[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN110424715A - Scaffold clasp - Google Patents

Scaffold clasp Download PDF

Info

Publication number
CN110424715A
CN110424715A CN201910734570.6A CN201910734570A CN110424715A CN 110424715 A CN110424715 A CN 110424715A CN 201910734570 A CN201910734570 A CN 201910734570A CN 110424715 A CN110424715 A CN 110424715A
Authority
CN
China
Prior art keywords
briquetting
basal base
main basal
clamp arm
scaffold clasp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910734570.6A
Other languages
Chinese (zh)
Inventor
柴森
柴士涵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu World Exhibition Group Co Ltd
Original Assignee
Jiangsu World Exhibition Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu World Exhibition Group Co Ltd filed Critical Jiangsu World Exhibition Group Co Ltd
Priority to CN201910734570.6A priority Critical patent/CN110424715A/en
Publication of CN110424715A publication Critical patent/CN110424715A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/06Stiff scaffolding clamps for connecting scaffold members of common shape
    • E04G7/22Stiff scaffolding clamps for connecting scaffold members of common shape for scaffold members in end-to-side relation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Ladders (AREA)

Abstract

The invention belongs to scaffold equipment technical fields, are related to a kind of scaffold clasp, including main basal base, the clamp arm of hinged two mutual cooperations effect on the main basal base, are additionally provided with the mobile briquetting of liftable on main basal base to push clamp arm to open or be closed;It is additionally provided with spacer pin on the main basal base to limit with the lifting extreme position to briquetting, elasticity reset device is set between the briquetting and main basal base.Product of the present invention clever structure is reasonable, the clamp arm acted on by two mutual cooperations hinged on main basal base, and briquetting is arranged and is effectively adjusted to the folding of clamp arm, and adjustment process is convenient and efficient, and reliable lock is stablized.

Description

Scaffold clasp
Technical field
The invention belongs to scaffold equipment technical fields, are related to a kind of scaffold clasp.
Background technique
Scaffold the fields tool such as builds in the stage of building, performing art and has been widely used, in order to realize the extension of scaffold Extension and respective support bar are set up, and scaffold clasp comes into being, and scaffold clasp connects as the centre for connecting two components Pipe fitting is chiefly used in the fixation to steel pipe feet hand in construction projects.
It is fixed currently, scaffold clasp on the market generallys use bolt, the scaffold clasp of this structure exists Main problem be bolt during installation and dismounting, need to back out on each bolt, steel pipe can be fixed or It removes, causes to consume excessive time and manpower during installation and dismounting.
Summary of the invention
The present invention in view of the above-mentioned problems, provide a kind of scaffold clasp, the scaffold clasp can be realized Fast Installation and The purpose of dismounting.
A kind of technical solution according to the invention: scaffold clasp, it is characterised in that: including main basal base, the main basal base The clamp arm of upper hinged two mutual cooperations effect, be additionally provided with the mobile briquetting of liftable on main basal base with push clamp arm open or Closure;It is additionally provided with spacer pin on the main basal base to limit with the lifting extreme position to briquetting, the briquetting and main base Elasticity reset device is set between seat.
As a further improvement of the present invention, the briquetting includes the briquetting compressed part of integrally connected, briquetting guide part, pressure Block guide part is slideably positioned in the pilot hole of main basal base, and the limit extended along the vertical direction is arranged on briquetting guide part Slot, spacer pin are arranged through the limiting slot.
As a further improvement of the present invention, the elasticity reset device includes the guiding for being set to briquetting compressed part bottom surface Bar and the guide groove being set on main basal base, the guide rod are equipped in guide groove, and sheathed spring on the guide bar.
As a further improvement of the present invention, left support abutment, the right support abutment of integrally connected, two folders are set on the main basal base Arm passes through articulated shaft respectively and is articulated with left support abutment, on right support abutment.
As a further improvement of the present invention, clamp arm is divided into clamping section and the forced section of integrally connected by the articulated shaft, Arc sections are arranged in the lower end of the forced section, and briquetting is matched with the arc sections to drive clamp arm to rotate.
As a further improvement of the present invention, the arc sections include the lower arc sections being connected smoothly, upper arc sections, When two clamp arm are opened, the vertex of lower arc sections is contacted with tangent at the vertex position of upper arc sections.
As a further improvement of the present invention, mounting groove is opened up in each clamp arm, mounting groove and corresponding left branch Seat, right support abutment match.
As a further improvement of the present invention, the main basal base is additionally provided with link slot.
The technical effects of the invention are that: product of the present invention clever structure is reasonable, passes through two phases hinged on main basal base The clamp arm of mutual mating reaction, and briquetting is set, the folding of clamp arm is effectively adjusted, adjustment process is convenient and efficient, reliable lock Stablize.
Detailed description of the invention
Fig. 1 is main view of the invention.
Fig. 2 is left view of the invention.
Fig. 3 is the G-G direction view of Fig. 1.
Fig. 4 is the H-H direction view of Fig. 2.
Fig. 5 is perspective view of the invention.
Specific embodiment
A specific embodiment of the invention is further described with reference to the accompanying drawing.
In Fig. 1 ~ 5, including main basal base 1, left support abutment 1-1, right support abutment 1-2, link slot 1-3, guide groove 1-4, clamp arm 2, folder Tight portion 2-1, forced section 2-2, lower arc sections 2-21, upper arc sections 2-22, spacer pin 3, briquetting 4, briquetting guide part 4-1, limit Slot 4-2, briquetting compressed part 4-3, guide rod 4-4, spring 5, articulated shaft 6 etc..
As shown in Figure 1, the present invention is a kind of scaffold clasp, including main basal base 1, hinged two phases on the main basal base 1 The clamp arm 2 of mutual mating reaction is additionally provided with the mobile briquetting 4 of liftable on main basal base 1 to push clamp arm 2 to open or closure;Institute It states and is additionally provided with spacer pin 3 on main basal base 1 and is limited with the lifting extreme position to briquetting 4, the briquetting 4 and main basal base 1 Between elasticity reset device is set.
Briquetting 4 includes the briquetting compressed part 4-3 of integrally connected, briquetting guide part 4-1, briquetting guide part 4-1 sliding setting In the pilot hole of main basal base 1, and the limiting slot 4-2 extended along the vertical direction, spacer pin 3 are set on briquetting guide part 4-1 It is arranged through the limiting slot 4-2.
As shown in figure 4, left support abutment 1-1, the right support abutment 1-2 of integrally connected are arranged on main basal base 1, two clamp arm 2 are led to respectively Articulated shaft 6 is crossed to be articulated on left support abutment 1-1, right support abutment 1-2.
As shown in figure 3, specifically, elasticity reset device include be set to the bottom surface briquetting compressed part 4-3 guide rod 4-4 and The guide groove 1-4 being set on main basal base 1, the guide rod 4-4 are equipped in guide groove 1-4, and on guide rod 4-4 Sheathed spring 5.It is understood that corresponding to left support abutment 1-1 on main basal base 1, guide groove is respectively set in the two sides of right support abutment 1-2 The bottom surface 1-4, briquetting compressed part 4-3 is provided with quantity and position guide rod 4-4 corresponding with guide groove 1-4 respectively, guide rod The upper end for the spring 5 being arranged on 4-4 is held out against in the bottom surface of briquetting compressed part 4-3.
The clamping section 2-1 and forced section 2-2 that articulated shaft 6 divides clamp arm 2 for integrally connected, the lower end of the forced section 2-2 Arc sections are set, and briquetting 4 is matched with the arc sections to drive clamp arm 2 to rotate.
Arc sections include the lower arc sections 2-21 being connected smoothly, upper arc sections 2-22, when two clamp arm 2 are opened, under The vertex of arc sections 2-21 is contacted with tangent at the vertex position of upper arc sections 2-22.
It is reliable and stable with external piece in order to when in use as shown in figure 4, main basal base 1 is additionally provided with link slot 1-3 Connection.
As shown in figure 5, clamp arm 2 and left support abutment 1-1, right support abutment 1-2 articulated manner can there are many, used in the present invention Scheme be: open up mounting groove in each clamp arm 2, mounting groove matches with corresponding left support abutment 1-1, right support abutment 1-2 It closes, i.e. left support abutment 1-1, right support abutment 1-2 are respectively protruding into corresponding mounting groove, in the upper end of left support abutment 1-1, right support abutment 1-2 point Not Tong Guo an articulated shaft 6 be rotatablely connected with corresponding clamp arm 2.
The use principle of product of the present invention is as follows: original state, and two clamp arm 2 of product of the present invention are open configuration, will Product of the present invention is placed at the scaffolding steel pipe for needing to connect, and two clamp arm 2 are encircled on the outside of steel pipe, the top of two clamp arm 2 It is resisted against on steel pipe at point, presses down on main basal base 1, main basal base 1 drives 4 synchronizing moving of briquetting, and briquetting compressed part 4-3 squeezes two The lower arc sections 2-21 of a clamp arm 2, so that two clamp arm 2 are rotated rotating around corresponding articulated shaft 6;With main basal base 1 It is lasting to push, until between the end for the forced section 2-2 that briquetting compressed part 4-3 is supported in two clamp arm 2, at this point, clamp arm 2 is in Closed state firm can be held tightly on the steel pipe of scaffold;When needing to dismantle product of the present invention from scaffolding steel pipe, It only needs to be lifted up briquetting 4, drives clamp arm 2 to rotate around articulated shaft 6 by briquetting 4, realize the opening of clamp arm 2.

Claims (8)

1. a kind of scaffold clasp, it is characterised in that: including main basal base (1), hinged two mutual cooperations on the main basal base (1) The clamp arm (2) of effect is additionally provided with the mobile briquetting (4) of liftable on main basal base (1) to push clamp arm (2) to open or closure; It is additionally provided with spacer pin (3) on the main basal base (1) to limit with the lifting extreme position to briquetting (4), the briquetting (4) Elasticity reset device is set between main basal base (1).
2. scaffold clasp as described in claim 1, it is characterised in that: the briquetting (4) includes the briquetting pressure of integrally connected Tight portion (4-3), briquetting guide part (4-1), briquetting guide part (4-1) is slideably positioned in the pilot hole of main basal base (1), and is being pressed The limiting slot (4-2) extended along the vertical direction is set on block guide part (4-1), and spacer pin (3) is set through the limiting slot (4-2) It sets.
3. scaffold clasp as claimed in claim 2, it is characterised in that: the elasticity reset device includes being set to briquetting pressure The guide rod (4-4) of tight bottom surface portion (4-3) and the guide groove (1-4) being set on main basal base (1), the guide rod (4-4) are matched Conjunction is set in guide groove (1-4), and the sheathed spring (5) on guide rod (4-4).
4. scaffold clasp as described in claim 1, it is characterised in that: a left side for integrally connected is arranged on the main basal base (1) Support (1-1), right support abutment (1-2), two clamp arm (2) are articulated with left support abutment (1-1), right support abutment (1- by articulated shaft (6) respectively 2) on.
5. scaffold clasp as claimed in claim 4, it is characterised in that: clamp arm (2) is divided by the articulated shaft (6) integrally to be connected Arc sections, briquetting (4) and the circle is arranged in the lower end of the clamping section (2-1) connect and forced section (2-2), the forced section (2-2) Arc portion is matched to drive clamp arm (2) to rotate.
6. scaffold clasp as claimed in claim 5, it is characterised in that: the arc sections include the lower circle being connected smoothly Arc portion (2-21), upper arc sections (2-22), when two clamp arm (2) are opened, the vertex of lower arc sections (2-21) and upper arc sections (2- 22) tangent contact at vertex position.
7. scaffold clasp as claimed in claim 4, it is characterised in that: open up mounting groove on each clamp arm (2), pacify Tankage is matched with corresponding left support abutment (1-1), right support abutment (1-2).
8. scaffold clasp as described in claim 1, it is characterised in that: the main basal base (1) is additionally provided with link slot (1- 3).
CN201910734570.6A 2019-08-09 2019-08-09 Scaffold clasp Pending CN110424715A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910734570.6A CN110424715A (en) 2019-08-09 2019-08-09 Scaffold clasp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910734570.6A CN110424715A (en) 2019-08-09 2019-08-09 Scaffold clasp

Publications (1)

Publication Number Publication Date
CN110424715A true CN110424715A (en) 2019-11-08

Family

ID=68415247

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910734570.6A Pending CN110424715A (en) 2019-08-09 2019-08-09 Scaffold clasp

Country Status (1)

Country Link
CN (1) CN110424715A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117266534A (en) * 2023-11-23 2023-12-22 河南秋创建筑工程有限公司 Safety protection device for building construction

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102828704A (en) * 2012-09-25 2012-12-19 无锡金帆钻凿设备股份有限公司 Clamping device for mechanical loading and unloading drill rod on drilling device
CN204024028U (en) * 2014-07-03 2014-12-17 福建金正丰金属工业有限公司 A kind of clamp structure of scaffold
CN206955457U (en) * 2017-06-27 2018-02-02 衡水凯达模压制品有限公司 A kind of pipe hydraulic hanging fixture
CN109333434A (en) * 2018-11-17 2019-02-15 北京则拓科技有限责任公司 The push-and-pull open-and-close mechanism with locking limit for power circuit sensor
CN208502221U (en) * 2018-04-20 2019-02-15 广东电网有限责任公司 Universal insulation scaffold hard link device
CN210508349U (en) * 2019-08-09 2020-05-12 江苏世展集团有限公司 Scaffold fastener

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102828704A (en) * 2012-09-25 2012-12-19 无锡金帆钻凿设备股份有限公司 Clamping device for mechanical loading and unloading drill rod on drilling device
CN204024028U (en) * 2014-07-03 2014-12-17 福建金正丰金属工业有限公司 A kind of clamp structure of scaffold
CN206955457U (en) * 2017-06-27 2018-02-02 衡水凯达模压制品有限公司 A kind of pipe hydraulic hanging fixture
CN208502221U (en) * 2018-04-20 2019-02-15 广东电网有限责任公司 Universal insulation scaffold hard link device
CN109333434A (en) * 2018-11-17 2019-02-15 北京则拓科技有限责任公司 The push-and-pull open-and-close mechanism with locking limit for power circuit sensor
CN210508349U (en) * 2019-08-09 2020-05-12 江苏世展集团有限公司 Scaffold fastener

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117266534A (en) * 2023-11-23 2023-12-22 河南秋创建筑工程有限公司 Safety protection device for building construction
CN117266534B (en) * 2023-11-23 2024-02-02 河南秋创建筑工程有限公司 Safety protection device for building construction

Similar Documents

Publication Publication Date Title
CN110424715A (en) Scaffold clasp
CN207296410U (en) A kind of aluminum alloy building template
CN204858223U (en) Novel transformer capacity test three -phase short -circuit connector
CN107931932A (en) A kind of catalytic converter assembly welding fixture for robot welding
CN204819523U (en) Jack catch clamping mechanism
CN206286488U (en) A kind of nut descends feeding clincher tool automatically
EP2682233B1 (en) Clamping tool capable of changing clamp handle angle
CN104944330B (en) Portable cable Well cover unlatching tool
CN104538901B (en) A kind of auxiliary protection device for cable laying
CN204304327U (en) A kind of auxiliary protection device for cable laying
CN209329176U (en) A kind of power distribution cabinet copper bar quick lap joint device
CN210508349U (en) Scaffold fastener
CN202148789U (en) Hollow vertical hinged door line pressing component
CN205591852U (en) Anvil worker deflection mechanism
CN204828124U (en) Hydraulic pressure material clamping mechanism
CN2923940Y (en) Large-folding furniture-door concealed hinge
CN206623030U (en) The spring fitting device of rack shaft assembly
CN209267102U (en) A kind of parallel groove clamp
CN203441226U (en) High head window hinge
CN208744605U (en) A kind of abnormity pincers
CN110451155A (en) A kind of steel plate handling device
CN207972891U (en) A kind of multi-functional express delivery packing support device
CN203724409U (en) Angle adjusting device
CN208495644U (en) A kind of quick curved line fixture
CN205101769U (en) Gas PE pipeline presss from both sides with ending gas

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination