[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN110334953A - Electricity statistical method, equipment and computer readable storage medium - Google Patents

Electricity statistical method, equipment and computer readable storage medium Download PDF

Info

Publication number
CN110334953A
CN110334953A CN201910610134.8A CN201910610134A CN110334953A CN 110334953 A CN110334953 A CN 110334953A CN 201910610134 A CN201910610134 A CN 201910610134A CN 110334953 A CN110334953 A CN 110334953A
Authority
CN
China
Prior art keywords
electricity
time
preset period
electrical equipment
ammeter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910610134.8A
Other languages
Chinese (zh)
Inventor
蔡兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Sincerity Zhuoyuan Science And Technology Development Co Ltd
Original Assignee
Wuhan Sincerity Zhuoyuan Science And Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Sincerity Zhuoyuan Science And Technology Development Co Ltd filed Critical Wuhan Sincerity Zhuoyuan Science And Technology Development Co Ltd
Priority to CN201910610134.8A priority Critical patent/CN110334953A/en
Publication of CN110334953A publication Critical patent/CN110334953A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/22Payment schemes or models
    • G06Q20/28Pre-payment schemes, e.g. "pay before"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • G06Q30/0206Price or cost determination based on market factors
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Development Economics (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Accounting & Taxation (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Finance (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Data Mining & Analysis (AREA)
  • General Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of electricity statistical method, equipment and computer readable storage mediums.This method comprises:, when any electrical equipment in monitoring area is in operating status, recording the operation duration of any electrical equipment in preset period of time, operation total duration of each electrical equipment in monitoring area in preset period of time is obtained;Electric quantity consumption value of each electrical equipment in preset period of time is calculated in the rated power for obtaining each electrical equipment, the operation total duration of rated power and each electrical equipment based on each electrical equipment in preset period of time.Through the invention, monitor the operating status of each electrical equipment, and record operation duration of each equipment in preset period of time, to operation duration and rated power based on each equipment, electric quantity consumption value of each electrical equipment in preset period of time is calculated, so that user is clear how the electricity consumption of each electrical equipment in each preset period of time.

Description

Electricity statistical method, equipment and computer readable storage medium
Technical field
The present invention relates to power management technique field more particularly to electricity statistical methods, equipment and computer-readable storage Medium.
Background technique
In at this stage, in order to which the electricity consumption to every household counts, an ammeter can be configured for each household.User passes through The degree shown on ammeter, that is, may know that electricity consumption.But what ammeter counted is the total electricity consumption of each household, and user shows according to ammeter Degree, can not know the electricity consumption of each electrical equipment of family.
Summary of the invention
The main purpose of the present invention is to provide a kind of electricity statistical method, equipment and computer readable storage medium, purports The degree that user shows according to ammeter in the prior art is being solved, can not know the technology of the electricity consumption of each electrical equipment of family Problem.
To achieve the above object, the present invention provides a kind of electricity statistical method, and the electricity statistical method includes following step It is rapid:
In preset period of time, when any electrical equipment in monitoring area is in operating status, any use is recorded The operation duration of electric equipment obtains operation total duration of each electrical equipment in monitoring area in preset period of time;
The rated power for obtaining each electrical equipment, rated power and each electricity consumption based on each electrical equipment Electric quantity consumption value of each electrical equipment in preset period of time is calculated in operation total duration of the equipment in preset period of time.
Optionally, the electricity statistical method is further comprising the steps of:
When the time being in the corresponding sart point in time of preset period of time, the first of the corresponding ammeter of the monitoring area is obtained Ammeter degree;
When the time being in the corresponding end time point of preset period of time, the second of the corresponding ammeter of the monitoring area is obtained Ammeter degree;
The absolute value of the difference of the first ammeter degree and the second ammeter degree is calculated, and using the absolute value as the prison Control total electricity consumption of the region in preset period of time.
Optionally, in the absolute value of the difference for calculating the first ammeter degree and the second ammeter degree, and will be described exhausted After the step of being worth the total electricity consumption as the monitoring area in preset period of time, further includes:
Obtain the preset electricity charge and pay strategy, pay strategy based on the electricity charge, obtain the total electricity consumption it is corresponding to Premium received;
It pays and is deducted in account with described to the corresponding amount of money of premium received from the corresponding electricity charge of the monitoring area.
Optionally, in the absolute value of the difference for calculating the first ammeter degree and the second ammeter degree, and will be described exhausted After the step of being worth the total electricity consumption as the monitoring area in preset period of time, further includes:
It sums to electric quantity consumption value of each electrical equipment in preset period of time, obtains theoretical total electricity consumption;
Whether the absolute value for detecting the difference of the theoretical total electricity consumption and the total electricity consumption is greater than preset threshold;
If the absolute value of the difference of the theory total electricity consumption and the total electricity consumption is greater than preset threshold, outputting alarm Prompt.
In addition, to achieve the above object, the present invention also provides a kind of electricity to count equipment, the electricity counts equipment packet It includes: memory, processor and being stored in the electricity statistics program that can be run on the memory and on the processor, it is described Electricity statistics program realizes the step of electricity statistical method as described above when being executed by processor.
In addition, to achieve the above object, it is described computer-readable the present invention also provides a kind of computer readable storage medium Electricity statistics program is stored on storage medium, the electricity statistics program realizes electricity as described above when being executed by processor The step of statistical method.
In the present invention, in preset period of time, when any electrical equipment in monitoring area is in operating status, institute is recorded The operation duration for stating any electrical equipment, obtain operation of each electrical equipment in preset period of time in monitoring area it is total when It is long;The rated power for obtaining each electrical equipment, rated power and each electrical equipment based on each electrical equipment Electric quantity consumption value of each electrical equipment in preset period of time is calculated in operation total duration in preset period of time.Pass through this Invention, monitors the operating status of each electrical equipment, and record operation duration of each equipment in preset period of time, to be based on Electric quantity consumption value of each electrical equipment in preset period of time is calculated in the operation duration and rated power of each equipment, So that user is clear how the electricity consumption of each electrical equipment in each preset period of time.
Detailed description of the invention
Fig. 1 is that the electricity for the hardware running environment that the embodiment of the present invention is related to counts device structure schematic diagram;
Fig. 2 is the flow diagram of electricity statistical method first embodiment of the present invention.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific embodiment
The electricity statistics device structure for the hardware running environment being related to as shown in FIG. 1, FIG. 1 is the embodiment of the present invention shows It is intended to.
As shown in Figure 1, electricity statistics equipment may include: processor 1001, such as CPU, network interface 1004, user Interface 1003, memory 1005, communication bus 1002.Wherein, communication bus 1002 is for realizing the connection between these components Communication.User interface 1003 may include display screen (Display), input unit such as keyboard (Keyboard), optional user Interface 1003 can also include standard wireline interface and wireless interface.Network interface 1004 optionally may include having for standard Line interface, wireless interface (such as WI-FI interface).Memory 1005 can be high speed RAM memory, be also possible to stable storage Device (non-volatilememory), such as magnetic disk storage.Memory 1005 optionally can also be independently of aforementioned processing The storage device of device 1001.
It will be understood by those skilled in the art that the statistics device structure of electricity shown in Fig. 1 is not constituted and is counted to electricity The restriction of equipment may include perhaps combining certain components or different component cloth than illustrating more or fewer components It sets.
As shown in Figure 1, as may include that operating system, network are logical in a kind of memory 1005 of computer storage medium Believe module, Subscriber Interface Module SIM and electricity statistics program.
In electricity statistics equipment shown in Fig. 1, network interface 1004 is mainly used for connecting background server, takes with backstage Business device carries out data communication;User interface 1003 is mainly used for connecting client (user terminal), carries out data communication with client; And processor 1001 can be used for calling the electricity statistics program stored in memory 1005, and execute following operation:
In preset period of time, when any electrical equipment in monitoring area is in operating status, any use is recorded The operation duration of electric equipment obtains operation total duration of each electrical equipment in monitoring area in preset period of time;
The rated power for obtaining each electrical equipment, rated power and each electricity consumption based on each electrical equipment Electric quantity consumption value of each electrical equipment in preset period of time is calculated in operation total duration of the equipment in preset period of time.
Further, processor 1001 can call the electricity statistics program stored in memory 1005, also execute following Operation:
When the time being in the corresponding sart point in time of preset period of time, the first of the corresponding ammeter of the monitoring area is obtained Ammeter degree;
When the time being in the corresponding end time point of preset period of time, the second of the corresponding ammeter of the monitoring area is obtained Ammeter degree;
The absolute value of the difference of the first ammeter degree and the second ammeter degree is calculated, and using the absolute value as the prison Control total electricity consumption of the region in preset period of time.
Further, processor 1001 can call the electricity statistics program stored in memory 1005, also execute following Operation:
Obtain the preset electricity charge and pay strategy, pay strategy based on the electricity charge, obtain the total electricity consumption it is corresponding to Premium received;
It pays and is deducted in account with described to the corresponding amount of money of premium received from the corresponding electricity charge of the monitoring area.
Further, processor 1001 can call the electricity statistics program stored in memory 1005, also execute following Operation:
It sums to electric quantity consumption value of each electrical equipment in preset period of time, obtains theoretical total electricity consumption;
Whether the absolute value for detecting the difference of the theoretical total electricity consumption and the total electricity consumption is greater than preset threshold;
If the absolute value of the difference of the theory total electricity consumption and the total electricity consumption is greater than preset threshold, outputting alarm Prompt.
It is the flow diagram of electricity statistical method first embodiment of the present invention referring to Fig. 2, Fig. 2.
In one embodiment, electricity statistical method includes:
Step S10, when any electrical equipment in monitoring area is in operating status, records institute in preset period of time The operation duration for stating any electrical equipment, obtain operation of each electrical equipment in preset period of time in monitoring area it is total when It is long;
In the present embodiment, the communication connection of electricity statistics equipment and each electrical equipment in monitoring area is pre-established, Specifically communication connection can be established by the way of wireless communication, be obtained in each electrical equipment in real time with power supply volume statistics equipment The equipment state (operating status and non-operating state) of report.
In the present embodiment, preset period of time have it is multiple, specifically with every month for a preset period of time, such as No.1 zero point in January To three ride on Bus No. 11 zero point in January be the first preset period of time, February No.1 zero point to 20 No. eight zero points in February be second it is default when Section, March, No.1 zero point to three ride on Bus No. 11 zero point in March was third preset period of time ... and so on, was provided with 12 altogether within 1 year Preset period of time.
In one embodiment of electricity statistical method of the present invention, with the 7th preset period of time, i.e. No.1 in July zero point to July 30 In No.1 zero point this period, when electricity statistics equipment receives the equipment state that any electrical equipment in monitoring area reports When for operating status, the operation duration of any electrical equipment is recorded.For example, July No.1 zero point to three ride on Bus No. 11 zero in July In point this period, when to receive the equipment state that electrical equipment 1 reports in t1 to t2 this period equal for electricity statistics equipment For operating status, the equipment state reported in t3 to t4 this period is operating status, then records electrical equipment 1 the 7th Operation duration in preset period of time is t1 to t2 this period and t3 to t4 this period, to obtain electrical equipment 1 the Operation total duration in seven preset period of time is t1 to t2 this period and t3 to the sum of t4 this period.Pass through above-mentioned monitoring side Operation total duration of each electrical equipment in monitoring area in preset period of time can be obtained in formula.
Step S20 obtains the rated power of each electrical equipment, rated power based on each electrical equipment and Operation total duration of each electrical equipment in preset period of time is calculated electricity of each electrical equipment in preset period of time and disappears Consumption value.
In the present embodiment, if operation total duration of the electrical equipment 1 in preset duration is T1, electrical equipment 2 is when default Operation total duration in length is T2, and operation total duration of the electrical equipment 3 in preset duration is T3 ... electrical equipment n default Operation total duration in duration is Tn.The rated power P1 of electrical equipment 1, the rated power P2 of electrical equipment 2 are obtained, electricity consumption is set The rated power Pn of standby 3 rated power P3 ... electrical equipment n, then electric quantity consumption value of the electrical equipment 1 in preset period of time W1=P1 × T1, electric quantity consumption value W2=P2 × T2 of the electrical equipment 2 in preset period of time, electrical equipment 3 is in preset period of time Electric quantity consumption value Wn=Pn × Tn of electric quantity consumption value W3=P3 × T3 ... electrical equipment n in preset period of time.
It, can be in display screen after obtaining electric quantity consumption value of each electrical equipment in preset period of time in the present embodiment Electric quantity consumption value of the upper each electrical equipment of display in preset period of time.The mode of display can be table or legend.
In the present embodiment, in preset period of time, when any electrical equipment in monitoring area is in operating status, record The operation duration of any electrical equipment, obtain operation of each electrical equipment in preset period of time in monitoring area it is total when It is long;The rated power for obtaining each electrical equipment, rated power and each electrical equipment based on each electrical equipment Electric quantity consumption value of each electrical equipment in preset period of time is calculated in operation total duration in preset period of time.Pass through this Embodiment, monitors the operating status of each electrical equipment, and records operation duration of each equipment in preset period of time, thus base In the operation duration and rated power of each equipment, electric quantity consumption of each electrical equipment in preset period of time is calculated Value, so that user is clear how the electricity consumption of each electrical equipment in each preset period of time.
Further, in one embodiment of electricity statistical method of the present invention, the electricity statistical method is further comprising the steps of:
When the time being in the corresponding sart point in time of preset period of time, the first of the corresponding ammeter of the monitoring area is obtained Ammeter degree;When the time being in the corresponding end time point of preset period of time, the of the corresponding ammeter of the monitoring area is obtained Two ammeter degrees;The absolute value of the difference of the first ammeter degree and the second ammeter degree is calculated, and using the absolute value as institute State total electricity consumption of the monitoring area in preset period of time.
In the present embodiment, when the time being in the corresponding sart point in time of preset period of time, the corresponding electricity of monitoring area is obtained First ammeter degree x1 of table obtains the corresponding electricity of monitoring area when the time being in the corresponding end time point of preset period of time Second ammeter degree x2 of table, the absolute value y, y for then calculating the difference of the first ammeter degree and the second ammeter degree are to supervise Control total electricity consumption of the region in preset period of time.
In the present embodiment, the communication connection of electricity statistics equipment and ammeter is pre-established, by the side for sending request of data Formula obtains ammeter degree.For example, electricity counts equipment to ammeter when the time being in preset period of time corresponding sart point in time A data acquisition request is sent, when ammeter receives data acquisition request, degree at this time is fed back into electricity statistics equipment, The first ammeter degree that the corresponding ammeter of monitoring area is obtained with power supply volume statistics equipment, when the time, to be in preset period of time corresponding When end time point, electricity counts equipment and sends a data acquisition request to ammeter, when ammeter receives data acquisition request, Degree at this time is fed back into electricity statistics equipment, the second electricity of the corresponding ammeter of monitoring area is obtained with power supply volume statistics equipment Scale number, so that total electricity consumption of the programming count monitoring area in preset period of time, eliminates the operation of manual metering.
Further, in one embodiment of electricity statistical method of the present invention, the first ammeter degree and the second ammeter degree are being calculated The absolute value of several differences, and using the absolute value as the step of total electricity consumption of the monitoring area in preset period of time it Afterwards, further includes:
Obtain the preset electricity charge and pay strategy, pay strategy based on the electricity charge, obtain the total electricity consumption it is corresponding to Premium received;
It pays and is deducted in account with described to the corresponding amount of money of premium received from the corresponding electricity charge of the monitoring area.
In the present embodiment, the electricity charge that the tactful region according to locating for monitoring area is paid in the preset electricity charge are paid rule and are set It sets.For example, it is the every degree electricity of electric 1 yuan of every degree or 100 degree or less 1 yuan that strategy is paid in the preset electricity charge, more than 100 degree Part, the every degree electricity of 1.2 yuans.After obtaining total electricity consumption, it is based further on the electricity charge and pays strategy, total electricity consumption pair can be obtained The band premium received answered.Paid from the corresponding electricity charge of monitoring area deducted in account with to the corresponding amount of money of premium received Complete automatic electricity payment.
Further, in one embodiment of electricity statistical method of the present invention, electricity statistical method further include:
It sums to electric quantity consumption value of each electrical equipment in preset period of time, obtains theoretical total electricity consumption;Detection Whether the absolute value of the difference of the theory total electricity consumption and the total electricity consumption is greater than preset threshold;If the total electricity consumption of theory The absolute value of amount and the difference of the total electricity consumption is greater than preset threshold, then outputting alarm prompt.
In the present embodiment, if electric quantity consumption value of the electrical equipment 1 in preset period of time is W1, electrical equipment 2 is when default Electric quantity consumption value in section is W2, and electric quantity consumption value of the electrical equipment 3 in preset period of time is W3 ... electrical equipment n default Electric quantity consumption value in period is Wn, then the electric quantity consumption value to each electrical equipment in preset period of time is summed, and is obtained Theoretical total electricity consumption S=W1+W2+W3+ ...+Wn.Then calculate the total electricity consumption y of S and monitoring area in preset period of time The absolute value of difference, and detect whether the absolute value is greater than preset threshold (preset threshold is configured according to actual needs), If more than preset threshold, then outputting alarm prompt.
In the present embodiment, if the absolute value of the difference of theoretical total electricity consumption and total electricity consumption is greater than preset threshold, such as manage It is greater than total electricity consumption by total electricity consumption, and difference is greater than preset threshold, then illustrating electrical equipment, there may be component agings, lead It causes power consumption to increase, first kind alarm prompt is exported, so that user overhauls electrical equipment;If theoretical total electricity consumption is less than Total electricity consumption, and difference is greater than preset threshold, then illustrating ammeter, there may be exceptions, the second class alarm prompt are exported, to be provided with User overhauls ammeter.
In addition, the embodiment of the present invention also proposes a kind of computer readable storage medium, the computer readable storage medium On be stored with electricity statistics program, the electricity statistics program realizes each reality of electricity statistical method as above when being executed by processor Apply the operation of example.
Each embodiment base of the specific embodiment of computer readable storage medium of the present invention and above-mentioned electricity statistical method This is identical, and this will not be repeated here.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that the process, method, article or the system that include a series of elements not only include those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or system institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do There is also other identical elements in the process, method of element, article or system.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side Method can be realized by means of software and necessary general hardware platform, naturally it is also possible to by hardware, but in many cases The former is more preferably embodiment.Based on this understanding, technical solution of the present invention substantially in other words does the prior art The part contributed out can be embodied in the form of software products, which is stored in one as described above In storage medium (such as ROM/RAM, magnetic disk, CD), including some instructions are used so that a terminal device executes the present invention respectively Method described in a embodiment.
The above is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field, is included within the scope of the present invention.

Claims (9)

1. a kind of electricity statistical method, which is characterized in that the electricity statistical method the following steps are included:
In preset period of time, when any electrical equipment in monitoring area is in operating status, records any electricity consumption and set Standby operation duration obtains operation total duration of each electrical equipment in monitoring area in preset period of time;
The rated power for obtaining each electrical equipment, rated power and each electrical equipment based on each electrical equipment Electric quantity consumption value of each electrical equipment in preset period of time is calculated in operation total duration in preset period of time.
2. electricity statistical method as described in claim 1, which is characterized in that the electricity statistical method further includes following step It is rapid:
When the time being in the corresponding sart point in time of preset period of time, the first ammeter of the corresponding ammeter of the monitoring area is obtained Degree;
When the time being in the corresponding end time point of preset period of time, the second ammeter of the corresponding ammeter of the monitoring area is obtained Degree;
The absolute value of the difference of the first ammeter degree and the second ammeter degree is calculated, and using the absolute value as the monitored space Total electricity consumption of the domain in preset period of time.
3. electricity statistical method as claimed in claim 2, which is characterized in that in the first ammeter degree of the calculating and the second electricity The absolute value of the difference of scale number, and the step of the total electricity consumption using the absolute value as the monitoring area in preset period of time After rapid, further includes:
It obtains the preset electricity charge and pays strategy, pay strategy based on the electricity charge, it is corresponding wait pay to obtain the total electricity consumption The amount of money;
It pays and is deducted in account with described to the corresponding amount of money of premium received from the corresponding electricity charge of the monitoring area.
4. electricity statistical method as claimed in claim 2, which is characterized in that in the first ammeter degree of the calculating and the second electricity The absolute value of the difference of scale number, and the step of the total electricity consumption using the absolute value as the monitoring area in preset period of time After rapid, further includes:
It sums to electric quantity consumption value of each electrical equipment in preset period of time, obtains theoretical total electricity consumption;
Whether the absolute value for detecting the difference of the theoretical total electricity consumption and the total electricity consumption is greater than preset threshold;
If the absolute value of the difference of the theory total electricity consumption and the total electricity consumption is greater than preset threshold, outputting alarm is mentioned Show.
5. a kind of electricity counts equipment, which is characterized in that the electricity statistics equipment includes: memory, processor and is stored in On the memory and the electricity statistics program that can run on the processor, the electricity statistics program is by the processor Following steps are realized when execution:
In preset period of time, when any electrical equipment in monitoring area is in operating status, records any electricity consumption and set Standby operation duration obtains operation total duration of each electrical equipment in monitoring area in preset period of time;
The rated power for obtaining each electrical equipment, rated power and each electrical equipment based on each electrical equipment Electric quantity consumption value of each electrical equipment in preset period of time is calculated in operation total duration in preset period of time.
6. electricity as claimed in claim 5 counts equipment, which is characterized in that the electricity statistics program is held by the processor Following steps are also realized when row:
When the time being in the corresponding sart point in time of preset period of time, the first ammeter of the corresponding ammeter of the monitoring area is obtained Degree;
When the time being in the corresponding end time point of preset period of time, the second ammeter of the corresponding ammeter of the monitoring area is obtained Degree;
The absolute value of the difference of the first ammeter degree and the second ammeter degree is calculated, and using the absolute value as the monitored space Total electricity consumption of the domain in preset period of time.
7. electricity as claimed in claim 5 counts equipment, which is characterized in that the electricity statistics program is held by the processor Following steps are also realized when row:
It obtains the preset electricity charge and pays strategy, pay strategy based on the electricity charge, it is corresponding wait pay to obtain the total electricity consumption The amount of money;
It pays and is deducted in account with described to the corresponding amount of money of premium received from the corresponding electricity charge of the monitoring area.
8. electricity as claimed in claim 5 counts equipment, which is characterized in that the electricity statistics program is held by the processor Following steps are also realized when row:
It sums to electric quantity consumption value of each electrical equipment in preset period of time, obtains theoretical total electricity consumption;
Whether the absolute value for detecting the difference of the theoretical total electricity consumption and the total electricity consumption is greater than preset threshold;
If the absolute value of the difference of the theory total electricity consumption and the total electricity consumption is greater than preset threshold, outputting alarm is mentioned Show.
9. a kind of computer readable storage medium, which is characterized in that be stored with electricity system on the computer readable storage medium It has the records of distance by the log sequence, the electricity statistics program realizes electricity statistics according to any one of claims 1 to 4 when being executed by processor The step of method.
CN201910610134.8A 2019-07-08 2019-07-08 Electricity statistical method, equipment and computer readable storage medium Pending CN110334953A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910610134.8A CN110334953A (en) 2019-07-08 2019-07-08 Electricity statistical method, equipment and computer readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910610134.8A CN110334953A (en) 2019-07-08 2019-07-08 Electricity statistical method, equipment and computer readable storage medium

Publications (1)

Publication Number Publication Date
CN110334953A true CN110334953A (en) 2019-10-15

Family

ID=68143337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910610134.8A Pending CN110334953A (en) 2019-07-08 2019-07-08 Electricity statistical method, equipment and computer readable storage medium

Country Status (1)

Country Link
CN (1) CN110334953A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111123114A (en) * 2019-12-12 2020-05-08 珠海格力电器股份有限公司 Household appliance electric quantity display method, computer readable storage medium and household appliance
CN111260246A (en) * 2020-02-12 2020-06-09 上海锐嘉科智能科技有限公司 Equipment management system and method for park
CN112198438A (en) * 2020-09-29 2021-01-08 Oppo广东移动通信有限公司 Method and device for detecting residual electric quantity of battery, electronic equipment and storage medium
CN112858751A (en) * 2021-01-08 2021-05-28 刘连英 Monitoring system and method for acquiring utilization rate of processing equipment in non-contact manner
CN113052482A (en) * 2021-04-08 2021-06-29 深圳市中瓴智慧科技有限公司 Construction site energy consumption monitoring method, device, equipment and storage medium thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103488152A (en) * 2013-10-08 2014-01-01 国家电网公司 Method for controlling power consumption
CN105388825A (en) * 2015-12-03 2016-03-09 深圳市酷开网络科技有限公司 Residential power monitoring method and system based on power line communication
CN106451766A (en) * 2016-09-09 2017-02-22 国家电网公司 Smart power supply management method and smart meter
CN106569026A (en) * 2015-10-09 2017-04-19 腾讯科技(深圳)有限公司 Power consumption device power consumption statistics method and system
CN107395750A (en) * 2017-08-22 2017-11-24 广东美的制冷设备有限公司 Electricity method for early warning, server, mobile terminal and storage medium

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103488152A (en) * 2013-10-08 2014-01-01 国家电网公司 Method for controlling power consumption
CN106569026A (en) * 2015-10-09 2017-04-19 腾讯科技(深圳)有限公司 Power consumption device power consumption statistics method and system
CN105388825A (en) * 2015-12-03 2016-03-09 深圳市酷开网络科技有限公司 Residential power monitoring method and system based on power line communication
CN106451766A (en) * 2016-09-09 2017-02-22 国家电网公司 Smart power supply management method and smart meter
CN107395750A (en) * 2017-08-22 2017-11-24 广东美的制冷设备有限公司 Electricity method for early warning, server, mobile terminal and storage medium

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111123114A (en) * 2019-12-12 2020-05-08 珠海格力电器股份有限公司 Household appliance electric quantity display method, computer readable storage medium and household appliance
CN111260246A (en) * 2020-02-12 2020-06-09 上海锐嘉科智能科技有限公司 Equipment management system and method for park
CN112198438A (en) * 2020-09-29 2021-01-08 Oppo广东移动通信有限公司 Method and device for detecting residual electric quantity of battery, electronic equipment and storage medium
CN112858751A (en) * 2021-01-08 2021-05-28 刘连英 Monitoring system and method for acquiring utilization rate of processing equipment in non-contact manner
CN112858751B (en) * 2021-01-08 2021-10-15 唐旸 Monitoring system and method for acquiring utilization rate of processing equipment in non-contact manner
CN113052482A (en) * 2021-04-08 2021-06-29 深圳市中瓴智慧科技有限公司 Construction site energy consumption monitoring method, device, equipment and storage medium thereof

Similar Documents

Publication Publication Date Title
CN110334953A (en) Electricity statistical method, equipment and computer readable storage medium
CN107392450B (en) Enterprise client marketing intelligent management system based on cloud computing
Seshadri et al. Mobile call graphs: beyond power-law and lognormal distributions
CN105403836B (en) Battery consumption monitoring
Kim et al. An empirical analysis of mobile voice service and SMS: a structural model
CN110213371A (en) Information consumption method, apparatus, equipment and computer storage medium
CN104486138A (en) Flow monitoring method and device and monitoring server
CN105302637A (en) Restoration method and apparatus for jamming caused by system process runtime exception and mobile terminal
CN108287790A (en) Application program capacity test method, device and the electronic equipment of terminal
CN108197002B (en) Mobile device non-buried point data statistical method, system, terminal and medium
CN109815094A (en) Monitoring method, device, equipment and the computer readable storage medium of tables of data
CN108197032A (en) Main thread interim card monitoring method, medium, equipment and the system of IOS applications
EP2023682A1 (en) Method and system for predicting the power consumption of a mobile terminal
CN110610376A (en) Behavior data response method and device, computer equipment and storage medium
CN110288190A (en) Event notification method, event notification server, storage medium and device
CN110417614A (en) Cloud Server self checking method, device, equipment and computer readable storage medium
CN113238930A (en) Software system testing method and device, terminal equipment and storage medium
CN113434396A (en) Interface test method, device, equipment, storage medium and program product
CN109819098A (en) Menu option display methods, server, system and computer readable storage medium
CN109543405A (en) A kind of privacy calls Activity recognition method and electronic equipment
CN106569917A (en) Data backup method and mobile terminal
CN113656174A (en) Resource allocation method, system, computer device and storage medium
CN109857802A (en) Daily record data synchronous method, device, equipment and computer readable storage medium
CN104427118B (en) Method for recommending contents and mobile terminal
CN115543608A (en) Method and device for rapidly accounting reference load of ordered power utilization users

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191015

RJ01 Rejection of invention patent application after publication