CN110374086A - It is a kind of for improving the spreading construction method of existing pier, pile bearing capacity - Google Patents

It is a kind of for improving the spreading construction method of existing pier, pile bearing capacity Download PDF

Info

Publication number
CN110374086A
CN110374086A CN201910450022.0A CN201910450022A CN110374086A CN 110374086 A CN110374086 A CN 110374086A CN 201910450022 A CN201910450022 A CN 201910450022A CN 110374086 A CN110374086 A CN 110374086A
Authority
CN
China
Prior art keywords
pile
small
small pile
pier
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910450022.0A
Other languages
Chinese (zh)
Inventor
顾宏
王克文
范多
陈晖�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Changkai Geotechnical Engineering Co Ltd
Original Assignee
Shanghai Changkai Geotechnical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Changkai Geotechnical Engineering Co Ltd filed Critical Shanghai Changkai Geotechnical Engineering Co Ltd
Priority to CN201910450022.0A priority Critical patent/CN110374086A/en
Publication of CN110374086A publication Critical patent/CN110374086A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/64Repairing piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of for improving the spreading construction method of existing pier, pile bearing capacity, it is characterised in that the spreading construction method forms vertical small pile stake holes the following steps are included: the progress drilling and forming hole operation in existing pier base;Small pile core material is set in the small pile stake holes, and pressure injection or perfusion injection cementitious material form small pile into the small pile stake holes, the small pile and the pier base rubber congeal into induration.The invention has the advantages that making full use of former pier, the foundation pile constructed, small pile of constructing inside it realizes the carrying and embedding rock requirement on demand of expected design to carry out effective spreading, reinforcement;The wasting of resources is avoided to the maximum extent, reduces environmental pollution;Continuous productive process, effectively save construction period can be intersected with other construction content realizations when small-sized pile driving construction.

Description

It is a kind of for improving the spreading construction method of existing pier, pile bearing capacity
Technical field
The present invention relates to technical field of civil engineering, and in particular to it is a kind of for improving existing pier, pile bearing capacity connects Long construction method.
Background technique
When natural foundation capability is unable to satisfy the load action of superstructure or structures or Deformation control requires, Often compensated using pier, foundation pile or composite foundation processing.Wherein pier, foundation pile because design it is unreasonable or in the construction process by It is unreasonable in the establishment such as management, lectotype selection, technical parameter, it often will cause the pier of construction molding, foundation pile cannot reach design It is expected that requiring;Or because superstructure or the change of structures function, add-story reconstruction need, it is necessary to adopt an effective measure to above-mentioned Pier, foundation pile are handled.Conventional treatment method specifically:
Method 1: superstructure or structures are not yet constructed
(1) on Yuan Dun, foundation pile periphery, construct again corresponding pier, foundation pile carries out all or part of replacement to it;
(2) Jiang Yuandun, foundation pile are carried out in situ broken or pull out, and re-start corresponding pier after backfill class undisturbed soil on demand, foundation pile is applied Work.
Method 2: superstructure or structures have been constructed
(1) meet pile sinking counter-force in superstructure or structures load or enough pile sinking counter-forces can be provided by counterweight setting In the case of, construction is compensated to former pier, foundation pile using anchor jacked pile (prefabricated pile, piling bar etc.) mode.
(2) in the case that pile sinking counter-force is unable to satisfy piling construction at the construction field (site), using in method 1 1. by the way of carry out Compensation construction.
Above-mentioned processing mode all cannot sufficiently be recycled corresponding pier, foundation pile, and difficulty of construction is larger, the duration compared with Long, higher cost, greatly causes the wasting of resources and environmental pollution.
Summary of the invention
According to the deficiencies of the prior art described above, It is an object of the present invention to provide a kind of for improving existing pier, base The spreading construction method of pile bearing capacity, the spreading construction method by opening up small pile stake holes inside existing pier, foundation pile, and to Wherein pour cementitious material formed small pile, while existing pier, foundation pile bottom pour or whirl spraying cementitious material formed small pile Additional solid reaches to make the additional solid of small pile, small pile and existing pier, foundation pile that induration be collectively formed and improves it Bearing capacity, socket length meet the purpose of design.
The object of the invention realization is completed by following technical scheme:
It is a kind of for improving the spreading construction method of existing pier, pile bearing capacity, it is characterised in that the spreading construction method packet It includes following steps: carrying out drilling and forming hole operation in existing pier base, form vertical small pile stake holes;In the small pile stake Small pile core material is set in hole, and pressure injection or perfusion injection cementitious material form small pile into the small pile stake holes, it is described Small pile and pier base rubber solidification knot form one.
Drilling depth is more than the elevation of bottom of the existing pier base in drilling and forming hole operation.
The spreading construction method is further comprising the steps of: the injection of bottom pressure injection or whirl spraying injection gelling of Xiang Suoshu pier base Material forms the common glue in lower part of the additional solid of small pile, the additional solid of small pile and the pier base and the small pile Congeal into one.
The small pile external reinforcement body is located in rock mass, and the additional solid of small pile is integrated with rock mass consolidation, The lower end of the small pile is through the additional solid of the small pile and is embedded in rock mass.
The small pile external reinforcement body is located in non-rock-soil layer, and the lower end of the small pile is additional in the small pile Solid interior.
The pier base is pier or foundation pile.
The cementitious material is one of cement slurry, cement mortar, concrete or grouting material or two or more combinations.
The quantity of the small pile is one or two or more.
The small pile is mini pile or non-mini pile.
The invention has the advantages that making full use of former pier, the foundation pile constructed, small pile is constructed inside it to carry out effectively Spreading, reinforcement realize carrying, the embedding rock requirement of expected design;The wasting of resources is avoided to the maximum extent, reduces environment dirt Dye;Continuous productive process, effectively save construction period can be intersected with other construction content realizations when small-sized pile driving construction.
Detailed description of the invention
Fig. 1 is the plan view of multiple existing piers in the present invention, the small pile in foundation pile;
Fig. 2 is the plan view of single existing pier in the present invention, the small pile in foundation pile;
Fig. 3 is the diagrammatic cross-section of single non-embedding rock small pile in the present invention;
Fig. 4 is the diagrammatic cross-section of two non-embedding rock small piles in the present invention;
Fig. 5 is the diagrammatic cross-section of single embedding rock small pile in the present invention;
Fig. 6 is the diagrammatic cross-section of two embedding rock small piles in the present invention.
Specific embodiment
Feature of the invention and other correlated characteristics are described in further detail by embodiment below in conjunction with attached drawing, with Convenient for the understanding of technical staff of the same trade:
Such as Fig. 1-6, label 1-7 is respectively as follows: cushion cap 1, structural column 2, foundation beam 3, pier base 4, small pile 5, small pile core material in figure 6, the additional solid 7 of small pile.
Embodiment: as shown in figures 1 to 6, the present embodiment more particularly to it is a kind of for improving existing pier, pile bearing capacity connects Long construction method, which forms small pile stake holes by creeping into inside pier base 4, and pours gelling material thereto Material forms small pile 5, while pouring cementitious material in 4 bottom of pier base and being formed outside small pile plus solid 7, to make small pile 5, small Induration is collectively formed in the additional solid 7 of type stake and pier base 4, achievees the purpose that improve its bearing capacity, socket length satisfaction design; Wherein, small pile 5 includes mini pile and non-mini pile.
As shown in figures 1 to 6, one of the present embodiment is used to improve the spreading construction method packet of existing pier, pile bearing capacity Include following steps:
(1) design document, the engineering geological data of existing pier base 4 learnt, be familiar with, make an on-the-spot survey construction site, just used Small pile spreading scheme carries out comprehensive feasibility analysis, proposes specific implementation designing and consuftng report.
(2) original design unit or special designing unit determine specific design document according to consultation report progress Deepen Design, And complete feasibility study.
(3) according to the design document determined after design demonstration, the property of incorporation engineering geological conditions and existing pier base 4 Suitable construction equipment is selected, further determines that construction parameter, formulates Specific construction scheme.
(4) before Specific construction, scene must first carry out examination bore forming, further determine that the construction parameter of construction site, mend Charge kind construction embodiment.
(5) according to the position of small pile 5, using the professional tool superstructure to pier base 4 or structures knot on demand Structure basis, that is, cushion cap 1, structural column 2 or foundation beam 3 drill, and drilling depth must be more than structure original pier base elevation of top with next Determine range, that is, penetrates superstructure or structure structure basis.
(6) 5 pore-forming operation of small pile is carried out according to construction embodiment, i.e., using pore-forming equipment in existing pier base 4 Pore-forming operation is carried out, the depth of drilling is more than the elevation of bottom of existing pier base 4, so that small pile 5 runs through 4 bottom of pier base, accordingly It needs to reduce the adverse effect to original structure to the greatest extent in operation process;The diameter and quantity in the hole of small pile 5 are carried according to design The combined factors such as power, the diameter of pier base 4, surrounding geological environment determine, a hole can be crept into a pier base 4, can also be with Drilling two, three is multiple, by opening up the hole of different number, diameter, can pour to obtain different number, diameter with the later period Small pile 5 can flexibly make and change so that the parameters such as the long, bearing capacity of stake of existing pier base 4 be made to meet different design requirements Become.
(7) after 5 pore-forming operation of small pile meets design requirement, according to design document dispose small pile 5 pile body component, Pre-buried professional institution, i.e. small pile core material 6, small pile core material 6 can be steel reinforcement cage, be also possible to other metal core materials or non-gold Belong to core material, to improve the bearing capacity etc. of small pile 5, enhances self structure intensity.
(8) it is poured cementitious material in the drilling into pier base 4, completes pouring for the pile body of small pile 5, cementitious material can be with It is one of cement slurry, cement mortar, concrete or grouting material etc. or two or more combinations, the side injected using pressure injection Formula uses perfusion pressurization note mode, keeps 5 structure of small pile to be formed closely knit, intensity is high, and sufficiently extends out, and connects with surrounding structure It is integrated to enhance its bearing capacity, and the bottom of pier base 4 is equally poured or whirl spraying cementitious material, bottom, small pile in pier base 4 5 lower periphery condenses to form the additional solid 7 of small pile, as a result, the lower part of small pile 5, the lower end of pier base 4 and small pile Additional 7 three of solid is gelled mutually integral induration, and spreading construction is completed.
(9) pile body of small pile 5 and its additional solid 7 of the small pile in outside are completed to conserve, be detected by design requirement, finally Obtained induration structural strength is high, bearing capacity is strong, and socket length etc. meets expected design requirement, and corresponding engineering delivery uses.
Pier base 4 in the present embodiment refers to pier or foundation pile, when the additional solid 7 of small pile is located in rock mass, small pile 5 Lower end should run through the additional solid 7 of small pile, end is embedded in rock mass on demand, depth is met the requirements, at this point, small pile 5 is embedding Rock stake form, wherein the additional solid 7 in rock mass is formed using dedicated high-pressure slip-casting equipment slip casting in rock mass 's;And when the additional solid 7 of small pile is not in rock mass, the lower end of small pile 5, which is then arranged in outside small pile, to be added in solid 7 Portion can effectively improve the stabilization of stake at this point, small pile 5 is non rock rooted pile form not through the additional solid 7 of small pile in this way Property and bearing capacity etc..
The beneficial effect of the present embodiment is: (1) making full use of former pier, the foundation pile constructed, small pile of constructing inside it To carry out effective spreading, reinforcement, the requirement such as bearing capacity, embedding rock of expected design is realized;(2) small pile (non-small pile) construction effect Rate is higher, and can intersect continuous productive process, effectively save construction period with other construction content realizations when its construction;(3) maximum limit Avoids the wasting of resources, reduces environmental pollution to degree;(4) economic benefit, social benefit are obvious.

Claims (9)

1. a kind of for improving the spreading construction method of existing pier, pile bearing capacity, it is characterised in that the spreading construction method The following steps are included: carrying out drilling and forming hole operation in existing pier base, vertical small pile stake holes is formed;In the small pile Small pile core material is set in stake holes, and pressure injection or perfusion injection cementitious material form small pile, institute into the small pile stake holes It states small pile and pier base rubber solidification knot forms one.
2. according to claim 1 a kind of for improving the spreading construction method of existing pier, pile bearing capacity, feature exists Drilling depth is more than the elevation of bottom of the existing pier base in drilling and forming hole operation.
3. according to claim 1 a kind of for improving the spreading construction method of existing pier, pile bearing capacity, feature exists Further comprising the steps of in the spreading construction method: cementitious material shape is injected in the injection of bottom pressure injection or whirl spraying of Xiang Suoshu pier base At the additional solid of small pile, the lower part of the additional solid of small pile and the pier base and the small pile is gelled into one jointly Body.
4. according to claim 3 a kind of for improving the spreading construction method of existing pier, pile bearing capacity, feature exists It is located in rock mass in the small pile external reinforcement body, the additional solid of small pile is integrated with rock mass consolidation, described small The lower end of type stake is through the additional solid of the small pile and is embedded in rock mass.
5. according to claim 3 a kind of for improving the spreading construction method of existing pier, pile bearing capacity, feature exists It is located in non-rock-soil layer in the small pile external reinforcement body, the lower end of the small pile is in the small pile external reinforcement body Portion.
6. according to claim 1 a kind of for improving the spreading construction method of existing pier, pile bearing capacity, feature exists In the pier base be pier or foundation pile.
7. according to claim 1 a kind of for improving the spreading construction method of existing pier, pile bearing capacity, feature exists In the cementitious material be one of cement slurry, cement mortar, concrete or grouting material or two or more combinations.
8. according to claim 1 a kind of for improving the spreading construction method of existing pier, pile bearing capacity, feature exists In the small pile quantity be one or two or more.
9. according to claim 1 a kind of for improving the spreading construction method of existing pier, pile bearing capacity, feature exists In the small pile be mini pile or non-mini pile.
CN201910450022.0A 2019-05-28 2019-05-28 It is a kind of for improving the spreading construction method of existing pier, pile bearing capacity Pending CN110374086A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910450022.0A CN110374086A (en) 2019-05-28 2019-05-28 It is a kind of for improving the spreading construction method of existing pier, pile bearing capacity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910450022.0A CN110374086A (en) 2019-05-28 2019-05-28 It is a kind of for improving the spreading construction method of existing pier, pile bearing capacity

Publications (1)

Publication Number Publication Date
CN110374086A true CN110374086A (en) 2019-10-25

Family

ID=68248863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910450022.0A Pending CN110374086A (en) 2019-05-28 2019-05-28 It is a kind of for improving the spreading construction method of existing pier, pile bearing capacity

Country Status (1)

Country Link
CN (1) CN110374086A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7334966B2 (en) * 2002-10-28 2008-02-26 Intelligent Engineering (Bahamas) Limited Reinforcement of tubular structures
CN103790190A (en) * 2014-02-19 2014-05-14 中铁第四勘察设计院集团有限公司 Remedying and reinforcing method for precast hollow driven piles
CN105625418A (en) * 2016-02-05 2016-06-01 云南建工基础工程有限责任公司 Cast-in-place pile structure provided with cored expanded head jet grouting piles and construction method of cast-in-place pile structure
CN105714770A (en) * 2016-02-05 2016-06-29 云南建工基础工程有限责任公司 Reinforced type cast-in-situ bored pile structure and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7334966B2 (en) * 2002-10-28 2008-02-26 Intelligent Engineering (Bahamas) Limited Reinforcement of tubular structures
CN103790190A (en) * 2014-02-19 2014-05-14 中铁第四勘察设计院集团有限公司 Remedying and reinforcing method for precast hollow driven piles
CN105625418A (en) * 2016-02-05 2016-06-01 云南建工基础工程有限责任公司 Cast-in-place pile structure provided with cored expanded head jet grouting piles and construction method of cast-in-place pile structure
CN105714770A (en) * 2016-02-05 2016-06-29 云南建工基础工程有限责任公司 Reinforced type cast-in-situ bored pile structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN105625294A (en) Composite foundation and construction method thereof
CN102011399B (en) PHC pile-based multiple high jet pedestal pile construction method
CN103184734A (en) Implanted and grouted compound pile and construction method
CN102277867A (en) Construction method for collapsible loess foundation
CN206784372U (en) Injection forming club-footed pile
CN106703004A (en) Treatment method for collapsible loess foundation
CN102900079A (en) High-frequency hydraulic vibratory construction method for cement-soil core-inserted combined pile
CN106996104A (en) Injection forming club-footed pile and its construction method
CN101255692B (en) Heterotype squeezing-close bottom-enlarging filling pile construction method
CN104314078A (en) Concrete pile construction equipment and construction method thereof
CN106192999A (en) The construction method of uplift pile
CN110387877A (en) A kind of stiff composite pile construction technology
CN111794216A (en) Construction method of uplift carrier pile
CN107012861B (en) A kind of discrete material core expansive concrete stake and its construction method
CN111485547A (en) Prefabricated horizontal bearing type high-toughness concrete permeable pile and preparation method thereof
CN203213101U (en) Embedding grouting combined pile
CN104762956B (en) Method for forming pile based on construction waste recycled aggregate
CN101936004A (en) Precast expanding pile as well as construction method and construction mechanical equipment thereof
CN102251514A (en) Multi-section type variable cross-section dynamic compaction method
CN214656943U (en) Core pile and slurry-fixed rigid-flexible combined pile
CN105064332A (en) Construction method for bearing base piles of square pile bodies
CN106245641A (en) PHC pile tube post grouting construction technique and PHC pile tube composite pile
CN106065608B (en) A kind of premixing high strength cement soil foundation
CN102605775B (en) Combination pile of flexible pile and rigid pile concentrically arranged at upper end and lower end and pile forming method
CN201762705U (en) Prefabricated extruding and expanding pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191025

RJ01 Rejection of invention patent application after publication