[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN110427653A - Parametrization collision detection and modified method based on BIM - Google Patents

Parametrization collision detection and modified method based on BIM Download PDF

Info

Publication number
CN110427653A
CN110427653A CN201910610175.7A CN201910610175A CN110427653A CN 110427653 A CN110427653 A CN 110427653A CN 201910610175 A CN201910610175 A CN 201910610175A CN 110427653 A CN110427653 A CN 110427653A
Authority
CN
China
Prior art keywords
revit
model
coordinate
collision detection
control point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910610175.7A
Other languages
Chinese (zh)
Other versions
CN110427653B (en
Inventor
李冬
黄嘉峪
田达
陈新喜
李赟
张双龙
朱国校
姜明明
周世超
郭志鑫
吴光辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201910610175.7A priority Critical patent/CN110427653B/en
Publication of CN110427653A publication Critical patent/CN110427653A/en
Application granted granted Critical
Publication of CN110427653B publication Critical patent/CN110427653B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Processing Or Creating Images (AREA)

Abstract

The present invention provides a kind of parametrization collision detection and modified method based on BIM, comprising steps of extracting prestress steel twist thread casing control point in Building Curtain Wall Structures from the reference base map of Revit model;The plane X-coordinate and Y-coordinate at control point are output in Excel table;The Z coordinate that control point is calculated in Excel table inputs back in Revit model, obtains updated Revit model;By collision detection software, in updated Revit model prestress steel twist thread casing and curtain wall embedded part carry out collision detection, for after collision detection as a result, the data adjusted will be needed to be input in Excel table, use when for updating Revit model again.Method of the invention substantially increases the precision of modeling, realizes the digital-to-analogue separation of Building Information Model, and the process reintegrated, the efficiency of model modification is improved under the premise of computer configuration reaches requirement.

Description

Parametrization collision detection and modified method based on BIM
Technical field
The present invention relates to technical field of building construction more particularly to a kind of parametrization collision detections and amendment based on BIM Method.
Background technique
In traditional structure design, the built-in fitting how prestress steel twist thread casing accurately avoids curtain wall is always one Problem.Traditional thinking be after architectural discipline determines curtain wall function division curtain wall profession is given to formulate built-in fitting position, then with The prestress wire sleeve position of structure discipline design is coordinated.The method is more universal and normal in current designing institute at home A kind of method seen, but the experience dependent on designer itself that the method is excessive, it is easy to slip, structure construction is deposited Stay obstacle.
In the case where country widelys popularize and helps the background of BIM technology application, this problem is by BIM threedimensional model collision detection institute It solves, using BIM 3 d modeling software, such as revit.Each Professional Model, the collaborations such as building, structure, curtain wall, electromechanics is established to set Meter, to accurately check whether construction pre-stress steel strand wires casing collides with curtain wall embedded part.It greatly reduces artificial Influence of the factor to testing result.
It is architect, landscape architect, structural engineer, software MEP work that Autodesk Revit, which is autodesk, inc., Cheng Shi, a set of Information The Nation implements Safety Manufacture Li-cense prototype software of designer and contractor's exploitation.It support user with 3D form design building and Structure and its group, using 2D drawing element annotation model, and from the database access Information The Nation implements Safety Manufacture Li-cense of buildings model.It is that China is answered With a kind of most commonly used BIM modeling software.
However, the BIM technology application in China is not mature enough at this stage, there are problems.For example, in structure discipline benefit When establishing prestress steel twist thread casing model with revit, by be similar to AUTOCAD form picture modeling pattern, this Method has two: 1, there are errors for the precision of model;2, very troublesome during secondary modification.
Summary of the invention
For the problem that existing in the prior art or potential defect, the present invention intend to solve be to provide it is a kind of above-mentioned to realize Technical effect, present invention provide the technical scheme that
A kind of parametrization collision detection and modified method based on BIM comprising step:
Establish the Revit model of Building Curtain Wall Structures;
Prestress steel twist thread casing in Building Curtain Wall Structures is extracted from the reference base map of the Revit model to control Point;
The plane X-coordinate and Y-coordinate at the control point are output in Excel table;
The Z coordinate that the control point is calculated in Excel table inputs back in the Revit model, after obtaining update Revit model;
By collision detection software, in the updated Revit model prestress steel twist thread casing and curtain wall bury Part carries out collision detection, for after collision detection as a result, the data that adjust will be needed to be input in the Excel table, supplies Use when updating the Revit model again.
In some embodiments of the invention, it is extracted from the reference base map of the Revit model by following steps The control point, comprising steps of
One X-direction construction pre-stress layout drawing is inserted into the Revit model, as referring to base map;
Dynamo visualisation parameters programmer card is opened under Revit model, into Dynamo program;
The control point range referring to prestress steel twist thread casing in base map is chosen in the Dynamo program, it will be described Dynamo pel is converted to referring to the Revit pel in base map;
Obtain the curve in the Dynamo pel in the control point range;
The central point for obtaining the curve, as prestress steel twist thread casing control point.
In some embodiments of the invention, the quantity at the control point is multiple, is extracting multiple control points Afterwards, the X-coordinate at multiple control points and Y-coordinate are output in Excel table by following steps, comprising steps of
The X-coordinate for obtaining multiple control points carries out arrangement from small to large to coordinate value, is output to Excel table In;
The Y-coordinate for obtaining multiple control points carries out arrangement from small to large to coordinate value, is output to the Excel In table.
In some embodiments of the invention, Control point is calculated by formula (1) in the Excel table Z coordinate:
Z (absolute coordinate)=Z1-h+Z2 (1)
Wherein, Z1 is the absolute elevation of floor where Building Curtain Wall Structures, and h is the slab thickness at the control point, Z2 It is the control point away from floor slab bottoms distance.
In some embodiments of the invention, it is inputted back after the Z coordinate for calculating the control point by following steps In the Revit model, updated Revit model is obtained, comprising steps of
In the Dynamo program, multiple control points are sequentially connected in series to obtain prestress wire set by curve The center line of pipe;
Using the section feature and the center line of prestress steel twist thread casing, scanning forms prestress steel twist thread casing Physical model;
The physical model is converted to Revit race, updates the Revit model.
In some embodiments of the invention, after the collision detection, by following steps to the data for needing to adjust It is updated, comprising steps of
Character pair point coordinate value in the Excel table is updated with the parameter value for needing to adjust;
The Dynamo program is run, the physical model is updated;
It converts updated physical model to new Revit race, updates the Revit model again
In some embodiments of the invention, the collision detection software is selected from Navisworks software, Fuzor software With Synchro software.
The present invention due to the adoption of the above technical scheme, make it have it is following the utility model has the advantages that
(1) Parametric drive to Revit model is realized using the programming of Dynamo visualisation parameters;
(2) Excel and Dynamo, the interactivity of Dynamo and Revit are realized.
(3) modeling precision and secondary modification efficiency are improved.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing.
Fig. 1 shows the main flow chart of parametrization collision detection and modified method of the embodiment of the present invention based on BIM.
Fig. 2 shows the model schematic of single prestress steel twist thread casing in the embodiment of the present invention.
Fig. 3 shows Dynamo curve graph in the embodiment of the present invention.
Fig. 4 shows in the embodiment of the present invention interactive relation figure between program.
Specific embodiment
Illustrate embodiments of the present invention below by way of specific specific example, those skilled in the art can be by this specification Other advantages and efficacy of the present invention can be easily understood for disclosed content.The present invention can also pass through in addition different specific realities The mode of applying is embodied or practiced, the various details in this specification can also based on different viewpoints and application, without departing from Various modifications or alterations are carried out under spirit of the invention.
Specific embodiments of the present invention are done in the following with reference to the drawings and specific embodiments and are further described in detail.
When structure discipline establishes prestress steel twist thread casing model using Revit technology, usually relies on and be similar to The picture modeling pattern of AUTOCAD form.The method has two: 1, there are errors for the precision of model;2, it is repaired secondary It is very troublesome during changing.
For two above deficiency, the present invention proposes a kind of parametrization prestress steel twist thread casing and curtain wall based on BIM Embedded part collision detection and modified method, referring to fig. 4, the software being related in this method mainly has: AUTOCAD, REVIT are flat The collision detections software such as platform, Dynamo software, Excel table and Navisworks, Fuzor, Synchro.The present invention is main It is realized by the visual programming software Dynamo of REVIT platform from the Parametric drive between Revit-Excel-Revit software.
Referring to Fig. 1, it is shown that the main flow of parametrization collision detection and modified method of the embodiment of the present invention based on BIM Figure, as shown, this method mainly comprises the steps that
Step 01: establishing the Revit model of Building Curtain Wall Structures;
Step 02: extracting prestress steel twist thread casing in Building Curtain Wall Structures from the reference base map of the Revit model Control point;
Step 03: the plane X-coordinate and Y-coordinate at control point are output in Microsoft Excel;
Step 04: calculating the Z coordinate at control point in Excel table, input back in Revit model, after obtaining update Revit model;
Step 05: by collision detection software, to the prestress steel twist thread casing and curtain wall in updated Revit model Embedded part carries out collision detection, for after collision detection as a result, the data adjusted will be needed to be input in Excel table, for again It is used when secondary update Revit model.
Specifically, it is exactly first referred in base map from Revit using Dynamo software and extracts prestress steel twist thread casing Plane XY coordinate is output in Excel (i.e. extraction model by each control point (also can use civil3d software directly to extract) Information), corresponding Z coordinate is calculated in Excel later, inputs back in Revit model and (assigns new model information), is realized Adjustment to model, model at this time are the model before collision detection.
Followed by collision detection software, such as Navisworks, Fuzor, Synchro, to structure discipline model and The Professional Models such as building curtain wall carry out collision detection, for collision detection as a result, the data that adjust will be needed to be input to before Excel table in, can be realized to the adjustment of the secondary fast accurate of model.
It is worth mentioning that: the core of the method for the present invention does not lie in collision detection, but for the result after collision detection Make the modification of fast accurate.
It for example, can be by the present invention is based on the parametrization collision detections of BIM and modified method to be subdivided into following reality Apply step:
1), certain layer of X-direction construction pre-stress layout drawing (AUTOCAD) is inserted into Rrevit model first, as ginseng According to base map." auto origin to origin " (automatic origin to origin) order may be selected in the method for insertion.
2) Dynamo visualisation parameters programmer card, is opened in Revit software, utilizes " select model Element " (preference pattern element) node selection Revit is referring to prestress steel twist thread casing control point range (this in base map Place is a great circle, rather than an accurately control point), it realizes being converted to referring to the element in base map in Revit Pel in Dynamo.
3), by " element.curves " (element curve) node, the curve in the pel after converting is obtained (into one It is round).
4), by " sphere.CenterPoint " (scanning central point) node, obtaining center of curve point, (point is Accurately prestress steel twist thread casing control point).
5), by the X-coordinate of " Point.X " (point .X) order acquisition point, then with " SortIndexByValue " After (according to value to index order) order carries out sequence from small to large to its coordinate value, " Excel.WriteToFile " (table is utilized File is written in lattice) order the corresponding position being output in Excel.Realize the model information extraction of Revit-Excel.
6) corresponding position, being similarly input to Y-coordinate value in Excel table.This is arrived, the XY coordinate at control point has been obtained Coordinate.In Excel table, it is calculated by the following formula out the Z coordinate of corresponding points:
Z (absolute coordinate)=Z1-h+Z2 (1)
Wherein, Z1 is the absolute elevation of floor where Building Curtain Wall Structures, and h is the floor (emitting containing column) at the control point Thickness, Z2 are the control point away from floor slab bottoms distance, and gained is the absolute coordinate.
7) it, is sat by the XYZ that characteristic point is extracted in " Excel.ReadFromFile " (table reads file) order respectively Mark utilizes " Point.ByCoordinates " (point passes through coordinate) order to establish new control point (it in Dynamo program The preceding no Z coordinate of point).
8) it, is ordered by " Nurbs Curve.ByPoints " (Nurbs curve passes through a little) and passes through series of features point Curve is sequentially connected in series to obtain Nurbs curve, the i.e. center line of prestressed casing, and as shown in Figures 2 and 3, figure midpoint A is not input The characteristic point of Z coordinate value is located on curve S after inputting Z coordinate value.
9) " solid.BySweep " (entity passes through scanning) node, is recycled, is existed by section+path method Physical model is formed in Dynamo program.So far, this model is only in Dynamo program.
10), by User- defined Node, Python code is write, calls Revit API, is realized Dynamo physical model The race being converted in Revit, and assign desired Praenomen and claim.The model information for completing Excel-Revit to this assigns.
11) it, repeats the above steps after the parametric modeling for completing X-direction and all prestressed casings of Y-direction, imported into Synchro carries out collision detection.For after collision detection as a result, it is desirable to adjust, the parameter value input that will need to adjust The corresponding position into Excel table, and Dynamo program is reruned, repeat the above steps 2)~step 10), can be completed The adjustment of Revit model, quickly and precisely.
Method of the invention substantially increases the precision of modeling, realizes the digital-to-analogue separation of Building Information Model, and again The process of integration improves the efficiency of model modification under the premise of computer configuration reaches requirement.
It should be noted that this specification structure depicted in this specification institute accompanying drawings, ratio, size etc., only to cooperate The bright revealed content of book is not intended to limit the invention enforceable limit so that those skilled in the art understands and reads Fixed condition, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, not It influences still fall in disclosed technology contents under the effect of present invention can be generated and the purpose that can reach and obtain In the range of capable of covering.Meanwhile it is cited such as "upper", "lower", "left", "right", " centre " and " one " in this specification Term is merely convenient to being illustrated for narration, rather than to limit the scope of the invention, the change of relativeness or tune It is whole, under the content of no substantial changes in technology, when being also considered as the enforceable scope of the present invention.
The above is only presently preferred embodiments of the present invention, not does limitation in any form to the present invention, though So the present invention has been disclosed as a preferred embodiment, and however, it is not intended to limit the invention, any technology people for being familiar with this profession Member, in the range of not departing from technical solution of the present invention, when the technology contents using the disclosure above make a little change or repair Decorations are the equivalent embodiment of equivalent variations, but anything that does not depart from the technical scheme of the invention content, technology according to the present invention are real Matter any simple modification, equivalent change and modification to the above embodiments, still fall within the range of technical solution of the present invention It is interior.

