CN114411564A - Novel guardrail steel bar installation device and construction method - Google Patents

Novel guardrail steel bar installation device and construction method Download PDF

Info

Publication number
CN114411564A
CN114411564A CN202210182147.1A CN202210182147A CN114411564A CN 114411564 A CN114411564 A CN 114411564A CN 202210182147 A CN202210182147 A CN 202210182147A CN 114411564 A CN114411564 A CN 114411564A
Authority
CN
China
Prior art keywords
installation device
guardrail
guardrail reinforcement
new
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210182147.1A
Other languages
Chinese (zh)
Inventor
潘强
黄永亮
阳洋
梁锋
余财文
曹斌
欧阳旭
孙尚宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN202210182147.1A priority Critical patent/CN114411564A/en
Publication of CN114411564A publication Critical patent/CN114411564A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a novel guardrail steel bar installation device and a construction method, wherein the novel guardrail steel bar installation device comprises: a support frame; the linear control frame is connected with the support frame and comprises a main body part and a positioning block connected with the main body part, and the positioning block positions the top of the guardrail steel bar; the fixing frame is connected with the linear control frame and controls the stability of the novel guardrail steel bar mounting device; because this novel guardrail steel bar installation device designs according to the design drawing in advance, and is the same with guardrail reinforcing bar shape, consequently, can be very easy install the guardrail reinforcing bar through novel guardrail steel bar installation device, solved conventional guardrail steel bar installation operating time long, the line type is poor, interval control is difficult scheduling problem, guaranteed engineering quality and construction safety, improved the efficiency of construction simultaneously for the construction progress.

Description

新型护栏钢筋安装装置及施工方法New type guardrail reinforcement installation device and construction method

技术领域technical field

本发明涉及新型护栏钢筋安装装置及施工方法,属于桥梁护栏施工技术领域。The invention relates to a novel guardrail reinforcement installation device and a construction method, and belongs to the technical field of bridge guardrail construction.

背景技术Background technique

随着国家基础建设的大力发展,施工标准化正日益成为主导趋势,同时大跨径桥梁建设日益增多,护栏的安全与质量更是重中之重。但常规的护栏钢筋施工很难满足精准、安全、便捷的要求,同时更难满足规范技术质量和施工标准化的要求,不仅预埋钢筋的位置定位,线型控制以及间距一直难以控制,导致大量施工时间、人员和机械的消耗,同时也使护栏的整体质量得不到保证,容易造成返工的现象。With the vigorous development of national infrastructure, construction standardization is increasingly becoming a dominant trend, and at the same time, the construction of large-span bridges is increasing, and the safety and quality of guardrails are the top priority. However, it is difficult to meet the requirements of precision, safety and convenience in the construction of conventional reinforcement bars for guardrails, and it is even more difficult to meet the requirements of technical quality and construction standardization. The consumption of time, personnel and machinery also makes the overall quality of the guardrail not guaranteed, which is easy to cause rework.

发明内容SUMMARY OF THE INVENTION

本发明的目的在于提供新型护栏钢筋安装装置及施工方法,解决了常规护栏钢筋安装作业时间长、线型差、间距控制难等问题,保证了工程质量和施工安全,同时提高了施工效率,加快了施工进度。The purpose of the present invention is to provide a new type of guardrail reinforcement installation device and construction method, which solves the problems of long operation time, poor line shape, and difficult spacing control for conventional guardrail reinforcement installation, ensures engineering quality and construction safety, and simultaneously improves construction efficiency and accelerates. construction progress.

为达到上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:

一种新型护栏钢筋安装装置,包括:A new type of guardrail reinforcement installation device, comprising:

支撑架;support frame;

线型控制架,与所述支撑架连接,所述线型控制架包括主体部和与所述主体部相连的定位块,所述定位块对护栏钢筋的顶部进行定位;a linear control frame, connected with the support frame, the linear control frame includes a main body part and a positioning block connected with the main body part, and the positioning block positions the top of the guardrail reinforcement;

固定架,与所述线型控制架相连,所述固定架控制所述新型护栏钢筋安装装置的稳定性。The fixing frame is connected with the linear control frame, and the fixing frame controls the stability of the new guardrail reinforcement installation device.

进一步地,所述支撑架包括支撑底座和可伸缩底座,所述可伸缩底座调整所述新型护栏钢筋安装装置的垂直度,所述支撑底座和所述可伸缩底座上安装有支撑套。Further, the support frame includes a support base and a retractable base, the retractable base adjusts the verticality of the new guardrail reinforcement installation device, and a support sleeve is installed on the support base and the retractable base.

进一步地,所述支撑套为方形。Further, the support sleeve is square.

进一步地,所述可伸缩底座包括可伸缩部和与所述可伸缩部相连的第一横杆,所述第一横杆与所述主体部相连,所述可伸缩部调节所述伸缩底座的高度。Further, the retractable base includes a retractable part and a first cross bar connected with the retractable part, the first cross bar is connected with the main body part, and the retractable part adjusts the movement of the retractable base. high.

进一步地,所述可伸缩部包括螺杆和与所述螺杆适配的螺孔。Further, the retractable part includes a screw rod and a screw hole adapted to the screw rod.

进一步地,所述主体部位于第一平面内,所述定位块自所述主体部的顶端向垂直于所述第一平面的方向延伸。Further, the main body portion is located in a first plane, and the positioning block extends from a top end of the main body portion in a direction perpendicular to the first plane.

进一步地,所述主体部近似A字型。Further, the main body portion is approximately A-shaped.

进一步地,所述主体部包括第一斜杆和第二斜杆,所述第一斜杆和所述第二斜杆的一端相连,所述第一斜杆和所述第二斜杆之间连接有若干第二横杆,若干第二横杆的长度不同。Further, the main body includes a first inclined rod and a second inclined rod, one end of the first inclined rod and the second inclined rod are connected, and the first inclined rod and the second inclined rod are connected between one end. A plurality of second transverse bars are connected, and the lengths of the plurality of second transverse bars are different.

一种新型护栏钢筋施工方法,所述方法适用于上述任一项所述的新型护栏钢筋安装装置中,所述方法包括:A new type of guardrail reinforcement construction method, the method is applicable to any one of the above-mentioned new type of guardrail reinforcement installation device, and the method comprises:

S1、根据设计图纸加工好新型护栏钢筋安装装置;S1. Process the new guardrail reinforcement installation device according to the design drawings;

S2、对施工部位进行精确放点;S2. Accurately place points on the construction site;

S3、将所述新型护栏钢筋安装装置放置到测量好的点上;S3, placing the new guardrail reinforcement installation device on the measured point;

S4、根据所述新型护栏钢筋安装装置的线型、间距完成护栏钢筋的安装。S4. Complete the installation of the guardrail reinforcement according to the line type and spacing of the new guardrail reinforcement installation device.

进一步地,在步骤S3后,还包括:使用水平仪对所述新型护栏钢筋安装装置进行竖直度调整。Further, after step S3, the method further includes: using a spirit level to adjust the verticality of the new guardrail reinforcement installation device.

本发明的有益效果在于:提供了新型护栏钢筋安装装置及施工方法,该装置包括支撑架、线型控制架和固定架,线型控制架与支撑架连接,线型控制架包括主体部和与主体部相连的定位块,定位块对护栏钢筋的顶部进行定位,固定架与线型控制架相连,用于控制新型护栏钢筋安装装置的稳定性;根据设计图纸提前将新型护栏钢筋安装装置设计好,在需要安装护栏钢筋时,将该装置放置到已测量好的点上,由于该新型护栏钢筋安装装置是按照设计图纸提前设计好的,与护栏钢筋形状相同,因此,可以很容易的通过新型护栏钢筋安装装置将护栏钢筋安装好,解决了常规护栏钢筋安装作业时间长、线型差、间距控制难等问题,保证了工程质量和施工安全,同时提高了施工效率,加快了施工进度。The beneficial effects of the present invention are as follows: a new guardrail reinforcement installation device and construction method are provided, the device includes a support frame, a linear control frame and a fixing frame, the linear control frame is connected with the support frame, and the linear control frame includes a main body part and a The positioning block connected to the main body, the positioning block locates the top of the guardrail steel bar, the fixing frame is connected with the linear control frame, and is used to control the stability of the new guardrail steel bar installation device; the new guardrail steel bar installation device is designed in advance according to the design drawings. , When the guardrail reinforcement needs to be installed, the device should be placed on the measured point. Since the new guardrail reinforcement installation device is designed in advance according to the design drawings and has the same shape as the guardrail reinforcement, it can be easily passed through the new type. The guardrail reinforcement installation device installs the guardrail reinforcement, which solves the problems of long installation time, poor line shape, and difficult spacing control of conventional guardrail reinforcement, ensures the quality of the project and construction safety, while improving the construction efficiency and speeding up the construction progress.

上述说明仅是本发明技术方案的概述,为了能够更清楚了解本发明的技术手段,并可依照说明书的内容予以实施,以下以本发明的较佳实施例并配合附图详细说明如后。The above description is only an overview of the technical solution of the present invention. In order to understand the technical means of the present invention more clearly, and implement it according to the content of the description, the preferred embodiments of the present invention are described in detail below with the accompanying drawings.

附图说明Description of drawings

图1为一种新型护栏钢筋安装装置的主视图;Fig. 1 is a front view of a new type of guardrail reinforcement installation device;

图2为一种新型护栏钢筋安装装置的侧视图;Figure 2 is a side view of a new type of guardrail reinforcement installation device;

图3为一种新型护栏钢筋安装装置的俯视图;Fig. 3 is a top view of a new type of guardrail reinforcement installation device;

图4为一种新型护栏钢筋施工方法的流程图。Fig. 4 is a flow chart of a new construction method of guardrail reinforcement.

100-新型护栏钢筋安装装置,1-支撑架,11-支撑底座,12-可伸缩底座,121-可伸缩部,1211-螺杆,122-第一横杆,13-支撑套,2-线型控制架,21-主体部,211-第一斜杆,212-第二斜杆,213-第二横杆,22-定位块,3-固定架,31-第一杆体,32-第二杆体。100-New type guardrail reinforcement installation device, 1-support frame, 11-support base, 12-retractable base, 121-retractable part, 1211-screw, 122-first cross bar, 13-support sleeve, 2-line type Control frame, 21-main body, 211-first inclined rod, 212-second inclined rod, 213-second cross rod, 22-positioning block, 3-fixed frame, 31-first rod body, 32-second rod body .

具体实施方式Detailed ways

下面结合附图和实施例,对本发明的具体实施方式作进一步详细描述。以下实施例用于说明本发明,但不用来限制本发明的范围。The specific embodiments of the present invention will be described in further detail below with reference to the accompanying drawings and embodiments. The following examples are intended to illustrate the present invention, but not to limit the scope of the present invention.

下面结合附图和实施例,对本申请的具体实施方式作进一步详细描述。以下实施例用于说明本申请,但不用来限制本申请的范围。The specific implementations of the present application will be described in further detail below with reference to the accompanying drawings and embodiments. The following examples are used to illustrate the present application, but are not intended to limit the scope of the present application.

在本申请的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本申请和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本申请保护范围的限制。此外,术语“第一”、“第二”等仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”等的特征可以明示或者隐含地包括一个或者更多个该特征。在本申请创造的描述中,除非另有说明,“多个”的含义是两个或两个以上。In the description of this application, it should be understood that the terms "center", "portrait", "horizontal", "top", "bottom", "front", "rear", "left", "right", " The orientations or positional relationships indicated by vertical, horizontal, top, bottom, inner, and outer are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and The description is simplified rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operate in a specific orientation, and therefore should not be construed as limiting the scope of protection of the present application. In addition, the terms "first", "second", etc. are used for descriptive purposes only, and should not be construed as indicating or implying relative importance or implying the number of indicated technical features. Thus, a feature defined as "first", "second", etc., may expressly or implicitly include one or more of that feature. In the description created in the present application, unless otherwise specified, "plurality" means two or more.

在本申请的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以通过具体情况理解上述术语在本申请中的具体含义。In the description of this application, it should be noted that, unless otherwise expressly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it may be a fixed connection or a detachable connection Connection, or integral connection; can be mechanical connection, can also be electrical connection; can be directly connected, can also be indirectly connected through an intermediate medium, can be internal communication between two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood through specific situations.

请参考图1至图3,本申请一较佳实施例提供了一种新型护栏钢筋安装装置100,包括:支撑架1、与支撑架1连接的线型控制架2以及与线型控制架2相连的固定架3。Referring to FIGS. 1 to 3 , a preferred embodiment of the present application provides a novel guardrail reinforcement installation device 100 , including: a support frame 1 , a linear control frame 2 connected to the support frame 1 , and a linear control frame 2 Attached brackets 3.

线型控制架2包括主体部21和与主体部21相连的定位块22。在本实施例中,由于护栏钢筋为近似A字型,因此,为了方便安装护栏钢筋,主体部21同样设置成近似A字型。进一步地,主体部21包括第一斜杆211和第二斜杆212,第一斜杆211和第二斜杆212的一端相连,另一端向两个相反方向相离。第一斜杆211和第二斜杆212之间连接有若干第二横杆213,若干第二横杆213的长度不同。如此设置,进一步提高了线型控制架2的稳固性。The linear control frame 2 includes a main body part 21 and a positioning block 22 connected with the main body part 21 . In the present embodiment, since the guardrail steel bars are approximately A-shaped, the main body portion 21 is also set to be approximately A-shaped in order to facilitate the installation of the guardrail bars. Further, the main body portion 21 includes a first inclined rod 211 and a second inclined rod 212, one end of the first inclined rod 211 and the second inclined rod 212 are connected, and the other ends are separated in two opposite directions. A plurality of second transverse rods 213 are connected between the first inclined rod 211 and the second inclined rod 212 , and the lengths of the plurality of second transverse rods 213 are different. This arrangement further improves the stability of the linear control frame 2 .

定位块22用于对护栏钢筋的顶部进行定位。具体的,将线型控制架2所在平面定义为第一平面(未图示),主体部21位于第一平面内,定位块22自主体部21的顶端向垂直于第一平面的方向延伸,使得定位块22突出主体部21,在实际安装护栏钢筋时,更加方便对护栏钢筋的定位。The positioning block 22 is used for positioning the top of the guardrail reinforcement. Specifically, the plane where the linear control frame 2 is located is defined as a first plane (not shown), the main body portion 21 is located in the first plane, and the positioning block 22 extends from the top of the main body portion 21 in a direction perpendicular to the first plane, The positioning block 22 is made to protrude from the main body portion 21, and the positioning of the guardrail reinforcement is more convenient when actually installing the guardrail reinforcement.

支撑架1作为整个新型护栏钢筋安装装置100的支撑部位,位于新型护栏钢筋安装装置100的底部。支撑架1包括支撑底座11和可伸缩底座12,当需要安装护栏钢筋时,将支撑底座11安装在预安装护栏钢筋的地面上。为了提高支撑架1的稳固性,在其中一个实施例中,支撑底座11和可伸缩底座12上安装有支撑套13。而为了进一步提高支撑架1的稳固性,将支撑套13设置为方形。The support frame 1 is located at the bottom of the new type of guardrail reinforcement installation device 100 as the supporting part of the whole new type guardrail reinforcement installation device 100 . The support frame 1 includes a support base 11 and a retractable base 12. When the guardrail reinforcement needs to be installed, the support base 11 is installed on the ground where the guardrail reinforcement is pre-installed. In order to improve the stability of the support frame 1 , in one embodiment, a support sleeve 13 is installed on the support base 11 and the retractable base 12 . In order to further improve the stability of the support frame 1, the support sleeve 13 is set in a square shape.

可伸缩底座12用于调整新型护栏钢筋安装装置100的垂直度,使得待施工地面不论是否平整,新型护栏钢筋安装装置100的中轴线始终与待施工地面垂直,提高该装置100的适用范围。具体的,可伸缩底座12包括可伸缩部121和与可伸缩部121相连的第一横杆122,第一横杆122与主体部相连,可伸缩部121用于调节伸缩底座12的高度。在本实施例中,可伸缩部121包括螺杆1211和与螺杆1211适配的螺孔(未图示),在实际施工时,螺杆1211的一端与待施工地面抵持,另一端穿过螺孔,当需要调整伸缩底座12的高度时,只需要旋转螺杆1211即可。当然,在其中实施例中,可伸缩部121还可以为其他结构,本申请不对此作限定。The retractable base 12 is used to adjust the verticality of the new guardrail reinforcement installation device 100, so that no matter whether the ground to be constructed is flat or not, the central axis of the new guardrail reinforcement installation device 100 is always perpendicular to the to-be-constructed ground, improving the application range of the device 100. Specifically, the telescopic base 12 includes a telescopic portion 121 and a first crossbar 122 connected to the telescopic portion 121 . The first crossbar 122 is connected to the main body portion, and the telescopic portion 121 is used to adjust the height of the telescopic base 12 . In the present embodiment, the retractable portion 121 includes a screw 1211 and a screw hole (not shown) adapted to the screw 1211. In actual construction, one end of the screw 1211 abuts against the ground to be constructed, and the other end passes through the screw hole , when the height of the telescopic base 12 needs to be adjusted, only the screw 1211 needs to be rotated. Of course, in the embodiments, the retractable portion 121 may also have other structures, which are not limited in this application.

固定架3用于控制新型护栏钢筋安装装置100的稳定性。在本实施例中,固定架3包括第一杆体31和与第一杆体31相连的第二杆体32,第一杆体31与地面垂直,第二杆体32与地面平行。需要说明的是,固定架3除了可以用于控制该安装装置100的稳定性外,还可以在放置、搬运该装置100时,作为握持部位,以方便工作人员更好的进行施工。The fixing frame 3 is used to control the stability of the new guardrail reinforcement installation device 100 . In this embodiment, the fixing frame 3 includes a first rod body 31 and a second rod body 32 connected with the first rod body 31 , the first rod body 31 is perpendicular to the ground, and the second rod body 32 is parallel to the ground. It should be noted that, in addition to controlling the stability of the installation device 100 , the fixing frame 3 can also be used as a holding part when placing and transporting the device 100 , so as to facilitate better construction by workers.

请参考图4所示,图4为本申请一实施例提供的一种新型护栏钢筋施工方法的流程图,该方法适用于上述新型护栏钢筋安装装置中。该方法包括:S1、根据设计图纸加工好新型护栏钢筋安装装置;S2、对施工部位进行精确放点;S3、将新型护栏钢筋安装装置放置到测量好的点上;S4、根据新型护栏钢筋安装装置的线型、间距完成护栏钢筋的安装。Please refer to FIG. 4 , which is a flowchart of a new construction method for guardrail reinforcement provided by an embodiment of the present application, and the method is applicable to the above-mentioned novel guardrail reinforcement installation device. The method includes: S1, processing a new type of guardrail reinforcement installation device according to the design drawing; S2, accurately placing points on the construction site; S3, placing the new type guardrail reinforcement installation device on the measured point; S4, according to the new type guardrail reinforcement installation The line type and spacing of the device complete the installation of the guardrail reinforcement.

可选地,在步骤S1中,设计图纸主要对护栏钢筋的形状、间距、保护层厚度以及线型进行设计。Optionally, in step S1, the design drawings mainly design the shape, spacing, thickness of protective layer and line type of the reinforcement bars of the guardrail.

可选地,在将新型护栏钢筋安装装置放置到提前测量好的点上后,为了保证该装置的中轴线与地面垂直,避免对后续的护栏钢筋的安装产生影响,在步骤S3后,该方法还包括:使用水平仪对新型护栏钢筋安装装置进行竖直度调整。Optionally, after the new guardrail reinforcement installation device is placed on the point measured in advance, in order to ensure that the central axis of the device is perpendicular to the ground and avoid affecting the subsequent installation of the guardrail reinforcement, after step S3, the method Also includes: using a spirit level to adjust the verticality of the new guardrail reinforcement installation device.

综上,本申请提供了新型护栏钢筋安装装置及施工方法,该装置包括支撑架、线型控制架和固定架,线型控制架与支撑架连接,线型控制架包括主体部和与主体部相连的定位块,定位块对护栏钢筋的顶部进行定位,固定架与线型控制架相连,用于控制新型护栏钢筋安装装置的稳定性;根据设计图纸提前将新型护栏钢筋安装装置设计好,在需要安装护栏钢筋时,将该装置放置到已测量好的点上,由于该新型护栏钢筋安装装置是按照设计图纸提前设计好的,与护栏钢筋形状相同,因此,可以很容易的通过新型护栏钢筋安装装置将护栏钢筋安装好,解决了常规护栏钢筋安装作业时间长、线型差、间距控制难等问题,保证了工程质量和施工安全,同时提高了施工效率,加快了施工进度。To sum up, the present application provides a new guardrail reinforcement installation device and construction method, the device includes a support frame, a linear control frame and a fixing frame, the linear control frame is connected with the support frame, and the linear control frame includes a main body part and a main body part. Connected positioning block, the positioning block locates the top of the guardrail steel bar, and the fixed frame is connected with the linear control frame, which is used to control the stability of the new guardrail steel bar installation device; according to the design drawings, the new guardrail steel bar installation device is designed in advance. When the guardrail reinforcement needs to be installed, place the device on the measured point. Since the new guardrail reinforcement installation device is designed in advance according to the design drawings and has the same shape as the guardrail reinforcement, it can be easily passed through the new guardrail reinforcement. The installation device installs the steel bars of the guardrail, which solves the problems of long installation time, poor line shape and difficult spacing control of conventional guardrail steel bars, ensures the quality of the project and the safety of the construction, and at the same time improves the construction efficiency and accelerates the construction progress.

以上所述实施例的各技术特征可以进行任意的组合,为使描述简洁,未对上述实施例中的各个技术特征所有可能的组合都进行描述,然而,只要这些技术特征的组合不存在矛盾,都应当认为是本说明书记载的范围。The technical features of the above-described embodiments can be combined arbitrarily. For the sake of brevity, all possible combinations of the technical features in the above-described embodiments are not described. However, as long as there is no contradiction between the combinations of these technical features, All should be regarded as the scope described in this specification.

以上所述实施例仅表达了本发明的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对发明专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形和改进,这些都属于本发明的保护范围。因此,本发明专利的保护范围应以所附权利要求为准。The above-mentioned embodiments only represent several embodiments of the present invention, and the descriptions thereof are specific and detailed, but should not be construed as a limitation on the scope of the invention patent. It should be pointed out that for those of ordinary skill in the art, without departing from the concept of the present invention, several modifications and improvements can also be made, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention should be subject to the appended claims.

Claims (10)

1.一种新型护栏钢筋安装装置,其特征在于,包括:1. a novel guardrail reinforcement installation device, is characterized in that, comprises: 支撑架;support frame; 线型控制架,与所述支撑架连接,所述线型控制架包括主体部和与所述主体部相连的定位块,所述定位块对护栏钢筋的顶部进行定位;a linear control frame, connected with the support frame, the linear control frame includes a main body part and a positioning block connected with the main body part, and the positioning block positions the top of the guardrail reinforcement; 固定架,与所述线型控制架相连,所述固定架控制所述新型护栏钢筋安装装置的稳定性。The fixing frame is connected with the linear control frame, and the fixing frame controls the stability of the new guardrail reinforcement installation device. 2.如权利要求1所述的新型护栏钢筋安装装置,其特征在于,所述支撑架包括支撑底座和可伸缩底座,所述可伸缩底座调整所述新型护栏钢筋安装装置的垂直度,所述支撑底座和所述可伸缩底座上安装有支撑套。2. The new type guardrail reinforcement installation device according to claim 1, wherein the support frame comprises a support base and a retractable base, the retractable base adjusts the verticality of the new type guardrail reinforcement installation device, and the A support sleeve is installed on the support base and the retractable base. 3.如权利要求2所述的新型护栏钢筋安装装置,其特征在于,所述支撑套为方形。3 . The new type guardrail reinforcement installation device according to claim 2 , wherein the support sleeve is square. 4 . 4.如权利要求2所述的新型护栏钢筋安装装置,其特征在于,所述可伸缩底座包括可伸缩部和与所述可伸缩部相连的第一横杆,所述第一横杆与所述主体部相连,所述可伸缩部调节所述伸缩底座的高度。4. The new guardrail reinforcement installation device according to claim 2, wherein the retractable base comprises a retractable part and a first cross bar connected with the retractable part, and the first cross bar is connected to the retractable part. The main body parts are connected, and the telescopic part adjusts the height of the telescopic base. 5.如权利要求4所述的新型护栏钢筋安装装置,其特征在于,所述可伸缩部包括螺杆和与所述螺杆适配的螺孔。5 . The new guardrail reinforcement installation device according to claim 4 , wherein the retractable part comprises a screw rod and a screw hole adapted to the screw rod. 6 . 6.如权利要求1所述的新型护栏钢筋安装装置,其特征在于,所述主体部位于第一平面内,所述定位块自所述主体部的顶端向垂直于所述第一平面的方向延伸。6 . The new guardrail reinforcement installation device according to claim 1 , wherein the main body portion is located in a first plane, and the positioning block is directed from the top of the main body portion to a direction perpendicular to the first plane. 7 . extend. 7.如权利要求1所述的新型护栏钢筋安装装置,其特征在于,所述主体部近似A字型。7 . The new guardrail reinforcement installation device according to claim 1 , wherein the main body is approximately A-shaped. 8 . 8.如权利要求7所述的新型护栏钢筋安装装置,其特征在于,所述主体部包括第一斜杆和第二斜杆,所述第一斜杆和所述第二斜杆的一端相连,所述第一斜杆和所述第二斜杆之间连接有若干第二横杆,若干第二横杆的长度不同。8 . The new guardrail reinforcement installation device according to claim 7 , wherein the main body portion comprises a first inclined rod and a second inclined rod, and one end of the first inclined rod and the second inclined rod is connected to one end. 9 . , a plurality of second transverse rods are connected between the first inclined rod and the second inclined rod, and the lengths of the plurality of second transverse rods are different. 9.一种新型护栏钢筋的施工方法,其特征在于,所述方法适用于如权利要求1至8任一项所述的新型护栏钢筋安装装置中,所述方法包括:9. A construction method for a new type of guardrail reinforcement, wherein the method is suitable for use in the installation device for the novel guardrail reinforcement according to any one of claims 1 to 8, and the method comprises: S1、根据设计图纸加工好新型护栏钢筋安装装置;S1. Process the new guardrail reinforcement installation device according to the design drawings; S2、对施工部位进行精确放点;S2. Accurately place points on the construction site; S3、将所述新型护栏钢筋安装装置放置到测量好的点上;S3, placing the new guardrail reinforcement installation device on the measured point; S4、根据所述新型护栏钢筋安装装置的线型、间距完成护栏钢筋的安装。S4. Complete the installation of the guardrail reinforcement according to the line type and spacing of the new guardrail reinforcement installation device. 10.如权利要求9所述的方法,其特征在于,在步骤S3后,还包括:使用水平仪对所述新型护栏钢筋安装装置进行竖直度调整。10 . The method according to claim 9 , wherein after step S3 , the method further comprises: using a spirit level to adjust the verticality of the new guardrail reinforcement installation device. 11 .
CN202210182147.1A 2022-02-25 2022-02-25 Novel guardrail steel bar installation device and construction method Pending CN114411564A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210182147.1A CN114411564A (en) 2022-02-25 2022-02-25 Novel guardrail steel bar installation device and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210182147.1A CN114411564A (en) 2022-02-25 2022-02-25 Novel guardrail steel bar installation device and construction method

Publications (1)

Publication Number Publication Date
CN114411564A true CN114411564A (en) 2022-04-29

Family

ID=81261280

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210182147.1A Pending CN114411564A (en) 2022-02-25 2022-02-25 Novel guardrail steel bar installation device and construction method

Country Status (1)

Country Link
CN (1) CN114411564A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN208105045U (en) * 2018-03-21 2018-11-16 邳州远通公路工程有限公司 A kind of Bridge guardrail reinforcing bar integrated positioning device
KR20190041189A (en) * 2017-10-12 2019-04-22 현대건설주식회사 Modular work platform of a long span bridge main tower rebar and construction method using the same
CN111270606A (en) * 2020-02-11 2020-06-12 山东省交通规划设计院有限公司 Connecting structure of assembled steel bridge floor concrete anti-collision guardrail and complete construction method thereof
KR20210017720A (en) * 2019-08-09 2021-02-17 한국도로공사 Vehicle protection wall connecting apparatus and method for constructing vehicle protection wall of bridge using the same
CN212582432U (en) * 2020-05-27 2021-02-23 中国水利水电第十工程局有限公司 Bridge anticollision barrier reinforcing bar protective layer controlling means
CN214089463U (en) * 2020-09-10 2021-08-31 中交一公局桥隧工程有限公司 Bridge concrete anticollision barrier steel bar installation bed-jig
CN113944104A (en) * 2021-10-26 2022-01-18 中交路桥建设有限公司 Hanging bracket convenient for positioning and moving horizontal steel bars of concrete guardrail and construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190041189A (en) * 2017-10-12 2019-04-22 현대건설주식회사 Modular work platform of a long span bridge main tower rebar and construction method using the same
CN208105045U (en) * 2018-03-21 2018-11-16 邳州远通公路工程有限公司 A kind of Bridge guardrail reinforcing bar integrated positioning device
KR20210017720A (en) * 2019-08-09 2021-02-17 한국도로공사 Vehicle protection wall connecting apparatus and method for constructing vehicle protection wall of bridge using the same
CN111270606A (en) * 2020-02-11 2020-06-12 山东省交通规划设计院有限公司 Connecting structure of assembled steel bridge floor concrete anti-collision guardrail and complete construction method thereof
CN212582432U (en) * 2020-05-27 2021-02-23 中国水利水电第十工程局有限公司 Bridge anticollision barrier reinforcing bar protective layer controlling means
CN214089463U (en) * 2020-09-10 2021-08-31 中交一公局桥隧工程有限公司 Bridge concrete anticollision barrier steel bar installation bed-jig
CN113944104A (en) * 2021-10-26 2022-01-18 中交路桥建设有限公司 Hanging bracket convenient for positioning and moving horizontal steel bars of concrete guardrail and construction method

Similar Documents

Publication Publication Date Title
CN107060357A (en) The bracing device of Assembled wall panels
CN205445093U (en) Buried bolt device in advance
CN114411564A (en) Novel guardrail steel bar installation device and construction method
CN112681760A (en) Construction method of BIM auxiliary inclined structural column
CN102505864A (en) Method for assembling fixed ends of scaffold of large-volume triangular variable-section tubular truss structure
CN205745938U (en) The mounting bracket of a kind of LED display and hoisting structure
CN213205009U (en) Component mounting and positioning guide frame
CN216339588U (en) A foundation pit support beam structure
CN214144807U (en) Large-diameter steel sleeve mounting device
CN212516334U (en) Electric power warning sign convenient to adjust
CN203222810U (en) Steel column and base structure system
CN222183920U (en) A split step structure for spiral staircase
KR20100004374U (en) Walls supporter of a truss type
CN218203917U (en) Positioning fine-adjustment device for installing arch rib sections with dumbbell-shaped cross sections of continuous beam arch bridge
CN107860376B (en) Measuring and positioning method for tripod of large-scale intercooling tower cone section
CN216380268U (en) External reinforcing steel bar positioning device
CN112982961B (en) A kind of quick pre-buried silo structure auxiliary steel structure silo wall
CN205637632U (en) Special instrument holder is rectified in installation of shaped steel post
CN218678305U (en) Adjustable cable tray device
CN219298784U (en) Quick detach formula building engineering template bearing structure
CN218479500U (en) Small-size operation platform of vertical aluminum alloy template
CN111335357A (en) A kind of pipe gallery formwork support system and construction method thereof
CN221955700U (en) Quick mounting structure for tower crane attached wall
CN219754011U (en) Portable tripod leg L-shaped steel supporting structure
CN215168042U (en) Concrete structure beam template fixing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20220429