threedimensional model;
4) judge the digitlization corresponding to the mathematical model of the applied construction material on the building threedimensional model Whether the simulation effect of information meets preset requirement;
If so, configuring the construction material currently selected for the building threedimensional model;
If it is not, be then another construction material of building threedimensional model selection, and by the feature of another construction material and institute The data stated in database are compared, judge another construction material feature and the database in data whether Match;
If so, repeating step 3);
If it is not, then repeating step 2);
Until choosing the construction material for meeting the preset requirement for the building threedimensional model.
6. high-building construction as claimed in claim 5 matches feeding method with intelligent-tracking, which is characterized in that the acquisition is several The mathematical model of construction material includes: the step of the digital information of corresponding true effect under the conditions of a particular sample
The three-dimensional virtual scene with a particular sample condition is established using a three-dimensional software;
The mathematical model of a construction material is created in the three-dimensional virtual scene;
According to the construction material with the true effect data in the real scene under same sampling condition, built described in acquisition The mathematical model for building material corresponds to the digital information of the true effect under the conditions of particular sample.
7. high-building construction as described in claim 1 matches feeding method with intelligent-tracking, which is characterized in that the material analysis Module analysis method includes:
(1) it is taken pictures by picture pick-up device to construction material and standard grey scale;Electronics is shone using image processing software Piece is converted to gray scale picture;
(2) by cutting, the split of test plate (panel) gray scale picture to be compared, the split grayscale image with obvious central breaks is obtained Piece;Brightness adjustment is carried out to split gray scale picture, makes split gray scale picture dark color side color and standard grey scale Plays Grey lattice are dark consistent;The standard gray of the later split gray scale picture of brightness from color difference grades different in standard grey scale will be adjusted Lattice comparison;
(3) selection color difference grade the most similar, as the color difference grade for evaluating construction material to be compared;
(4) construction material to be compared and standard grey scale are placed under standard sources and are taken pictures, obtain sample to be compared The electronic photo of plate and standard gray colour atla;
(5) gray proces are done to above-mentioned electronic photo using photo handling software, is converted to gray scale picture;
(6) the gray scale picture of different construction materials to be compared is cut using photo handling software and is stitched to together, obtained There must be the split gray scale picture of obvious central breaks;
(7) the above-mentioned split gray scale picture with obvious central breaks is cut or is amplified using photo handling software, Or it is contracted to be less than standard grey scale Plays ash lattice area, and by the central breaks and standard grey of split gray scale picture The central breaks of scale Plays ash lattice are aligned, make the depth of split gray scale picture, light colour direction respectively with standard gray tinctorial pattern Deep, the light direction of card Plays ash lattice is corresponding;
(8) brightness that split gray scale picture is adjusted using photo handling software, makes split gray scale picture dark color side color and mark Quasi- gray scale Plays ash lattice are dark consistent;It is different from standard grey scale that the later split gray scale picture of brightness will be adjusted The standard gray lattice of color difference grade compare, selection color difference grade the most similar, as the color difference for evaluating construction material to be compared Grade.
8. a kind of high-building construction matches feed system with intelligent-tracking, which is characterized in that the high-building construction intelligence It tracks with feed system and includes:
Video monitoring module is connect with main control module, is dispensed for monitoring high-building construction by image pick-up device with intelligent-tracking Expect process video data;
Main control module, with video monitoring module, material selecting module, material analysis module, labor and materials computing module, batching modes, Transportation module, locating module, inversion module, display module connection, work normally for controlling modules by single-chip microcontroller;
Material selecting module, connect with main control module, for selecting high-building construction material;
Material analysis module, connect with main control module, for being analyzed by analyzing program building facing material color difference;
Labor and materials computing module, connect with main control module, based on being carried out by calculation procedure to construction material quantity, ingredient It calculates;
Batching modes are connect with main control module, for passing through mixing machine according to calculating data configuration construction materials;
Transportation module is connect with main control module, for being transported by labor and materials of the means of transport to configuration;
Locating module is connect with main control module, for being positioned by locator to labor and materials transporting position;
Inversion module is connect with main control module, for the labor and materials of transport to be carried out discharging operations by delivery device;
Display module is connect with main control module, for showing that monitoring high-building construction intelligent-tracking is matched by display module Feeding process video data, location data.
9. a kind of information realized high-building construction intelligent-tracking described in claim 1~7 any one and match feeding method Data processing terminal.
10. a kind of computer readable storage medium, including instruction, when run on a computer, so that computer executes such as High-building construction described in claim 1-7 any one matches feeding method with intelligent-tracking.
CN201910718448.XA 2019-08-05 2019-08-05 A kind of high-building construction matches feeding system and method with intelligent-tracking Pending CN110428347A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910718448.XA CN110428347A (en) 2019-08-05 2019-08-05 A kind of high-building construction matches feeding system and method with intelligent-tracking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910718448.XA CN110428347A (en) 2019-08-05 2019-08-05 A kind of high-building construction matches feeding system and method with intelligent-tracking

Publications (1)

Publication Number Publication Date
CN110428347A true CN110428347A (en) 2019-11-08

Family

ID=68412684

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910718448.XA Pending CN110428347A (en) 2019-08-05 2019-08-05 A kind of high-building construction matches feeding system and method with intelligent-tracking

Country Status (1)

Country Link
CN (1) CN110428347A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111651826A (en) * 2020-06-09 2020-09-11 吉林建筑大学 Building information model technology-based building industrialization system
CN111985893A (en) * 2020-08-15 2020-11-24 武汉华胜工程建设科技有限公司 Building engineering project material entry auditing method, intelligent terminal and storage medium
CN112150435A (en) * 2020-09-23 2020-12-29 徐州联城住宅工业科技发展有限公司 Construction management method and device for prefabricated part

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003006400A (en) * 2001-06-25 2003-01-10 Masaki Funano System for monitoring profit of construction
CN104680321A (en) * 2015-02-13 2015-06-03 上海同筑信息科技有限公司 BIM technology-based visual material control system and method
CN107203173A (en) * 2017-07-24 2017-09-26 合肥星袖机械科技有限公司 A kind of material transport vehicle management control system
CN108959727A (en) * 2018-06-12 2018-12-07 上海天华建筑设计有限公司 The methods of comparison and selection of construction material
CN109342335A (en) * 2018-12-10 2019-02-15 辽宁省产品质量监督检验院(辽宁省建筑材料监督检验院) A kind of building facing material color difference analysis method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003006400A (en) * 2001-06-25 2003-01-10 Masaki Funano System for monitoring profit of construction
CN104680321A (en) * 2015-02-13 2015-06-03 上海同筑信息科技有限公司 BIM technology-based visual material control system and method
CN107203173A (en) * 2017-07-24 2017-09-26 合肥星袖机械科技有限公司 A kind of material transport vehicle management control system
CN108959727A (en) * 2018-06-12 2018-12-07 上海天华建筑设计有限公司 The methods of comparison and selection of construction material
CN109342335A (en) * 2018-12-10 2019-02-15 辽宁省产品质量监督检验院(辽宁省建筑材料监督检验院) A kind of building facing material color difference analysis method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111651826A (en) * 2020-06-09 2020-09-11 吉林建筑大学 Building information model technology-based building industrialization system
CN111985893A (en) * 2020-08-15 2020-11-24 武汉华胜工程建设科技有限公司 Building engineering project material entry auditing method, intelligent terminal and storage medium
CN112150435A (en) * 2020-09-23 2020-12-29 徐州联城住宅工业科技发展有限公司 Construction management method and device for prefabricated part
CN112150435B (en) * 2020-09-23 2023-05-05 江苏睿住住工科技有限公司 Construction management method and device for prefabricated part

Similar Documents

Publication Publication Date Title
US11557009B2 (en) System and method for generating financial assessments based on construction site images
US20230394405A1 (en) Controlling image acquisition robots in construction sites
Nguyen et al. Application of BIM and 3D laser scanning for quantity management in construction projects
CN110428347A (en) A kind of high-building construction matches feeding system and method with intelligent-tracking
CN110852696A (en) Project progress monitoring method and system
CN111260325A (en) Bridge construction progress management system based on BIM
CN105051781A (en) Machine-vision system and method for remote quality inspection of a product
WO2019159115A1 (en) System and method for processing of construction site images
Zhao et al. Using real-time indoor resource positioning to track the progress of tasks in construction sites
CN116090634A (en) Engineering fine-packaging and repairing intelligent management platform and method based on Internet of things
EP3985583A1 (en) Information processing device, information processing method, information processing program, and recording medium
CN111524394A (en) Method, device and system for improving accuracy of comprehensive track monitoring data of apron
CN115510754A (en) Method and system for predicting and controlling performance of cement concrete
Paige et al. Towards agile engineering of high-integrity systems
CN117094660A (en) Construction monitoring method and system based on digital twin technology
CN116977940A (en) Building engineering supervision method, device, system and storage medium
Gupta et al. Optimization of Project progress using 3d Laser scanning technique
CN212747877U (en) Digital bridge detection system
CN115481941B (en) Multifunctional area combined intelligent security management method and system
KR101988350B1 (en) Automated site-process management system through ai analysis of work display and process inspection using virtual process module
CN110969544A (en) Intelligent tracking material distribution and feeding system and method for high-rise building construction
Ercan et al. Deep learning for accurate corner detection in computer vision-based inspection
CN115019252A (en) Concrete quality detection method and device and monitoring equipment
Johnson et al. Dimensional & accuracy control automation in shipbuilding fabrication: an integration of advanced image interpretation, analysis, and visualization techniques
CN211787200U (en) Intelligent tracking material distribution and feeding system for high-rise building construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191108

RJ01 Rejection of invention patent application after publication