CN115405123B - Gymnasium wall bar planting construction device and construction method thereof - Google Patents
Gymnasium wall bar planting construction device and construction method thereof Download PDFInfo
- Publication number
- CN115405123B CN115405123B CN202211010221.8A CN202211010221A CN115405123B CN 115405123 B CN115405123 B CN 115405123B CN 202211010221 A CN202211010221 A CN 202211010221A CN 115405123 B CN115405123 B CN 115405123B
- Authority
- CN
- China
- Prior art keywords
- cleaning
- connecting plate
- bar planting
- plate
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 32
- 238000004140 cleaning Methods 0.000 claims description 142
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims description 37
- 235000017491 Bambusa tulda Nutrition 0.000 claims description 37
- 241001330002 Bambuseae Species 0.000 claims description 37
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims description 37
- 239000011425 bamboo Substances 0.000 claims description 37
- 210000003205 muscle Anatomy 0.000 claims description 18
- 229910000831 Steel Inorganic materials 0.000 claims description 15
- 239000000428 dust Substances 0.000 claims description 15
- 239000003292 glue Substances 0.000 claims description 15
- 239000010959 steel Substances 0.000 claims description 15
- 238000005553 drilling Methods 0.000 claims description 13
- 239000007788 liquid Substances 0.000 claims description 9
- 241000196324 Embryophyta Species 0.000 claims description 8
- 238000007667 floating Methods 0.000 claims description 7
- 239000002893 slag Substances 0.000 claims description 7
- 238000007664 blowing Methods 0.000 claims description 6
- 230000003014 reinforcing effect Effects 0.000 claims description 6
- 238000002347 injection Methods 0.000 claims description 5
- 239000007924 injection Substances 0.000 claims description 5
- 238000005406 washing Methods 0.000 claims description 5
- 239000000243 solution Substances 0.000 claims description 4
- 229910000746 Structural steel Inorganic materials 0.000 claims description 3
- 239000000853 adhesive Substances 0.000 claims description 3
- 230000001070 adhesive effect Effects 0.000 claims description 3
- 238000007689 inspection Methods 0.000 claims description 3
- 238000000034 method Methods 0.000 claims description 3
- 238000009527 percussion Methods 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 5
- 238000009423 ventilation Methods 0.000 description 5
- CSCPPACGZOOCGX-UHFFFAOYSA-N Acetone Chemical compound CC(C)=O CSCPPACGZOOCGX-UHFFFAOYSA-N 0.000 description 4
- LFQSCWFLJHTTHZ-UHFFFAOYSA-N Ethanol Chemical compound CCO LFQSCWFLJHTTHZ-UHFFFAOYSA-N 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 239000011148 porous material Substances 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000001680 brushing effect Effects 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 239000011799 hole material Substances 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 238000005201 scrubbing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/12—Mounting of reinforcing inserts; Prestressing
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Cleaning In General (AREA)
Abstract
The application relates to the technical field of bar planting construction, in particular to a bar planting construction device for a gym wall and a construction method thereof. The application has the effect of reducing the labor intensity of workers.
Description
Technical Field
The application relates to the technical field of bar planting construction, in particular to a gym wall bar planting construction device and a construction method thereof.
Background
In the construction and construction process of a gym, other functional areas are usually required to be constructed on a main wall body which is constructed, at the moment, shear walls are required to be added, an upper structure is required to be spread, the girder and the column are prolonged by jacking, the column is connected by adding layers to a house, and the like, the reinforcement planting operation is required to be carried out on the existing wall body, and the reinforcement planting is a simple, convenient and effective connection and anchoring technology for a concrete structure. The bar planting mainly comprises the processes of drilling holes, washing holes, injecting glue, bar planting, maintaining and the like, so that the concrete structure poured later is connected and anchored with the existing wall body.
Aiming at the related technology, the inventor finds that after drilling, the bar planting holes need to be cleaned manually, and the labor intensity of operators is high.
Disclosure of Invention
In order to reduce the labor intensity of workers, the application provides a gymnasium wall bar planting construction device and a construction method thereof.
In a first aspect, the application provides a gymnasium wall bar planting construction device, which adopts the following technical scheme:
the utility model provides a gymnasium wall body plants muscle construction equipment, includes the base, be provided with the lifter on the base, be provided with the mounting panel on the lifter, all slide on the top and the bottom of mounting panel are provided with the connecting plate, slide on the connecting plate at mounting panel top and be provided with on the connecting plate of mounting panel top and strike and bore, it is provided with the clearance section of thick bamboo to rotate on the connecting plate of mounting panel bottom, the clearance section of thick bamboo is located and strikes and bore directly under, the length direction of clearance section of thick bamboo is parallel with the length direction who strikes and bore, the clearance section of thick bamboo is provided with on the mounting panel and is used for driving two gliding drive assembly of connecting plate respectively, be provided with the rotating member that is used for rotating the clearance section of thick bamboo on the connecting plate of mounting panel bottom, be provided with the brush hair on the lateral wall of clearance section of thick bamboo, the diameter of thick bamboo is less than the drill bit diameter that strikes bores, the brush hair with plant the inside wall butt in muscle hole.
By adopting the technical scheme, the device is moved to the mark position on the wall body, the mounting plate is moved to the required height, the drill bit of the impact drill is opposite to the mark point, the impact drill is started, the connecting plate at the top of the mounting plate is independently moved by the driving assembly, and the connecting plate drives the impact drill to move so as to drill the wall body; the impact drill is moved out again, the height of the mounting plate is adjusted, the cleaning barrel is just opposite to the bar planting hole, the connecting plate at the bottom of the mounting plate is independently moved through the driving component, the cleaning barrel is moved into the bar planting hole, the cleaning barrel is rotated, the cleaning barrel is moved into and out of the bar planting hole in a reciprocating mode, dust and broken slag are taken out, the drilling and cleaning of the bar planting hole are achieved, labor intensity of workers is reduced, and compared with manual cleaning, efficiency of drilling cleaning is improved, and workers are not required to climb the upper portion of a wall body when drilling and cleaning, so that working efficiency is further improved.
Optionally, the drive assembly is including rotating the first lead screw that sets up on the mounting panel, the spout has been seted up on the mounting panel, the both sides of mounting panel are run through to the spout, first lead screw is located the spout, threaded connection has the slider on the first lead screw, slider sliding connection is in the spout, the mounting panel is provided with and is used for driving first lead screw pivoted first motor, two all be provided with on the connecting plate be used for with slider connection.
Through adopting above-mentioned technical scheme, through the connecting piece, will need the connecting plate that removes be connected to the slider on, the manual start first motor, first motor drive lead screw rotates, and the lead screw drives the slider and slides in the spout, and the slider drives the connecting plate that connects and remove to two connecting plates about the independent sliding mounting panel according to the demand, thereby realized respectively to the removal of a clearance section of thick bamboo and percussion drill, only need set up a motor and can drive respectively, the cost is reduced.
Optionally, the connecting piece is including setting up the grafting piece on the connecting plate, the grafting piece slides and wears to establish on the connecting plate, the grafting groove has all been seted up at the both ends of slider, the grafting piece is pegged graft in the grafting groove, set up on the connecting plate and be used for driving the gliding first electric putter of grafting piece, the piston rod and the grafting piece of first electric putter are connected.
Through adopting above-mentioned technical scheme, first electric putter drives the grafting piece and peg graft in the grafting groove to realized the connection of connecting plate and slider, in the corresponding grafting groove is pegged graft through different grafting pieces of manual control, thereby realized driving the slip of two connecting plates respectively.
Optionally, the rotating member includes the ring gear of cover on the clearance section of thick bamboo, rotate on the connecting plate of mounting panel bottom and be provided with first gear, first gear and ring gear meshing, be provided with on the connecting plate of mounting panel bottom and be used for driving first gear pivoted second motor.
Through adopting above-mentioned technical scheme, start the second motor, the second motor drives first gear and rotates, and first gear drives the ring gear and rotates, and the ring gear drives the cleaning cylinder and rotates to the limit rotation border degree of depth direction that has realized the cleaning cylinder to planting the muscle hole reciprocates, thereby is favorable to taking out the dust and the broken bits in the muscle hole of planting, improves the effect of clearance.
Optionally, the clearance section of thick bamboo internal rotation cover is equipped with the splendid attire section of thick bamboo, splendid attire section of thick bamboo sets up with the clearance section of thick bamboo coaxial line, be equipped with the cleaning solution in the splendid attire section of thick bamboo, the tip of splendid attire section of thick bamboo is provided with the adapter sleeve, the tip of adapter sleeve flushes with the tip of clearance section of thick bamboo, the splendid attire section of thick bamboo sliding is provided with the connecting rod, the connecting rod sets up with splendid attire section of thick bamboo coaxial line, the slip direction of connecting rod is on a parallel with the length direction of clearance section of thick bamboo, the connecting rod runs through the splendid attire section of thick bamboo and extends to in the adapter sleeve, be provided with two limiting plates on the connecting rod, two limiting plates are located the adapter sleeve, two be provided with the clearance sponge between the limiting plates, the intercommunicating pore has been seted up to the one end that the splendid attire section of thick bamboo is close to limiting plate, the cleaning solution is from the intercommunicating pore flow in the clearance sponge, clearance sponge compresses in the adapter sleeve, works as when the clearance sponge shifts out to planting the muscle downthehole, clearance sponge inflation and is provided with the second electric putter for driving the connecting rod to slide.
Through adopting above-mentioned technical scheme, after the brush on the clearance section of thick bamboo will plant the muscle hole clearance, stop rotating the clearance section of thick bamboo, the clearance section of thick bamboo is stopped in planting the muscle downthehole, the connecting rod moves again, will clear up the sponge and shift out the clearance section of thick bamboo, clear up the sponge inflation, clear up the sponge and plant the lateral wall butt in muscle hole, and it has cleaning fluid to adsorb on the clearance sponge, reciprocating movement mounting panel bottom connecting plate, the connecting plate drives the clearance sponge and cleans planting the muscle hole, with the inside clean-up in planting the muscle hole, further improvement the effect of clearance, in order to improve the firm degree of planting the muscle.
Optionally, the connecting rod is the hollow tube, the connecting rod runs through the limiting plate, connecting rod and outside air supply intercommunication, rotate on the limiting plate and be provided with the board of opening and close that is used for opening and close the export of connecting rod tip.
Through adopting above-mentioned technical scheme, after the brush on the clearance section of thick bamboo will plant the downthehole clearance of muscle, stop rotating the clearance section of thick bamboo, the clearance section of thick bamboo stays in planting the muscle downthehole, with outside air supply intercommunication connecting rod, blow off downthehole floating dust, through cleaning, blow, the cleaning of washing liquid, three step furthest will plant downthehole clean up of muscle to guarantee the steadiness of planting the muscle.
Optionally, the lifter includes dead lever and slide bar, the dead lever is fixed on the base, slide bar sliding connection is on the dead lever, the dead lever rotation is provided with the second lead screw, and the second lead screw sets up with the dead lever coaxial line, second lead screw thread bush is established on the slide bar, the cover is equipped with the second gear on the second lead screw, it is provided with the third gear to rotate on the base, third gear and second gear engagement, be provided with the third motor that is used for driving third gear pivoted on the base.
Through adopting above-mentioned technical scheme, when the height of mounting panel needs to be adjusted, start the third motor, the third motor drives the third gear and rotates, and the third gear drives the second gear and rotates, and the second gear drives the second lead screw and rotates, and the second lead screw drives the sliding rod and slides on the dead lever to realized the regulation to mounting panel pole height, be convenient for to the drilling and the clearance of planting the muscle hole of co-altitude.
Optionally, the fixing rod is provided with an inclined strut for supporting the fixing rod, and one end of the inclined strut is connected with the base.
Through adopting above-mentioned technical scheme, the diagonal brace has improved the support ability to the dead lever to the condition that the dead lever rocked when punching has been reduced.
In a second aspect, the application provides a construction method for planting ribs on a wall body of a gym, which adopts the following technical scheme:
the gymnasium wall bar planting construction device further comprises;
s1: spring line positioning, namely staggering the positions of the original structural steel bars according to the positions and the number of the reinforcing bars in the design drawing, and marking out the positions of the reinforcing bars;
s2: drilling, namely moving the device to a mark position on a wall body, moving the mounting plate to a required height, enabling a drill bit of the impact drill to face the mark point, starting the impact drill, connecting a connecting plate at the top of the mounting plate to the sliding block, and then moving the connecting plate at the top of the mounting plate to drill the wall body;
s3: washing holes, removing the impact drill, moving the height of the mounting plate, enabling the cleaning barrel to be opposite to the bar planting hole, separating a connecting plate at the top of the mounting plate from the sliding block, connecting the connecting plate at the bottom of the mounting plate on the sliding block, moving the cleaning barrel into the bar planting hole, rotating the cleaning barrel, reciprocally moving the cleaning barrel into and out of the bar planting hole, taking dust and broken slag out, stopping rotating the cleaning barrel, enabling the cleaning barrel to stay in the bar planting hole, communicating an external air source with the connecting rod, blowing out floating dust in the hole, moving the connecting rod again, removing the cleaning sponge out of the cleaning barrel, reciprocally moving the connecting plate at the bottom of the mounting plate, and cleaning the inside of the bar planting hole;
s4: injecting glue, namely injecting a group of bar planting glue into the bar planting holes, wherein the glue injection amount in the holes is 80% of the volume of the bar planting holes;
s5: the steel bar is planted, the steel bar after derusting treatment is immediately placed into the hole opening after the hole is filled with glue, and then the steel bar is slowly screwed in one way and can not reversely rotate in the middle until the steel bar stretches into the hole bottom;
s6: curing, namely curing the reinforced bar, positioning the reinforced bar by a preset template, curing the reinforced bar-planting adhesive for 50 hours at normal temperature, performing a drawing test after curing, and performing subsequent operation after qualified inspection.
In summary, the present application includes at least one of the following beneficial technical effects:
1. moving the device to a mark position on a wall body, moving the mounting plate to a required height, enabling a drill bit of the impact drill to face the mark point, starting the impact drill, and independently moving a connecting plate at the top of the mounting plate through a driving assembly, wherein the connecting plate drives the impact drill to move so as to drill the wall body; the impact drill is moved out, the height of the mounting plate is adjusted, the cleaning barrel is opposite to the bar planting hole, the connecting plate at the bottom of the mounting plate is independently moved through the driving assembly, the cleaning barrel is moved into the bar planting hole, the cleaning barrel is rotated, the cleaning barrel is reciprocally moved into and out of the bar planting hole, dust and broken slag are taken out, the drilling and cleaning of the bar planting hole are realized, the labor intensity of workers is reduced, in addition, compared with manual cleaning, the efficiency of drilling and cleaning is improved, and workers are not required to climb a scaffold to the upper part of a wall body during drilling and cleaning, so that the working efficiency is further improved;
2. after the hairbrush on the cleaning cylinder cleans the bar planting hole, the cleaning cylinder stops rotating, the cleaning cylinder stays in the bar planting hole, an external air source is communicated with the connecting rod, floating dust in the hole is blown out, and the three steps furthest clean the bar planting hole through cleaning, blowing and wiping by cleaning liquid, so that the stability of bar planting is ensured.
Drawings
Fig. 1 is a schematic overall structure of an embodiment of the present application.
Fig. 2 is an exploded view of a connection plate and mounting plate of an embodiment of the present application.
Fig. 3 is a cross-sectional view of an embodiment of the present application.
Fig. 4 is an enlarged schematic view of the portion a in fig. 3.
Fig. 5 is a schematic view of the structure of the opening and closing plate of the present application.
Reference numerals illustrate: 1. a base; 2. a lifting rod; 201. a fixed rod; 202. a slide bar; 3. a mounting plate; 4. a connecting plate; 5. percussion drilling; 6. a cleaning cylinder; 7. brushing; 8. a first lead screw; 9. a chute; 10. a slide block; 11. a first motor; 12. a plug block; 13. a plug-in groove; 14. a first electric push rod; 15. a toothed ring; 16. a first gear; 17. a second motor; 18. a holding cylinder; 19. connecting sleeves; 20. a connecting rod; 21. a limiting plate; 22. cleaning the sponge; 23. a second electric push rod; 24. a ventilation hose; 25. an opening and closing plate; 26. a second lead screw; 27. a second gear; 28. a third gear; 29. a third motor; 30. a diagonal brace; 31. a T-shaped groove; 32. a T-shaped block; 33. a U-shaped plate; 34. a mounting block; 35. and (3) a torsion spring.
Detailed Description
The application is described in further detail below with reference to fig. 1-5.
The embodiment of the application discloses a gymnasium wall bar planting construction device. Referring to fig. 1 and 2, gymnasium wall body plants muscle construction equipment includes base 1, be fixed with lifter 2 on base 1, lifter 2's top welded fastening has mounting panel 3, equal sliding connection has connecting plate 4 on the top and the bottom of mounting panel 3, sliding connection has on connecting plate 4 at mounting panel 3 top to strike and bore 5, strike and bore 5 bolt fastening on connecting plate 4, strike and bore the drill bit of 5 and extend to outside connecting plate 4, rotate on connecting plate 4 of mounting panel 3 bottom and be connected with cleaning cylinder 6, cleaning cylinder 6 is located and strikes and bore 5 under, cleaning cylinder 6's length direction is parallel with the length direction who strikes and bore 5, cleaning cylinder 6 and strike and bore 5's slip direction all to be on a parallel with cleaning cylinder 6's length direction, be provided with on mounting panel 3 and be used for driving two connecting plate 4 gliding drive assembly respectively, be provided with on the connecting plate 4 of mounting panel 3 bottom and be used for rotating cleaning cylinder 6's the piece, integrated into one piece has brush hair 7 on cleaning cylinder 6's the lateral wall, cleaning cylinder 6's diameter is less than the drill bit diameter of 5, brush hair 7 and planting the inside wall butt in hole. Universal wheels are mounted at the bottom of the base 1 to facilitate movement of the base 1.
Referring to fig. 2 and 3, the drive assembly includes rotating the first lead screw 8 of connection on mounting panel 3, set up spout 9 on the mounting panel 3, spout 9 runs through the both sides of mounting panel 3, first lead screw 8 is located spout 9, threaded connection has slider 10 on the first lead screw 8, slider 10 sliding connection is in spout 9, mounting panel 3 is provided with the first motor 11 that is used for driving first lead screw 8 pivoted, the output shaft of first motor 11 is connected with first lead screw 8, the axis of rotation of first lead screw 8 is on a parallel with the slip direction of connecting plate 4, one side welded fastening that connecting plate 4 is close to mounting panel 3 has two T shape pieces 32, set up two T-shaped groove 31 on the mounting panel 3, two T-shaped groove 31 and two T shape pieces 32 one-to-one, T shape piece 32 sliding connection is in T-shaped groove 31, two T-shaped groove 31 are located the both sides of spout 9, the slip direction of T shape piece 32 is parallel with the slip direction of connecting plate 4, all be provided with the connecting piece that is used for being connected with slider 10 on two connecting plates 4.
Referring to fig. 2 and 3, the connector comprises a plug-in block 12 connected to the connecting plate 4, the plug-in block 12 is slidably arranged on the connecting plate 4 in a penetrating manner, plug-in grooves 13 are formed in two ends of the sliding block 10, the plug-in block 12 is plugged in the plug-in grooves 13, a first electric push rod 14 for driving the plug-in block 12 to slide is fixed on the connecting plate 4, a piston rod of the first electric push rod 14 is connected with the plug-in block 12, and the connecting plates 4 on two sides of the mounting plate 3 are equally arranged. When the plug 12 is plugged into the plug slot 13, the plug 12 is partially located within the connecting plate 4.
When the connecting plate 4 is started, the connecting plate 4 is positioned at one end close to the first motor 11, a piston rod is extended out through the first electric push rod 14, the plug-in block 12 is plugged into the plug-in groove 13, the connecting plate 4 to be moved is connected to the sliding block 10, the first motor 11 is started, the first motor 11 drives the first lead screw 8 to rotate, the first lead screw 8 drives the sliding block 10 to slide in the sliding groove 9, and the sliding block 10 drives the connected connecting plate 4 to move; when the other connecting plate 4 needs to be moved, the original connecting plate 4 is only required to be moved back to the initial position, the plug-in block 12 is separated from the plug-in groove 13, and then the plug-in block 12 on the other connecting plate 4 is plugged into the plug-in groove 13; therefore, the upper connecting plate 4 and the lower connecting plate 4 of the independent sliding mounting plate 3 can be used according to requirements, the cleaning barrel 6 and the impact drill 5 can be moved respectively, and the cleaning barrel can be driven respectively only by arranging one motor, so that the cost is reduced.
Referring to fig. 1 and 3, the lifting rod 2 includes a fixing rod 201 and a sliding rod 202, one end of the fixing rod 201 is welded and fixed on the base 1, the sliding rod 202 is slidably connected on the fixing rod 201, one end of the sliding rod 202, which is far away from the fixing rod 201, is welded and fixed with a U-shaped plate 33, the end of the U-shaped plate 33 is welded and fixed on the mounting plate 3, the connecting plate 4, which is provided with the cleaning cylinder 6, is positioned in the U-shaped plate 33, the fixing rod 201 and the sliding rod 202 are square rods so as to limit the rotation of the sliding rod 202 in the fixing rod 201, an inclined strut 30 for supporting the fixing rod 201 is welded and fixed on the fixing rod 201, one end of the inclined strut 30 is welded and fixed with the base 1, and the other end of the inclined strut 30 is welded and fixed with the fixing rod 201, so as to improve the stability of the fixing rod 201.
Referring to fig. 1 and 3, a second lead screw 26 is rotationally connected to a fixed rod 201, the second lead screw 26 is coaxially arranged with the fixed rod 201, the second lead screw 26 is sleeved on a sliding rod 202 in a threaded manner, a second gear 27 is fixedly sleeved at the end part of the second lead screw 26, which is close to the base 1, the base 1 is rotationally connected with a third gear 28, the third gear 28 is meshed with the second gear 27, a third motor 29 for driving the third gear 28 to rotate is mounted on the base 1, and an output shaft of the third motor 29 is connected with the third gear 28.
When the height of the mounting plate 3 needs to be adjusted, the third motor 29 is started, the third motor 29 drives the third gear 28 to rotate, the third gear 28 drives the second gear 27 to rotate, the second gear 27 drives the second lead screw 26 to rotate, and the second lead screw 26 drives the sliding rod 202 to slide on the fixed rod 201, so that the height of the mounting plate 3 is adjusted.
Referring to fig. 3 and 4, the rotating member comprises a toothed ring 15 sleeved on the cleaning cylinder 6, a mounting block 34 is welded and fixed on the connecting plate 4 at the bottom of the mounting plate 3, the cleaning cylinder 6 is positioned at one side of the mounting block 34, the mounting plate 3 is rotationally connected with a first gear 16, the first gear 16 is meshed with the toothed ring 15, and a second motor 17 for driving the first gear 16 to rotate is mounted on the mounting block 34. The second motor 17 is started, the second motor 17 drives the first gear 16 to rotate, the first gear 16 drives the toothed ring 15 to rotate, and the toothed ring 15 drives the cleaning barrel 6 to rotate, so that the cleaning barrel 6 moves back and forth in the depth direction along the rotating edge in the bar planting hole, and dust and slag in the bar planting hole can be conveniently brought out.
Referring to fig. 3 and 4, a containing tube 18 is rotatably sleeved in the cleaning tube 6, the containing tube 18 is fixedly arranged on the mounting block 34 in a penetrating manner, the containing tube (18) and the cleaning tube 6 are coaxially arranged, cleaning liquid is filled in the containing tube 18, the cleaning liquid is alcohol or acetone, and the alcohol and the acetone are easy to volatilize, so that the inside of the bar planting hole can be quickly dried after scrubbing, and the subsequent glue injection treatment is facilitated; the end of the holding cylinder (18) is fixedly welded with a connecting sleeve 19, the end of the connecting sleeve 19 is flush with the end of the cleaning cylinder 6, bearings are arranged between the inner side wall of the cleaning cylinder 6 and the connecting sleeve 19 and between the inner side wall of the cleaning cylinder 6 and the holding cylinder 18, and the cleaning cylinder 6 can be rotatably sleeved on the holding cylinder 18.
Referring to fig. 3 and 4, the connecting rod 20 is slidably connected in the holding cylinder 18, the connecting rod 20 and the holding cylinder (18) are coaxially arranged, the sliding direction of the connecting rod 20 is parallel to the length direction of the cleaning cylinder 6, the connecting rod 20 penetrates through two ends of the holding cylinder 18, one end of the connecting rod 20 extends into the connecting sleeve 19, the other end of the connecting rod extends out of the mounting block 34, two limiting plates 21 are welded and fixed on the connecting rod 20, the two limiting plates 21 are located in the connecting sleeve 19 and are abutted against the inner wall of the connecting sleeve 19, a cleaning sponge 22 is fixed between the two limiting plates 21, the cleaning sponge 22 is fixedly sleeved on the connecting rod 20, the end part of the cleaning sponge 22, close to the limiting plates 21, is provided with a round table, the diameter of the end part of the cleaning sponge 22, close to the limiting plates 21, is smaller than the middle diameter of the cleaning sponge 22, away from the limiting plates 21, a communication hole is formed in one end of the holding cylinder 18, close to the limiting plates 21, cleaning liquid flows from the communication hole, the cleaning sponge 22 is compressed in the connecting sleeve 19, when the cleaning sponge 22 moves out of the connecting rod hole, the cleaning sponge 22 is in the connecting sleeve 22, the side wall of the connecting rod is abutted against the connecting rod, the mounting block 34 is provided with a second electric push rod 23 for sliding on the connecting rod 20, and the end of the connecting rod is communicated with the piston rod 23.
The cleaning cylinder 6 is stopped in the bar planting hole, the connecting rod 20 is moved, the cleaning sponge 22 is moved out of the cleaning cylinder 6, the cleaning sponge 22 is expanded, the cleaning sponge 22 is abutted against the side wall of the bar planting hole, cleaning liquid is adsorbed on the cleaning sponge 22, the connecting plate 4 at the bottom of the mounting plate 3 is moved back and forth, the connecting plate 4 drives the cleaning sponge 22 to scrub the bar planting hole, the inside of the bar planting hole is cleaned, and the cleaning effect is further improved, so that the stability of bar planting is improved.
Referring to fig. 3, 4 and 5, the connecting rod 20 is hollow pipe, the connecting rod 20 runs through limiting plate 21, the end connection of connecting rod 20 has ventilation hose 24, ventilation hose 24 and outside air supply intercommunication, the one end that limiting plate 21 kept away from ventilation hose 24 rotates and is connected with the opening and close board 25 that is used for opening and close the export of connecting rod 20 tip, connecting rod 20 welded fastening has the pivot, opening and close board 25 rotates to be connected in the pivot, the cover is equipped with in the pivot and is used for driving opening and close board 25 towards the one side pivoted torsional spring 35 that is close to ventilation hose 24, the one end of torsional spring 35 is fixed on opening and close board 25, the other end is fixed in the pivot. When the air source is not opened, the torsion spring 35 drives the opening and closing plate 25 to rotate to close the end part of the connecting rod 20, and after the air source is communicated with the air source, the pressure of the air is larger than the elasticity of the torsion spring 35, so that the opening and closing plate 25 is driven to rotate to open the outlet of the connecting rod 20.
After the hairbrush on the cleaning cylinder 6 cleans the bar planting hole, the cleaning cylinder 6 stops rotating, the cleaning cylinder 6 stays in the bar planting hole, an external air source is communicated with the connecting rod 20, floating dust in the hole is blown out, cleaning is performed through cleaning, blowing and cleaning liquid wiping, and the bar planting hole is cleaned up to the maximum extent, so that the stability of bar planting is ensured.
The implementation principle of the gymnasium wall bar planting construction device provided by the embodiment of the application is as follows: moving the device to a mark position on a wall body, moving the mounting plate 3 to a required height, enabling a drill bit of the impact drill 5 to face the mark point, starting the impact drill 5, independently moving the connecting plate 4 at the top of the mounting plate 3, and driving the impact drill 5 to move by the connecting plate 4 to drill the wall body; then the impact drill 5 is moved out, the height of the mounting plate 3 is adjusted, the cleaning cylinder 6 is opposite to the bar planting hole, the connecting plate 4 at the bottom of the mounting plate 3 is independently moved, the cleaning cylinder 6 is moved into the bar planting hole, the cleaning cylinder 6 is rotated, the cleaning cylinder 6 is reciprocally moved into and out of the bar planting hole, and dust and broken slag are taken out; after the hairbrush on the cleaning cylinder 6 cleans the bar planting hole, stopping rotating the cleaning cylinder 6, keeping the cleaning cylinder 6 in the bar planting hole, communicating an external air source with the connecting rod 20, and blowing out floating dust in the hole; and then the connecting rod 20 is moved, the cleaning sponge 22 is moved out of the cleaning barrel 6, the cleaning sponge 22 is expanded, the cleaning sponge 22 is abutted against the side wall of the bar planting hole, cleaning liquid is adsorbed on the cleaning sponge 22, the connecting plate 4 at the bottom of the mounting plate 3 is moved back and forth, and the connecting plate 4 drives the cleaning sponge 22 to scrub the bar planting hole, so that the bar planting hole is drilled and cleaned.
The embodiment of the application discloses a construction method for planting ribs on a gym wall, and referring to fig. 1, the construction method for planting ribs on the gym wall uses a gym wall rib planting construction device and further comprises the following steps of;
s1: spring line positioning, namely staggering the positions of the original structural steel bars according to the positions and the number of the reinforcing bars in the design drawing, and marking out the positions of the reinforcing bars;
s2: drilling, namely moving the device to a mark position on a wall body, moving the mounting plate 3 to a required height, enabling a drill bit of the impact drill 5 to face the mark point, starting the impact drill 5, connecting a connecting plate 4 at the top of the mounting plate 3 to a sliding block 10, and then moving the connecting plate 4 at the top of the mounting plate 3 to drill the wall body;
s3: washing holes, removing the impact drill 5, moving the height of the mounting plate 3 to enable the cleaning barrel 6 to be opposite to the bar planting holes, separating the connecting plate 4 at the top of the mounting plate 3 from the sliding block 10, connecting the connecting plate 4 at the bottom of the mounting plate 3 to the sliding block 10, moving the cleaning barrel 6 into the bar planting holes, rotating the cleaning barrel 6, reciprocally moving the cleaning barrel 6 out of the bar planting holes, taking dust and broken slag out, stopping rotating the cleaning barrel 6, stopping the cleaning barrel 6 in the bar planting holes, communicating an external air source with the connecting rod 20, blowing floating dust in the holes, moving the connecting rod 20, moving the cleaning sponge 22 out of the cleaning barrel 6, reciprocally moving the connecting plate 4 at the bottom of the mounting plate 3, and driving the cleaning sponge 22 to scrub the bar planting holes by the connecting plate 4 so as to clean the inside of the bar planting holes;
s4: injecting glue, namely injecting a group of bar planting glue into the bar planting holes after the bar planting holes are dried, wherein the glue injection amount in the holes is 80% of the volume of the bar planting holes, and the injection nozzle of the injector is extended to the bottom of the bar planting holes, so that the bar planting glue is slowly injected to discharge air in the bar planting holes;
s5: the steel bar is planted, the steel bar after derusting treatment is immediately placed into the hole opening after the hole is filled with glue, and then the steel bar is slowly screwed in one way and can not reversely rotate in the middle until the steel bar stretches into the hole bottom;
s6: curing, namely curing the reinforced bar, positioning the reinforced bar by a preset template, curing the reinforced bar-planting adhesive for 50 hours at normal temperature, performing a drawing test after curing, and performing subsequent operation after inspection is qualified.
The above embodiments are not intended to limit the scope of the present application, so: all equivalent changes in structure, shape and principle of the application should be covered in the scope of protection of the application.
Claims (7)
1. The utility model provides a gymnasium wall body plants muscle construction equipment which characterized in that: including base (1), be provided with lifter (2) on base (1), be provided with mounting panel (3) on lifter (2), all slide on the top and the bottom of mounting panel (3) are provided with connecting plate (4), slide on connecting plate (4) at mounting panel (3) top and be provided with on connecting plate (4) of mounting panel (3) bottom and strike and bore (5), rotate on connecting plate (4) of mounting panel (3) bottom and be provided with cleaning cylinder (6), cleaning cylinder (6) are located and strike under boring (5), the length direction of cleaning cylinder (6) is parallel with the length direction of boring (5), cleaning cylinder (6) are all parallel with the length direction of cleaning cylinder (6) with strike the slip direction of boring (5), be provided with on mounting panel (3) and be used for driving two gliding actuating assembly of connecting plate (4) respectively, be provided with on connecting plate (4) of mounting panel (3) bottom and be used for rotating cleaning cylinder (6) and rotate on the lateral wall of cleaning cylinder (6), cleaning cylinder (6) are provided with brush hair (7) on the lateral wall, cleaning cylinder (6) are located and strike the length direction of boring (5) and are parallel with the length direction of boring (6), tooth brush hair (15) are established on the inner wall (6), the utility model discloses a cleaning device, including a connecting plate (4) of mounting panel (3), a connecting plate (4) of mounting panel (3) bottom is gone up and is provided with first gear (16), first gear (16) and tooth ring (15) meshing, be provided with on connecting plate (4) of mounting panel (3) bottom and be used for driving first gear (16) pivoted second motor (17), cleaning tube (6) internal rotation cover is equipped with splendid attire section of thick bamboo (18), splendid attire section of thick bamboo (18) and cleaning tube (6) coaxial line set up, be equipped with cleaning solution in splendid attire section of thick bamboo (18) coaxial line set up, the cleaning solution is equipped with in splendid attire section of thick bamboo (18), the tip of splendid attire section of thick bamboo (18) is provided with adapter sleeve (19), the tip of adapter sleeve (19) and the tip of splendid attire section of thick bamboo (18) flushes with the tip of cleaning tube (6), the interior sliding of splendid attire section of thick bamboo (18) is provided with connecting rod (20), connecting rod (20) and splendid attire section of thick bamboo (18) coaxial line set up, the slip direction of connecting rod (20) is parallel to the length direction of cleaning tube (6), connecting rod (20) run through splendid attire section of thick bamboo (18) and extend in (19), connecting rod (21) coaxial line set up, two limiting plates (21) and two limiting plates (21) are located between two limiting plates (21) and two limiting plates (21), the utility model discloses a cleaning device for a steel bar planting hole, including a connecting plate (4), a connecting rod (20) and a cleaning sponge (22), a connecting sleeve (19) is arranged in the connecting sleeve, a connecting hole is arranged at one end of a containing barrel (18) close to the limiting plate (21), cleaning liquid flows from the connecting hole and takes in the cleaning sponge (22), the cleaning sponge (22) is compressed in the connecting sleeve (19), when the cleaning sponge (22) moves out into the steel bar planting hole, the cleaning sponge (22) expands and is abutted against the side wall of the steel bar planting hole, a second electric push rod (23) for driving the connecting rod (20) to slide is arranged on the connecting plate (4), and a piston rod of the second electric push rod (23) is connected with the connecting rod (20).
2. The gymnasium wall bar planting construction device according to claim 1, wherein: the driving assembly comprises a first lead screw (8) which is rotationally arranged on a mounting plate (3), a sliding groove (9) is formed in the mounting plate (3), the sliding groove (9) penetrates through two sides of the mounting plate (3), the first lead screw (8) is located in the sliding groove (9), a sliding block (10) is connected to the first lead screw (8) in a threaded mode, the sliding block (10) is slidingly connected to the sliding groove (9), the mounting plate (3) is provided with a first motor (11) which is used for driving the first lead screw (8) to rotate, and connecting pieces which are used for being connected with the sliding block (10) are arranged on the connecting plates (4).
3. The gymnasium wall bar planting construction device according to claim 2, wherein: the connecting piece is including setting up grafting piece (12) on connecting plate (4), grafting piece (12) slip wears to establish on connecting plate (4), grafting groove (13) have all been seted up at the both ends of slider (10), grafting piece (12) are pegged graft in grafting groove (13), set up on connecting plate (4) and be used for driving gliding first electric putter (14) of grafting piece (12), the piston rod of first electric putter (14) is connected with grafting piece (12).
4. A gymnasium wall bar planting construction device according to claim 3, wherein: the connecting rod (20) is a hollow pipe, the connecting rod (20) penetrates through the limiting plate (21), the connecting rod (20) is communicated with an external air source, and an opening and closing plate (25) for opening and closing an outlet at the end part of the connecting rod (20) is rotatably arranged on the limiting plate (21).
5. The gymnasium wall bar planting construction device according to claim 4, wherein: lifting rod (2) are including dead lever (201) and slide bar (202), dead lever (201) are fixed on base (1), slide bar (202) sliding connection is on dead lever (201), dead lever (201) rotation is provided with second lead screw (26), and second lead screw (26) and dead lever (201) coaxial line set up, second lead screw (26) thread bush is established on slide bar (202), the cover is equipped with second gear (27) on second lead screw (26), it is provided with third gear (28) to rotate on base (1), third gear (28) and second gear (27) meshing, be provided with on base (1) and be used for driving third gear (28) pivoted third motor (29).
6. The gymnasium wall bar planting construction device according to claim 5, wherein: the fixing rod (201) is provided with an inclined support rod (30) for supporting the fixing rod (201), and one end of the inclined support rod (30) is connected with the base (1).
7. A construction method for planting ribs on a gymnasium wall body is characterized by comprising the following steps: the gymnasium wall bar planting construction device according to claim 6, further comprising;
s1: spring line positioning, namely staggering the positions of the original structural steel bars according to the positions and the number of the reinforcing bars in the design drawing, and marking out the positions of the reinforcing bars;
s2: drilling, namely moving the device to a mark position on a wall body, moving the mounting plate (3) to a required height, enabling a drill bit of the impact drill (5) to face the mark point, starting the impact drill (5), connecting a connecting plate (4) at the top of the mounting plate (3) to a sliding block (10), and then moving the connecting plate (4) at the top of the mounting plate (3) to drill the wall body;
s3: the method comprises the steps of washing holes, moving out a percussion drill (5), adjusting the height of a mounting plate (3) to enable a cleaning barrel (6) to be opposite to a bar planting hole, separating a connecting plate (4) at the top of the mounting plate (3) from a sliding block (10), connecting the connecting plate (4) at the bottom of the mounting plate (3) to the sliding block (10), moving the cleaning barrel (6) into the bar planting hole, rotating the cleaning barrel (6), moving the cleaning barrel (6) into and out of the bar planting hole in a reciprocating mode, taking dust and broken slag out, stopping rotating the cleaning barrel (6), enabling the cleaning barrel (6) to stay in the bar planting hole, communicating an external air source with a connecting rod (20), blowing out floating dust in the hole, moving the connecting rod (20), moving a cleaning sponge (22) out of the cleaning barrel (6), and reciprocally moving the connecting plate (4) at the bottom of the mounting plate (3), and cleaning the inside of the bar planting hole;
s4: injecting glue, namely injecting a group of bar planting glue into the bar planting holes, wherein the glue injection amount in the bar planting holes is 80% of the volume of the bar planting holes;
s5: the steel bar is planted, the steel bar after derusting treatment is immediately placed into the hole opening after the hole is filled with glue, and then the steel bar is slowly screwed in one way and can not reversely rotate in the middle until the steel bar stretches into the hole bottom;
s6: curing, namely curing the reinforced bar, positioning the reinforced bar by a preset template, curing the reinforced bar-planting adhesive for 50 hours at normal temperature, performing a drawing test after curing, and performing subsequent operation after qualified inspection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211010221.8A CN115405123B (en) | 2022-08-23 | 2022-08-23 | Gymnasium wall bar planting construction device and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211010221.8A CN115405123B (en) | 2022-08-23 | 2022-08-23 | Gymnasium wall bar planting construction device and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN115405123A CN115405123A (en) | 2022-11-29 |
CN115405123B true CN115405123B (en) | 2023-12-08 |
Family
ID=84161023
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202211010221.8A Active CN115405123B (en) | 2022-08-23 | 2022-08-23 | Gymnasium wall bar planting construction device and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115405123B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN118547916B (en) * | 2024-07-30 | 2024-10-22 | 内蒙古凯旋全屋装饰有限公司 | Nail hole filling device and process thereof |
Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU490515A1 (en) * | 1974-03-05 | 1975-11-05 | Украинский Научно-Исследовательский Институт Спиртовой И Ликерно-Водочной Промышленности | Part cleaning device |
CN102486049A (en) * | 2010-12-06 | 2012-06-06 | 上海伙隆实业有限公司 | Filler wall masonry tie bar planting method |
CN104612094A (en) * | 2015-02-12 | 2015-05-13 | 嵊州德庆机械有限公司 | Universal wheel borne bridge gas residue clearing device and use method thereof |
JP2016128143A (en) * | 2015-01-09 | 2016-07-14 | 株式会社安藤・間 | Intra-hole cleaning roughening device |
US9505039B1 (en) * | 2014-08-11 | 2016-11-29 | Gunnar Keith Green | Tool for expanding a bore swab |
CN207823537U (en) * | 2017-12-23 | 2018-09-07 | 河南省康源生物工程技术有限公司 | A kind of cleaning brush and the integrated medical glass test tube cleaning equipment of cleaning solution |
CN209772845U (en) * | 2019-03-19 | 2019-12-13 | 深圳市瑞辰易为科技有限公司 | IGBT circuit board dust collector |
CN210160113U (en) * | 2019-07-12 | 2020-03-20 | 刘雨欣 | Novel narrow-mouth bottle cleaning device |
CN210248908U (en) * | 2019-07-18 | 2020-04-07 | 安徽科技学院 | Retractable test-tube brush is used in laboratory |
CN111042007A (en) * | 2019-12-10 | 2020-04-21 | 汪又菊 | Planting rib anchoring method |
CN111250447A (en) * | 2020-01-15 | 2020-06-09 | 张利红 | Sintering furnace belt cleaning device for silicon wafer processing |
CN214644870U (en) * | 2021-05-08 | 2021-11-09 | 四川清凤建设工程有限公司 | Wall body drilling equipment for housing construction |
CN113829515A (en) * | 2020-06-08 | 2021-12-24 | 四川省第十五建筑有限公司 | Wall drilling and reinforcing construction method |
CN215319706U (en) * | 2021-07-26 | 2021-12-28 | 福建省泉一建设发展有限公司 | Building structure bar planting device |
CN215443245U (en) * | 2021-04-02 | 2022-01-07 | 中能雨稷(辽宁)建设工程有限公司 | Building crack repairing device |
CN217232213U (en) * | 2022-04-27 | 2022-08-19 | 王萌 | Drainage pipeline cleaning device |
-
2022
- 2022-08-23 CN CN202211010221.8A patent/CN115405123B/en active Active
Patent Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU490515A1 (en) * | 1974-03-05 | 1975-11-05 | Украинский Научно-Исследовательский Институт Спиртовой И Ликерно-Водочной Промышленности | Part cleaning device |
CN102486049A (en) * | 2010-12-06 | 2012-06-06 | 上海伙隆实业有限公司 | Filler wall masonry tie bar planting method |
US9505039B1 (en) * | 2014-08-11 | 2016-11-29 | Gunnar Keith Green | Tool for expanding a bore swab |
JP2016128143A (en) * | 2015-01-09 | 2016-07-14 | 株式会社安藤・間 | Intra-hole cleaning roughening device |
CN104612094A (en) * | 2015-02-12 | 2015-05-13 | 嵊州德庆机械有限公司 | Universal wheel borne bridge gas residue clearing device and use method thereof |
CN207823537U (en) * | 2017-12-23 | 2018-09-07 | 河南省康源生物工程技术有限公司 | A kind of cleaning brush and the integrated medical glass test tube cleaning equipment of cleaning solution |
CN209772845U (en) * | 2019-03-19 | 2019-12-13 | 深圳市瑞辰易为科技有限公司 | IGBT circuit board dust collector |
CN210160113U (en) * | 2019-07-12 | 2020-03-20 | 刘雨欣 | Novel narrow-mouth bottle cleaning device |
CN210248908U (en) * | 2019-07-18 | 2020-04-07 | 安徽科技学院 | Retractable test-tube brush is used in laboratory |
CN111042007A (en) * | 2019-12-10 | 2020-04-21 | 汪又菊 | Planting rib anchoring method |
CN111250447A (en) * | 2020-01-15 | 2020-06-09 | 张利红 | Sintering furnace belt cleaning device for silicon wafer processing |
CN113829515A (en) * | 2020-06-08 | 2021-12-24 | 四川省第十五建筑有限公司 | Wall drilling and reinforcing construction method |
CN215443245U (en) * | 2021-04-02 | 2022-01-07 | 中能雨稷(辽宁)建设工程有限公司 | Building crack repairing device |
CN214644870U (en) * | 2021-05-08 | 2021-11-09 | 四川清凤建设工程有限公司 | Wall body drilling equipment for housing construction |
CN215319706U (en) * | 2021-07-26 | 2021-12-28 | 福建省泉一建设发展有限公司 | Building structure bar planting device |
CN217232213U (en) * | 2022-04-27 | 2022-08-19 | 王萌 | Drainage pipeline cleaning device |
Also Published As
Publication number | Publication date |
---|---|
CN115405123A (en) | 2022-11-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN115405123B (en) | Gymnasium wall bar planting construction device and construction method thereof | |
CN219262280U (en) | Drilling device for earth and stone side construction | |
CN111021681A (en) | Wall plastering machine and using method | |
CN205400584U (en) | Novel be applied to down -hole drill of water conservancy construction | |
CN209597712U (en) | A kind of telescopic down-the-hold drill bit cleaning device | |
CN206011463U (en) | A kind of marble drilling equipment for building | |
CN209585547U (en) | A kind of painting device of the multi-angle regulation with rack and pinion engagement mechanism | |
CN112677268A (en) | Festival device in bamboo is used | |
CN214749036U (en) | Quick drilling and coring device for pavement detection | |
CN208502676U (en) | A kind of clear earthenware and drilling machine of long spire engineering method | |
CN112659047B (en) | PDC drill bit kit | |
CN215368887U (en) | Coating wall prosthetic devices | |
CN111218937B (en) | Pile top slurry layer breaking device for slurry retaining wall pore-forming filling pile | |
CN221194953U (en) | Drilling device for geotechnical engineering investigation | |
CN221909863U (en) | Electromechanical device processing drilling machine | |
CN216299652U (en) | Prefabricated component's mould platform scavenging machine | |
CN219974774U (en) | Valve body valve seat for slurry pump | |
CN111270834B (en) | Indoor wall bottom whitewashes device | |
CN118417269B (en) | Cement barrel cleaning device for constructional engineering | |
CN214686943U (en) | Automatic drilling device for automobile blow molding washing kettle | |
CN216922036U (en) | Drilling bored concrete pile pore-forming device of rotary drilling rig | |
CN219076127U (en) | Drilling equipment capable of timely discharging soil | |
CN214303683U (en) | Dust and slag removing device of anchoring drilling machine | |
CN221096419U (en) | Drilling device for construction engineering | |
CN209243399U (en) | A kind of cleaning device of overflow dye vat auxiliary tank |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |