Train coal unattended operation, counting and turning combined control system and control method thereof Download PDFInfo
- Publication number
- CN115265740A CN115265740A CN202210813560.3A CN202210813560A CN115265740A CN 115265740 A CN115265740 A CN 115265740A CN 202210813560 A CN202210813560 A CN 202210813560A CN 115265740 A CN115265740 A CN 115265740A
- Authority
- CN
- China
- Prior art keywords
- train
- wagon
- unit
- weighing
- unloading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000003245 coal Substances 0.000 title claims abstract description 58
- 238000000034 method Methods 0.000 title claims abstract description 20
- 238000005303 weighing Methods 0.000 claims abstract description 116
- 238000012544 monitoring process Methods 0.000 claims description 15
- 230000004044 response Effects 0.000 claims description 6
- 238000012937 correction Methods 0.000 claims description 4
- 238000005259 measurement Methods 0.000 description 11
- 230000003068 static effect Effects 0.000 description 11
- 230000007306 turnover Effects 0.000 description 7
- 238000010586 diagram Methods 0.000 description 6
- 230000008901 benefit Effects 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000012546 transfer Methods 0.000 description 3
- 230000009471 action Effects 0.000 description 2
- 238000004590 computer program Methods 0.000 description 2
- 230000003137 locomotive effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01G—WEIGHING
- G01G19/00—Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups
- G01G19/02—Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for weighing wheeled or rolling bodies, e.g. vehicles
- G01G19/04—Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for weighing wheeled or rolling bodies, e.g. vehicles for weighing railway vehicles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G67/00—Loading or unloading vehicles
- B65G67/02—Loading or unloading land vehicles
- B65G67/24—Unloading land vehicles
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06K—GRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K17/00—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
- G06K17/0022—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisions for transferring data to distant stations, e.g. from a sensing device
- G06K17/0029—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisions for transferring data to distant stations, e.g. from a sensing device the arrangement being specially adapted for wireless interrogation of grouped or bundled articles tagged with wireless record carriers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Aviation & Aerospace Engineering (AREA)
- Mechanical Engineering (AREA)
- Computer Networks & Wireless Communication (AREA)
- General Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a train coal unattended operation, counting and turning combined control system and a control method thereof, wherein the system comprises a main control unit, a train number identification unit, a parking place judgment unit, a weighing unit, a parking place adjustment unit and a unloading unit; the train number identification unit is used for identifying electronic tag information of each train wagon in the train; the main control unit is used for determining the number of the train wagon according to the electronic tag information; the parking place judging unit is used for judging whether the wagon on the weighing platform meets the metering condition and generating a judging result; the main control unit is used for generating a weighing instruction when the judgment result is satisfied, and generating an adjusting instruction when the judgment result is not satisfied; the weighing unit is used for weighing the wagon according to the weighing instruction; the parking space adjusting unit is used for adjusting the position of the wagon according to the adjusting instruction so that the wagon meets the metering condition; and the unloading unit controls the unloader to unload the wagon which is weighed and is positioned in the unloader. The invention improves the unloading efficiency and the metering accuracy.
Description
Technical Field
The invention relates to the technical field of counting and turning joint control, in particular to an unattended counting and turning joint control system for train coal and a control method thereof.
Background
Most of the fire coal required by a thermal power plant is transported into a plant by a railway train wagon, a state railway locomotive pushes the train wagon carrying the coal to a static rail weighbridge area of a train unloading line of the power plant, traction power is provided for the train wagon by a shunting machine of a turn-back type tipper system, the train wagon is dragged section by section to carry out metering operation through the static rail weighbridge, and then the train wagon is dragged into the tipper to carry out unloading operation. The tippler system completes the metering and unloading work of each coal-carrying wagon in a turn-back type operation mode. The unloading operation of the coal-carrying vehicle is completed by the cooperative work of the static railroad track scale and the tipper system, and the unloading operation flow is as follows: a domestic railway locomotive pushes a whole train of coal-loaded wagons to a static rail weighbridge area of a power plant unloading line, and a tipper operator adjusts a first section of wagons to a metering parking space by controlling the traction or reverse pushing of a shunting machine, as shown in figure 1; after confirming that four wheels of the railway wagon are completely static on a weighing platform of the railway wagon and the weight of the instrument is stable, the railway wagon operator clicks a weighing button to complete the measurement of the first section of railway wagon. After the first section of wagon is weighed, the tipper operator pulls the first section of wagon to the wheel clamping device area by controlling the shunting machine until the second section of wagon reaches the metering parking space, as shown in fig. 2; and after four wheels of the train wagon are completely static on a weighing platform of the rail weighbridge and the weight of the instrument is stable, clicking a weighing button to complete the metering of the second section of train wagon. After the second section of train wagon is weighed, the tipper operator controls the shunting machine to pull the first section of train wagon to the unloader to unload, during which, the unhooking worker unhooks and separates the first section of train wagon from the whole train wagon in the wheel clamp area, the first section of train wagon is pulled to the unloader by the shunting machine to unload, the unhooked whole train wagon naturally decelerates to advance under the action of inertia due to loss of traction power until the second section of train wagon stops in the wheel clamp area, and at this time, a third section of train wagon to be weighed is on the weighing platform of the rail weighbridge, as shown in fig. 3; after the rail weighbridge operator confirms that the four wheels of the third section of train wagon are completely stopped on the weighing platform and the weight of the instrument is stable through manual work, the weighing key is manually clicked, and the weighing of the third section of train wagon is completed. And repeating the steps until the last train wagon finishes the coal unloading operation.
Since the railway train wagons are formed by mixing three series of train types of C62, C64 and C70, the length of the railway wagons of the C62 series and the C64 series is 13438mm, the length of the railway wagons of the C70 series is 13976mm, and the length of the railway wagons of the C62 series and the C64 series is 538mm different from that of the railway wagons of the C70 series. Under the condition of dumping of a mixed vehicle type, due to certain uncertainty of the manual unhooking position and the inertial travel distance of the rest whole train of wagons after unhooking, it is difficult to ensure that only four wheels of N +2 wagons are completely static on a weighing platform of a rail weighbridge under the inertial action after unhooking, and the metering condition that only four wheels of the same wagon are completely on the weighing platform in the railway coal transportation unloading process is not met.
When the metering condition is not satisfied, the following technical problems are brought about: (1) In the prior art, a metering operator and a tippler operator are required to frequently communicate and transfer, so that metering and unloading are not smooth, and unloading efficiency is influenced; (2) When the condition that the metering condition is not met exists, a certain probability that the condition is not found by a metering operator exists, and the condition is mistakenly taken as a metering condition to weigh, so that the metering data is inaccurate. Therefore, it is urgently needed to provide a train coal unattended operation, counting and turning combined control system and a control method thereof, so as to solve the technical problems of inaccurate metering data and low unloading efficiency caused by the fact that the metering conditions are not met in the prior art.
Disclosure of Invention
In view of this, it is necessary to provide a train coal unattended operation, counting and roll-over joint control system and a control method thereof, so as to solve the technical problems of inaccurate measured data and low unloading efficiency caused by the fact that the measured conditions are not satisfied in the prior art.
On one hand, the invention provides a train coal unattended operation counting and turning combined control system, which comprises a main control unit, a train number identification unit, a parking place judgment unit, a weighing unit, a parking place adjustment unit and an unloading unit;
the train number identification unit is used for identifying electronic tag information of each train wagon in the train;
the main control unit is used for determining the train number of the train wagon according to the electronic tag information;
the parking place judging unit is used for judging whether the wagon on the weighing platform meets the metering condition and generating a judging result;
the main control unit is used for generating a weighing instruction when the judgment result is satisfied, and generating an adjusting instruction when the judgment result is not satisfied;
the weighing unit is used for weighing the train wagon according to the weighing instruction to obtain a weighing result;
the parking space adjusting unit is used for adjusting the position of the wagon according to the adjusting instruction so that the wagon meets the metering condition;
and the unloading unit is used for controlling the unloader to unload the wagon which is weighed and is positioned in the unloader.
In some possible implementations, the car number identification unit includes a dual-path car number identifier, a first wide microwave antenna, and a second wide microwave antenna;
the first wide-amplitude microwave antenna and the second wide-amplitude microwave antenna are used for generating response signals according to the electronic tags of the train wagons;
and the double-path vehicle number identifier is used for identifying the electronic tag information according to the response signal.
In some possible implementations, the parking space determination unit includes a first group of wheel sensors, a second group of wheel sensors, and a first determination controller, where the first group of wheel sensors includes a plurality of first wheel sensors arranged at intervals, and the second group of wheel sensors includes a plurality of second wheel sensors arranged at intervals;
the first plurality of wheel sensors is to identify a direction of wheel travel and a group passing the first plurality of wheel sensors;
the second plurality of wheel sensors is for identifying a direction of wheel travel and a group passing the second plurality of wheel sensors;
the first judgment controller is used for judging whether the train wagon on the weighing platform meets the metering condition according to the traveling directions and the groups of the wheels passing through the first wheel sensors and the second wheel sensors and generating a judgment result.
In some possible implementations, the plurality of first wheel sensors includes a first sub-wheel sensor attached to an inner side of the weighing platform, the plurality of second wheel sensors includes a second sub-wheel sensor attached to an inner side of the weighing platform, and the train coal unattended operation and turning joint control system further includes a shunting machine interlocking control unit;
the first judging controller is further used for judging whether the wagon on the weighing platform is in a boundary state according to the first sub-wagon wheel sensor and the second sub-wagon wheel sensor;
and the shunting machine interlocking control unit is used for controlling the shunting machine to stop pulling when the train wagon is in a boundary state.
In some possible implementations, the train coal unattended operation, counting and overturning combined control system further includes a train number correction unit, the train number correction unit includes a third group of wheel sensors and a second judgment controller, the third group of wheel sensors is installed between the wheel clamp and the unloading machine, and the third group of wheel sensors includes a plurality of third wheel sensors;
the third set of wheel sensors is for identifying a direction of wheel travel and a set passing by the plurality of third wheel sensors;
the second judgment controller is used for determining the number of the train wagons entering the unloading machine according to the traveling direction and the group of the wheels passing through the plurality of third wheel sensors.
In some possible implementation manners, the train coal unattended operation and turnover integrated control system further comprises a metering-unloading interlocking control unit;
the metering-unloading interlocking control unit is used for determining whether the train wagon which reaches the wheel clamping device or the unloading machine without metering exists according to the number of the train wagon entering the unloading machine and the number of the train wagon which is weighed;
the parking space adjusting unit is also used for adjusting the wagon which reaches the wheel clamping device or the unloading machine without being measured to the weighing platform.
In some possible implementation manners, the metering-unloading interlocking control unit is specifically configured to determine whether the number of train wagons entering the unloading machine and the number of train wagons entering the unloading machine are equal to 2, and if the number of train wagons entering the unloading machine and the number of train wagons entering the unloading machine are equal to 2, there is no train wagon which reaches the unloading machine without being metered; and if the number of the train wagons entering the unloading machine and the number of the train wagons entering the unloading machine are less than 2, the train wagons which reach the wheel clamping device or the unloading machine without being measured exist.
In some possible implementations, the train coal unattended operation, counting and overturning combined control system further comprises a stability monitoring unit;
the stability monitoring unit is used for judging whether the weighing result is stable or not, and when the weighing result is stable, the weighing result is a target weighing result.
In some possible implementations, the train coal unattended operation, counting and overturning combined control system further comprises a heartbeat monitoring unit;
the heartbeat monitoring unit is used for judging whether the main control unit fails or not, and when the main control unit fails, the unloading unit is controlled to stop unloading.
On the other hand, the invention also provides a control method of the train coal unattended operation, charge and turn-over joint control system, which is suitable for the train coal unattended operation, charge and turn-over joint control system in any one of the possible implementation manners, and the control method of the train coal unattended operation, charge and turn-over joint control system comprises the following steps:
identifying electronic tag information of each train wagon in the train;
determining the train number of the train wagon according to the electronic tag information;
judging whether the train wagon positioned on the weighing platform meets the metering condition or not, and generating a judgment result;
when the judgment result is satisfied, generating a weighing instruction, and when the judgment result is not satisfied, generating an adjusting instruction;
weighing the train wagon according to the weighing instruction to obtain a weighing result;
adjusting the position of the wagon according to the adjusting instruction to enable the wagon to meet the metering condition;
and controlling the unloader to unload the wagon which is weighed and is positioned in the unloader.
The beneficial effects of adopting the above embodiment are: the train coal unattended operation meter-turnover joint control system provided by the invention has the advantages that whether a train wagon on a weighing platform meets a metering condition is judged by arranging a parking place judging unit, a judging result is generated, and when the judging result is met, a weighing instruction is generated, and a weighing unit is used for weighing the train wagon according to the weighing instruction to obtain a weighing result; and when the judgment result is that the measurement data does not meet the requirement, generating an adjusting instruction, wherein the parking space adjusting unit is used for adjusting the position of the train wagon according to the adjusting instruction so that the train wagon meets the requirement of measurement adjustment, manual intervention for measurement work can be omitted, and the accuracy of the measurement data is improved. Moreover, metering and unloading are realized without manual intervention, and metering and unloading efficiency is improved. Furthermore, manual intervention is eliminated, labor cost is reduced, and remarkable benefits can be brought to enterprises.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
FIG. 1 is a schematic diagram of a prior art embodiment for measuring a first section of railroad car;
FIG. 2 is a schematic diagram of an embodiment of a prior art system for measuring a second railroad car;
FIG. 3 is a schematic diagram of an embodiment of a prior art system for measuring a third railroad car;
FIG. 4 is a schematic structural diagram of an embodiment of the train coal unattended operation, counting and overturning joint control system provided by the invention;
fig. 5 is a schematic flow chart of a control method of the train coal unattended operation, counting and overturning joint control system provided by the invention.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. It is to be understood that the described embodiments are merely exemplary of the invention, and not restrictive of the full scope of the invention. All other embodiments, which can be obtained by a person skilled in the art without making any creative effort based on the embodiments in the present invention, belong to the protection scope of the present invention.
It should be understood that the schematic drawings are not necessarily to scale. The flowcharts used in this disclosure illustrate operations implemented according to some embodiments of the present invention. It should be understood that the operations of the flow diagrams may be performed out of order, and that steps without logical context may be reversed in order or performed concurrently. In addition, one skilled in the art, under the direction of the present disclosure, may add one or more other operations to the flowchart, or may remove one or more operations from the flowchart.
Some of the block diagrams shown in the figures are functional entities and do not necessarily correspond to physically or logically separate entities. These functional entities may be implemented in the form of software, or in one or more hardware modules or integrated circuits, or in different networks and/or processor systems and/or microcontroller systems.
Reference herein to "an embodiment" means that a particular feature, structure, or characteristic described in connection with the embodiment can be included in at least one embodiment of the invention. The appearances of the phrase in various places in the specification are not necessarily all referring to the same embodiment, nor are separate or alternative embodiments mutually exclusive of other embodiments. It is explicitly and implicitly understood by one skilled in the art that the embodiments described herein can be combined with other embodiments.
The embodiment of the invention provides a train coal unattended operation, counting and turning combined control system and a control method thereof, which are respectively explained below.
Before the embodiment is shown, equipment for unloading operation and metering conditions are introduced, as shown in fig. 1-3, a static railroad track scale is a wagon metering weighing platform, a wagon tipper comprises an unloader, a shunting machine and a wheel clamping machine, and the length of the static railroad track scale weighing platform is 14 meters and is used for static metering of a whole wagon; the wheel clamping device is positioned between the track scale and the unloading machine, the central line of the wheel clamping device is 12 meters away from the near end of the static track scale, and the wheel clamping device is used for limiting the wheels of the wagon to be turned to slide; the shunting machine is traction equipment and is responsible for drawing the wagon to the unloading machine; the unloading machine is a turnover coal unloading device and is used for unloading the wagon.
The metering conditions include: only four wheels of the same wagon are allowed to be completely on the weighing platform; the meter weight data remained stable.
The train coal unattended operation, counting and turning combined control system and the control method thereof provided by the embodiment of the invention are used for realizing the automation of unloading operation.
Fig. 4 is a schematic flow chart of an embodiment of the train coal unattended operation counting and turning integrated control system provided by the present invention, and as shown in fig. 4, the train coal unattended operation counting and turning integrated control system 10 includes a main control unit 100, a train number identification unit 200, a parking space determination unit 300, a weighing unit 400, a parking space adjustment unit 500, and a unloading unit 600;
the train number identification unit 200 is used for identifying electronic tag information of each train wagon in the train;
the main control unit 100 is configured to determine a train number of the train wagon according to the electronic tag information;
the parking space determining unit 300 is used for determining whether the wagon on the weighing platform meets the metering condition and generating a determination result;
the main control unit 100 is configured to generate a weighing instruction when the determination result is satisfied, and generate an adjustment instruction when the determination result is not satisfied;
the weighing unit 400 is used for weighing the wagon according to the weighing instruction to obtain a weighing result;
the parking space adjusting unit 500 is used for adjusting the position of the wagon according to the adjusting instruction so that the wagon meets the metering condition;
the unloading unit 600 is used for controlling the unloader to unload the wagon which is weighed and is located in the unloader.
Compared with the prior art, the train coal unattended operation meter-turning joint control system 10 provided by the embodiment of the invention judges whether the train wagon on the weighing platform meets the metering condition or not by arranging the parking place judging unit 300, generates the judging result, generates the weighing instruction when the judging result is met, and the weighing unit 400 is used for weighing the train wagon according to the weighing instruction to obtain the weighing result; and when the judgment result is that the measurement data does not meet the requirement, an adjusting instruction is generated, and the parking space adjusting unit 500 is used for adjusting the position of the wagon according to the adjusting instruction, so that the wagon meets the requirement of measurement adjustment, manual intervention for measurement work can be omitted, and the accuracy of the measurement data is improved. And moreover, metering and unloading are realized without manual intervention, and the metering and unloading efficiency is improved. Furthermore, manual intervention is eliminated, labor cost is reduced, and obvious benefits can be brought to enterprises.
It should be understood that: the executing mechanism of the parking space adjusting unit 500 is a shunting machine.
In an embodiment of the present invention, as shown in fig. 4, the car number identification unit 200 includes a dual-path car number identifier 210, a first wide microwave antenna 220, and a second wide microwave antenna 230;
the first broad width microwave antenna 220 and the second broad width microwave antenna 230 are used for generating response signals according to the electronic tag of the train wagon;
the dual path car number identifier 210 is used to identify the electronic tag information according to the response signal.
It should be understood that: the first wide microwave antenna 220 and the second wide microwave antenna 230 are attached to the weighing platform, and the microwave identification range of the first wide microwave antenna 220 and the second wide microwave antenna 230 can cover the whole electronic tag installation area between the bogie of the railway wagon, so that the electronic tag information of the railway wagon can be correctly identified as long as four wheels of the railway wagon are completely stopped on the weighing platform.
Furthermore, the embodiment of the invention can realize the identification of the train number of the train wagon close to or far away from the two movement directions of the car unloader by arranging the double-path train number identifier 210, the first wide microwave antenna 220 and the second wide microwave antenna 230, and overcomes the technical problems that the train wagon cannot be identified due to the fact that the train number of the train wagon which only can travel along the direction close to the car unloader is identified in the prior art and the train wagon needs to be controlled to move along the direction far away from the car unloader when the metering condition is not met, and the train wagon cannot be identified due to the fact that the installation position of the electronic tag is uncertain and the identification range of the microwave antenna in the prior art cannot fully cover the installation area of the electronic tag between the whole bogie in the prior art when the train wagon is positioned on the weighing platform, and improves the accuracy and the reliability of identifying the train wagon number.
In a specific embodiment of the present invention, the horizontal lobe widths of the first broad microwave antenna 220 and the second broad microwave antenna 230 are 150 °.
In some embodiments of the present invention, as shown in fig. 4, the parking space determining unit 300 includes a first set of wheel sensors 310, a second set of wheel sensors 320 and a first determining controller 330, which are disposed at two ends of the weighing platform, wherein the first set of wheel sensors 310 includes a plurality of first wheel sensors disposed at intervals, and the second set of wheel sensors 320 includes a plurality of second wheel sensors disposed at intervals;
a plurality of first wheel sensors for identifying a direction of travel and a group of wheels passing the plurality of first wheel sensors;
a plurality of second wheel sensors for identifying a direction of travel and a group of wheels passing the plurality of second wheel sensors;
the first determination controller 330 is configured to determine whether the railroad car located on the weighing platform satisfies the measurement condition according to the traveling direction and the group of the wheels passing through the plurality of first wheel sensors and the plurality of second wheel sensors, and generate a determination result.
According to the embodiment of the invention, the traveling directions and the groups of the wheels are identified by arranging the first wheel sensors and the second wheel sensors, so that the reliability of the identified traveling directions and the groups of the wheels can be improved.
In the embodiment of the present invention, each railroad car has 4 wheels, and the number of the wheels passed by the first set of wheel sensors 310 and the second set of wheel sensors 320 when the railroad car stops on the weighing platform is calculated as follows: when the nth section of the railway vehicle stops until the weighing platform meets the metering condition, the number of wheels passed by the first group of wheel sensors 310 is 4N, and the number of wheels passed by the second group of wheel sensors 320 is 4N-4. The wheel travel direction is in the direction approaching the unloader.
In a specific embodiment of the present invention, the first set of wheel sensors 310 includes three first wheel sensors, the second set of wheel sensors 320 includes three second wheel sensors, and the first and second wheel sensors are spaced apart by 8cm.
In order to avoid that the shunting machine pulls the train wagon which originally meets the metering condition to continue to advance, so that the train wagon does not meet the metering condition, in some embodiments of the present invention, as shown in fig. 4, the plurality of first wheel sensors include a first sub-wheel sensor 311 attached to the inner side of the weighing platform, the plurality of second wheel sensors include a second sub-wheel sensor 321 attached to the inner side of the weighing platform, and the train coal unattended operation and counting and turning combined control system 10 further includes a shunting machine interlock control unit 700;
the first judging controller 330 is further configured to judge whether the train wagon on the weighing platform is in a boundary state according to the first sub-wheel sensor 311 and the second sub-wheel sensor 321;
the shunting machine interlock control unit 700 is used for controlling the shunting machine to stop pulling the train when the train wagon is in the boundary state.
According to the invention, by arranging the shunting machine interlocking control unit 700, when the train wagon is in a boundary state, the shunting machine is controlled to stop pulling the train, so that the train wagon on the weighing platform can be ensured to meet the metering condition, and the metering efficiency is improved.
Specifically, the boundary states are: when the wheel 4N +5 of the (N + 2) th section of the train wagon triggers the second sub-wheel sensor 321 or the wheel 4N +8 triggers the first sub-wheel sensor 311, the train wagon is in a boundary state.
It should be understood that: and after weighing is finished, the shunting machine is controlled to stop the traction by contact, and the shunting machine pulls the weighed train wagon into the unloading machine.
In order to count the number of train wagons entering the unloading machine, in some embodiments of the present invention, as shown in fig. 4, the train coal unattended operation counting and turning combined control system further includes a train number correcting unit 800, the train number correcting unit 800 includes a third group of wheel sensors 810 and a second judgment controller 820 which are installed between the wheel clamping device and the unloading machine, and the third group of wheel sensors 810 includes a plurality of third wheel sensors;
a third set of wheel sensors 810 for identifying a direction of travel and a set of wheels past a third plurality of wheel sensors;
the second judgment controller 820 is used for determining the number of the railroad cars entering the unloader according to the traveling direction and the group of the wheels passing through the plurality of third wheel sensors.
In the embodiment of the present invention, the third set of wheel sensors 810 includes three third wheel sensors equidistantly spaced apart, and the distance between two adjacent third wheel sensors is 8cm.
In order to avoid the situation of 'car losing' that the train wagon is pulled into the unloading machine to be unloaded without being measured, and the measurement data of the missing train wagon is lost, in some embodiments of the present invention, as shown in fig. 4, the train coal unattended operation counting and overturning integrated control system 10 further includes a measurement-unloading interlocking control unit 900;
the metering-unloading interlocking control unit 900 is used for determining whether a train wagon which reaches a wheel clamp or an unloading machine without metering exists according to the number of train wagons entering the unloading machine and the number of train wagons which are weighed;
the parking space adjusting unit 500 is also used for adjusting the wagon which reaches the wheel clamping device or the unloading machine without being metered to the weighing platform.
In the embodiment of the invention, the weighing-unloading interlocking control unit 900 is arranged, so that the train wagons arriving at the unloading machine are all weighed train wagons, and the reliability of the train coal unattended counting and turning combined control system 10 is improved.
Since in the embodiment of the invention the wagon at the weighing platform differs from the wagon in the unloading machine by two, namely: if the number of the train wagons at the weighing platform is N +2, the number of the train wagons in the unloading machine is N, so in the embodiment of the present invention, the metering-unloading interlocking control unit 900 is specifically configured to determine whether the number of the train wagons entering the weighing machine and the number of the train wagons entering the unloading machine are equal to 2, and if the number of the train wagons entering the weighing machine and the number of the train wagons entering the unloading machine are equal to 2, there is no train wagon which reaches the wheel clamp or the unloading machine without being metered; if the number of the wagons entering the weighing machine and the number of the wagons entering the unloading machine are less than 2, the wagons which reach the wheel clamping device or the unloading machine without being measured exist.
It should be understood that: if the train wagon which is not measured and reaches the wheel clamping device or the train unloader exists, the train unloader should be controlled to stop dumping until the train wagon which is not measured and reaches the wheel clamping device or the train unloader does not exist, the train unloader relieves the limitation of stopping dumping and dumps the train wagon.
It should be noted that: the weighing result of the weighing unit 400 is displayed by the weighing instrument, and the metering condition includes the limitation that the metering is performed only if the weight data of the instrument is kept stable, so that, in some embodiments of the invention, as shown in fig. 4, the train coal unattended operation and turnover joint control system 10 further includes a stability monitoring unit 1000;
the stability monitoring unit 1000 is configured to determine whether a weighing result is stable, and when the weighing result is stable, the weighing result is a target weighing result.
The embodiment of the invention can ensure that the metering meets the metering condition by arranging the stability monitoring unit 1000, and further improve the metering accuracy.
In a specific embodiment of the present invention, the stable weighing result specifically comprises: the stability monitoring unit 1000 collects data of the weighing instrument in real time, performs difference calculation on the adjacent 50 frames of instrument data, and when the range of 50 groups of adjacent frames of data is smaller than a set range standard value, the weighing result is stable, otherwise, the weighing result is unstable.
It should be understood that: the standard range value can be set or adjusted according to empirical values, and is not particularly limited herein.
In order to avoid disconnection between the main control unit 100 and the unloading unit 600 caused by a crash, a power failure, and the like, when the main control unit 100 fails, the unloading unit 600 still performs unloading operation, which causes an error in the unloading operation, in some embodiments of the present invention, as shown in fig. 4, the train coal unattended operation roll-over joint control system 10 further includes a heartbeat monitoring unit 1100;
the heartbeat monitoring unit 1100 is configured to determine whether the main control unit 100 fails, and control the unloading unit 600 to stop unloading when the main control unit 100 fails.
It should be understood that: when the main control unit 100 is restored to normal, and when there is no railroad car that has not been metered into the unloader, the unloading operation of the unloading unit 600 is resumed.
The embodiment of the invention can further improve the reliability and the accuracy of the unloading operation of the unloading unit 600 by arranging the heartbeat monitoring unit 1100.
On the other hand, on the basis of the train coal unattended operation, counting and turning joint control system, correspondingly, the embodiment of the invention also provides a control method of the train coal unattended operation, counting and turning joint control system, which is suitable for the train coal unattended operation, counting and turning joint control system described in any one of the embodiments; as shown in fig. 5, the control method of the train coal unattended operation, counting and overturning combined control system comprises the following steps:
s501, identifying electronic tag information of each train wagon in the train;
s502, determining the number of the train wagon according to the electronic tag information;
s503, judging whether the wagon on the weighing platform meets the metering condition, and generating a judgment result;
s504, generating a weighing instruction when the judgment result is satisfied, and generating an adjusting instruction when the judgment result is not satisfied;
s505, weighing the wagon according to the weighing instruction to obtain a weighing result;
s506, adjusting the position of the wagon according to the adjusting instruction to enable the wagon to meet the metering condition;
and S507, controlling the unloader to unload the wagon which is weighed and is positioned in the unloader.
It should be noted that: the steps in the method in the above embodiment may be added or expanded according to each module or unit in the train coal unattended operation charge-transfer integrated control system, and specific details are described in the train coal unattended operation charge-transfer integrated control system embodiment, and are not described herein again.
Those skilled in the art will appreciate that all or part of the flow of the method implementing the above embodiments may be implemented by instructing relevant hardware (such as a processor, a controller, etc.) by a computer program, and the computer program may be stored in a computer readable storage medium. The computer readable storage medium is a magnetic disk, an optical disk, a read-only memory or a random access memory.
The train coal unattended operation and turnover integrated control system and the control method thereof provided by the invention are described in detail, specific examples are applied to explain the principle and the implementation mode of the invention, and the description of the examples is only used for helping to understand the method and the core idea of the invention; meanwhile, for those skilled in the art, according to the idea of the present invention, there may be variations in the specific embodiments and the application scope, and in summary, the content of the present specification should not be construed as a limitation to the present invention.
Claims (10)
1. An unattended train coal counting and turning combined control system is characterized by comprising a main control unit, a train number identification unit, a parking space judgment unit, a weighing unit, a parking space adjustment unit and a unloading unit;
the train number identification unit is used for identifying electronic tag information of each train wagon in the train;
the main control unit is used for determining the train number of the train wagon according to the electronic tag information;
the parking place judging unit is used for judging whether the wagon on the weighing platform meets the metering condition and generating a judging result;
the main control unit is used for generating a weighing instruction when the judgment result is satisfied, and generating an adjusting instruction when the judgment result is not satisfied;
the weighing unit is used for weighing the wagon according to the weighing instruction to obtain a weighing result;
the parking space adjusting unit is used for adjusting the position of the wagon according to the adjusting instruction so that the wagon meets the metering condition;
and the unloading unit is used for controlling the unloader to unload the wagon which is weighed and is positioned in the unloader.
2. The train coal unattended operation meter-turnover joint control system according to claim 1, wherein the train number identification unit comprises a double-path train number identifier, a first wide microwave antenna and a second wide microwave antenna;
the first wide-amplitude microwave antenna and the second wide-amplitude microwave antenna are used for generating response signals according to the electronic tags of the train wagons;
and the double-path vehicle number identifier is used for identifying the electronic tag information according to the response signal.
3. The train coal unattended operation meter overturning joint control system according to claim 1, wherein the parking space determination unit comprises a first group of wheel sensors, a second group of wheel sensors and a first determination controller, the first group of wheel sensors comprises a plurality of first wheel sensors arranged at intervals, and the second group of wheel sensors comprises a plurality of second wheel sensors arranged at intervals;
the plurality of first wheel sensors are to identify a direction of wheel travel and a group passing the plurality of first wheel sensors;
the second plurality of wheel sensors is configured to identify a direction of wheel travel and a group of wheels past the second plurality of wheel sensors;
the first judgment controller is used for judging whether the train wagon on the weighing platform meets the metering condition or not according to the traveling directions and groups of the wheels passing through the plurality of first wheel sensors and the plurality of second wheel sensors and generating a judgment result.
4. The train coal unattended operation, counting and turning combined control system according to claim 3, wherein the first wheel sensors comprise first sub wheel sensors attached to the inner side of the weighing platform, the second wheel sensors comprise second sub wheel sensors attached to the inner side of the weighing platform, and the train coal unattended operation, counting and turning combined control system further comprises a shunting machine interlocking control unit;
the first judging controller is further used for judging whether the wagon on the weighing platform is in a boundary state according to the first sub-wagon wheel sensor and the second sub-wagon wheel sensor;
and the shunting machine interlocking control unit is used for controlling the shunting machine to stop pulling when the train wagon is in a boundary state.
5. The train coal unattended operation, counting and turning combined control system according to claim 1, further comprising a train number correction unit, wherein the train number correction unit comprises a third group of wheel sensors and a second judgment controller, the third group of wheel sensors comprises a plurality of third wheel sensors, and the third group of wheel sensors is installed between the wheel clamping device and the unloading machine;
the third set of wheel sensors is for identifying a direction of wheel travel and a set passing by the plurality of third wheel sensors;
the second judgment controller is used for determining the number of the train wagons entering the unloading machine according to the traveling direction and the group of the wheels passing through the plurality of third wheel sensors.
6. The train coal unattended operation counting and turning integrated control system according to claim 5, wherein the train coal unattended operation counting and turning integrated control system further comprises a metering-unloading interlocking control unit;
the metering-unloading interlocking control unit is used for determining whether the train wagon which reaches the wheel clamping device or the unloading machine without metering exists according to the number of the train wagon entering the unloading machine and the number of the train wagon which is weighed;
the parking space adjusting unit is also used for adjusting the wagon which reaches the wheel clamping device or the unloading machine without being measured to the weighing platform.
7. The train coal unattended operation meter-turnover combined control system according to claim 6, wherein the metering-unloading interlocking control unit is specifically configured to determine whether the number of train wagons entering the unloading machine and the number of train wagons entering the weighing machine are equal to 2, and if the number of train wagons entering the weighing machine and the number of train wagons entering the unloading machine are equal to 2, there is no train wagon which reaches the unloading machine without being metered; and if the number of the train wagons entering the unloading machine and the number of the train wagons entering the unloading machine are less than 2, the train wagons which reach the wheel clamping device or the unloading machine without being measured exist.
8. The train coal unattended operation counting and turning integrated control system according to claim 1, wherein the train coal unattended operation counting and turning integrated control system further comprises a stability monitoring unit;
the stability monitoring unit is used for judging whether the weighing result is stable or not, and when the weighing result is stable, the weighing result is a target weighing result.
9. The train coal unattended operation, counting and turning joint control system according to claim 1, wherein the train coal unattended operation, counting and turning joint control system further comprises a heartbeat monitoring unit;
the heartbeat monitoring unit is used for judging whether the main control unit fails or not, and when the main control unit fails, the unloading unit is controlled to stop unloading.
10. A control method of a train coal unattended operation counting and turning integrated control system, which is characterized by being applicable to the train coal unattended operation counting and turning integrated control system of any one of claims 1 to 9, and the control method of the train coal unattended operation counting and turning integrated control system comprises the following steps:
identifying electronic tag information of each train wagon in the train;
determining the train number of the train wagon according to the electronic tag information;
judging whether the wagon on the weighing platform meets the metering condition or not, and generating a judgment result;
when the judgment result is satisfied, generating a weighing instruction, and when the judgment result is not satisfied, generating an adjusting instruction;
weighing the train wagon according to the weighing instruction to obtain a weighing result;
adjusting the position of the wagon according to the adjusting instruction to enable the wagon to meet the metering condition;
and controlling the unloader to unload the wagon which is weighed and is positioned in the unloader.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210813560.3A CN115265740A (en) | 2022-07-11 | 2022-07-11 | Train coal unattended operation, counting and turning combined control system and control method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210813560.3A CN115265740A (en) | 2022-07-11 | 2022-07-11 | Train coal unattended operation, counting and turning combined control system and control method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115265740A true CN115265740A (en) | 2022-11-01 |
Family
ID=83765257
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210813560.3A Pending CN115265740A (en) | 2022-07-11 | 2022-07-11 | Train coal unattended operation, counting and turning combined control system and control method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115265740A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117923191A (en) * | 2024-03-21 | 2024-04-26 | 沈阳奇辉机器人应用技术有限公司 | Intelligent control method and system for unloading of car dumper based on unhooking robot |
-
2022
- 2022-07-11 CN CN202210813560.3A patent/CN115265740A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117923191A (en) * | 2024-03-21 | 2024-04-26 | 沈阳奇辉机器人应用技术有限公司 | Intelligent control method and system for unloading of car dumper based on unhooking robot |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107709136B (en) | Method and device for determining driving authorization for a rail vehicle | |
US9672743B2 (en) | Vehicle traffic control system | |
JP6196688B2 (en) | Detection of vehicles guided on guideways based on RFID systems | |
US20160109476A1 (en) | Method for determining at least one speed in a rail vehicle | |
JP6586521B2 (en) | On-vehicle device and train occupation range calculation method | |
CN115265740A (en) | Train coal unattended operation, counting and turning combined control system and control method thereof | |
JP2010120544A (en) | Train length detection system and train weight calculation system | |
US8036784B2 (en) | System and method for verifying the integrity of a train | |
WO2019181019A1 (en) | Obstacle detection system and obstacle detection method | |
US12037032B2 (en) | Method for detecting systematic deviations during determination of a movement variable of a ground-based, more particularly rail-based, vehicle | |
CN109466591A (en) | The positioning system of rail container power flatcar | |
WO2020217724A1 (en) | Position estimation device, position estimation system, and position estimation method | |
US8723059B2 (en) | System and method for weighing coupled-in-motion railcars loaded with displaceable material | |
JP3246924B2 (en) | Train position detection device | |
RU2560211C1 (en) | Method and control unit for determination of length of portion of line | |
EP0019479B1 (en) | System for weighing freight cars in motion during loading | |
CN110304109A (en) | A kind of axle counting method that can prevent from losing axis | |
JPH07144877A (en) | Device for correcting stop position of tire-type crane | |
CN114735046B (en) | Train wheel diameter measurement system | |
SU1285324A1 (en) | Device for bogiewise weighing of railway rolling stock | |
JP3351453B2 (en) | Current traveling position detection device of transport train | |
JPH0546084Y2 (en) | ||
SU862146A1 (en) | Device for registration of output section productivity | |
Cota | Robust automatic train steering control under jamming and skidding constraints | |
JPH08292813A (en) | Travel control method for rail truck |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |