CN117027707B - Hydrologic geological investigation Kong Chongshui plugging device - Google Patents
Hydrologic geological investigation Kong Chongshui plugging device Download PDFInfo
- Publication number
- CN117027707B CN117027707B CN202311287899.5A CN202311287899A CN117027707B CN 117027707 B CN117027707 B CN 117027707B CN 202311287899 A CN202311287899 A CN 202311287899A CN 117027707 B CN117027707 B CN 117027707B
- Authority
- CN
- China
- Prior art keywords
- side wall
- outer side
- fixedly connected
- sliding sleeve
- plugging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000011835 investigation Methods 0.000 title description 5
- 238000004873 anchoring Methods 0.000 claims abstract description 27
- 238000005070 sampling Methods 0.000 abstract description 33
- 230000000694 effects Effects 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 8
- 238000007789 sealing Methods 0.000 description 7
- 238000010276 construction Methods 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007123 defense Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 229910052500 inorganic mineral Inorganic materials 0.000 description 1
- 239000003041 laboratory chemical Substances 0.000 description 1
- 239000011707 mineral Substances 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- -1 stratum structures Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A90/00—Technologies having an indirect contribution to adaptation to climate change
- Y02A90/30—Assessment of water resources
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The invention provides a hydrological geological survey Kong Chongshui plugging device, which belongs to the technical field of geological survey and comprises a plugging assembly and an anchoring assembly, wherein the plugging assembly comprises a fixed column, a thread groove, a rubber plugging ring, six limiting grooves, a spring, a sliding sleeve, six limiting sliding blocks, a mounting disc and a mounting hole; the mounting hole is formed in the center of the upper surface of the mounting disc, and the inner side wall of the rubber plugging ring is fixedly connected with the outer side wall of the sliding sleeve. According to the invention, the rubber plugging ring is inserted into the sampling hole, then the mounting plate is pushed downwards through the treading assembly, the sliding sleeve slides in the limiting groove through the limiting sliding block under the pushing of the mounting plate, the sliding sleeve extrudes the spring, and then the rubber plugging ring is tightly attached to the sampling hole under the pushing of the spring, so that the sampling hole can be plugged through the rubber plugging ring, the situation that the sampling hole collapses is avoided, and the plugging effect on the sampling hole is improved.
Description
Technical Field
The invention relates to a plugging device, in particular to a Kong Chongshui plugging device for hydrogeological investigation, and belongs to the technical field of geological investigation.
Background
Geological survey is an acronym for geological survey work. Broadly, the method can be generally understood as synonyms of geological work, and is characterized by carrying out different investigation and research works on the geological conditions of rocks, stratum structures, minerals, groundwater, landforms and the like in a certain area according to the requirements of economic construction, national defense construction and scientific and technological development. There are different geological survey works, depending on the purpose. In the geological exploration process, staff needs to set up the hole on the ground and take a sample to judge the deep geological structure of this place region, and after the sample was taken to laboratory chemical examination, geological exploration sample hole just can directly expose in the external environment, and when the position that the exploration hole was seted up was nearer to underground waterway, underground river water just oozes into the hole and gushes out from the open end of exploration hole easily, this will produce adverse effect to the ecological environment around.
At present, when the geological exploration sampling hole is plugged, the upper soil on the ground is often adopted to backfill the sampling hole, when a worker needs to explore the address again, the hole needs to be drilled again, time and labor are wasted, the soil layer on the ground can be broken, when the worker uses a hard object to plug the sampling hole, the complete sealing of the sampling hole cannot be realized, under the pressure of a heavy object, the situation that the sampling hole collapses easily occurs, and when the worker uses a sealing cover to plug the sampling hole, although the situation that the sampling Kong Shouli collapses can be avoided, the situation that the sealing effect is poor and the sealing device easily falls off from the sampling hole still exists is proposed, and therefore, the hydrological exploration Kong Chongshui sealing device.
Disclosure of Invention
In view of the foregoing, the present invention provides a device for hydrogeological survey Kong Chongshui, which solves or alleviates the technical problems of the prior art, and at least provides a beneficial choice.
The technical scheme of the embodiment of the invention is realized as follows: the utility model provides a hydrogeology reconnaissance Kong Chongshui plugging device, includes shutoff subassembly and anchor assembly, the shutoff subassembly includes fixed column, thread groove, rubber shutoff ring, six spacing grooves, spring, slip cap, six spacing sliders, mounting disc and mounting hole;
the mounting hole is formed in the center of the upper surface of the mounting disc, the inner side wall of the rubber plugging ring is fixedly connected to the outer side wall of the sliding sleeve, six limit sliding blocks are symmetrically and fixedly connected to the inner side wall of the sliding sleeve, six limit grooves are symmetrically formed in the outer side wall of the fixed column, the spring is sleeved on the outer side wall of the fixed column, and the thread grooves are formed in the fixed column;
the anchoring assembly comprises four anchoring seats, two connecting seats, an anchoring cone, a tension spring, a conical lifting seat, a threaded rod and a rotating disc;
the two connecting seats are symmetrically and fixedly connected to adjacent surfaces of the two adjacent anchoring seats, the anchoring cone is fixedly connected to the outer side wall of the anchoring seat, two ends of the tension spring are symmetrically and fixedly connected to the adjacent surfaces of the two adjacent connecting seats, the conical lifting seat is rotationally connected to the bottom end of the threaded rod, and the rotating disc is fixedly connected to the top end of the threaded rod.
Further preferably, the top ends of the four anchor seats are symmetrically and rotatably connected to the bottom of the outer side wall of the fixed column, the outer side wall of the threaded rod is in threaded connection with the inner side wall of the threaded groove, and the rotating disc is located above the fixed column.
Further preferably, the conical lifting seat is located in the four anchoring seats, the outer side wall of the conical lifting seat is attached to the adjacent surfaces of the four anchoring seats, and the conical lifting seat is located below the fixing column.
Further preferably, the top of the outer side wall of the fixing column is fixedly connected to the inner side wall of the mounting hole, and the sliding sleeve is located below the mounting plate.
Further preferably, the outer side wall of the limit slider is slidably connected to the outer side wall of the limit groove, the inner side wall of the sliding sleeve is slidably connected to the outer side wall of the fixed column, the top end of the spring is fixedly connected to the lower surface of the mounting disc, and the bottom end of the spring is fixedly connected to the upper surface of the sliding sleeve.
Further preferably, the outer side wall of the rubber plugging ring is arc-shaped, and the section of the anchoring seat is right trapezoid.
Further preferably, the upper surface of the mounting plate is provided with a treading assembly, and the treading assembly comprises two pedals, a limiting cone, three jacks, two grooves, three inserted posts, threaded holes and limiting bolts;
two the recess symmetry is seted up in the upper surface both sides of mounting disc, three the bottom symmetry fixed connection of spliced pole is in the interior diapire of recess, the anti-skidding line has evenly been seted up to the upper surface of running-board.
Further preferably, the three jacks are symmetrically arranged on the upper surface of the pedal, the threaded holes are arranged in the center of the upper surface of the inserted column, and the limiting cones are fixedly connected to the lower surface of the pedal at equal intervals.
Further preferably, the lower surfaces of the two pedals are symmetrically attached to the inner bottom walls of the two grooves, and the outer side walls of the inserting posts are slidably connected to the inner side walls of the inserting holes.
Further preferably, the outer side wall of the limit bolt is in threaded connection with the inner side wall of the threaded hole, and the limit bolt is attached to the upper surface of the pedal.
By adopting the technical scheme, the embodiment of the invention has the following advantages:
1. according to the invention, the rubber plugging ring is inserted into the sampling hole, then the mounting plate is pushed downwards through the treading assembly, the sliding sleeve slides in the limiting groove through the limiting sliding block under the pushing of the mounting plate, the sliding sleeve extrudes the spring, and then the rubber plugging ring is tightly attached to the sampling hole under the pushing of the spring, so that the sampling hole can be plugged through the rubber plugging ring, the situation that the sampling hole collapses is avoided, and the plugging effect on the sampling hole is improved.
2. According to the invention, the rotating disc is rotated clockwise, the threaded rod is driven by the rotating disc to move downwards along the threaded groove, the conical lifting seat is pushed by the threaded rod, and the four anchoring seats are pushed by the conical lifting seat, so that the anchoring seats are far away from each other and close to the inner wall of the sampling hole, the anchoring seats are contacted with the inner wall of the sampling hole through the anchoring cone, the positions of the fixing column and the mounting disc can be limited through the anchoring cone and the anchoring seats, the positions of the rubber plugging ring can be limited through the mounting disc, the rubber plugging ring can be tightly attached to the sampling hole, and the situation that the plugging device falls off from the sampling hole is avoided.
The foregoing summary is for the purpose of the specification only and is not intended to be limiting in any way. In addition to the illustrative aspects, embodiments, and features described above, further aspects, embodiments, and features of the present invention will become apparent by reference to the drawings and the following detailed description.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described below, it being obvious that the drawings in the following description are only some embodiments of the present application, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a block diagram of the present invention;
FIG. 2 is a block diagram of the present invention;
FIG. 3 is a schematic diagram showing the connection of the sliding sleeve and the limiting slide block;
FIG. 4 is a diagram of a fixed column structure of the present invention;
FIG. 5 is a block diagram of an anchor assembly of the present invention;
FIG. 6 is a diagram of a mounting plate configuration of the present invention;
FIG. 7 is a block diagram of a foot pedal of the present invention;
figure 8 is a block diagram of an anchor according to the present invention.
Reference numerals: 101. a plugging assembly; 11. fixing the column; 12. a thread groove; 13. a rubber plugging ring; 14. a limit groove; 15. a spring; 16. a sliding sleeve; 17. a limit sliding block; 19. a mounting plate; 20. a mounting hole; 301. an anchor assembly; 31. an anchor mount; 32. a connecting seat; 33. an anchoring cone; 34. a tension spring; 35. a conical lifting seat; 36. a threaded rod; 37. a rotating disc; 401. a tread assembly; 41. a foot pedal; 42. a limiting cone; 43. a jack; 44. a groove; 45. inserting a column; 46. a threaded hole; 47. a limit bolt; 48. anti-skid lines.
Detailed Description
Hereinafter, only certain exemplary embodiments are briefly described. As will be recognized by those of skill in the pertinent art, the described embodiments may be modified in various different ways without departing from the spirit or scope of the present invention. Accordingly, the drawings and description are to be regarded as illustrative in nature and not as restrictive.
Embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
As shown in fig. 1-8, an embodiment of the present invention provides a hydrogeological survey Kong Chongshui plugging device, which comprises a plugging assembly 101 and an anchoring assembly 301, wherein the plugging assembly 101 comprises a fixed column 11, a thread groove 12, a rubber plugging ring 13, six limit grooves 14, a spring 15, a sliding sleeve 16, six limit sliding blocks 17, a mounting disc 19 and a mounting hole 20;
the mounting hole 20 is formed in the center of the upper surface of the mounting disc 19, the inner side wall of the rubber plugging ring 13 is fixedly connected to the outer side wall of the sliding sleeve 16, the six limit sliding blocks 17 are symmetrically and fixedly connected to the inner side wall of the sliding sleeve 16, the six limit grooves 14 are symmetrically formed in the outer side wall of the fixed column 11, the spring 15 is sleeved on the outer side wall of the fixed column 11, and the thread groove 12 is formed in the fixed column 11;
the anchor assembly 301 comprises four anchor seats 31, two connecting seats 32, an anchor cone 33, a tension spring 34, a conical lifting seat 35, a threaded rod 36 and a rotating disc 37;
the two connecting seats 32 are symmetrically and fixedly connected to adjacent surfaces of the two adjacent anchor seats 31, the anchor cone 33 is fixedly connected to the outer side wall of the anchor seat 31, two ends of the tension spring 34 are symmetrically and fixedly connected to adjacent surfaces of the two adjacent connecting seats 32, the conical lifting seat 35 is rotatably connected to the bottom end of the threaded rod 36, and the rotating disc 37 is fixedly connected to the top end of the threaded rod 36.
In one embodiment, the top ends of the four anchor seats 31 are symmetrically and rotatably connected to the bottom of the outer side wall of the fixed column 11, the outer side wall of the threaded rod 36 is in threaded connection with the inner side wall of the threaded groove 12, the rotating disc 37 is located above the fixed column 11, the conical lifting seat 35 is located inside the four anchor seats 31, the outer side wall of the conical lifting seat 35 is attached to the adjacent surfaces of the four anchor seats 31, the conical lifting seat 35 is located below the fixed column 11, the outer side wall of the rubber plugging ring 13 is arc-shaped, the section of the anchor seats 31 is right trapezoid, and when the threaded rod 36 is rotated clockwise, the threaded rod 36 moves downwards along the threaded groove 12 and pushes the conical lifting seat 35 to move downwards, the conical lifting seat 35 pushes the four anchor seats 31 to be away from each other, the anchor cone 33 is driven by the conical lifting seat 31, and the anchor seats 31 can be anchored on the inner wall of the sampling hole through the anchor cone 33.
In one embodiment, the top of the outer side wall of the fixed column 11 is fixedly connected to the inner side wall of the mounting hole 20, the sliding sleeve 16 is located below the mounting disc 19, the outer side wall of the limiting slider 17 is slidably connected to the outer side wall of the limiting groove 14, the inner side wall of the sliding sleeve 16 is slidably connected to the outer side wall of the fixed column 11, the top end of the spring 15 is fixedly connected to the lower surface of the mounting disc 19, the bottom end of the spring 15 is fixedly connected to the upper surface of the sliding sleeve 16, when the mounting disc 19 moves downwards, the mounting disc 19 pushes the sliding sleeve 16 to move downwards through the spring 15, the sliding sleeve 16 drives the rubber sealing ring 13, and then the rubber sealing ring 13 can be tightly attached to the top of the inner wall of the sampling hole under the pushing of the spring 15.
In one embodiment, the upper surface of the mounting plate 19 is provided with a treading assembly 401, and the treading assembly 401 comprises two pedals 41, a limiting cone 42, three jacks 43, two grooves 44, three studs 45, threaded holes 46 and limiting bolts 47;
two recesses 44 symmetry are seted up in the upper surface both sides of mounting disc 19, the bottom symmetry fixed connection of three spliced pole 45 is in the interior bottom wall of recess 44, anti-skidding line 48 has evenly been seted up to the upper surface of running-board 41, three jack 43 symmetry is seted up in the upper surface of running-board 41, screw hole 46 is seted up in the upper surface center of spliced pole 45, spacing awl 42 equidistance fixed connection is in the lower surface of running-board 41, through the cooperation of spliced pole 45 and jack 43, can conveniently fix a position running-board 41, through setting up anti-skidding line 48, the security when can improving the use.
In one embodiment, the lower surfaces of the two pedals 41 are symmetrically attached to the inner bottom walls of the two grooves 44, the outer side walls of the inserting posts 45 are slidably connected to the inner side walls of the inserting holes 43, the outer side walls of the limiting bolts 47 are in threaded connection with the inner side walls of the threaded holes 46, the limiting bolts 47 are attached to the upper surfaces of the pedals 41, the mounting of the pedal assembly 401 is facilitated, the mounting plate 19 is conveniently pressed, and the pedal assembly 401 is detachably designed, so that the plugging device is conveniently integrally carried.
The invention works when in work: firstly, two pedals 41 are installed, a plunger 45 is aligned with an insertion hole 43, then the pedals 41 are placed into a groove 44, at the moment, the positions of the pedals 41 can be limited through the matching of the plunger 45 and the insertion hole 43, a limit bolt 47 is inserted into a threaded hole 46 and screwed down, the positions of the pedals 41 can be limited again through the limit bolt 47, further the pedals 41 are installed, an anchor seat 31 is inserted into a sampling hole, the outer side wall of a rubber plugging ring 13 is attached to the top of the inner side wall of the sampling hole, a mounting disc 19 is placed on the ground, two pedals 41 are trampled by two feet, at the moment, the mounting disc 19 moves downwards, the rubber plugging ring 13 is tightly contacted with the top of the outer wall of the sampling hole, a sliding sleeve 16 slides in a limiting groove 14 through a limit sliding block 17 under the pushing of the mounting disc 19 and the reverse pushing of the outer wall of the sampling hole, the sliding sleeve 16 presses the spring 15, so that the rubber plugging ring 13 is tightly attached to the sampling hole under the pushing of the spring 15, then the rotating disc 37 is rotated clockwise, the rotating disc 37 drives the threaded rod 36 to rotate, the threaded rod 36 moves downwards along the threaded groove 12, the threaded rod 36 pushes the conical lifting seat 35 to move downwards when moving downwards, the conical lifting seat 35 pushes the four anchor seats 31 to further enable the four anchor seats 31 to be far away from each other and close to the inner wall of the sampling hole, the anchor cone 33 can be anchored in the inner wall of the sampling hole along with the downward movement of the conical lifting seat 35, then the position of the fixed column 11 can be limited through the anchor cone 33 and the anchor seats 31, after the position of the fixed column 11 is fixed, the position of the mounting disc 19 is fixed, and then the rubber plugging ring 13 can be tightly attached to the inner wall of the sampling hole, so as to realize the plugging of the sampling hole.
The foregoing is merely illustrative of the present invention, and the present invention is not limited thereto, and any person skilled in the art will readily recognize that various changes and substitutions are possible within the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
Claims (6)
1. A hydrogeological survey Kong Chongshui plugging device, comprising a plugging assembly (101) and an anchor assembly (301), characterized in that: the plugging assembly (101) comprises a fixed column (11), a thread groove (12), a rubber plugging ring (13), six limiting grooves (14), a spring (15), a sliding sleeve (16), six limiting sliding blocks (17), a mounting disc (19) and a mounting hole (20);
the mounting hole (20) is formed in the center of the upper surface of the mounting disc (19), the inner side wall of the rubber plugging ring (13) is fixedly connected to the outer side wall of the sliding sleeve (16), six limit sliding blocks (17) are symmetrically and fixedly connected to the inner side wall of the sliding sleeve (16), six limit grooves (14) are symmetrically formed in the outer side wall of the fixing column (11), the spring (15) is sleeved on the outer side wall of the fixing column (11), and the thread groove (12) is formed in the fixing column (11);
the anchoring assembly (301) comprises four anchoring seats (31), two connecting seats (32), an anchoring cone (33), a tension spring (34), a conical lifting seat (35), a threaded rod (36) and a rotating disc (37);
the two connecting seats (32) are symmetrically and fixedly connected to adjacent surfaces of the two adjacent anchoring seats (31), the anchoring cone (33) is fixedly connected to the inner side wall of the threaded groove (12), the two ends of the tension spring (34) are symmetrically and fixedly connected to adjacent surfaces of the two adjacent connecting seats (32), the conical lifting seat (35) is rotationally connected to the bottom end of the threaded rod (36), the rotating disc (37) is fixedly connected to the top end of the threaded rod (36), the top ends of the four anchoring seats (31) are symmetrically and rotationally connected to the bottom of the outer side wall of the fixed column (11), the outer side wall of the threaded rod (36) is in threaded connection with the inner side wall of the threaded groove (12), the rotating disc (37) is positioned above the fixed column (11), the outer side wall of the conical lifting seat (35) is positioned inside the four anchoring seats (31), the outer side wall of the conical lifting seat (35) is attached to the adjacent surfaces of the four anchoring seats (31), the conical lifting seat (35) is positioned below the fixed column (11), the outer side wall of the sliding sleeve (16) is positioned on the inner side wall of the sliding sleeve (16) and is positioned on the inner side wall of the sliding sleeve (16), the top of the spring (15) is fixedly connected to the lower surface of the mounting disc (19), and the bottom of the spring (15) is fixedly connected to the upper surface of the sliding sleeve (16).
2. The hydrogeological survey Kong Chongshui plugging device of claim 1, wherein: the outer side wall of the rubber plugging ring (13) is arc-shaped, and the section of the anchoring seat (31) is right trapezoid.
3. The hydrogeological survey Kong Chongshui plugging device of claim 1, wherein: the upper surface of the mounting disc (19) is provided with a treading assembly (401), and the treading assembly (401) comprises two pedals (41), a limiting cone (42), three jacks (43), two grooves (44), three inserting columns (45), threaded holes (46) and limiting bolts (47);
two grooves (44) are symmetrically arranged on two sides of the upper surface of the mounting plate (19), the bottom ends of three inserting posts (45) are symmetrically and fixedly connected to the inner bottom wall of the groove (44), and anti-slip patterns (48) are uniformly arranged on the upper surface of the pedal plate (41).
4. A hydrogeological survey Kong Chongshui plugging device according to claim 3 and wherein: the three jacks (43) are symmetrically arranged on the upper surface of the pedal plate (41), the threaded holes (46) are arranged in the center of the upper surface of the inserting column (45), and the limiting cones (42) are fixedly connected to the lower surface of the pedal plate (41) at equal intervals.
5. The hydrogeological survey Kong Chongshui plugging device of claim 4, wherein: the lower surfaces of the two foot pedals (41) are symmetrically attached to the inner bottom walls of the two grooves (44), and the outer side walls of the inserting columns (45) are connected to the inner side walls of the inserting holes (43) in a sliding mode.
6. A hydrogeological survey Kong Chongshui plugging device according to claim 3 and wherein: the outer side wall of the limit bolt (47) is in threaded connection with the inner side wall of the threaded hole (46), and the limit bolt (47) is attached to the upper surface of the pedal plate (41).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202311287899.5A CN117027707B (en) | 2023-10-08 | 2023-10-08 | Hydrologic geological investigation Kong Chongshui plugging device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202311287899.5A CN117027707B (en) | 2023-10-08 | 2023-10-08 | Hydrologic geological investigation Kong Chongshui plugging device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN117027707A CN117027707A (en) | 2023-11-10 |
CN117027707B true CN117027707B (en) | 2024-01-09 |
Family
ID=88635826
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202311287899.5A Active CN117027707B (en) | 2023-10-08 | 2023-10-08 | Hydrologic geological investigation Kong Chongshui plugging device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN117027707B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN118327503B (en) * | 2024-06-14 | 2024-09-20 | 山东省地质矿产勘查开发局第七地质大队(山东省第七地质矿产勘查院) | Hydrologic geological investigation Kong Chongshui plugging device |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0839964A2 (en) * | 1996-11-04 | 1998-05-06 | Eijkelkamp Agrisearch Equipment B.V. | Well cover |
CN210509101U (en) * | 2019-03-14 | 2020-05-12 | 徐伟 | Cement potting expansion type water stopper for geological drilling well |
CN210858635U (en) * | 2019-10-28 | 2020-06-26 | 天津东拓油田技术服务有限公司 | Over-clamping distance steel wire operation slip plug |
CN211898470U (en) * | 2020-01-22 | 2020-11-10 | 庄守云 | Municipal administration foundation ditch drilling plugging device that gushes water |
CN212272107U (en) * | 2020-01-15 | 2021-01-01 | 安庆市磐石岩土有限公司 | Pressure-stopping water plug for hydrogeological exploration |
CN213574007U (en) * | 2020-09-14 | 2021-06-29 | 大庆市光苒石油科技开发有限公司 | Bridge plug with anchoring structure |
CN214576857U (en) * | 2021-01-06 | 2021-11-02 | 王磊 | Plugging device that oil field oil testing was used |
CN215927315U (en) * | 2021-09-14 | 2022-03-01 | 中石化石油工程技术服务有限公司 | Plugging device in oil well |
CN114482106A (en) * | 2022-02-10 | 2022-05-13 | 山东省地质矿产勘查开发局第一地质大队(山东省第一地质矿产勘查院) | Water gushing plugging device for basic geological exploration hole |
CN216841543U (en) * | 2022-02-19 | 2022-06-28 | 温州工程勘察院有限公司 | Hole sealing device for investigation drilling in limestone area |
CN217354321U (en) * | 2022-05-10 | 2022-09-02 | 湖北道泽勘测设计院有限公司 | Hole sealing plug for drilling |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB0023032D0 (en) * | 2000-09-20 | 2000-11-01 | Weatherford Lamb | Downhole apparatus |
US20160194932A1 (en) * | 2015-01-06 | 2016-07-07 | Shuhao Liu | Rubber Sleeve Protection Ring and Downhole Plugging Apparatus |
-
2023
- 2023-10-08 CN CN202311287899.5A patent/CN117027707B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0839964A2 (en) * | 1996-11-04 | 1998-05-06 | Eijkelkamp Agrisearch Equipment B.V. | Well cover |
CN210509101U (en) * | 2019-03-14 | 2020-05-12 | 徐伟 | Cement potting expansion type water stopper for geological drilling well |
CN210858635U (en) * | 2019-10-28 | 2020-06-26 | 天津东拓油田技术服务有限公司 | Over-clamping distance steel wire operation slip plug |
CN212272107U (en) * | 2020-01-15 | 2021-01-01 | 安庆市磐石岩土有限公司 | Pressure-stopping water plug for hydrogeological exploration |
CN211898470U (en) * | 2020-01-22 | 2020-11-10 | 庄守云 | Municipal administration foundation ditch drilling plugging device that gushes water |
CN213574007U (en) * | 2020-09-14 | 2021-06-29 | 大庆市光苒石油科技开发有限公司 | Bridge plug with anchoring structure |
CN214576857U (en) * | 2021-01-06 | 2021-11-02 | 王磊 | Plugging device that oil field oil testing was used |
CN215927315U (en) * | 2021-09-14 | 2022-03-01 | 中石化石油工程技术服务有限公司 | Plugging device in oil well |
CN114482106A (en) * | 2022-02-10 | 2022-05-13 | 山东省地质矿产勘查开发局第一地质大队(山东省第一地质矿产勘查院) | Water gushing plugging device for basic geological exploration hole |
CN216841543U (en) * | 2022-02-19 | 2022-06-28 | 温州工程勘察院有限公司 | Hole sealing device for investigation drilling in limestone area |
CN217354321U (en) * | 2022-05-10 | 2022-09-02 | 湖北道泽勘测设计院有限公司 | Hole sealing plug for drilling |
Also Published As
Publication number | Publication date |
---|---|
CN117027707A (en) | 2023-11-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105954464B (en) | A kind of well building method of SOIL GAS groundwater monitoring well | |
CN117027707B (en) | Hydrologic geological investigation Kong Chongshui plugging device | |
CN106918322B (en) | Horizontal and vertical deformation combined test method for deep rock mass or soil body | |
CN109060073A (en) | Single hole observes Karst Mountain bilayer level of ground water device and method | |
CN104975593A (en) | Static sounding type deep soil samplers | |
CN105043806A (en) | Amphibious soil and underground water sampling apparatus | |
CN202544790U (en) | Releasing slip socket for well repair | |
CN112610181B (en) | Underwater tunnel engineering exploration hole plugging structure and plugging method thereof | |
CN208313646U (en) | Separate zone stimulation system in a kind of underground water multilayer monitoring well | |
CN112855134A (en) | Midway testing device and method for immobile drilling tool | |
CN107701104B (en) | Vertical engineering investigation vehicle and operation method | |
CN203846475U (en) | Feeler inspection type underground pipeline probe shovel | |
CN207177731U (en) | A kind of vertical engineering investigation car | |
CN109322315A (en) | A kind of retaining structure and its construction method for high Steep Slope Embankment location | |
CN201152898Y (en) | Shallow layer core fetching tool for oil and seismic exploration | |
CN210598884U (en) | Drill bit in geotechnical engineering investigation drilling equipment | |
CN114354255A (en) | Hydrogeology sampling device | |
CN201713803U (en) | On-site water injection testing device | |
CN201292819Y (en) | Simple floating hoop for well drilling completion | |
CN106759221B (en) | Mounting device and method based on the pore pressure of the rock mass underground space | |
CN219012587U (en) | Pressure-bearing water level measuring probe | |
KR100552241B1 (en) | An installing device of simple pipe well for monitering underground water | |
CN217901244U (en) | Novel a sample for geological environment monitoring device | |
CN112113883B (en) | System and method for monitoring transport of underground water solute in river subsurface | |
CN204758316U (en) | Amphibious soil and groundwater sampling equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |