CN1163397C - Method for coiling or decoiling bunch of parallel steel wires - Google Patents

Method for coiling or decoiling bunch of parallel steel wires Download PDF

Info

Publication number
CN1163397C
CN1163397C CNB001278088A CN00127808A CN1163397C CN 1163397 C CN1163397 C CN 1163397C CN B001278088 A CNB001278088 A CN B001278088A CN 00127808 A CN00127808 A CN 00127808A CN 1163397 C CN1163397 C CN 1163397C
Authority
CN
China
Prior art keywords
bundle
thigh
wire unit
turntable
parallel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
CNB001278088A
Other languages
Chinese (zh)
Other versions
CN1356254A (en
Inventor
罗国强
金平
单继安
李刚
朱金林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Pujiang Cable Co Ltd
Original Assignee
Shanghai Pujiang Cable Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=4592720&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN1163397(C) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Shanghai Pujiang Cable Co Ltd filed Critical Shanghai Pujiang Cable Co Ltd
Priority to CNB001278088A priority Critical patent/CN1163397C/en
Publication of CN1356254A publication Critical patent/CN1356254A/en
Application granted granted Critical
Publication of CN1163397C publication Critical patent/CN1163397C/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Landscapes

  • Winding Filamentary Materials (AREA)
  • Ropes Or Cables (AREA)

Abstract

The present invention relates to a method for coiling and decoiling a bundle of a strand ring of a parallel steel wire bundle. When the bundle is coiled, strands of the parallel steel wire bundle are coiled on a reel drum in vertical winding displacement on a turn table whose rotary shaft center wire is vertical; when the bundle is uncoiled, the strand ring of the parallel steel wire bundle is placed on the turn table whose rotary shaft center wire is vertical. In coiling and uncoiling operation, the strands of the parallel steel wire bundle move up and down and orderly range or stretch, the self weight of the strands is carried by the turn table driving the reel drum to rotate, the strands of the parallel steel wire bundle can not fall down because of gravity influence, and therefore, various defects caused by the horizontal placement of the rotary shaft center wire of the reel drum are eliminated.

Description

Method for coiling or decoiling bunch of parallel steel wires
Technical field
The present invention relates to make the folding and unfolding bundle operational method of the parallel wire unit thigh circle that main rope of suspension bridge uses.
Background technology
Suspension bridge is the crucial primary structure member of suspension bridge with main push-towing rope parallel wire unit thigh, its structure as shown in Figure 1, each root steel wire is parallel in the parallel wire unit thigh 2 ' isometricly (sees that Fig. 1-a) is arranged in regular hexagon and (sees Fig. 1-b), every 1.0~1.5 meters compound band 1 ' wrappings of usefulness, because of not passing through the stranded of screw pitch formula, so, be the difficult point that the parallel wire unit thigh is produced how to its rolling lopping always, same problem is even more serious when putting bundle assembly unit main push-towing rope, " Honshu four countries communication bridge " of the magazine R.D KOBE STEEL ENGINEERINGREPORTS/Vol.33 No.1 (1988) of the visible Japan of relevant report and Japanese publication.Equal reference cable, cable rolling both at home and abroad at present and the method for putting bundle, the steel disk 4 ' that is level a shaft center line is gone up the horizontal winding displacement rolling of parallel wire unit thigh on this steel disk 4 '; Put bundle during assembly unit when volume has the steel disk 4 ' of parallel wire unit thigh to be transported to the building site, then its transverse horizontal is placed on the support and put bundle.In above-mentioned rolling with put in the process of bundle, the shaft center line horizontal positioned of parallel wire unit thigh circle, be wound on the steel disk the bundle thigh owing to the deadweight reason, a bundle strand meeting generation ellipse is fallen and is weighed down 3 ', see shown in Figure 2, like this, the one, it is lax feasiblely to reel, and can produce friction between the bundle thigh during steel disk rotation; The 2nd, constantly in the rotary course, this bob of falling can produce so-called " Ho La hoop " effect with steel disk for bundle strand, see shown in Figure 3, thereby upset the bundle strand due ordering of reeling, make that the bundle thigh involves difficulty when putting bundle; In wrapup procedure, increase along with the coiling number of turns, the increasing of deadweight, friction between the bundled steel wires thigh is more and more serious, and pull and making the lax bundle thigh of reeling neglect the tight pine of neglecting putting intrafascicular traction, friction between the bundled steel wires thigh more can aggravate, and makes band 1 ' scratch until fracture, causes bundle strand steel wire loose.Present method of redress be at the scene constantly the halved tie thigh carry out artificial shaping and wrapping, to shut down to take out to the Ho La hoop that has formed and put bundle again after tight, be shaped for the assembly unit of main push-towing rope and bring very big inconvenience, to influence the duration when serious.
Summary of the invention
The purpose of this invention is to provide a kind of method for coiling or decoiling bunch of parallel steel wires, can eliminate the bob phenomenon of falling of bundle strand circle, overcome the defective of existing method for coiling or decoiling bunch of parallel steel wires.
Technical scheme of the present invention is: a kind of method for coiling or decoiling bunch of parallel steel wires, and the step that comprises rolling and put bundle is characterized in that, and folding and unfolding strand circle all carries out on a shaft center line is vertical turntable, and turntable has the reel of a scalable adjusting diameter; During rolling,, regulate and determine winding diameter according to the steel wire quantity difference that the parallel wire unit thigh is formed, the vertical winding displacement rolling of parallel wire unit thigh behind reel, is tied up fixing bundle burst termination to the bundled steel wires thigh of reeling, set up some suspension centres, shrink reel, take parallel wire unit thigh circle away; When putting bundle, parallel wire unit thigh circle is winched to and aforementioned same turntable, uphold outside barrel diameter, tightly prop up bundle strand circle inner ring, follow the turntable rotation and put bundle.
Main points of the present invention are that the shaft center line with parallel wire unit thigh circle is placed on the upright position, rolling and put among the Shu Zuoye that the parallel wire unit thigh all moves up and down and arrange in regular turn or stretch, its deadweight is by driving the turntable carrying that reel rotates, the parallel wire unit thigh can not eliminated the various defectives of bringing because of the shaft center line horizontal positioned of parallel wire unit thigh circle therefrom because of the gravity effect bob of falling.
Description of drawings
Below in conjunction with embodiment and accompanying drawing thereof the present invention is further described.
Fig. 4 is the embodiment of the invention one an operation scheme drawing.
Fig. 5 is the parallel wire unit thigh circle scheme drawing of a rolling lopping of the embodiment of the invention.
Fig. 6 is the embodiment of the invention two operation scheme drawings.
Fig. 7 is a device therefor structural representation of the present invention.
See shown in Figure 7ly, winch turntable 1 used in the present invention is and is horizontally disposed with, and motor 12, retarder 11, miniature gears 10, big gear wheel 2, bearing 4 constitute actuating devices, make turntable 1 do the rotation of horizontal direction.Turntable 1 is provided with reel, drum diameter can be made adjustable, form by reel piecemeal 3, adjusting screw(rod) 5, nut framework 6, connecting rod 7, also be provided with bundle burst termination anchor clamps 8 on the reel and come clamping and traction parallel wire unit thigh, other establish one up and down wire-arranging mechanism 9 dredge the parallel wire unit thigh and be arranged in order on the reel or from reel and stretch successively.Such winch can solve according to operating needs for those skilled in the art, and has multiple structure to conceive, and above structure is wherein a kind of just, and requirement of the present invention is that the shaft center line of turntable must be vertical.
The specific embodiment
See that the aforementioned winch of usefulness shown in Figure 4 carries out the embodiment one of coiling or decoiling bunch of parallel steel wires operation, wrapup procedure is: the steel wire quantity difference that the parallel wire unit thigh is formed, its winding diameter are also different, so set up the external diameter of reel 3 before the lopping earlier; The termination of bundle gang C is fixed on the reel; Start turntable 1 rotation, begin to reel with certain speed, halved tie thigh C carries out winding displacement up and down during coiling; Coiling finishes, the bundled steel wires thigh C that reels tied up, and fixing bundle burst termination, and set up some suspension centres 0; Shrink reel, the bundled steel wires thigh of lopping is hung turntable 1, bundled steel wires thigh C and reel 3 disengagings, the parallel wire unit thigh circle of the no steel disk of rolling lopping, as shown in Figure 5.Putting the bundle process is: parallel wire unit thigh circle is winched to aforementioned turntable; Uphold outside barrel diameter, tightly prop up bundle strand circle inner ring; Ejected beam thigh termination, parallel wire unit thigh circle are in company with turntable 1 coaxial rotation, and bundle is put in traction, owing to be passive pulling, Shu Sudu is put in the brake control of using winch when putting bundle; Along with putting Shu Jinhang, regulate outside barrel diameter and uphold, reel stretching bundle thigh C finishes until putting bundle.Above-mentioned rolling with put in the bundle process, parallel wire unit thigh circle remains proper alignment, between bundled steel wires thigh C without any friction.
Parallel wire unit thigh circle for using additive method to be wound into all has steel disk usually, when putting bundle, can remove adjustable reel 3, parallel wire unit thigh circle is winched to aforementioned turntable 1 together with steel disk, and parallel wire unit thigh circle is in company with turntable 1 coaxial rotation, and bundle is put in traction.
Embodiment two shown in Figure 6 all adopts the parallel wire unit thigh circle operational method of major diameter steel disk for the folding and unfolding bundle, its operating process and embodiment one are basic identical, difference is to replace reel 3 with steel disk P, during rolling, parallel wire unit thigh circle is that rolling is on a steel disk P, be formed with the parallel wire unit thigh circle of steel disk P, this steel disk P is the same with existing steel disk, does not need the bundled steel wires thigh of reeling is tied up; Put when bundle, remove adjustable reel 3, parallel wire unit thigh circle is winched to aforementioned turntable 1 together with steel disk P and in company with turntable 1 coaxial rotation, bundle is put in traction.

Claims (1)

1, a kind of method for coiling or decoiling bunch of parallel steel wires, the step that comprises rolling and put bundle is characterized in that, and folding and unfolding strand circle all carries out on a shaft center line is vertical turntable, and turntable has the reel of a scalable adjusting diameter; During rolling,, regulate and determine winding diameter according to the steel wire quantity difference that the parallel wire unit thigh is formed, the vertical winding displacement rolling of parallel wire unit thigh behind reel, is tied up fixing bundle burst termination to the bundled steel wires thigh of reeling, set up some suspension centres, shrink reel, take parallel wire unit thigh circle away; When putting bundle, parallel wire unit thigh circle is winched to and aforementioned same turntable, uphold outside barrel diameter, tightly prop up bundle strand circle inner ring, follow the turntable rotation and put bundle.
CNB001278088A 2000-12-06 2000-12-06 Method for coiling or decoiling bunch of parallel steel wires Ceased CN1163397C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB001278088A CN1163397C (en) 2000-12-06 2000-12-06 Method for coiling or decoiling bunch of parallel steel wires

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB001278088A CN1163397C (en) 2000-12-06 2000-12-06 Method for coiling or decoiling bunch of parallel steel wires

Publications (2)

Publication Number Publication Date
CN1356254A CN1356254A (en) 2002-07-03
CN1163397C true CN1163397C (en) 2004-08-25

Family

ID=4592720

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB001278088A Ceased CN1163397C (en) 2000-12-06 2000-12-06 Method for coiling or decoiling bunch of parallel steel wires

Country Status (1)

Country Link
CN (1) CN1163397C (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101049880B (en) * 2007-04-17 2012-01-25 江苏法尔胜新日制铁缆索有限公司 Method for tightening main cable of new type suspension bridge
CN100489195C (en) * 2007-04-17 2009-05-20 江苏法尔胜新日制铁缆索有限公司 Suspension bridge main cable rope retracting method
CN101829898B (en) * 2010-04-28 2011-07-06 宝厦建设(集团)股份有限公司 Method for accurately controlling installation levelness and verticality of large-size mechanical rotating shaft
CN103723578B (en) * 2014-01-06 2015-12-09 江苏理工学院 Movable winding drum core
CN104016188B (en) * 2014-06-11 2017-01-11 国网山东省电力公司沂水县供电公司 Cable wrapping and paying-off wheel
CN112960484A (en) * 2021-01-20 2021-06-15 上海浦江缆索股份有限公司 Large-size zinc-aluminum-magnesium coating cable strand horizontal coiling and stripping device and stripping method

Also Published As

Publication number Publication date
CN1356254A (en) 2002-07-03

Similar Documents

Publication Publication Date Title
CN115472342B (en) Cable forming machine for composite cable and processing technology
CN109817392B (en) Cable wrapping method
CN203751467U (en) Electric discharge wire cutting, winding and tensioning device
CN1163397C (en) Method for coiling or decoiling bunch of parallel steel wires
CN110143487B (en) Combined winding equipment for buffering cable tension
CN107658070A (en) A kind of cable cabling machine
CN207293755U (en) A kind of backwinding machine
CN114542903A (en) Building monitoring device based on BIM
CN110540135B (en) Crane steel wire rope replacement method
CN208561306U (en) A kind of long conducting wire draw off gear
CN101264837A (en) Reorganizer for binding thread
CN201427822Y (en) Automatic wire arranging rewinding machine for steel stranded wire
CN212558917U (en) Synchronous take-up and pay-off device
CN2702979Y (en) Yarn-paying-out type constant tension aramid fibre paying-out apparatus
CN112255723A (en) Few-mode optical fiber and preparation method thereof
CN209922590U (en) Sample manufacturing system for crosstalk test
CN217881002U (en) Wrapping machine capable of driving multiple tape reels to wrap simultaneously
CN209365416U (en) A kind of cable type tyre bead silk manufacturing equipment
CN220351299U (en) Unreeling device for multiple groups of cables
CN208964245U (en) Cable winder after a kind of improvement
CN207404592U (en) Portable Stranded cable synchronization capstan winch
CN219842838U (en) High-efficient cabling device is used in cable production
CN217229725U (en) Pay-off rack for cable production
CN1812216A (en) Cable take-up reel eccentric winding current collecting device
CN110950164A (en) Electric power engineering's hank mill

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: PUJIANG CABLE ROPE CO., LTD., SHANGHAI

Free format text: FORMER NAME OR ADDRESS: PUJIANG CABLE CO LTD, SHANGHAI

CP03 Change of name, title or address

Address after: 201314 Xuan Qiao Town, Nanhui County, Shanghai

Patentee after: Pujiang Cable Rope Co., Ltd., Shanghai

Address before: 201314 Xuan Qiao Town, Nanhui County, Shanghai

Patentee before: Pujiang Cable Co., Ltd., Shanghai

C35 Partial or whole invalidation of patent or utility model
IW01 Full invalidation of patent right

Decision date of declaring invalidation: 20080301

Decision number of declaring invalidation: 11030

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee
C35 Partial or whole invalidation of patent or utility model
IW01 Full invalidation of patent right

Decision date of declaring invalidation: 20080301

Decision number of declaring invalidation: 11030

Granted publication date: 20040825