Claims (7)

1. a kind of parametrization collision detection and modified method based on BIM, which is characterized in that comprising steps of
Establish the Revit model of Building Curtain Wall Structures;
Prestress steel twist thread casing control point in Building Curtain Wall Structures is extracted from the reference base map of the Revit model;
The plane X-coordinate and Y-coordinate at the control point are output in Excel table;
The Z coordinate that the control point is calculated in Excel table is inputted back in the Revit model, is obtained updated Revit model;
By collision detection software, in the updated Revit model prestress steel twist thread casing and curtain wall embedded part into Row collision detection, for after collision detection as a result, the data adjusted will be needed to be input in the Excel table, for again Use when updating the Revit model.
2. parametrization collision detection and modified method based on BIM as described in claim 1, which is characterized in that by with Lower step extracts the control point from the reference base map of the Revit model, comprising steps of
One X-direction construction pre-stress layout drawing is inserted into the Revit model, as referring to base map;
Dynamo visualisation parameters programmer card is opened under Revit model, into Dynamo program;
The control point range referring to prestress steel twist thread casing in base map is chosen in the Dynamo program, by the reference Revit pel in base map is converted to Dynamo pel;
Obtain the curve in the Dynamo pel in the control point range;
The central point for obtaining the curve, as prestress steel twist thread casing control point.
3. parametrization collision detection and modified method based on BIM as claimed in claim 2, which is characterized in that the control The quantity of system point be it is multiple, after extracting multiple control points, by following steps by the X-coordinate at multiple control points It is output in Excel table with Y-coordinate, comprising steps of
The X-coordinate for obtaining multiple control points carries out arrangement from small to large to coordinate value, is output in Excel table;
The Y-coordinate for obtaining multiple control points carries out arrangement from small to large to coordinate value, is output to the Excel table In.
4. parametrization collision detection and modified method based on BIM as claimed in claim 2, it is characterised in that: described The Z coordinate of Control point is calculated in Microsoft Excel by formula (1);
Z (absolute coordinate)=Z1-h+Z2 (1)
Wherein, Z1 is the absolute elevation of floor where Building Curtain Wall Structures, and h is the slab thickness at the control point, and Z2 is institute Control point is stated away from floor slab bottoms distance.
5. parametrization collision detection and modified method based on BIM as claimed in claim 2, which is characterized in that by with Lower step inputs back in the Revit model after the Z coordinate for calculating the control point, obtains updated Revit mould Type, comprising steps of
In the Dynamo program, multiple control points are sequentially connected in series to obtain prestress steel twist thread casing by curve Center line;
Using the section feature and the center line of prestress steel twist thread casing, scanning forms the entity of prestress steel twist thread casing Model;
The physical model is converted to Revit race, updates the Revit model.
6. parametrization collision detection and modified method based on BIM as claimed in claim 5, which is characterized in that described After collision detection, it is updated by the data that following steps adjust needs, comprising steps of
Character pair point coordinate value in the Excel table is updated with the parameter value for needing to adjust;
The Dynamo program is run, the physical model is updated;
It converts updated physical model to new Revit race, updates the Revit model again.
7. parametrization collision detection and modified method based on BIM as described in claim 1, it is characterised in that: described to touch Inspection software is hit selected from Navisworks software, Fuzor software and Synchro software.
CN201910610175.7A 2019-07-08 2019-07-08 BIM-based parameterized collision detection and correction method Active CN110427653B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910610175.7A CN110427653B (en) 2019-07-08 2019-07-08 BIM-based parameterized collision detection and correction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910610175.7A CN110427653B (en) 2019-07-08 2019-07-08 BIM-based parameterized collision detection and correction method

Publications (2)

Publication Number Publication Date
CN110427653A true CN110427653A (en) 2019-11-08
CN110427653B CN110427653B (en) 2023-01-24

Family

ID=68410372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910610175.7A Active CN110427653B (en) 2019-07-08 2019-07-08 BIM-based parameterized collision detection and correction method

Country Status (1)

Country Link
CN (1) CN110427653B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112288844A (en) * 2020-09-15 2021-01-29 南昌大学 BIM-based three-dimensional engineering curve automatic fitting method
CN112417562A (en) * 2020-11-23 2021-02-26 潍柴动力股份有限公司 Dynamo-based earthwork construction modeling method and device
CN113434932A (en) * 2021-06-25 2021-09-24 广联达科技股份有限公司 Collision detection method and device of BIM (building information modeling) model and electronic equipment
CN113536428A (en) * 2021-07-15 2021-10-22 中建科技成都有限公司 Dynamo-based assembled component information extraction method and system
CN114491756A (en) * 2022-01-25 2022-05-13 安徽富煌钢构股份有限公司 BIM technology-based steel structure unit installation error control method
CN114564772A (en) * 2022-04-28 2022-05-31 广东世纪达建设集团有限公司 Indoor decoration wall installation design method and system based on BIM
CN115964788A (en) * 2022-12-28 2023-04-14 深圳市胜德建筑科技有限公司 Building structure collision correction method and device based on BIM model
CN116542152A (en) * 2023-05-10 2023-08-04 中建地下空间有限公司 Anchor rod length calculation method based on Dynamo+BIM model

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002043006A1 (en) * 2000-11-27 2002-05-30 Ding Huang Modeling object interactions and facial expressions
CN104123412A (en) * 2014-07-17 2014-10-29 金刚幕墙集团有限公司 Method for detecting collision of curtain wall through BIM technology
WO2018040838A1 (en) * 2016-08-29 2018-03-08 广州地铁设计研究院有限公司 Modeling and designing method for elevated structure bim model
CN108121873A (en) * 2017-12-25 2018-06-05 广州江河幕墙系统工程有限公司 A kind of application process of buildings model in curtain wall construction
CN108763845A (en) * 2018-08-20 2018-11-06 南通理工学院 Novel adjacent water multi-storey building design optimization method and optimization system
CN109446558A (en) * 2018-09-18 2019-03-08 中国建筑第八工程局有限公司 The soft collision detection method of electromechanical tube wired-AND gate based on unconventional BIM race

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002043006A1 (en) * 2000-11-27 2002-05-30 Ding Huang Modeling object interactions and facial expressions
CN104123412A (en) * 2014-07-17 2014-10-29 金刚幕墙集团有限公司 Method for detecting collision of curtain wall through BIM technology
WO2018040838A1 (en) * 2016-08-29 2018-03-08 广州地铁设计研究院有限公司 Modeling and designing method for elevated structure bim model
CN108121873A (en) * 2017-12-25 2018-06-05 广州江河幕墙系统工程有限公司 A kind of application process of buildings model in curtain wall construction
CN108763845A (en) * 2018-08-20 2018-11-06 南通理工学院 Novel adjacent water multi-storey building design optimization method and optimization system
CN109446558A (en) * 2018-09-18 2019-03-08 中国建筑第八工程局有限公司 The soft collision detection method of electromechanical tube wired-AND gate based on unconventional BIM race

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
张俊松: "BIM技术在轨道交通沿线高层办公楼幕墙工程中的应用", 《中国市政工程》 *
李昌华等: "基于BIM的管线优化方法", 《计算机与现代化》 *
林树枝等: "基于BIM技术的装配式建筑智慧建造", 《建筑结构》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112288844B (en) * 2020-09-15 2022-09-13 南昌大学 BIM-based three-dimensional engineering curve automatic fitting method
CN112288844A (en) * 2020-09-15 2021-01-29 南昌大学 BIM-based three-dimensional engineering curve automatic fitting method
CN112417562A (en) * 2020-11-23 2021-02-26 潍柴动力股份有限公司 Dynamo-based earthwork construction modeling method and device
CN112417562B (en) * 2020-11-23 2023-05-05 潍柴动力股份有限公司 Dynamo-based earthwork construction modeling method and device
CN113434932A (en) * 2021-06-25 2021-09-24 广联达科技股份有限公司 Collision detection method and device of BIM (building information modeling) model and electronic equipment
CN113434932B (en) * 2021-06-25 2024-04-30 广联达科技股份有限公司 Collision detection method and device of BIM model and electronic equipment
CN113536428A (en) * 2021-07-15 2021-10-22 中建科技成都有限公司 Dynamo-based assembled component information extraction method and system
CN114491756A (en) * 2022-01-25 2022-05-13 安徽富煌钢构股份有限公司 BIM technology-based steel structure unit installation error control method
CN114564772B (en) * 2022-04-28 2022-08-09 广东世纪达建设集团有限公司 Indoor decoration wall installation design method and system based on BIM
CN114564772A (en) * 2022-04-28 2022-05-31 广东世纪达建设集团有限公司 Indoor decoration wall installation design method and system based on BIM
CN115964788A (en) * 2022-12-28 2023-04-14 深圳市胜德建筑科技有限公司 Building structure collision correction method and device based on BIM model
CN116542152A (en) * 2023-05-10 2023-08-04 中建地下空间有限公司 Anchor rod length calculation method based on Dynamo+BIM model
CN116542152B (en) * 2023-05-10 2024-07-12 中建地下空间有限公司 Anchor rod length calculation method based on Dynamo +BIM model

Also Published As

Publication number Publication date
CN110427653B (en) 2023-01-24

Similar Documents

Publication Publication Date Title
CN110427653A (en) Parametrization collision detection and modified method based on BIM
CN107391862B (en) Three-dimensional collaborative design method for prefabricated concrete structure
CN102201129B (en) Three-dimensional visual operation maintenance system and method of subway comprehensive pipelines
CN109191576A (en) A kind of figure layer classification method that architectural drawing is converted to three-dimensional BIM model
CN110362887B (en) Revit-based rapid modeling method
CN109359351B (en) Three-dimensional modeling method for pipeline and pipeline design method
CN106372293B (en) Building BIM (building information modeling) model establishing method based on three-dimensional datum line
CN107220462A (en) The production method and system of a kind of parametrization reinforcing bar applied to prefabricated components
CN108763685A (en) A kind of construction method of spacial special-shaped curved surface curtain wall system
CN108765545A (en) A kind of kitchen and bath's sun room decorating Deepen Design method based on BIM technology
CN103309944A (en) Surface feature symbolization method for realizing map library integration
CN112257160A (en) BIM-based standardized forward design method for waste incineration power plant
CN107153744B (en) Underground three-dimensional pipeline decision making system
CN111046459A (en) Building model image design method based on 3D software
CN109933900A (en) A kind of construction three dimensional field cloth modeling method based on BIM technology
WO2024109959A1 (en) Three-dimensional automatic design method and apparatus for trays and bearers in gallery, and medium and device
CN110502834A (en) Depot of urban railway transit vehicles design method based on BIM
CN109376404A (en) Build outer profile model generating method, system, device and readable storage medium storing program for executing
CN109271701B (en) Water supply and drainage BIM forward design method based on reach system
CN113420359B (en) Method for automatically transmitting parameters to well placement based on REVIT (remote visual inspection) electric power engineering general diagram
Beirão et al. Structuring a generative model for urban design: linking GIS to shape grammars
CN103810310A (en) Parameterization determination method for pitch foaming module equipment oriented to bituminous mixing plant
CN106997416A (en) Utilize the multistage model stepped mixing loading method of BIM technology
CN107729703A (en) One kind is based on " Sketch Up " the factory building process design methods of " Ruby " language
CN109086528B (en) Method for automatically naming netty roads in civil3d according to ordering rule

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant