CN103967041B - Construction method of fan foundation ring - Google Patents

Construction method of fan foundation ring Download PDF

Info

Publication number
CN103967041B
CN103967041B CN201410213966.3A CN201410213966A CN103967041B CN 103967041 B CN103967041 B CN 103967041B CN 201410213966 A CN201410213966 A CN 201410213966A CN 103967041 B CN103967041 B CN 103967041B
Authority
CN
China
Prior art keywords
foundation ring
blower foundation
ring
adjustment
leveling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410213966.3A
Other languages
Chinese (zh)
Other versions
CN103967041A (en
Inventor
杨鹏鹏
张朋宇
李勇佳
宋烁
秦小山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201410213966.3A priority Critical patent/CN103967041B/en
Publication of CN103967041A publication Critical patent/CN103967041A/en
Application granted granted Critical
Publication of CN103967041B publication Critical patent/CN103967041B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a construction method of a fan foundation ring, wherein the fan foundation ring comprises an upper flange and a lower flange, and the leveling method comprises the following steps: the method includes the steps of aligning a fan foundation ring; coarse adjustment of a fan foundation ring; binding the ground iron, the bottom plate steel bars and the torsion-resistant steel bars on the inner side and the outer side of the foundation ring; fourthly, finely adjusting a foundation ring of the draught fan; and fifthly, pouring concrete. The leveling method only adopts one set of measuring instrument during leveling each time, reduces the number of instruments and personnel allocation, and simplifies the original at least three times of leveling and control to two times. The anti-torsion rib is utilized to play a role in reinforcing the foundation ring, and simultaneously, the safety of staff working on the vertical ruler during fine adjustment is ensured, the error of the invention is only between 0.0mm and 0.3mm, the design requirement is completely met, and after the foundation ring is fine and flat, the adjustment is not needed in the construction process of the foundation; the manufacturing error of the foundation ring is quickly and accurately leveled.

Description

Blower foundation ring construction method
Technical field
The invention belongs to blower foundation ring installing area, especially a kind of blower foundation ring construction method.
Background technology
Blower foundation ring construction method mainly comprises the leveling of blower foundation ring and concrete construction, and the leveling of blower foundation ring can be divided into coarse adjustment, fine setting, accurate adjustment 3 procedure.Coarse adjustment coordinates 2 level gauges to measure at discharge ring support member place with 1 total powerstation exactly, by adjustment screw rod lifting discharge ring, makes discharge ring surface reach substantially smooth; Fine setting is exactly arrange 9 or 12 points at discharge ring surface uniform on the basis of coarse adjustment, utilizes 1 total powerstation to coordinate 2 level gauges to carry out in-site measurement control, to make base surface levelness Deviation Control within the scope of designing requirement; The object of accurate leveling mainly eliminates error during fine setting, utilizes 2 level gauges to carry out in-site measurement control, 9 control points that comprehensive Fundamentals of Measurement ring upper surface is arranged, makes surface levelness Deviation Control in least limit as far as possible.After precision regulating reef knot bundle, locking adjustment nut, when people is not gone up on discharge ring surface, personnel stand on stool at the vertical Sopwith staff in side, side, utilize 2 level gauges again to carry out repetition measurement to layout points, if levelness deviation meets the demands, just enter next procedure construction, if do not meet the demands, re-start leveling work, more than this kind of method measuring apparatus and personnel, also need frequent repetition measurement, be unfavorable for construction speed and quality, also will strengthen difficulty of construction and cost.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, a kind of blower foundation ring construction method is provided, this leveling method reduces measuring apparatus quantity and staffing, simplify leveling operation, reduce the expense produced because of reinforcement measure, reduce construction costs, improve installation rate, and this method is simple and easy to grasp, installation quality is easy to control.
The present invention solves its technical problem and is achieved through the following technical solutions:
A kind of blower foundation ring construction method, blower foundation ring comprises upper flange and lower flange, and its leveling method is:
(1), blower foundation ring centering: first blower foundation ring crane is vertically sling, support leveling bolt is equidistantly contained on the lower flange of blower foundation ring by design load, with tower cylinder door central point corresponding outside the lower flange of blower foundation ring for starting point, divide the outer perimeter of the lower flange of blower foundation ring by invar tape 3 grade after verification, and carry out 3 corresponding gauge points; Blower foundation ring in place to the pre-embedded steel slab on bed course time, alignd with the tower cylinder door central point that the line of ink marker ejects with on bed course by the tower cylinder door central point on blower foundation ring upper flange, error is less than 10mm; Wait 3 gauge points of point girth to align with 3 built-in fitting center lines that the line of ink marker ejects with on bed course mark on blower foundation ring lower flange, error is less than 15mm, checks with plumb bob; After centering, by three supporting legs arranged equidistant below blower foundation ring respectively with the pre-embedded steel slab firm welding on bed course, can crane be withdrawn;
(2), blower foundation ring coarse adjustment: set up the level gauge one verified on bed course, height of leveling instrument is lower than the lower flange bottom surface of blower foundation ring, steel set-square reversal of the natural order of things is measured at the upper surface of a supporting leg lower flange, other two supporting legs are measured successively, after measurement completes, according to the survey data at three supporting leg places, respectively other 2 are regulated for reference point with a bit, support with the jack of 10 tons during adjustment, height coarse adjustment is carried out by the adjusting bolt that supporting leg is arranged, release jack after adjustment completes, and adjusting nut is tightened, repetition measurement is carried out after adjustment completes, the horizontal gradient error of three supporting leg place blower foundation rings is controlled within 5mm,
(3), the colligation of the antitorque reinforcing bar in both sides inside and outside base plate guiding principle muscle and discharge ring;
(4), blower foundation ring accurate adjustment: row labels of first being gone forward side by side in point 12 some positions such as the upper flange of blower foundation ring surface outer shroud before accurate adjustment, arrange clockwise with the bolt hole corresponding to tower cylinder door direction, the electronic level one verified is set up on foundation ditch edge, be equipped with glass steel ruler carries out levelness control to these 12 some positions, then 3 some positions at three supporting leg places are measured and recorded data, with reference to the error information of some position corresponding on blower foundation ring Delivery Inspection Report, the difference of 3 some positions, three supporting leg places is adjusted to the numerical value same with fabrication error, this control method and step (2) in the coarse adjustment of blower foundation ring the same, finally measure all the other 9 some positions, after adjustment completes with electric welding by adjusting screw(rod) and nut-welding firm, the leveling of blower foundation ring is complete,
(5), pouring concrete construction: first blower foundation ring is exposed concrete part from plastics cloth parcel before concrete placings, clockwise or counterclockwise by outside to inside placement layer by layer during cast, finally build blower foundation ring center, utilize peripheral concrete of having built to the effect solid base ring of reinforcing bar, blower foundation circulating application work is complete
Advantage of the present invention and beneficial effect are:
Leveling method of the present invention only have employed a set of measuring apparatus when each leveling, decreases instrument quantity and staffing, again original at least three leveling and control is simplified to twice.Utilize antitorque muscle to serve the effect of underpinning ring, found the safety of chi staff simultaneously when also ensure that accurate adjustment, meet design requirement completely, after discharge ring essence is flat, without the need to adjusting again in the work progress on basis; Foozle according to discharge ring is smart flat fast.Concrete placings of the present invention is by outside to inside, and what both met prevention of mass concrete builds requirement, the discharge ring that utilized again peripheral concrete of having built firm, reduces the disturbance to discharge ring in concrete placings process.After having constructed by this construction method, then recheck discharge ring, compared with the survey data after complete with accurate adjustment, error is only between 0.0mm-0.3mm.
Accompanying drawing explanation
Fig. 1 is blower foundation ring structure schematic diagram of the present invention;
Fig. 2 is that the A-A of Fig. 1 is to sectional view;
Fig. 3 is the position view of jack and steel set-square in installing;
Fig. 4 is the pouring concrete sequential schematic of blower foundation ring.
Detailed description of the invention
Below by specific embodiment, the invention will be further described, and following examples are descriptive, is not determinate, can not limit protection scope of the present invention with this.
A kind of blower foundation ring construction method, blower foundation ring 2 comprises upper flange 9 and lower flange 8, and its leveling method is:
(1), blower foundation ring centering: first blower foundation ring crane is vertically sling, support leveling bolt is equidistantly contained on the lower flange of blower foundation ring by design load, with tower cylinder door 1 central point corresponding outside the lower flange of blower foundation ring for starting point, divide the outer perimeter of the lower flange of blower foundation ring by invar tape 3 grade after verification, and carry out 3 corresponding gauge points; Blower foundation ring in place to the pre-embedded steel slab on bed course time, alignd with the tower cylinder door central point that the line of ink marker ejects with on bed course by the tower cylinder door central point on blower foundation ring upper flange, error is less than 10mm; Wait 3 gauge points of point girth to align with 3 built-in fitting center lines that the line of ink marker ejects with on bed course mark on blower foundation ring lower flange, error is less than 15mm, checks with plumb bob; After centering, by three supporting legs 6 arranged equidistant below blower foundation ring respectively with the pre-embedded steel slab firm welding on bed course, can crane be withdrawn;
(2), blower foundation ring coarse adjustment: set up the level gauge one verified on bed course, height of leveling instrument is lower than the lower flange bottom surface of blower foundation ring, steel set-square 11 is hung upside down and measures at the upper surface of a supporting leg lower flange, other two supporting legs are measured successively, after measurement completes, according to the survey data at three supporting leg places, respectively other 2 are regulated for reference point with a bit, support with the jack 10 of 10 tons during adjustment, height coarse adjustment is carried out by the adjusting bolt 5 that supporting leg is arranged, adjusting bolt is arranged on supporting leg upper surface 7, adjusting bolt above lower flange is provided with adjusting nut 3, adjusting bolt below lower flange is provided with lower adjusting nut 4, release jack after adjustment completes, and adjusting nut is tightened, repetition measurement is carried out after adjustment completes, the horizontal gradient error of three supporting leg place blower foundation rings is controlled within 5mm,
(3), the colligation of the antitorque reinforcing bar in both sides inside and outside base plate guiding principle muscle and discharge ring;
(4), blower foundation ring accurate adjustment: row labels of first being gone forward side by side in point 12 some positions such as the upper flange of blower foundation ring surface outer shroud before accurate adjustment, arrange clockwise with the bolt hole corresponding to tower cylinder door direction, the electronic level one verified is set up on foundation ditch edge, be equipped with glass steel ruler carries out levelness control to these 12 some positions, then 3 some positions at three supporting leg places are measured and recorded data, with reference to the error information of some position corresponding on blower foundation ring Delivery Inspection Report, the difference of 3 some positions, three supporting leg places is adjusted to the numerical value same with fabrication error, this control method and step (2) in the coarse adjustment of blower foundation ring the same, finally measure all the other 9 some positions, after adjustment completes with electric welding by adjusting screw(rod) and nut-welding firm, the leveling of blower foundation ring is complete,
(5), pouring concrete construction: first blower foundation ring is exposed concrete part from plastics cloth parcel before concrete placings, clockwise or counterclockwise by outside to inside placement layer by layer during cast, finally build blower foundation ring center, utilize peripheral concrete of having built to the effect solid base ring of reinforcing bar, blower foundation circulating application work is complete.

Claims (1)

1. a blower foundation ring construction method, blower foundation ring comprises upper flange and lower flange, it is characterized in that: leveling method is:
(1), blower foundation ring centering: first blower foundation ring crane is vertically sling, support leveling bolt is equidistantly contained on the lower flange of blower foundation ring by design load, with tower cylinder door central point corresponding outside the lower flange of blower foundation ring for starting point, divide the outer perimeter of the lower flange of blower foundation ring by invar tape 3 grade after verification, and carry out 3 corresponding gauge points; Blower foundation ring in place to the pre-embedded steel slab on bed course time, alignd with the tower cylinder door central point that the line of ink marker ejects with on bed course by the tower cylinder door central point on blower foundation ring upper flange, error is less than 10mm; Wait 3 gauge points of point girth to align with 3 pre-embedded steel slab center lines that the line of ink marker ejects with on bed course mark on blower foundation ring lower flange, error is less than 15mm, checks with plumb bob; After centering, by three supporting legs arranged equidistant below blower foundation ring respectively with the pre-embedded steel slab firm welding on bed course, can crane be withdrawn;
(2), blower foundation ring coarse adjustment: set up the level gauge one verified on bed course, height of leveling instrument is lower than the lower flange bottom surface of blower foundation ring, steel set-square reversal of the natural order of things is measured at the upper surface of a supporting leg lower flange, other two supporting legs are measured successively, after measurement completes, according to the survey data at three supporting leg places, respectively other 2 are regulated for reference point with a bit, support with the jack of 10 tons during adjustment, height coarse adjustment is carried out by the adjusting bolt that supporting leg is arranged, release jack after adjustment completes, and adjusting nut is tightened, repetition measurement is carried out after adjustment completes, the horizontal gradient error of three supporting leg place blower foundation rings is controlled within 5mm,
(3), the colligation of the antitorque reinforcing bar in both sides inside and outside baseplate reinforcing bar and discharge ring;
(4), blower foundation ring accurate adjustment: row labels of first being gone forward side by side in point 12 some positions such as the upper flange of blower foundation ring surface outer shroud before accurate adjustment, arrange clockwise with the bolt hole corresponding to tower cylinder door direction, the electronic level one verified is set up on foundation ditch edge, be equipped with glass steel ruler carries out levelness control to these 12 some positions, then 3 some positions at three supporting leg places are measured and recorded data, with reference to the error information of some position corresponding on blower foundation ring Delivery Inspection Report, the difference of 3 some positions, three supporting leg places is adjusted to the numerical value same with fabrication error, this control method and step (2) in the coarse adjustment of blower foundation ring the same, finally measure all the other 9 some positions, after adjustment completes with electric welding by adjusting screw(rod) and nut-welding firm, the leveling of blower foundation ring is complete,
(5), pouring concrete construction: first blower foundation ring is exposed concrete part from plastics cloth parcel before concrete placings, clockwise or counterclockwise by outside to inside placement layer by layer during cast, finally build blower foundation ring center, utilize peripheral concrete of having built to the effect solid base ring of reinforcing bar, blower foundation circulating application work is complete.
CN201410213966.3A 2014-05-21 2014-05-21 Construction method of fan foundation ring Active CN103967041B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410213966.3A CN103967041B (en) 2014-05-21 2014-05-21 Construction method of fan foundation ring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410213966.3A CN103967041B (en) 2014-05-21 2014-05-21 Construction method of fan foundation ring

Publications (2)

Publication Number Publication Date
CN103967041A CN103967041A (en) 2014-08-06
CN103967041B true CN103967041B (en) 2016-04-27

Family

ID=51237010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410213966.3A Active CN103967041B (en) 2014-05-21 2014-05-21 Construction method of fan foundation ring

Country Status (1)

Country Link
CN (1) CN103967041B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929148B (en) * 2015-07-06 2017-01-04 同济大学建筑设计研究院(集团)有限公司 The upside-down mounting hardened system of generation power foundation of wind power ring group plinth and reinforcement means thereof
CN105134512B (en) * 2015-08-14 2018-09-04 大连理工大学 A kind of dedicated attachment gasket ring of wind turbine
CN106436735B (en) * 2016-07-27 2018-06-12 中国能源建设集团安徽电力建设第一工程有限公司 A kind of installation method of blower foundation ring
CN106595449B (en) * 2016-12-21 2019-04-30 河南工程学院 Pipeline valve both ends flange coaxiality detection method
CN106738295A (en) * 2017-01-17 2017-05-31 中交公局第二工程有限公司 A kind of adjustable forced centering apparatus of beam sections short-line prefabrication measurement
CN111963383B (en) * 2020-08-17 2021-08-31 上海电气风电集团股份有限公司 Foundation ring and machining and construction method thereof
CN112123251B (en) * 2020-08-31 2022-04-15 广东工业大学 Offshore wind turbine bolt set centering method based on visual tracking

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002256573A (en) * 2001-03-02 2002-09-11 Chubu Electric Power Co Inc Foundation for existing foundation reinforcing steel tower and construction method for it
CN201915507U (en) * 2011-01-13 2011-08-03 葛洲坝集团第五工程有限公司 Adjustable setting mould
CN202023199U (en) * 2011-03-25 2011-11-02 国水投资集团包头风电科技有限公司 Pre-stressed anchor plate and anchor bolt assembly for foundation
CN102758445B (en) * 2011-04-27 2015-01-07 华锐风电科技(集团)股份有限公司 Foundation forming method for wind driven generator tower
CN103255778B (en) * 2013-03-22 2015-04-29 广东明阳风电产业集团有限公司 Grouting positioning and leveling method for offshore wind turbine jacket foundation setting

Also Published As

Publication number Publication date
CN103967041A (en) 2014-08-06

Similar Documents

Publication Publication Date Title
CN103967041B (en) Construction method of fan foundation ring
CN103967048B (en) Fan foundation ring leveling method
CN204781624U (en) Floor elevation and roughness controlling means
CN112376606A (en) Equipment foundation bolt mounting die and construction method thereof
CN106193094B (en) A kind of embedding anchor bolts construction mould and foundation bolt adjust construction method
CN110836019A (en) Novel lattice column verticality positioner
CN106368237A (en) Leveling mounting method for foundation ring of fan
CN103669314B (en) High-efficiency rack mounting method and auxiliary adjustment device of gear rack climbing type vertical ship lift
CN104535045A (en) Wall-hanging hydrostatic level mounting device and wall-hanging hydrostatic level mounting method
CN206002038U (en) A kind of wall column formwork vertical gauge
CN104457788A (en) Large-size mobile base line pile and calibration method thereof
CN103696410A (en) Efficient installation method for nut columns of gear and rack climbing-type vertical ship lift and auxiliary device
CN204495333U (en) A kind of erecting device of wall-hanging hydrostatic level
CN109322323A (en) A kind of installation method of wide-angle tilt equipment bay
CN106639338A (en) Positioning device for anchor bolts and construction method of positioning device
CN207538326U (en) A kind of steel structure column with micromatic setting
CN113107100B (en) Leveling method for tower crane embedded joint
CN212843365U (en) Verticality measuring scale
CN110093842B (en) Auxiliary device for interlocking block construction and using method thereof
CN206091326U (en) Portable floor thickness controller
CN208567724U (en) A kind of device of measurement and control thickness of cast-in-place concrete
CN207620391U (en) A kind of foam concrete pours elevation control device
CN210858044U (en) Cast-in-place thickness control device
CN208383024U (en) A kind of device measuring protective layer thickness and concrete thickness
CN204831200U (en) Pavement width automatic measuring device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant