CN110307396A - A kind of dilatory pipe of spheroidal graphite cast-iron and its construction method - Google Patents
A kind of dilatory pipe of spheroidal graphite cast-iron and its construction method Download PDFInfo
- Publication number
- CN110307396A CN110307396A CN201910432411.0A CN201910432411A CN110307396A CN 110307396 A CN110307396 A CN 110307396A CN 201910432411 A CN201910432411 A CN 201910432411A CN 110307396 A CN110307396 A CN 110307396A
- Authority
- CN
- China
- Prior art keywords
- iron
- pipe
- graphite cast
- spheroidal graphite
- dilatory
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C63/00—Lining or sheathing, i.e. applying preformed layers or sheathings of plastics; Apparatus therefor
- B29C63/38—Lining or sheathing, i.e. applying preformed layers or sheathings of plastics; Apparatus therefor by liberation of internal stresses
- B29C63/42—Lining or sheathing, i.e. applying preformed layers or sheathings of plastics; Apparatus therefor by liberation of internal stresses using tubular layers or sheathings
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
- F16L1/036—Laying or reclaiming pipes on land, e.g. above the ground in the ground the pipes being composed of sections of short length
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Mechanical Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The invention discloses a kind of dilatory pipes of spheroidal graphite cast-iron, it is related to no-excavation construction method field, including accepting socket, PE set and steel bushing, protrusion part is provided on the undertaking socket, the dilatory pipe of several spheroidal graphite cast-iron is covered by PE, steel bushing and protrusion split-phase connect, the PE set and steel bushing are socketed on undertaking spigot, the invention also discloses spheroidal graphite cast-iron to draw pipe installation method, main material of the present invention using SIA-Wb interface ductile iron pipe as dilatory pipe, drag pipe construction technique is combined with the excellent properties of ductile iron pipe itself, improve the safe operating life of pipeline, improve the corrosion resistance and mechanical property of dilatory pipe, it is affected by environment small when installation, it can be installed under various circumstances, it is simple and fast, it can save a large amount of artificial, time, space cost.
Description
Technical field
The present invention relates to no-excavation construction method field, the dilatory pipe of specifically a kind of spheroidal graphite cast-iron and its construction method.
Background technique
Because ductile iron pipe has, intensity is big, corrosion resistance is strong, rigidity is similar to the excellent properties such as steel pipe, extensively
It is general to be applied on industrial, civilian waterline.
When ductile iron pipeline carries out non-excavating construction using trombone slide method, length of pipeline is differed from tens meters to hundreds of meters,
It needs to connect into the disposable whole pulling construction of a pipeline progress, therefore pipeline and soil during pulling by tubing one by one
Very big frictional force can be generated between earth, due to being location that is poor for some soil properties, being not easy pore-forming, need to use biggish pulling force
Tubing could be pulled, since ductile iron pipe is connected using bell and spigot frame, pipeline disconnection is easy to appear in heave,
The construction of pipeline engineering may cause and seriously affect.During buried crossing construction, entering for pipeline and is pierced by ground at location
There are the deformations of certain angle for face section, therefore again such that quality problems occur for the pipeline at this.So common ductile iron pipe
Road is difficult with trombone slide method and carries out non-excavating construction.
Summary of the invention
The purpose of the present invention is to provide a kind of dilatory pipe of spheroidal graphite cast-iron and its construction methods, to solve above-mentioned background technique
The problem of middle proposition.
To achieve the above object, the invention provides the following technical scheme:
A kind of dilatory pipe of spheroidal graphite cast-iron, is SIA-Wb interface, further includes accepting socket, PE set and steel bushing, on the undertaking socket
It is provided with protrusion part, the dilatory pipe of several spheroidal graphite cast-iron is connected by PE set, steel bushing and protrusion split-phase, the PE set and steel
It is socketed on undertaking spigot, and is heated.
As a further solution of the present invention: carrying out the tension after socket joint connection using SIA-Wb interface ductile iron pipeline
Power, can satisfy the pulling tension requirements of dilatory pipe, therefore ductile iron pipeline is in non-digging pipe installation, especially with dragging
Trombone slide method promoted and applied in terms of non-excavating construction.
A kind of spheroidal graphite cast-iron drag pipe construction method, the specific steps are as follows:
Step S1, socket joint connection will be carried out by ductile iron pipe two-by-two;
Step S2, socket is accepted in every connection together, and upper pyrocondensation PE set is just covered on interface;
Step S3, PE set is heated with heat sources such as grilled guns, PE set is made to shrink and tightly wrap undertaking socket;Wherein PE covers
Effect are as follows: socket and pipeline external sundries are accepted in isolation, make to accept socket in dragging process, cleaning is kept after dragging,
It not only keeps clean and tidy and is able to extend service life;
Step S4, after the installation for completing PE set, then the protrusion part being provided on external bellmouth is covered to PE with steel bushing and carries out ring packet,
And with iron wire banding, is scratched when dilatory by the particulate matter in hole with preventing PE from covering, improve the service performance of the device;
Step S5, step S1 to step S4 is repeated, then third ball graphite cast iron pipe is held with the ductile iron pipe connected
Connection is inserted, until being all installed.
Spheroidal graphite cast-iron as mentioned draws utilization of pipe during non-excavating construction.
Compared with prior art, the beneficial effects of the present invention are: the present invention uses the ductile iron pipe conduct of SIA-Wb interface
The main material of dilatory pipe, drag pipe construction technique is combined with the excellent properties of ductile iron pipe itself, improves pipeline
Safe operating life, improves the corrosion resistance and mechanical property of dilatory pipe, and when installation is affected by environment small, can be in difference
It is installed under environment, it is simple and fast, a large amount of artificial, time, space cost can be saved.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that two ball graphite cast iron pipes are carried out to socket joint connection in step 1.
Fig. 2 is Step 2: in the structural schematic diagram of the position cladding PE set of socket joint connection in three.
Fig. 3 is to coat the structural schematic diagram of steel bushing in bellmouth prominent position in step 4.
In figure: 1-PE set, 2- steel bushing, 3- protrude part.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Embodiment 1
Fig. 1~3 are please referred to, a kind of dilatory pipe of spheroidal graphite cast-iron further includes accepting socket, PE set 1 and steel bushing using SIA-Wb interface
2, protrusion part 3 is provided on the undertaking socket, the dilatory pipe of several spheroidal graphite cast-iron is by PE set 1, steel bushing 2 and protrudes part 3
It is connected with each other, the PE set 1 and steel bushing 2 are socketed on undertaking spigot, and are heated.
The stretching resistance after socket joint connection is carried out using SIA-Wb interface ductile iron pipeline, can satisfy the pulling force of dilatory pipe
It is required that therefore ductile iron pipeline especially carry out non-excavating construction side with dilatory tube method in non-digging pipe installation
Face is promoted and applied.
Embodiment 2
Please refer to Fig. 1~3, in the embodiment of the present invention, a kind of spheroidal graphite cast-iron drag pipe construction method, the specific steps are as follows:
Step S1, socket joint connection will be carried out by ductile iron pipe two-by-two;
Step S2, socket is accepted in every connection together, and upper pyrocondensation PE set 1 is just covered on interface;
Step S3, PE set 1 is heated with the heat sources such as grilled gun or efficient heat exchanger, PE set 1 is made to shrink and tightly wrap up
Firmly accept socket;The wherein effect of PE set are as follows: socket and pipeline external sundries are accepted in isolation, make to accept socket in dragging process
In, after dragging keep cleaning, not only keep clean and tidy and be able to extend service life;
Step S4, after the installation for completing PE set 1, then the protrusion part 3 being provided on 1 outside bellmouth is covered to PE with steel bushing 2 and is carried out
Ring packet improves the service performance of the device to prevent PE set 1 from being scratched when dilatory by the particulate matter in hole;
Step S5, step S1 to step S4 is repeated, then third ball graphite cast iron pipe is held with the ductile iron pipe connected
Connection is inserted, until being all installed.
Embodiment 3
Spheroidal graphite cast-iron as described in Example 1 draws utilization of pipe during non-excavating construction.
The working principle of the invention is: main material of the present invention using SIA-Wb interface ductile iron pipe as dilatory pipe,
By the way that PE set 1, steel bushing 2 are arranged at birdsmouth and carries out fixing process, to make the device that there is preferable tensile property, use
Service life is long, installs simple and convenient.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims
Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiments being understood that.
Claims (7)
1. a kind of dilatory pipe of spheroidal graphite cast-iron, including accept socket, PE set (1) and steel bushing (2), which is characterized in that described accept is inserted
Protrusion part (3) is provided on mouthful, the dilatory pipe of several spheroidal graphite cast-iron is mutual by PE set (1), steel bushing (2) and protrusion part (3)
Connection, the PE set (1) and steel bushing (2) are socketed on undertaking spigot.
2. a kind of spheroidal graphite cast-iron drag pipe construction method, which is characterized in that specific step is as follows:
Step S1, two ball graphite cast iron pipes are subjected to socket joint connection;
Step S2, socket is accepted in every connection together, and upper pyrocondensation PE set (1) is just covered on interface;
Step S3, PE set (1) is heated with heating equipment;
Step S4, after the installation for completing PE set (1), then with steel bushing (2) to the protrusion part being provided on the external bellmouth of PE set (1)
(3) ring packet is carried out;
Step S5, step S1 to step S4 is repeated, then third ball graphite cast iron pipe is held with the ductile iron pipe connected
Connection is inserted, until being all installed.
3. spheroidal graphite cast-iron drag pipe construction method according to claim 2, which is characterized in that in step S3, heating equipment
For grilled gun.
4. spheroidal graphite cast-iron drag pipe construction method according to claim 2, which is characterized in that in step S3, heating equipment
For efficient heat exchanger.
5. according to any spheroidal graphite cast-iron drag pipe construction method of claim 2-4, which is characterized in that in step S4, ring
Iron wire banding is used after packet.
6. spheroidal graphite cast-iron drag pipe construction method according to claim 1, which is characterized in that spheroidal graphite cast-iron is drawn pipe and used
SIA-Wb interface.
7. spheroidal graphite cast-iron as described in claim 1 draws utilization of pipe during non-excavating construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910432411.0A CN110307396A (en) | 2019-05-23 | 2019-05-23 | A kind of dilatory pipe of spheroidal graphite cast-iron and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910432411.0A CN110307396A (en) | 2019-05-23 | 2019-05-23 | A kind of dilatory pipe of spheroidal graphite cast-iron and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110307396A true CN110307396A (en) | 2019-10-08 |
Family
ID=68074962
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910432411.0A Pending CN110307396A (en) | 2019-05-23 | 2019-05-23 | A kind of dilatory pipe of spheroidal graphite cast-iron and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110307396A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4936707A (en) * | 1984-10-17 | 1990-06-26 | Shishkin Viktor V | Method of laying a pipeline |
CN201066015Y (en) * | 2007-08-03 | 2008-05-28 | 周伟 | Socket hot-melting confining type steel-plastic pipe conversion joint |
CN107035918A (en) * | 2017-06-07 | 2017-08-11 | 天津市源泉市政工程有限公司 | One kind feedwater pipe fitting engineering construction method |
CN108612910A (en) * | 2018-07-23 | 2018-10-02 | 重庆建工市政交通工程有限责任公司 | A kind of construction method of installation T-type ductile iron pipe |
-
2019
- 2019-05-23 CN CN201910432411.0A patent/CN110307396A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4936707A (en) * | 1984-10-17 | 1990-06-26 | Shishkin Viktor V | Method of laying a pipeline |
CN201066015Y (en) * | 2007-08-03 | 2008-05-28 | 周伟 | Socket hot-melting confining type steel-plastic pipe conversion joint |
CN107035918A (en) * | 2017-06-07 | 2017-08-11 | 天津市源泉市政工程有限公司 | One kind feedwater pipe fitting engineering construction method |
CN108612910A (en) * | 2018-07-23 | 2018-10-02 | 重庆建工市政交通工程有限责任公司 | A kind of construction method of installation T-type ductile iron pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110307396A (en) | A kind of dilatory pipe of spheroidal graphite cast-iron and its construction method | |
CN203339638U (en) | Steering device of machine-connecting cable | |
RU187923U9 (en) | PIPE FOR LAYING CABLE LINE WITH PROTECTION OF CABLE SHELL AGAINST MECHANICAL DAMAGE AT END PARTS | |
CN209729587U (en) | A kind of low friction pipeline composite rope | |
KR101228133B1 (en) | Ballcaster type carrier for pulling and laying cable through submarine conduit line | |
CN209516529U (en) | Novel cable protective case | |
CN206804952U (en) | Optical cable and communications cable component | |
CN204424850U (en) | Cable laying RC pipejacking | |
CN201017715Y (en) | Self-supporting data cable | |
CN215071571U (en) | Pipeline installation device for underground works | |
CN104612294A (en) | Inhaul cable with stainless steel tube covered externally and production method thereof | |
CN218883320U (en) | Galvanized steel pipe pipeline structure | |
CN220204951U (en) | Natural gas pipeline with flexible coating | |
CN204628843U (en) | A kind of pipe connecting structure of electric heating melting welding | |
JP2001258115A (en) | Cable removing method and subsidiary tool for cable removal | |
CN212343230U (en) | Cable CPVC protection tube capable of preventing corrosion and moisture | |
CN211201220U (en) | Civil engineering concrete cooling pipeline | |
CN216625214U (en) | Protection subassembly of cable laying | |
CN209329657U (en) | A kind of industrial wastewater discharge construction MPP power pipe | |
CN203099162U (en) | Flexible connector | |
CN206671634U (en) | A kind of fiber optic cables waterproof gland cover | |
CN2509761Y (en) | Mixed cable protection tube apparatus | |
CN204901065U (en) | Steel construction building body and pipeline fixing device thereof | |
CN208915828U (en) | A kind of tubing fixing device for transport | |
CN211951805U (en) | Stainless steel formula heat preservation bellows that prevents frostbite |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191008 |
|
RJ01 | Rejection of invention patent application after publication |