[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN114386829A - Industrial intelligent park control system - Google Patents

Industrial intelligent park control system Download PDF

Info

Publication number
CN114386829A
CN114386829A CN202210025651.0A CN202210025651A CN114386829A CN 114386829 A CN114386829 A CN 114386829A CN 202210025651 A CN202210025651 A CN 202210025651A CN 114386829 A CN114386829 A CN 114386829A
Authority
CN
China
Prior art keywords
module
monitoring
data
odor
safety
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210025651.0A
Other languages
Chinese (zh)
Inventor
林烔槟
于淼
张丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Xinwen Technology Co ltd
Original Assignee
Shenzhen Xinwen Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Xinwen Technology Co ltd filed Critical Shenzhen Xinwen Technology Co ltd
Priority to CN202210025651.0A priority Critical patent/CN114386829A/en
Publication of CN114386829A publication Critical patent/CN114386829A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Tourism & Hospitality (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Development Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an industrial intelligent park control system which comprises a big data processing platform, a data acquisition and analysis module, an energy control module, an environment monitoring module and a safety monitoring module, wherein the big data processing platform is used for processing various data of an intelligent industrial park and collecting service data and various data information related to service analysis, the data acquisition and analysis module is used for collecting environment information through smell, processing the collected information and judging the safety of the surrounding environment, and the energy control module is used for integrating energy devices by the energy control system and monitoring the area to form a point, line and plane grading and sub-control three-dimensional monitoring network system in the park. The invention relates to an industrial intelligent park control system, which belongs to the technical field of control systems.

Description

Industrial intelligent park control system
Technical Field
The invention relates to the technical field of control systems, in particular to an industrial intelligent park control system.
Background
Along with the development process of the society, intellectualization permeates into the life of people for a short time, a new generation of information technology is fully applied to an industrial park in the intelligent park, the informatization and the industrialization are deeply integrated, the intelligent park is refined and dynamically managed, the information isolation among the large parks is improved, the transaction and resource information is lack of circulation, and the current industrial park is not provided with an intelligent monitoring system, so that the environmental pollution treatment and evidence collection are difficult and the source cannot be clearly traced; the established information system does not carry out effective daily operation and maintenance, and value-added and intelligent decision operation services for professional data are lacked; accident emergency can not be subjected to multi-party linkage emergency command, and the full-flow cooperative supervision of an industrial park is not realized; an effective monitoring, early warning and disposal platform and a grading and sub-control three-dimensional monitoring network system are not established for potential safety hazards.
The construction and development of the park lack overall planning, the industrial park and the urban overall planning lack unified coordination, the layout and construction lack macroscopic guidance and information service, the phenomena of unclear positioning, blind point distribution and repeated construction occur, and the real intelligent industrial park construction cannot be realized; the emergency command of accidents can not be carried out in a multi-party linkage manner, the cooperative supervision of the whole process of dangerous chemicals is not realized, the safety distance between part of parks and urban areas, residential areas and peripheral enterprises is further shortened, the potential safety hazard is increased, and some chemical projects with high dangerousness tend to be transferred from developed areas to areas with low safety and environmental protection investment or underdeveloped areas; the ultra-large devices and the intensive layout increase the safety and environmental protection risks. But no effective monitoring, early warning and disposal platform and a grading and sub-control three-dimensional monitoring network system are established for the potential safety hazard.
Disclosure of Invention
The invention mainly aims to provide an industrial intelligent park control system which can effectively solve the problem that some chemical projects with higher risks in the background technology have the tendency of transferring from developed areas to areas with low safety and environmental protection investment or underdeveloped areas; the ultra-large devices and the intensive layout increase the safety and environmental protection risks. But does not establish an effective monitoring, early warning and disposal platform and a grading and sub-control three-dimensional monitoring network system for potential safety hazards.
In order to achieve the purpose, the invention adopts the technical scheme that:
an industrial intelligent park control system comprises a big data processing platform, a data acquisition and analysis module, an energy control module, an environment monitoring module and a safety monitoring module, wherein the big data processing platform is used for processing various data of an intelligent industrial park, collecting service data and various data information related to service analysis, the data acquisition and analysis module is used for collecting environment information through smell, processing the collected information and judging the safety of the surrounding environment, the energy control module is used for integrating an energy device by the energy control system and monitoring the area to form a three-dimensional monitoring network system with points, lines, surfaces and hierarchical control in the park, the environment monitoring module is used for integrating enterprise pollution sources, park environment and atmosphere gridding monitoring, establishing a multi-dimensional monitoring system, and based on environment monitoring and general survey data, the safety monitoring module is used for the safety system based on major hazard source filing data, the system comprises an online monitoring and early warning data module, a data acquisition and analysis module, an environment monitoring module and a warning module, wherein the data acquisition and analysis module comprises an odor acquisition and monitoring module, an odor purification module, a data comparison module, a database storage module and a human-computer interface processing module, the environment monitoring module comprises a multidimensional monitoring module, a control module and a warning module, and the safety monitoring module comprises a safety information monitoring module, an association analysis module and an early warning module.
Preferably, the big data processing platform enters a big data resource center through the processes of data acquisition, cleaning, standardization and the like, is analyzed and processed by using a big data technology, is finally served to all levels of functional departments and management layers, and is used for assisting decision support, thereby being the basis for the operation of the intelligent industrial park.
Preferably, the odor collection monitoring module is used for collecting odor data, the odor purification module is used for purifying the collected odor, the database storage module is used for storing data information of different odors, the data comparison module is used for comparing the collected odor with the data information of different stored odors, and the human-computer interface processing module is used for realizing human-computer interaction.
Preferably, the touch screen and the USB mouse on the human-computer interface processing module realize human-computer interaction, and the odor purification module is used for placing the carrier of the odor to be detected into the small air compressor for air compression and purifying the odor.
Preferably, the multidimensional monitoring module is used for detecting the monitored area in multiple directions, the control module is used for fine supervision and traceability analysis, and the warning module is used for warning monitoring personnel.
Preferably, the safety information monitoring module is used for monitoring equipment specifications, monitoring personnel safety and monitoring plant safety, the association analysis module is used for comparing and analyzing monitoring data, and the early warning module is used for early warning equipment use non-specifications and personnel distress.
Preferably, the energy control module comprises a wind energy control module, an oil energy control module, a gas energy control module, an electric energy control module and a water energy control module, and the wind energy control module, the oil energy control module, the gas energy control module, the electric energy control module and the water energy control module are arranged to monitor energy, so that the utilization rate of energy can be improved, a monitoring track is formed for energy consumption habits, an energy use plan is reasonably planned, and resources are saved to the maximum extent.
Preferably, the safety monitoring module analyzes the regional distribution, seasonal distribution, industry distribution and type distribution of the alarm and mines the incidence relation between the alarm and the accident.
Compared with the prior art, the invention has the following beneficial effects: the odor collection monitoring module is used for collecting odor data, the odor purification module is used for purifying the collected odor, the database storage module is used for storing data information of different odors, the data comparison module is used for comparing the collected odor with the data information of different odors, the human-computer interface processing module is used for realizing human-computer interaction, collecting environmental information through odor, processing the collected information, judging the safety of the surrounding environment, integrating enterprise pollution sources, park environment and atmospheric gridding monitoring, establishing a multi-dimensional monitoring system, finely supervising and tracing analysis based on the environmental monitoring and general survey data, processing various data of an intelligent industrial park, collecting service data and various data information related to service analysis, realizing human-computer interaction by a touch screen and a USB mouse on the human-computer interface processing module, and putting a carrier of the odor to be detected into a small-sized air compressor by the odor purification module, the air compression is carried out, the odor is purified, the energy is monitored by arranging the wind energy control module, the oil energy control module, the gas energy control module, the electric energy control module and the water energy control module, the utilization rate of the energy can be improved, a monitoring track is formed for energy consumption habits, an energy use plan is reasonably planned, resources are saved to the maximum degree, and the actual use is facilitated.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the invention easy to understand, the invention is further described with the specific embodiments.
As shown in figure 1, an industrial intelligent park control system comprises a big data processing platform, a data acquisition and analysis module, an energy control module, an environment monitoring module and a safety monitoring module, wherein the big data processing platform is used for processing various data of an intelligent industrial park, collecting service data and various data information related to service analysis, the data acquisition and analysis module is used for collecting environment information through odor, processing the collected information and judging the safety of the surrounding environment, the energy control module is used for integrating an energy device by the energy control system and monitoring the area to form a three-dimensional monitoring network system with points, lines, planes and hierarchical control in the park, the environment monitoring module is used for integrating enterprise pollution sources, park environment and atmosphere gridding monitoring, establishing a multi-dimensional monitoring system and based on environment monitoring and general survey data, the system comprises a safety monitoring module, a data acquisition and analysis module, an environment monitoring module, a data storage module, a human-computer interface processing module, a data acquisition and analysis module, a data storage module, a data processing module and a data processing module, wherein the safety monitoring module is used for monitoring early warning data on line by a safety system based on major hazard source filing data;
in this embodiment, the big data processing platform enters a big data resource center through processes of data acquisition, cleaning, standardization and the like, performs analysis and processing by using a big data technology, finally serves all levels of functional departments and management layers, and performs decision support assistance, which is a basis for operation of an intelligent industrial park.
In this embodiment, the odor collection monitoring module is used for collecting odor data, the odor purification module is used for purifying the collected odor, the database storage module is used for storing data information of different odors, the data comparison module is used for comparing the collected odor with the data information of the stored different odors, and the human-computer interface processing module is used for realizing human-computer interaction.
In this embodiment, the touch screen and the USB mouse on the human-computer interface processing module realize human-computer interaction, and the odor purification module puts the carrier of the odor to be detected into the small air compressor to perform air compression and purify the odor.
In this embodiment, the multidimensional monitoring module is used for detecting a monitored area in multiple directions, the control module is used for refined supervision and traceability analysis, and the warning module is used for warning monitoring personnel.
In this embodiment, the safety information monitoring module is used for monitoring equipment specifications, monitoring personnel safety and monitoring plant safety, the association analysis module is used for comparing and analyzing monitoring data, and the early warning module is used for early warning equipment use non-specifications and personnel distress.
In this embodiment, the energy control module includes a wind energy control module, an oil energy control module, a gas energy control module, an electric energy control module and a water energy control module, and the wind energy control module, the oil energy control module, the gas energy control module, the electric energy control module and the water energy control module are arranged to monitor the energy, so that the utilization rate of the energy can be improved, a monitoring track is formed for the energy consumption habit, the energy use plan is reasonably planned, and the resource is saved to the maximum.
In this embodiment, the security monitoring module analyzes the regional distribution, seasonal distribution, industry distribution, type distribution of the alarm and mines the association relationship between the alarm and the accident.
The invention is an industrial intelligent park control system, when in use, the large data processing platform, the data acquisition and analysis module, the energy control module, the environment monitoring module and the safety monitoring module are used for processing various data of an intelligent industrial park, collecting service data and various data information related to service analysis, the large data processing platform enters a large data resource center through the processes of data acquisition, cleaning, standardization and the like, performs analysis and processing by using a large data technology, finally serves all levels of functional departments and management layers to perform auxiliary decision support, is the basis of the operation of the intelligent industrial park, the data acquisition and analysis module is used for collecting environmental information through odor, processing the collected information and judging the safety of the surrounding environment, the energy control module is used for the energy control system to integrate energy, the region is monitored to form a three-dimensional monitoring network system with points, lines, surface grading and separate control in the park, the environment monitoring module is used for integrating enterprise pollution sources, park environment and atmosphere gridding monitoring, a multi-dimensional monitoring system is established, based on environment monitoring and general survey data, the safety monitoring module is used for monitoring early warning data on line based on major hazard source record data of a safety system, the data acquisition and analysis module comprises an odor acquisition monitoring module, an odor purification module, a data comparison module, a database storage module and a human-computer interface processing module, the odor acquisition monitoring module is used for acquiring odor data, the odor purification module is used for purifying acquired odor, the database storage module is used for storing data information of different odors, and the data comparison module is used for comparing the acquired odor with data information of different odors, the human-computer interface processing module is used for realizing human-computer interaction, a touch screen and a USB mouse on the human-computer interface processing module realize human-computer interaction, the odor purification module is used for putting a carrier of odor to be detected into a small air compressor for air compression and purifying the odor, the environment monitoring module comprises a multidimensional monitoring module, a control module and a warning module, the multidimensional monitoring module is used for detecting a monitored area in multiple directions, the control module is used for fine supervision and traceability analysis, the warning module is used for warning monitoring personnel, the safety monitoring module comprises a safety information monitoring module, an association analysis module and an early warning module, the safety information monitoring module is used for monitoring equipment specification, monitoring personnel safety and monitoring plant area safety, the association analysis module is used for comparing and analyzing monitoring data, and the early warning module is used for early warning abnormal use of the equipment and danger of personnel, the safety monitoring module analyzes the regional distribution, seasonal distribution, industry distribution and type distribution of alarm and excavates the incidence relation between the alarm and an accident, the energy control module comprises a wind energy control module, an oil energy control module, a gas energy control module, an electric energy control module and a water energy control module, and the wind energy control module, the oil energy control module, the gas energy control module, the electric energy control module and the water energy control module are arranged to monitor the energy, so that the utilization rate of the energy can be improved, a monitoring track is formed for the energy consumption habit, an energy use plan is reasonably planned, the resources are saved to the maximum degree, and the practical use is facilitated.
The principles and embodiments of the present invention have been described herein using specific examples, which are provided only to help understand the method and the core concept of the present invention; meanwhile, for a person skilled in the art, according to the idea of the present invention, the specific embodiments and the application range may be changed. It will be evident that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. Accordingly, the embodiments should be considered as exemplary and non-limiting. The above are only preferred embodiments of the present invention, and do not limit the scope of the claims of the present invention.

Claims (8)

1. The utility model provides an industry wisdom garden control system which characterized in that: the intelligent industrial park environment monitoring system comprises a big data processing platform, a data acquisition and analysis module, an energy control module, an environment monitoring module and a safety monitoring module, wherein the big data processing platform is used for processing various data of an intelligent industrial park, collecting service data and various data information related to service analysis, the data acquisition and analysis module is used for collecting environmental information through odor, processing the collected information and judging the safety of the surrounding environment, the energy control module is used for integrating an energy device by an energy control system and monitoring the area to form a point, line, surface grading and separate control three-dimensional monitoring network system in the park, the environment monitoring module is used for integrating enterprise pollution sources, park environment and atmosphere gridding monitoring, establishing a multi-dimensional monitoring system, and based on environment monitoring and general survey data, the safety monitoring module is used for solving case data of a safety system based on major hazard sources, the system comprises an online monitoring and early warning data module, a data acquisition and analysis module, an environment monitoring module and a warning module, wherein the data acquisition and analysis module comprises an odor acquisition and monitoring module, an odor purification module, a data comparison module, a database storage module and a human-computer interface processing module, the environment monitoring module comprises a multidimensional monitoring module, a control module and a warning module, and the safety monitoring module comprises a safety information monitoring module, an association analysis module and an early warning module.
2. The intelligent industrial park control system according to claim 1, wherein: the big data processing platform enters a big data resource center through the processes of data acquisition, cleaning, standardization and the like, is analyzed and processed by using a big data technology, finally serves all levels of functional departments and management layers, and carries out auxiliary decision support, thereby being the basis for the operation of an intelligent industrial park.
3. The intelligent industrial park control system according to claim 1, wherein: the odor acquisition monitoring module is used for acquiring odor data, the odor purification module is used for purifying the acquired odor, the database storage module is used for storing data information of different odors, the data comparison module is used for comparing the acquired odor with the data information of the stored different odors, and the human-computer interface processing module is used for realizing human-computer interaction.
4. The intelligent industrial park control system according to claim 3, wherein: the touch screen and the USB mouse on the human-computer interface processing module realize human-computer interaction, and the odor purification module is used for placing a carrier of odor to be detected into the small air compressor for air compression and purification of the odor.
5. The intelligent industrial park control system according to claim 1, wherein: the multi-dimensional monitoring module is used for detecting a monitoring area in multiple directions, the control module is used for fine supervision and traceability analysis, and the warning module is used for warning monitoring personnel.
6. The intelligent industrial park control system according to claim 1, wherein: the safety information monitoring module is used for monitoring equipment specifications, monitoring personnel safety and monitoring plant safety, the association analysis module is used for comparing and analyzing monitoring data, and the early warning module is used for early warning equipment use irregularities and personnel distress.
7. The intelligent industrial park control system according to claim 1, wherein: the energy control module comprises a wind energy control module, an oil energy control module, a gas energy control module, an electric energy control module and a water energy control module, and the wind energy control module, the oil energy control module, the gas energy control module, the electric energy control module and the water energy control module are arranged to monitor energy, so that the utilization rate of energy can be improved, a monitoring track is formed for energy consumption habits, an energy use plan is reasonably planned, and resources are saved to the maximum extent.
8. The intelligent industrial park control system according to claim 1, wherein: the safety monitoring module analyzes the regional distribution, seasonal distribution, industry distribution and type distribution of the alarm and excavates the incidence relation between the alarm and the accident.
CN202210025651.0A 2022-01-11 2022-01-11 Industrial intelligent park control system Pending CN114386829A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210025651.0A CN114386829A (en) 2022-01-11 2022-01-11 Industrial intelligent park control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210025651.0A CN114386829A (en) 2022-01-11 2022-01-11 Industrial intelligent park control system

Publications (1)

Publication Number Publication Date
CN114386829A true CN114386829A (en) 2022-04-22

Family

ID=81201467

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210025651.0A Pending CN114386829A (en) 2022-01-11 2022-01-11 Industrial intelligent park control system

Country Status (1)

Country Link
CN (1) CN114386829A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115314288A (en) * 2022-08-08 2022-11-08 广州晁沓科技有限公司 Data tracing system and method based on block chain technology

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115314288A (en) * 2022-08-08 2022-11-08 广州晁沓科技有限公司 Data tracing system and method based on block chain technology
CN115314288B (en) * 2022-08-08 2023-11-10 上海好剧影视发行有限公司 Data tracing system and method based on encryption verification technology

Similar Documents

Publication Publication Date Title
CN111145064B (en) Dynamic emergency early warning assessment and decision support method and system for sudden air pollution accidents
CN112085241B (en) Environmental big data analysis and decision platform based on machine learning
CN110888950A (en) Intelligent construction site management system based on intelligent safety helmet
CN110189058B (en) Municipal environment management control system based on block chain
CN110197443A (en) A kind of intelligent safety helmet risk management and control system
CN111914687B (en) Method for actively identifying accidents based on Internet of vehicles
CN116415816B (en) M-CPS intelligent mine management platform and system
CN106774322A (en) A kind of photovoltaic plant cruising inspection system and its operation method
CN111899143A (en) Regional water environment intelligent management and control system based on big data analysis strategy
CN101931648A (en) Chemical industrial park environment risk source monitoring platform
CN117689516A (en) Chemical industry garden water, soil and gas environment monitoring system
CN103560590B (en) Electric network intelligent scheduling framework and its implementation
CN114386829A (en) Industrial intelligent park control system
CN104266681A (en) Electric cable well state safety monitoring system based on Internet of Things and GIS
CN111915144A (en) Digital emergency plan management system
CN107545519B (en) Power grid enterprise operation and inspection management and control method
CN112132451A (en) Platform is built fast to industrial park integrated management system
CN114493550A (en) Intelligent odor sensor intelligent monitoring system applied to oil depot
CN114581046A (en) Data processing method based on big data and cloud computing and big data service platform
CN114961857A (en) Mine neural network perception and intelligent early warning method based on Internet of things
CN110245163A (en) A kind of Operation of Electric Systems hidden troubles removing method
CN108196493A (en) A kind of wisdom water utilities control system and method based on cloud platform
CN219778314U (en) Storm detection early warning system
CN114519124A (en) Joint defense and joint control treatment method for atmospheric environmental pollution
CN204330009U (en) Based on the cable shaft status safety monitoring system of Internet of Things and GIS

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination