[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN103967468B - Counting device and multi-stage full-drift-diameter injection ball sliding sleeve device - Google Patents

Counting device and multi-stage full-drift-diameter injection ball sliding sleeve device Download PDF

Info

Publication number
CN103967468B
CN103967468B CN201410220978.9A CN201410220978A CN103967468B CN 103967468 B CN103967468 B CN 103967468B CN 201410220978 A CN201410220978 A CN 201410220978A CN 103967468 B CN103967468 B CN 103967468B
Authority
CN
China
Prior art keywords
lobe
counting device
pitching
pipe
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410220978.9A
Other languages
Chinese (zh)
Other versions
CN103967468A (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Victor Petroleum Technology Service Co Ltd
Original Assignee
Hunan Victor Petroleum Technology Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Victor Petroleum Technology Service Co Ltd filed Critical Hunan Victor Petroleum Technology Service Co Ltd
Priority to CN201410220978.9A priority Critical patent/CN103967468B/en
Publication of CN103967468A publication Critical patent/CN103967468A/en
Application granted granted Critical
Publication of CN103967468B publication Critical patent/CN103967468B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)
  • Joints Allowing Movement (AREA)

Abstract

The invention discloses a counting device and a multi-stage full-drift-diameter injection ball sliding sleeve device. The counting device comprises a first pipe body, a cylindrical sliding mandrel and an injection ball, wherein the cylindrical sliding mandrel is movably arranged in the first pipe body and sealed with the first pipe body. A plurality of first vacant grooves are formed in the inner wall of the first pipe body in the axial direction. An upper set of first petal doors and a lower set of first petal doors are arranged on the sliding mandrel. Each set of first petal doors is composed of first petal blocks and a first sealing ring. Each first petal block penetrates through the cylindrical wall of the sliding mandrel and is movably arranged on the sliding mandrel and matched with the injection ball and the corresponding first vacant groove in the first pipe body. Each first sealing ring is arranged above the corresponding first petal blocks in the cylinder wall and matched with the injection ball. The multi-stage full-drift-diameter injection ball sliding sleeve device provided with the counting device enables fracturing operation to be conducted on the situation that the diameter of an oil pipe is not changed and has the advantages that the inner drift diameter is large and enough flow channels can be provided compared with a common injection ball sliding sleeve.

Description

A kind of counting device and multistage full-bore pitching sliding bush apparatus
Technical field
The invention belongs to oil and gas exploitation equipment is and in particular to a kind of counting device and multistage full-bore pitching sliding sleeve Device.
Background technology
In modern oil-gas mining, fracturing work is a kind of very effective volume increase method.Pitching sliding sleeve is a kind of in water The downhole tool of oil jacket annular space switch is realized in flat bore hole or cased well separate zone production or pressure break.By ground to oil pipe pitching, The unlatching of sliding sleeve is realized in the face of oil pipe pressurization in ground, and pressure is passed to payzone by the perforate of sliding sleeve, carries out pressure break to payzone by well liquid. For same specification oil pipe, typically there are the supporting steel ball of multiple diameter, the setting aperture of cooperation pitching sliding sleeve, achievable multilayer is same When go into the well stratified operation.The technology of pitching sliding sleeve is no more than and is slided with the pitching of respective aperture using the steel ball of different-diameter both at home and abroad The setting of set is matched, and from small to large, from top to bottom, realizes stratified operation.But due to being limited by tubing diameter size With the requirement of latus rectum, the classification quantity of steel ball size is restricted, and makes latus rectum less because the setting aperture of lower floor is less, It is unfavorable for the lifting of pressure break production efficiency.
Content of the invention
It is an object of the invention to provide a kind of multiple zone of realizing in the case that tubing diameter is constant is layered unlatching operation Counting device and multistage full-bore pitching sliding bush apparatus.
Realize the object of the invention the technical scheme is that
The counting device that the present invention provides, include the first body, be actively installed in first pipe body and with the first body sealing Tubular slip mandrel and pitching, the inwall of described first body is axially arranged with some first room grooves, described slip mandrel It is provided with upper and lower two group of first lobe door, every group of first lobe door is formed by the first lobe block and the first sealing ring, described first lobe Block is movably arranged on slip mandrel through slide cores shaft wall and is matched with the first room groove in pitching and the first body, institute State the first sealing ring and be located at the top of the first lobe block in barrel and match with pitching.
Described first body is threaded connection by top connection and cylinder and constitutes, and described first room groove and slip mandrel set On cylinder.
The upper and lower ends of described slip mandrel are provided with the first elastic claw head matching with the first room groove on cylinder.
The size of described first lobe block is more than the wall thickness of slip mandrel.
The distance between two first lobe blocks in described upper and lower two group of first lobe door and two neighboring first room groove it Between distance unequal.
The multistage full-bore pitching sliding bush apparatus that the present invention provides, connected including described counting device and with counting device Plugging device, described plugging device includes the second body, is actively installed in second pipe body and slip mandrel in described counting device Match and with second body sealing closure pipe, be located in second pipe body and by first shearing nail with the second body connection position Shear sleeve below closure pipe, the tubular being set in closure pipe and shear sleeve and being connected with closure pipe by the second shearing nail Ball seat;It is provided with the second room groove between described closure pipe and shear sleeve;It is provided with the second lobe door, the second lobe Men You in described ball seat Two lobe blocks and the second sealing ring composition, described second lobe block is movably arranged on empty with pitching and second on ball seat through ball seat barrel Position groove matches, and described second sealing ring is that two upper and lowers being respectively provided at the second lobe block in ball seat barrel are matched with pitching Close;The inwall of described second body is provided with draw-in groove, and described closure pipe is provided with the card on the second elastic claw head and the second body Groove matches, and closure pipe and the second body are respectively equipped with can be with corresponding first, second through hole;In described shear sleeve, lower end sets There is the first seam with the cooperation of described ball seat, the lower end in described second pipe body is provided with the second seam with shear sleeve cooperation.
Described second body is from top to bottom threaded connection successively and is formed by center tap, shearing cylinder and lower contact;Described Through hole on second body and draw-in groove are located on center tap, and described closure pipe is located in center tap;Described first shearing nail is located at On described shearing cylinder, described shearing is set in shearing cylinder;Seam on described second body is located in described lower contact.
The distance between described first seam and described ball seat are equal to the distance between described first through hole and second through hole.
It is provided with suitable distance between described second seam and described shear sleeve.
The size of described second lobe block is more than the wall thickness of ball seat.
In described second lobe door, the second lobe block is 4 being circular layout.
The present invention can implement fracturing work in the case that tubing diameter is constant, has the advantage that
1) possesses the function of many number of stages hierarchical control fracturing work, layering quantity is not limited by tubing diameter;
2) because tubing diameter is constant, can possess larger interior latus rectum, can provide more compared with common pitching sliding sleeve Enough fluid passages;
3) it can be ensured that setting after pitching is setting, reliably bear frac pressure;
4) it is suitable for the pitching mode of operation of standard, makes operation generalization, simplify.
The present invention will be further described below in conjunction with the accompanying drawings.
Brief description
Fig. 1 is the multistage full-bore pitching sliding bush apparatus structural representation of the present invention.
Fig. 2 is the structural representation of counting device in the present invention.
Fig. 3 is the operation principle schematic diagram of counting device.
Fig. 4 is the structural representation of plugging device in the present invention.
Fig. 5 is the operation principle schematic diagram of plugging device.
Fig. 6 is the multistage full-bore pitching sliding bush apparatus operation principle schematic diagram of the present invention.
Specific embodiment
As shown in figure 1, the multistage full-bore pitching sliding bush apparatus that the present invention provides, fill including counting device 1 with counting Put the plugging device 2 of 1 connection.
Described counting device, as shown in Fig. 2 including the first body, the first body is passed through by top connection 101 and cylinder 102 Threaded composition, the inwall of cylinder 102 is axially arranged with some first room grooves 107, the quantity of the first room groove 107 according to The count requirement setting of counter;It is movably equipped with tubular slip mandrel 106 in cylinder 102, up and down the two of tubular slip mandrel 106 End is provided with the first elastic claw head 104 matching with the first room groove 107 on cylinder 102, and tubular slip mandrel 106 is provided with Form sealing, the middle part of slip mandrel 106 is provided with upper and lower two group of first lobe door, every group first between o shape circle 105 and cylinder 102 Lobe door is formed by 4 (or six) the first lobe block 109 being circular layout and first sealing ring 108, the first lobe block 109 Size is more than the wall thickness of slip mandrel 106, and the first lobe block 109 is movably arranged on slide cores through slip mandrel 106 barrel Match with the first room groove 107 in pitching 103 and cylinder 102 on axle 106, two in upper and lower two group of first lobe door The distance between the distance between one lobe block 109 and two neighboring first room groove 107 unequal so that when one of them first When lobe block 109 and the first room groove 107 cooperation, another the first lobe block 109 is not matched with other first room grooves 107 Close;Matched with pitching 103 in the top that first sealing ring 108 is located at the first lobe block 109 in slip mandrel 106 barrel.
The operation principle of counting device 1 is as shown in Figure 2 and Figure 3.Counting device 1 be slip counting structure, by with slip mandrel The first room groove 107 number on cylinder 102 that the first lobe door mesopetalum block 109 on 106 matches is counting.Steel pitching Pressurize after 103 sealings, promote 2 groups of lobe blocks 109 of slip mandrel 106 to be alternately closed and opening action, often cross a steel ball 103 Complete a cycle, promote elastic claw head 104 to move down a groove, realize counting.The concrete action of counting device 1 is as follows:
When the position of the first lobe block 109 is relative with the first room groove 107 on cylinder 102, can be to the first room groove Avoid in 107, so that pitching 103 is passed through, this lobe door is open mode.Otherwise lobe block 109 no avoids space, and pitching 103 cannot be led to Cross, be closed mode.Epivalve door in original position as shown in Fig. 2 in two group of first lobe door for the counting device 1 is closed, hypovalve Door open, when pitching 103 falls into this device, pitching 103 is withstood by the lobe block 109 in epivalve door, and with the first sealing ring 108 shape Become sealing;O shape circle 105 is now had to seal between slip mandrel 106 and cylinder 102, tubing pressure promotes slip mandrel 106 relatively Cylinder 102 slide downward one segment distance, until the lobe block 109 in epivalve door is opened, the lobe block 109 in hypovalve door is closed, steel ball Fall between the lobe block 109 of two lobe doors, such as shown in Fig. 3 (a);Therefore pitching 103 continues to press on slip mandrel under tubing pressure 106 relative cylinder 102 slide downward, until the lobe block 109 in hypovalve door is opened pitching 103 and passed through, as shown in Fig. 3 (b). Now, whole counting device 1 passes through a pitching 103, slip mandrel 106 cylinder one meter digital of 102 slide downward relatively, meter The number of numerical digit to determine as desired by the number n of the first room groove 107 being provided for counting, for count the One room groove 107, from the first lobe block 109 first first room groove in lower section of set below the first lobe door of slip mandrel 106 107 count, as shown in Figure 2.The first room groove 107 phase on the first elastic claw head 104 on slip mandrel 106 and cylinder 102 Cooperation is mainly used in positioning in sliding process for the slip mandrel 106.
Described plugging device, as shown in figure 4, include the second body, the second body by center tap 201, shearing cylinder 213 and under Joint 218 is from top to bottom threaded connection composition successively;Center tap 201 is threadeded with the cylinder 102 in counting device 1, Center tap 201 is provided with first through hole 206, and the inwall of center tap 201 is provided with lower bayonet slot 203, is movably equipped with center tap 201 The closure pipe 204 matching with slip mandrel 106 in described counting device, closure pipe 204 is provided with o shape circle 207 and center tap 201 sealings;Shearing cylinder 213 in be provided with shear sleeve 216, shear sleeve 216 pass through first shearing nail 215 with shear cylinder 213 be connected and It is located at below closure pipe 204;Interior between closure pipe 204 and shear sleeve 216 be arranged with tubular ball seat 209, ball seat 209 passes through the Two shearing nails 208 are connected with closure pipe 204;It is provided with the second room groove 212 between closure pipe 204 and shear sleeve 216;Ball seat 209 Inside it is provided with the second lobe door, the second lobe door is made up of the second lobe block 211 and the second sealing ring 210, the second lobe block 211 is to be circular layout 4 (or six), the size of the second lobe block 211 is more than the wall thickness of ball seat 209, and the second lobe block 211 passes through ball seat 209 Barrel is movably arranged on and is matched with pitching and the second room groove 212 on ball seat 209, and the second sealing ring 210 sets respectively for two In ball seat barrel, the upper and lower of the second lobe block 211 is matched with pitching, and ball seat 209 is provided with o shape circle 219 and shear sleeve 216 Sealing;Closure pipe 204 is provided with the second elastic claw head 202 and is matched with the draw-in groove 203 being located on center tap 201 inwall, closure Pipe 204 be provided with can with center tap 201 on corresponding second through hole 205 of first through hole 206;In shear sleeve 216, lower end sets There is the first seam 214 with ball seat 209 cooperation, the first seam 214 and the distance between ball seat 209 l2 are equal to first through hole 206 With the distance between the second through hole 205 l1;Lower end in lower contact 218 is provided with the second seam 217 with shear sleeve 216 cooperation, It is provided with suitable distance l3 between second seam 217 and shear sleeve 216.
As shown in Figure 4, Figure 5, plugging device 2 is in original state as shown in figure 4, at this moment for the operation principle of plugging device 2 In the upper draw-in groove 203 that second elastic claw head 202 of closure pipe 204 is located on center tap 201 inwall, make the second lobe on ball seat 209 The second lobe block 211 in door, against by the vacant slot 212 being formed between center tap 201 and shear sleeve 216, is in open mode. Under slip mandrel 106 triggering in counting device 1, such as shown in Fig. 5 (a), closure pipe 204 is promoted, and center tap 201 relatively is downward Mobile, now the second lobe door on ball seat 209 is closed, and the second lobe block 211 is return in ball seat 209, the o shape circle 219 on ball seat 209 Enter shear sleeve 216 sealing surface, pitching 103 falls from counting device 1, fall under being formed with the second sealing ring 210 in ball seat 209 Portion blocks.As shown in Fig. 5 (b), under the continuation of tubing pressure acts on, pitching 103 drag ball seat 209 and closure pipe 204 until The second elastic claw head 202 of closure pipe 204 enters in the lower bayonet slot 203 on center tap 201 inwall, the second shearing nail 208 cut-out, At this moment the second through hole 205 on closure pipe 204 and center tap 201, first through hole 206 align formation oil pipe passage;Then ball seat 209 fall in shear sleeve 216, and finally and shear sleeve 216 together falls in lower contact 218 to cut off the first shearing nail 215, such as schemes Shown in 5 (c), vacant slot 212 dimension extension that now formed between center tap 201 and shear sleeve 216, make lower floor's pitching 103 can To pass through this ball seat 209, such as shown in Fig. 5 (d).
Before being triggered, all pitchings can pass through plugging device 2, and after being counted device triggering, pitching will be sealed Plug-hole footpath, and tubing pressure effect under, by plugging device 2 closure pipe 204 and center tap 201 on the second through hole 205, First through hole 206 opens oil pipe passage, makes oil pipe internal pressure be transferred to payzone, starts fracturing work.
Shown in the multistage full-bore pitching sliding bush apparatus of present invention situation such as Fig. 6 (a) (e) in practical application, first First determine the number of pitching sliding bush apparatus according to pressure break payzone number, set using specific purpose tool in advance according to layer position on well before installing The numerical value of the counting device position of fixed this layer of position, that is, be used for the number n of the first room groove 107 of counting, then will be with meter digital The equal pitching sliding bush apparatus of numerical value be sequentially connected in oil pipe lower going-into-well, the oil of pitching sliding bush apparatus will be provided with packer d Pipe isolation forms pressure break payzone, and pitching sliding bush apparatus shown in Fig. 6 is 3, including counting device 1a 1c, plugging device 2a 2c.During use, put into the steel pitching 103 of supporting formed objects, when pitching passes sequentially through the counting device of each layer position n, touch Send out a counting action r, be counted as s=n-r, r=0,1,2,3 ... n, until pitching falls into undermost pitching sliding bush apparatus, touch Send out the last counting action of counting device in this pitching sliding bush apparatus, and start plugging device.Raise with tubing pressure, open Begin undermost fracturing work.Often put into a pitching afterwards, gradually carry out fracturing work from lower to upper.After the completion of operation, throw Ball returns to ground with oily tube fluid.

Claims (10)

1. a kind of counting device, it is characterized in that including the first body, be actively installed in first pipe body and with the first body sealing Tubular slip mandrel and pitching, the inwall of described first body are axially arranged with some first room grooves, on described slip mandrel It is provided with upper and lower two group of first lobe door, every group of first lobe door is formed by the first lobe block and the first sealing ring, and described first lobe block is worn Cross slide cores shaft wall and be movably arranged on and match with the first room groove in pitching and the first body on slip mandrel, described Matched with pitching in the top that one sealing ring is located at the first lobe block in barrel.
2. counting device according to claim 1, is characterized in that described first body passes through screw thread by top connection and cylinder Connect and compose, described first room groove and slip mandrel are located on cylinder.
3. counting device according to claim 1 and 2, is characterized in that the upper and lower ends of described slip mandrel are provided with and cylinder On the first elastic claw head of matching of the first room groove.
4. counting device according to claim 3, is characterized in that the size of described first lobe block is more than the cylinder of slip mandrel Wall thickness.
5. counting device according to claim 4, is characterized in that two the first lobes in described upper and lower two group of first lobe door The distance between the distance between block and two neighboring first room groove are unequal.
6. a kind of multistage full-bore pitching sliding bush apparatus using counting device as claimed in claim 1, is characterized in that including institute State counting device and the plugging device connecting with counting device, described plugging device includes the second body, is actively installed on second pipe Internal match with slip mandrel in described counting device and the closure pipe with the second body sealing, be located in second pipe body and lead to Cross the first shearing nail with the second body connection position in blocking the shear sleeve below pipe, be set in closure pipe and shear sleeve and pass through The tubular ball seat that second shearing nail is connected with closure pipe;It is provided with the second room groove between described closure pipe and shear sleeve;Described ball It is provided with the second lobe door, the second lobe door is made up of the second lobe block and the second sealing ring, described second lobe block passes through ball seat barrel in seat It is movably arranged on and matches with pitching and the second room groove on ball seat, described second sealing ring is two, is respectively provided at ball seat cylinder In wall, the upper and lower of the second lobe block is matched with pitching;The inwall of described second body is provided with draw-in groove, described closure Guan Shangshe The second elastic claw head is had to match with the draw-in groove on the second body, closure pipe and the second body are respectively equipped with can be with corresponding the First, the second through hole;In described shear sleeve, lower end is provided with the first seam with the cooperation of described ball seat, the lower end in described second pipe body It is provided with the second seam with shear sleeve cooperation.
7. multistage full-bore pitching sliding bush apparatus according to claim 6, it is characterized in that described second body by center tap, Shearing cylinder and lower contact are from top to bottom threaded connection composition successively;Through hole on described second body and draw-in groove connect in being located at On head, described closure pipe is located in center tap;Described first shearing nail is located on described shearing cylinder, and described shearing is set in shearing In cylinder;Seam on described second body is located in described lower contact.
8. the multistage full-bore pitching sliding bush apparatus according to claim 6 or 7, it is characterized in that described first seam with described The distance between ball seat is equal to the distance between described first through hole and second through hole.
9. multistage full-bore pitching sliding bush apparatus according to claim 8, is characterized in that described second seam is cut with described Cut and between set, be provided with suitable distance.
10. multistage full-bore pitching sliding bush apparatus according to claim 9, is characterized in that the size of described second lobe block is big Wall thickness in ball seat.
CN201410220978.9A 2014-05-23 2014-05-23 Counting device and multi-stage full-drift-diameter injection ball sliding sleeve device Active CN103967468B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410220978.9A CN103967468B (en) 2014-05-23 2014-05-23 Counting device and multi-stage full-drift-diameter injection ball sliding sleeve device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410220978.9A CN103967468B (en) 2014-05-23 2014-05-23 Counting device and multi-stage full-drift-diameter injection ball sliding sleeve device

Publications (2)

Publication Number Publication Date
CN103967468A CN103967468A (en) 2014-08-06
CN103967468B true CN103967468B (en) 2017-01-18

Family

ID=51237426

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410220978.9A Active CN103967468B (en) 2014-05-23 2014-05-23 Counting device and multi-stage full-drift-diameter injection ball sliding sleeve device

Country Status (1)

Country Link
CN (1) CN103967468B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9587464B2 (en) * 2014-10-02 2017-03-07 Sc Asset Corporation Multi-stage liner with cluster valves and method of use
CN112709549B (en) * 2021-01-13 2024-09-17 天津德瑞克石油工具有限公司 Binary ball-throwing counting cluster sliding sleeve

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201610748U (en) * 2009-11-03 2010-10-20 长沙市罡拓能源科技有限公司 Ball throwing-type sliding sleeve screen pipe device
CN201738869U (en) * 2010-07-02 2011-02-09 中国石油集团川庆钻探工程有限公司 Drillable ball-throwing sliding sleeve suitable for horizontal well
GB2473786A (en) * 2008-07-15 2011-03-23 Caledyne Ltd Well tool
CN201908639U (en) * 2010-12-23 2011-07-27 中国石油集团渤海钻探工程有限公司 Valving claw locking ball injection type sand blasting sliding sleeve for horizontal well fracturing
CN203847090U (en) * 2014-05-23 2014-09-24 湖南唯科拓石油科技服务有限公司 Counting device and multistage full-port ball-casting slide bushing device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9353598B2 (en) * 2012-05-09 2016-05-31 Utex Industries, Inc. Seat assembly with counter for isolating fracture zones in a well

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2473786A (en) * 2008-07-15 2011-03-23 Caledyne Ltd Well tool
CN201610748U (en) * 2009-11-03 2010-10-20 长沙市罡拓能源科技有限公司 Ball throwing-type sliding sleeve screen pipe device
CN201738869U (en) * 2010-07-02 2011-02-09 中国石油集团川庆钻探工程有限公司 Drillable ball-throwing sliding sleeve suitable for horizontal well
CN201908639U (en) * 2010-12-23 2011-07-27 中国石油集团渤海钻探工程有限公司 Valving claw locking ball injection type sand blasting sliding sleeve for horizontal well fracturing
CN203847090U (en) * 2014-05-23 2014-09-24 湖南唯科拓石油科技服务有限公司 Counting device and multistage full-port ball-casting slide bushing device

Also Published As

Publication number Publication date
CN103967468A (en) 2014-08-06

Similar Documents

Publication Publication Date Title
CN101624904B (en) Open hole completion well sand resistant pipe string of sidetracking branch well and inserting type acid cleaning filling inner pipe string thereof
CN108166965B (en) Sand blasting perforation, fracturing and packing integrated device
CN105401917B (en) Full-bore infinite stages protruding shaft switching regulator fracturing sliding bush
CN110107251B (en) Fracturing filling conversion tool
CN103982167B (en) A kind of full-bore pitching sliding sleeve staged fracturing equipment
CN106089664B (en) Efficiently divide and adopt double acting sucker rod pump
RU94628U1 (en) DEVICE FOR OPERATION OF THE LAYER WITH DIFFERENT PERMEABILITY ZONES
CN103410491B (en) reducing sliding sleeve
CN102410009B (en) Controlled-valve placed well-cementing staged-fracturing well-completion string and hydraulically-controlled switch string
CN105822253A (en) Casing sliding sleeve and hydraulic bridge plug combined well completion pipe string and rapid fracturing method
CN101598522A (en) A liquid explosive delivery and detonation device for deflagration and fracturing in hydraulic fractures and its application
CN103967468B (en) Counting device and multi-stage full-drift-diameter injection ball sliding sleeve device
CN106150468B (en) A construction method for reservoir reconstruction, production monitoring and control
CN103967467B (en) Counting assembly and multistage full-bore pitching sliding bush apparatus
CN109707358B (en) Fracturing string and fracturing method thereof
CN201486538U (en) Sand prevention pipe string used for open-hole well completion of side-drilled multilateral well and plug-in type acid cleaning filling inner pipe string thereof
CN105134131B (en) Well cementation casing or oil pipe sliding sleeve without limit of segment number and cluster number
CN202170789U (en) Sliding sleeve adaptor
CN203847090U (en) Counting device and multistage full-port ball-casting slide bushing device
CN111485849B (en) Casing hydraulic packer
CN209212216U (en) Tube exterior subsection gravel filling completion tubular column
CN109236234B (en) Mechanical opening valve for controlling yield of each oil layer by remote production allocation and control method thereof
CN203847089U (en) Counting device and multistage full-bore ball injection sliding sleeve device
CN203239310U (en) Sleeve sliding sleeve without limited segment fracturing
CN203925461U (en) A kind of full-bore pitching sliding sleeve staged fracturing equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant