CN114399176A - Intelligent management system for construction site of power transmission and transformation project - Google Patents

Intelligent management system for construction site of power transmission and transformation project Download PDF

Info

Publication number
CN114399176A
CN114399176A CN202111643024.5A CN202111643024A CN114399176A CN 114399176 A CN114399176 A CN 114399176A CN 202111643024 A CN202111643024 A CN 202111643024A CN 114399176 A CN114399176 A CN 114399176A
Authority
CN
China
Prior art keywords
construction site
power transmission
management system
personnel
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111643024.5A
Other languages
Chinese (zh)
Inventor
张建军
陆彬彬
安在兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Guojin Electric Power Engineering Co ltd
Original Assignee
Anhui Guojin Electric Power Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Guojin Electric Power Engineering Co ltd filed Critical Anhui Guojin Electric Power Engineering Co ltd
Priority to CN202111643024.5A priority Critical patent/CN114399176A/en
Publication of CN114399176A publication Critical patent/CN114399176A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of power transmission and transformation engineering, and discloses an intelligent management system for a power transmission and transformation engineering construction site, which comprises a BIM data storage module, a personnel information input module, a data processing module, a two-dimension code generation module, a central processing unit, two-dimension code scanning equipment and a display mobile terminal, wherein the BIM data storage module is used for uploading a BIM model and automatically extracting component attribute data in an IFC format file, and automatically extracting yard information data, including yard bearing capacity data preset in advance. The intelligent management system for the power transmission and transformation project construction site can record the entering time and the leaving time of entering personnel, so that managers can conveniently assess and record the performance of the personnel, non-workers can be prevented from entering the construction site, the construction site is not affected by external personnel, and the management level of the construction site is improved by an informatization means of the system.

Description

Intelligent management system for construction site of power transmission and transformation project
Technical Field
The invention relates to the technical field of power transmission and transformation projects, in particular to an intelligent management system for a construction site of a power transmission and transformation project.
Background
The construction site refers to a construction site where construction activities such as house construction, civil engineering, equipment installation, and pipeline laying are performed in industrial and civil projects, and the construction site is approved to be occupied, and a site where safety production, civilized work, and construction are performed by human beings, including all regions where construction work can be performed on land, sea, and in the air. The project manager is responsible for the field management of the construction process, and the project manager establishes the management responsibility of the construction field and organizes and implements the management responsibility according to the project scale, the technical complexity and the specific situation of the construction field.
The existing construction site is inconvenient and can isolate non-workers, so that the non-workers on the construction site can influence the work of the workers, and therefore the invention provides the intelligent management system for the construction site of the power transmission and transformation project.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides an intelligent management system for a construction site of a power transmission and transformation project, which solves the problems in the background art.
(II) technical scheme
In order to achieve the above purpose, the invention provides the following technical scheme: the utility model provides a power transmission and transformation engineering job site intelligent management system, includes BIM data storage module, personnel information input module, data processing module, two-dimensional code generation module, central processing unit, two-dimensional code scanning equipment and display mobile terminal, BIM data storage module carries out the BIM model and uploads and the component attribute data in the automatic extraction IFC format file, and automatic extraction stock yard information data is including the stock yard bearing capacity data that predetermines in advance.
Preferably, the personnel information input module is a computer-side input device, and inputs personnel information and manager information in a construction site into a personnel information input module system.
Preferably, the data processing module integrates the BIM model data and the factory processing information data stream, and generates a unique two-dimensional code of the component according to the personnel information through the two-dimensional code generating module, that is, the certificate is manufactured for each employee.
Preferably, the certificate is scanned through a two-dimensional code scanning device, and then the certificate is detected, compared and screened by a central processing unit, so that staff and non-staff on a construction site are screened.
Preferably, the mobile terminal of the display is connected with an entrance gate to be accessible by screened personnel.
Preferably, the mobile terminal of the display records the entering time and the leaving time of the entering person.
(III) advantageous effects
Compared with the prior art, the invention provides an intelligent management system for a construction site of a power transmission and transformation project, which has the following beneficial effects:
the intelligent management system for the power transmission and transformation project construction site can record the entering time and the leaving time of entering personnel, so that managers can conveniently assess and record the performance of the personnel, non-workers can be prevented from entering the construction site, the construction site is not affected by external personnel, and the management level of the construction site is improved by an informatization means of the system.
Drawings
FIG. 1 is a schematic structural diagram of an intelligent management system for a construction site of a power transmission and transformation project according to the present invention;
in the figure: 1. BIM data storage module 2, personnel information input module 3, data processing module 4, two-dimensional code generation module 5, central processing unit 6, two-dimensional code scanning equipment 7, display mobile terminal.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, the present invention provides a technical solution: including BIM data storage module 1, personnel information input module 2, data processing module 3, two-dimensional code generation module 4, central processing unit 5, two-dimensional code scanning equipment 6 and display mobile terminal 7, its characterized in that: the BIM data storage module 1 uploads a BIM model and automatically extracts component attribute data in an IFC format file, and automatically extracts yard information data, including yard bearing capacity data preset in advance, the personnel information input module 2 is computer-side input equipment, and integrates personnel information and management personnel information in a construction site, an input personnel information input module 2 system, the data processing module 3 integrates the BIM model data and factory processing information data flow, and generates a unique two-dimensional code of the component according to the personnel information through a two-dimensional code generating module 4, the certificate is manufactured for each employee, the certificate is scanned through the two-dimensional code scanning device 6, then the central processing unit 5 is used for detecting and comparing and screening employees and non-employees on a construction site, the display mobile terminal 7 is connected with the entrance gate and can enter through screened personnel, and the display mobile terminal 7 can record the entering time and leaving time of the entering personnel.
Working;
1. the BIM model is uploaded through the BIM data storage module 1, the component attribute data in the IFC format file is automatically extracted, and the yard information data, including the yard bearing capacity data preset in advance, is automatically extracted.
2. The personnel information input module 2 is a computer-side input device, and personnel information and manager information in a construction site are input into the personnel information input module 2 system.
3. BIM model data and factory processing information data flow are integrated through the data processing module 3, and a unique component two-dimensional code is generated through the two-dimensional code generating module 4 according to personnel information, namely, a certificate is manufactured for each employee.
4. The certificates are scanned through the two-dimensional code scanning device 6, and then the central processing unit 5 is used for detecting, comparing and screening employees and non-employees on the construction site.
To sum up, the intelligent management system for the construction site of the power transmission and transformation project can record the entering time and the leaving time of entering personnel, so that managers can conveniently assess and record the performance of the personnel, non-workers can be prevented from entering the construction site, the construction site is not affected by external personnel, and the management level of the construction site is improved by an informatization means of the system.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a power transmission and transformation engineering job site intelligent management system, includes BIM data storage module (1), personnel information entry module (2), data processing module (3), two-dimensional code generation module (4), central processing unit (5), two-dimensional code scanning equipment (6) and display mobile terminal (7), its characterized in that: the BIM data storage module (1) uploads a BIM model and automatically extracts component attribute data in the IFC format file, and stock yard information data including stock yard bearing capacity data preset in advance are automatically extracted.
2. The intelligent management system for the construction site of the power transmission and transformation project, according to claim 1, is characterized in that: the personnel information input module (2) is a computer-side input device, and inputs personnel information and manager information in a construction site into the personnel information input module (2) system.
3. The intelligent management system for the construction site of the power transmission and transformation project, according to claim 1, is characterized in that: the data processing module (3) integrates the BIM model data and the factory processing information data stream, and generates a unique component two-dimensional code according to the personnel information through the two-dimensional code generating module (4), namely, the unique component two-dimensional code is used for making the certificate for each employee.
4. The intelligent management system for the construction site of the power transmission and transformation project, according to claim 1, is characterized in that: the certificate is scanned through a two-dimensional code scanning device (6), and then is detected and compared through a central processing unit (5) to screen employees and non-employees on a construction site.
5. The intelligent management system for the construction site of the power transmission and transformation project, according to claim 1, is characterized in that: the display mobile terminal (7) is connected with the entrance gate and can be accessed by screened personnel.
6. The intelligent management system for the construction site of the power transmission and transformation project, according to claim 1, is characterized in that: the display mobile terminal (7) records the entering time and the leaving time of the entering personnel.
CN202111643024.5A 2021-12-29 2021-12-29 Intelligent management system for construction site of power transmission and transformation project Pending CN114399176A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111643024.5A CN114399176A (en) 2021-12-29 2021-12-29 Intelligent management system for construction site of power transmission and transformation project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111643024.5A CN114399176A (en) 2021-12-29 2021-12-29 Intelligent management system for construction site of power transmission and transformation project

Publications (1)

Publication Number Publication Date
CN114399176A true CN114399176A (en) 2022-04-26

Family

ID=81228145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111643024.5A Pending CN114399176A (en) 2021-12-29 2021-12-29 Intelligent management system for construction site of power transmission and transformation project

Country Status (1)

Country Link
CN (1) CN114399176A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105989431A (en) * 2015-02-04 2016-10-05 四川蜀能电力有限公司 Power transmission and transformation project construction field management system
CN107292538A (en) * 2017-07-25 2017-10-24 浙江精工钢结构集团有限公司 A kind of live material visual intelligent management system of Construction of Steel Structure
CN107888665A (en) * 2017-10-26 2018-04-06 中铁四局集团有限公司 Construction site personnel information and safety management system
CN108376437A (en) * 2018-05-23 2018-08-07 清华大学 A kind of conference management method and system based on smart mobile phone application

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105989431A (en) * 2015-02-04 2016-10-05 四川蜀能电力有限公司 Power transmission and transformation project construction field management system
CN107292538A (en) * 2017-07-25 2017-10-24 浙江精工钢结构集团有限公司 A kind of live material visual intelligent management system of Construction of Steel Structure
CN107888665A (en) * 2017-10-26 2018-04-06 中铁四局集团有限公司 Construction site personnel information and safety management system
CN108376437A (en) * 2018-05-23 2018-08-07 清华大学 A kind of conference management method and system based on smart mobile phone application

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
""基于"互联网+物联网"的工程质量智慧监管研究"", 《企业改革与管理》, no. 12, 31 December 2019 (2019-12-31), pages 60 *

Similar Documents

Publication Publication Date Title
CN114399210B (en) Geological disaster emergency management and decision system, method and readable storage medium
CN111784140A (en) Wisdom water affairs management and control scheduling platform based on internet of things
CN108915771B (en) Cloud control mine comprehensive management system
CN109559069B (en) Production management method and device based on assembly type building platform and terminal equipment
CN111260325A (en) Bridge construction progress management system based on BIM
CN113325153A (en) Water quality multi-parameter monitoring comprehensive information management system
CN115374508A (en) Large and medium-sized reservoir safety inspection system based on virtual reality technology
Pavić et al. Development of seismic vulnerability and exposure models—A case study of Croatia
Zhou et al. Development of a database exclusively for subway construction accidents and corresponding analyses
CN112712674A (en) Urban waterlogging early warning method based on informatization technology
CN112286994A (en) Glass curtain wall integrated management platform
CN111488999A (en) Be applied to wind-powered electricity generation field safety production information-based management system
CN111429471A (en) Geological disaster information management system and method
CN112261384A (en) Artificial intelligence violation behavior recognition system
Xu et al. Effectiveness Study of Artificial Intelligent Facility System in Maintaining Building Fire Safety (Case Study: Typical Public Building Cases of Fire‐Fighting Facilities Management in China)
CN105653777A (en) Intelligent mapping system for general survey of underground power pipeline
CN107527162B (en) House safety identification system and use method thereof
CN111882081A (en) BIM model-based operation and maintenance management method, medium, terminal and system
Templeton et al. A project lifetime approach to the management of induced seismicity risk at geologic carbon storage sites
CN115453998A (en) Visual monitoring method and platform for safety production of tank field of hazardous chemical enterprise
CN114399176A (en) Intelligent management system for construction site of power transmission and transformation project
CN117371992A (en) Reservoir operation and maintenance control system based on GIS
CN117689360A (en) Manufacturing method of intelligent inspection integrated platform of fan
CN106404052B (en) Road vehicle test method and system
Dawidowicz et al. The evolving role of the cadastre in the land administration system in Poland

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination