CN110270593A - A kind of installation method interfered when rolling-mill housing being avoided to jack - Google Patents

A kind of installation method interfered when rolling-mill housing being avoided to jack Download PDF

Info

Publication number
CN110270593A
CN110270593A CN201910567824.XA CN201910567824A CN110270593A CN 110270593 A CN110270593 A CN 110270593A CN 201910567824 A CN201910567824 A CN 201910567824A CN 110270593 A CN110270593 A CN 110270593A
Authority
CN
China
Prior art keywords
hoisting frame
jacking
rolling
mill housing
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910567824.XA
Other languages
Chinese (zh)
Other versions
CN110270593B (en
Inventor
齐麟
魏尚起
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mcc Group Shanghai Metallurgical Industry Co ltd
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201910567824.XA priority Critical patent/CN110270593B/en
Publication of CN110270593A publication Critical patent/CN110270593A/en
Application granted granted Critical
Publication of CN110270593B publication Critical patent/CN110270593B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B31/00Rolling stand structures; Mounting, adjusting, or interchanging rolls, roll mountings, or stand frames
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B31/00Rolling stand structures; Mounting, adjusting, or interchanging rolls, roll mountings, or stand frames
    • B21B31/08Interchanging rolls, roll mountings, or stand frames, e.g. using C-hooks; Replacing roll chocks on roll shafts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Leg Units, Guards, And Driving Tracks Of Cranes (AREA)

Abstract

The present invention provides it is a kind of avoid rolling-mill housing from jacking when the installation method interfered, this method: the interference position according to interference to hoisting frame determines that transport to the difference in height between two transport vehicles at hoisting frame both ends, and makes two transport vehicles;It will be lifted to hoisting frame to two transport vehicles, and be supported by the both ends that two transport vehicles treat hoisting mechanism, so as to step down to hoisting frame to interference position;It will be traversing to installation site to hoisting frame by two transport vehicles;Jacking is to hoisting frame.The present invention treats hoisting frame there are the transport vehicle of difference in height by two height and is supported and transports, so as to be obliquely installed to hoisting frame, and then avoid interference with the interference that hoisting frame jacking installation is treated at position, to solve two rolling-mill housing spacing too short the case where leading to not installation, realize the efficient installation of rolling-mill housing under confined condition, reduce jacking number, shortens the lifting time.

Description

A kind of installation method interfered when rolling-mill housing being avoided to jack
Technical field
The present invention relates to metallurgical machinery mounting technique fields, do when avoiding rolling-mill housing from jacking in particular to one kind The installation method related to.
Background technique
In metallurgy steel rolling engineering construction at present, the installation of large-sized rolling mills rack need to rely on hydraulic jacking device under restricted clearance To realize.
Structural schematic diagram referring to Fig. 1, when being lifted for rolling-mill housing in the prior art.As shown, using hydraulic Jacking apparatus 1' is carried out in rolling-mill housing hoisting process, and discovery is because machine frame at two sides spacing is shorter, and installation frame 2' is installed to machine On frame pedestal 4', trolley 3' will be carried out using hydraulic jacking device 1' wait lift after hoisting frame 5' is moved to installation site When the jacking of rack 5', occur to head (right end as shown in Figure 1) meeting of hoisting frame 5' and between installation frame 2' to do It relates to, is unable to complete lifting.
Summary of the invention
In consideration of it, the invention proposes it is a kind of avoid rolling-mill housing from jacking when the installation method interfered, it is intended to solve existing Spacing is small between two rolling-mill housing causes the problem of installation frame interferes the installation to hoisting frame.
The invention proposes it is a kind of avoid rolling-mill housing from jacking when the installation method interfered, this method following steps: vehicle system Make step, according to interference position of the interference to hoisting frame, determine transport two transport vehicles to hoisting frame both ends it Between difference in height, and make described two transport vehicles;Rack shift step is lifted described to hoisting frame to described two fortune On defeated vehicle, and the both ends to hoisting mechanism are supported by described two transport vehicles, so that described to hoisting frame It steps down to the interference position;Vehicle trafficking step, will be described traversing to peace to hoisting frame by described two transport vehicles Holding position;Rack jacks step, and jacking is described to hoisting frame.
Further, the above-mentioned installation method interfered when rolling-mill housing being avoided to jack, in the rack shift step, institute It states and is inclined on described two transport vehicles to hoisting mechanism.
Further, the above-mentioned installation method interfered when rolling-mill housing being avoided to jack, in the rack shift step, institute It states to upward to hoisting mechanism described in the end to the end close to interference position on hoisting frame from the separate interference position It is obliquely installed.
Further, the above-mentioned installation method interfered when rolling-mill housing being avoided to jack leads in rack jacking step It crosses hydraulic jacking device and carries out jacking installation to hoisting frame to described.
Further, the above-mentioned installation method interfered when rolling-mill housing being avoided to jack, it is first in rack jacking step It first passes through revolute the head to hoisting frame is connected on the hydraulic hoist unit, then passes through the hydraulic top Rise the device jacking head to hoisting frame so that while the jacking to hoisting frame around it is described to hoisting frame with The link position of the hydraulic jacking device rotates.
Further, the above-mentioned installation method interfered when rolling-mill housing being avoided to jack, passes through the hydraulic jacking device top It is described first to be separated with the transport vehicle close to the interference position to hoisting frame described in rising when the head of hoisting frame, And the transport vehicle that will be close to the interference position is withdrawn.
The installation method provided by the invention interfered when rolling-mill housing being avoided to jack, by two height, there are differences in height Transport vehicle treats hoisting frame and is supported and transports, so as to be obliquely installed to hoisting frame, and then avoids interference with position and treats The interference of hoisting frame jacking installation especially can avoid the interference that installation frame treats installing mechanism, to solve two Rolling-mill housing spacing is too short to lead to not the case where installing, and realizes the efficient installation of rolling-mill housing under confined condition, reduces Number is jacked, the lifting time is shortened.
Detailed description of the invention
By reading the following detailed description of the preferred embodiment, various other advantages and benefits are common for this field Technical staff will become clear.The drawings are only for the purpose of illustrating a preferred embodiment, and is not considered as to the present invention Limitation.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 is the structural schematic diagram of rolling-mill housing lifting in the prior art;
Fig. 2 is the flow diagram of the installation method provided in an embodiment of the present invention interfered when rolling-mill housing being avoided to jack;
Fig. 3 is the structural schematic diagram provided in an embodiment of the present invention being horizontally set with when on transport vehicle when hoisting frame;
Fig. 4 is the knot after the transport vehicle provided in an embodiment of the present invention jacked after hoisting frame to close interference position is withdrawn Structure schematic diagram.
Specific embodiment
Exemplary embodiments of the present disclosure are described in more detail below with reference to accompanying drawings.Although showing the disclosure in attached drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure It is fully disclosed to those skilled in the art.It should be noted that in the absence of conflict, embodiment in the present invention and Feature in embodiment can be combined with each other.The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
Referring to fig. 2 to Fig. 4, it illustrates it is provided in an embodiment of the present invention avoid rolling-mill housing from jacking when the installation side that interferes The preferred structure of method.As shown, this method comprises the following steps:
Vehicle making step S1, the interference position according to interference to hoisting frame determine two of transport to hoisting frame both ends Difference in height between a transport vehicle, and make two transport vehicles.
Specifically, firstly, confirmation interference especially interferes 21 phase of position to the position at the interference position 21 of hoisting frame 1 For when hoisting frame 1 lift when relative position, i.e., be horizontally set with when hoisting frame 1 in installed position, interference position 21 with To the relative position between hoisting frame 1;Then, confirmation transport is to the height between two transport vehicles 3 at 1 both ends of hoisting frame Difference is carried out by left transport vehicle 31 and right transport vehicle 32 respectively to the both ends of hoisting frame 1 (left and right ends as shown in Figure 3) The tilt angle that support, i.e. confirmation step down to interference position 21 when hoisting frame 1 is located at installation site, and combine wait hang The length of installation frame 1, calculates in the difference in height and transport vehicle 3 between the i.e. left transport vehicle 31 of two transport vehicles 3 and right transport vehicle 32 Minimum altitude, that is, left transport vehicle 31 height so that the both ends to hoisting frame 1 are individually positioned in left transport vehicle 31 and right fortune On defeated vehicle 32, to not interfered between hoisting frame 1 and interference position 21, wherein minimum altitude, that is, left fortune in transport vehicle 3 The height of defeated vehicle 31 can be the height of interference part position 21;Finally, being left transport vehicle 31 and right transport vehicle according to two transport vehicles 3 Minimum altitude, that is, left transport vehicle 31 height in difference in height and transport vehicle 3 between 32, makes two transport vehicles 3.Its In, interference position 21 can on installation frame 2 position or dependency structure, also can treat hoisting machine certainly for other equipment The interference position of frame 1 or dependency structure.
Rack shift step S2 will be lifted to hoisting frame to two transport vehicles, be hung with being treated by two transport vehicles The both ends of mounting mechanism are supported, so as to step down to hoisting frame to interference position.
Specifically, firstly, will be hung to hoisting frame 1 on two transport vehicles 3, i.e., to the left and right ends of hoisting frame 1 point It is not hung on left transport vehicle 31 and right transport vehicle 32, is supported with the both ends for treating hoisting mechanism 1 by two transport vehicles 3. Since there are differences in height between two transport vehicles 2, therefore it is obliquely installed on two transport vehicles 2 to hoisting frame 1;Further preferably Ground, to the end (left end as shown in Figure 3) on hoisting frame 1 from separate interference position 21 extremely close to the end at interference position 21 (right end as shown in Figure 3, the i.e. head to hoisting frame 1) is obliquely installed upwards to hoisting mechanism 1, i.e., from left to right wait lift Rack 1 tilts upwards.
Vehicle trafficking step S3, will be traversing to installation site to hoisting frame by two transport vehicles.
It specifically, is that left transport vehicle 31 and right transport vehicle 32 will be transported to hoisting mechanism 1 to installation by two transport vehicles 3 Position.Due to being tilted upwards to hoisting frame 1 from left to right, that is to say, that the height of left transport vehicle 31 is lower than right transport vehicle 32 Height so that when hoisting frame 1 is located at installation site, the head to hoisting frame 1 is higher than interference position 21, avoids The interference of the jacking installation of hoisting frame 1 is treated at interference position 21, especially, be can avoid installation frame 2 and is treated installing mechanism 1 Interference, moreover, being higher than interference position 21 also when the head of hoisting frame 1 can avoid waiting hanging when the jacking of the head of hoisting frame 1 Interference between the head and interference position 21 of installation frame 1, to solve, two rolling-mill housing spacing are too short to be led to not install The case where, the efficient installation of rolling-mill housing under confined condition is realized, jacking number is reduced, shortens the lifting time, it can be into one Step expands the scope of application of hydraulic jacking device.
Rack jacks step S4, jacks to hoisting frame.
Specifically, the jacking for realization to hoisting frame 1, it is preferable that hoisting frame can be treated by hydraulic jacking device 4 1 carries out jacking installation;Firstly, by revolute hydraulic will be connected to the head of hoisting frame 1 (right part as shown in Figure 3) It rises on device 4;Then, the head to hoisting frame 1 is jacked by hydraulic jacking device 4, so as to jack to hoisting frame 1 same When rotated around the link position to hoisting frame 1 and hydraulic jacking device 4 so that waiting for hoisting machine while 1 raising of rolling-mill housing Frame 1 rotates counterclockwise therewith, until being in upright state to hoisting frame 1, wherein due to the head connection to hoisting frame 1 On hydraulic jacking device 4, and to the close interference position 21 in the head of hoisting frame 1, therefore will be first and by near-end to hoisting frame 1 The transport vehicle 3 of position separates, i.e., can the first fortune with close to interference position 21 to hoisting frame 1 during jacking to hoisting frame 1 Defeated vehicle 3 is that right transport vehicle 32 separates, and the transport vehicle 3 that can first will be close to interference position 21 is withdrawn, i.e., to hoisting frame 1 and right fortune Defeated vehicle 32 can first withdraw right transport vehicle 32 after separating;Finally, continuing through the jacking of hydraulic jacking device 4 to hoisting frame 1 Head, so that being separated between hydraulic jacking device 4 and left transport vehicle 31.
To sum up, the installation method provided in this embodiment interfered when rolling-mill housing being avoided to jack passes through two height and exists The transport vehicle 3 of difference in height treats hoisting frame 1 and is supported and transports, so as to be obliquely installed to hoisting frame 1, and then avoids doing The interference that the jacking installation of hoisting frame 1 is treated at position 21 is related to, especially, installation frame 2 is can avoid and treats the dry of installing mechanism 1 It relates to, to solve two rolling-mill housing spacing too short the case where leading to not installation, realizes rolling-mill housing under confined condition Efficiently installation reduces jacking number, shortens the lifting time.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to include these modifications and variations.

Claims (6)

1. a kind of installation method interfered when rolling-mill housing being avoided to jack, which comprises the steps of:
Vehicle making step, the interference position according to interference to hoisting frame determine transport two to hoisting frame both ends Difference in height between transport vehicle, and make described two transport vehicles;
Rack shift step is lifted described to hoisting frame to described two transport vehicles, and passes through described two transport vehicles The both ends to hoisting mechanism are supported, so that described step down to the interference position to hoisting frame;
Vehicle trafficking step, will be described traversing to installation site to hoisting frame by described two transport vehicles;
Rack jacks step, and jacking is described to hoisting frame.
2. the installation method according to claim 1 interfered when rolling-mill housing being avoided to jack, which is characterized in that
It is described to be inclined on described two transport vehicles to hoisting mechanism in the rack shift step.
3. the installation method according to claim 2 interfered when rolling-mill housing being avoided to jack, which is characterized in that
In the rack shift step, the end on hoisting frame from the separate interference position is to close to interference part It is obliquely installed upwards described in the end of position to hoisting mechanism.
4. the installation method according to any one of claims 1 to 3 interfered when rolling-mill housing being avoided to jack, feature exist In,
In rack jacking step, jacking installation is carried out to hoisting frame to described by hydraulic jacking device.
5. the installation method according to claim 4 interfered when rolling-mill housing being avoided to jack, which is characterized in that
In rack jacking step, the head to hoisting frame is connected to described hydraulic by revolute first It rises on device, then by the hydraulic jacking device jacking head to hoisting frame, so that described to hoisting frame It is rotated around described to the link position of hoisting frame and the hydraulic jacking device while jacking.
6. the installation method according to claim 5 interfered when rolling-mill housing being avoided to jack, which is characterized in that
It is described when the head of hoisting frame by hydraulic jacking device jacking, it is described first and close described to hoisting frame Interfere the transport vehicle separation at position, and the transport vehicle that will be close to the interference position is withdrawn.
CN201910567824.XA 2019-06-27 2019-06-27 Installation method for avoiding interference during lifting of rolling mill frame Active CN110270593B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910567824.XA CN110270593B (en) 2019-06-27 2019-06-27 Installation method for avoiding interference during lifting of rolling mill frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910567824.XA CN110270593B (en) 2019-06-27 2019-06-27 Installation method for avoiding interference during lifting of rolling mill frame

Publications (2)

Publication Number Publication Date
CN110270593A true CN110270593A (en) 2019-09-24
CN110270593B CN110270593B (en) 2021-04-16

Family

ID=67963568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910567824.XA Active CN110270593B (en) 2019-06-27 2019-06-27 Installation method for avoiding interference during lifting of rolling mill frame

Country Status (1)

Country Link
CN (1) CN110270593B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11123409A (en) * 1997-10-15 1999-05-11 Sumitomo Metal Ind Ltd Device for changing mill stand and changing method therefor
CN102756975A (en) * 2012-07-20 2012-10-31 天津二十冶建设有限公司 Method for hoisting rolling mill housing
CN103203364A (en) * 2012-01-12 2013-07-17 中国有色金属工业第六冶金建设有限公司 Rolling mill equipment installing method
CN203473809U (en) * 2013-08-27 2014-03-12 中国二十冶集团有限公司 Slip type frame inclined transportation device for rolling mill
CN104512844A (en) * 2013-09-27 2015-04-15 中国二十冶集团有限公司 Transverse sliding and vertical hydraulic jacking lifting method for super-huge type mill housing frame
CN104555831A (en) * 2013-10-16 2015-04-29 中国二十冶集团有限公司 Reserved hoisting method for base of large rolling mill stand
CN105293322A (en) * 2015-11-17 2016-02-03 中国三冶集团有限公司 Lifting method of rolling mill housings

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11123409A (en) * 1997-10-15 1999-05-11 Sumitomo Metal Ind Ltd Device for changing mill stand and changing method therefor
CN103203364A (en) * 2012-01-12 2013-07-17 中国有色金属工业第六冶金建设有限公司 Rolling mill equipment installing method
CN102756975A (en) * 2012-07-20 2012-10-31 天津二十冶建设有限公司 Method for hoisting rolling mill housing
CN203473809U (en) * 2013-08-27 2014-03-12 中国二十冶集团有限公司 Slip type frame inclined transportation device for rolling mill
CN104512844A (en) * 2013-09-27 2015-04-15 中国二十冶集团有限公司 Transverse sliding and vertical hydraulic jacking lifting method for super-huge type mill housing frame
CN104555831A (en) * 2013-10-16 2015-04-29 中国二十冶集团有限公司 Reserved hoisting method for base of large rolling mill stand
CN105293322A (en) * 2015-11-17 2016-02-03 中国三冶集团有限公司 Lifting method of rolling mill housings

Also Published As

Publication number Publication date
CN110270593B (en) 2021-04-16

Similar Documents

Publication Publication Date Title
KR20120095848A (en) Carrier transfer facilitating device
CN109153539B (en) Elevator traction machine installation method
JP6012578B2 (en) Heavy material transport method and heavy material transport device
WO2015194264A1 (en) Carrier buffering device and buffering method
WO2016152770A1 (en) Boom attach/detach device of crane and boom attach/detach method for crane
CN105800417B (en) Elevator weight sensor moves out the method for moving in
CN105800418B (en) Elevator weight sensor, which moves out, moves in device
CN110270593A (en) A kind of installation method interfered when rolling-mill housing being avoided to jack
CN102303822A (en) Balance weight loading and unloading mechanism for crane as well as crane and loading and unloading method for balance weight
CN105129271A (en) Automatic disassembling device for container rotating lock, system comprising same and disassembling method
CN105358400B (en) For replacing the device of roller group
JP3053547B2 (en) How to install heavy objects in the PCV
CN101948080B (en) Method for reducing tail height of equipment
JP6379122B2 (en) Lifting column and lifting device
CN103508319B (en) The bracing or strutting arrangement that uses and lift the method for one end of large-scale workpiece during upset large-scale workpiece
JPH11199908A (en) Device for dissembling/assembling blast furnace
JP4508073B2 (en) Method and system for transporting and loading heavy objects
CN201834681U (en) Turnover mechanism for reducing tail slip height of equipment
JP2016175754A (en) Crane boom attachment/detachment device and crane boom attachment/detachment method
JP5490814B2 (en) Cart and method for conveying a drive spindle for a roll of a rolling stand
JP4085293B2 (en) Blast furnace assembly / disassembly apparatus and assembly / disassembly method
JP2008088454A (en) Hoisting system for bar-member to be heat-treated
JP5713096B2 (en) Carrier transfer promotion device
JPH0748947A (en) Mechanical type parking device with intermediate driving-in section
KR100864443B1 (en) Apparatus for separating hoop coil in coil car

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230526

Address after: 200949 Room 2802, No. 3999 Yunchuan Road, Baoshan District, Shanghai

Patentee after: MCC Group (Shanghai) Metallurgical Industry Co.,Ltd.

Patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Address before: 201900 No. 777 Pangu Road, Shanghai, Baoshan District

Patentee before: CHINA MCC20 GROUP Corp.,Ltd.

TR01 Transfer of patent right