CN103774676A - Construction method for dismounting foundation pit waist beam - Google Patents
Construction method for dismounting foundation pit waist beam Download PDFInfo
- Publication number
- CN103774676A CN103774676A CN201410053999.6A CN201410053999A CN103774676A CN 103774676 A CN103774676 A CN 103774676A CN 201410053999 A CN201410053999 A CN 201410053999A CN 103774676 A CN103774676 A CN 103774676A
- Authority
- CN
- China
- Prior art keywords
- waist rail
- construction method
- foundation pit
- waist beam
- groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Sewage (AREA)
- Foundations (AREA)
Abstract
The invention relates to a construction method for dismounting a foundation pit waist beam. The construction method is characterized by comprising steps as follows: a steel bar based on the foundation pit waist beam is implanted in an embedded manner, a construction joint between old and new concrete is used, the waist beam (1) is cut into sections by a barrel saw, a groove (4) is dug out in the middle of each section by an air pick, then a hydraulic concrete jack (3) is placed into each groove (4), and finally, the waist beam (1) is wholly removed from the side wall of a foundation pit. The construction method for dismounting the foundation pit waist beam is reasonable in design, fast in effect taking, environment-friendly and low in construction cost, and has high practicability and generalization performance.
Description
Technical field
The invention belongs to architectural engineering pit demolition of support structure field, particularly a kind of construction method of foundation ditch waist rail detaching.
Background technology
At present, the dismounting complex steps of foundation ditch waist rail, needs experience peeling, punching, perfusion, finally removes by pneumatic pick, it is slow that the method is removed effect, construction noise is large and produce a large amount of dust, therefore, need a kind of new not only fast but also the technology of environmental protection to solve above-mentioned waist rail detaching drawback.
Summary of the invention
The present invention, in order to overcome problem and the shortcoming of above-mentioned prior art existence, provides a kind of construction method of foundation ditch waist rail detaching, has solved the drawback that traditional waist rail detaching effect is slow, cost is high, noise is large, energy consumption is high.
For realizing above object, the present invention takes following technical scheme:
A kind of construction method of foundation ditch waist rail detaching, it is characterized in that carrying out according to the following steps: after the reinforcing bar based on foundation ditch waist rail adopts, the mode of bar planting is implanted, utilize the constuction joint between new-old concrete, adopt barrel saw by waist rail cutting section, in the middle of every section, adopt pneumatic pick to pick and dig out a groove, then hydraulic concrete jack is inserted in groove, waist rail entirety is pulled out from foundation pit side-wall the most at last.
Described waist rail cutting section, every segment length is 1.8-2.2m;
Described groove (4) is of a size of that 500mm is long, 300mm is wide, 300mm is dark, and length direction is perpendicular to foundation pit side-wall direction, can insert hydraulic concrete jack (3) completely.
The present invention has following beneficial effect:
(1) reasonable in design, workable, effect is fast;
(2) environmental protection (noise is low, dust is few, energy consumption little);
(3) cost-saving;
(4) practical, replicability is strong (along with increasing of deep-foundation pit engineering, pattern foundation pit supporting structure adopts the supporting and protection structure of diaphragm wall+inner support beam also to increase thereupon, and diaphragm wall and outer wall of basement pitch space are limited, in order to complete basement backfill, support wale need be removed).
Accompanying drawing explanation
Fig. 1 is waist rail detaching floor map of the present invention.
Fig. 2 is the A-A sectional drawing of Fig. 1.
The specific embodiment
Below in conjunction with accompanying drawing, the present invention will be described in detail, but embodiments of the present invention are not limited to this:
As shown in Figure 1 and Figure 2,1 is foundation ditch waist rail, and 2 is foundation pit side-wall, and 3 is hydraulic concrete jack, and 4 is groove.
The construction method of a kind of foundation ditch waist rail detaching of the present invention is as follows:
(1) as shown in Figure 1, after adopting based on the reinforcing bar of foundation ditch waist rail, bar planting mode is implanted, and utilizes the constuction joint between new-old concrete, first with barrel saw by foundation ditch waist rail 1 cutting section, every segment length 2m is advisable.
(2) adopt pneumatic pick to pick on every section of waist rail and dig out groove 4, groove picks cutter to inserting hydraulic concrete jack 3, and its size is generally 500mm long (perpendicular to foundation pit side-wall direction), 300mm is wide, 300mm is dark.
(3) hydraulic concrete jack 3 is inserted in groove 4, start jack and carry out work, waist rail is pulled out from foundation pit side-wall 2 by entirety, and waist rail detaching is complete.
As above describe, can complete preferably the present invention.
Claims (3)
1. the construction method of a foundation ditch waist rail detaching, it is characterized in that carrying out according to the following steps: after the reinforcing bar based on foundation ditch waist rail adopts, bar planting mode is implanted, utilize the constuction joint between new-old concrete, adopt barrel saw by waist rail (1) cutting section, in the middle of every section, adopt pneumatic pick to pick and dig out a groove (4), then hydraulic concrete jack (3) is inserted in groove (4), waist rail (1) entirety is pulled out from foundation pit side-wall the most at last.
2. the construction method of a kind of foundation ditch waist rail detaching according to claim 1, is characterized in that: described waist rail (1) cutting section, every segment length is 1.8-2.2m.
3. the construction method of a kind of foundation ditch waist rail detaching according to claim 1, is characterized in that: described groove (4) is of a size of that 500mm is long, 300mm is wide, 300mm is dark, can insert hydraulic concrete jack (3) completely.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410053999.6A CN103774676A (en) | 2014-02-18 | 2014-02-18 | Construction method for dismounting foundation pit waist beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410053999.6A CN103774676A (en) | 2014-02-18 | 2014-02-18 | Construction method for dismounting foundation pit waist beam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103774676A true CN103774676A (en) | 2014-05-07 |
Family
ID=50567387
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410053999.6A Pending CN103774676A (en) | 2014-02-18 | 2014-02-18 | Construction method for dismounting foundation pit waist beam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103774676A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101050632A (en) * | 2007-05-18 | 2007-10-10 | 北京建工集团有限责任公司 | Prestressed wale dismantling and replacing structure and method |
KR100855098B1 (en) * | 2007-05-22 | 2008-08-29 | 정택동 | Strut structure as temporary system using a vertical truss at the end and the method thereof |
CN101280564A (en) * | 2008-06-06 | 2008-10-08 | 北京建工集团有限责任公司 | Pit pile anchor breast wall concrete breast beam structure and construction method thereof |
CN101705687A (en) * | 2009-10-23 | 2010-05-12 | 广东省基础工程公司 | Deep foundation pit reinforced concrete waist rail detaching device and construction method |
CN102677680A (en) * | 2012-05-08 | 2012-09-19 | 广东省基础工程公司 | Dismantling method for concrete waist beam |
-
2014
- 2014-02-18 CN CN201410053999.6A patent/CN103774676A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101050632A (en) * | 2007-05-18 | 2007-10-10 | 北京建工集团有限责任公司 | Prestressed wale dismantling and replacing structure and method |
KR100855098B1 (en) * | 2007-05-22 | 2008-08-29 | 정택동 | Strut structure as temporary system using a vertical truss at the end and the method thereof |
CN101280564A (en) * | 2008-06-06 | 2008-10-08 | 北京建工集团有限责任公司 | Pit pile anchor breast wall concrete breast beam structure and construction method thereof |
CN101705687A (en) * | 2009-10-23 | 2010-05-12 | 广东省基础工程公司 | Deep foundation pit reinforced concrete waist rail detaching device and construction method |
CN102677680A (en) * | 2012-05-08 | 2012-09-19 | 广东省基础工程公司 | Dismantling method for concrete waist beam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103410174B (en) | GXJ underground diaphragm wall rubber is every water joint tool and constructional method thereof | |
CN104912101A (en) | Tunneling and assembling structure and construction method of comprehensive pipe gallery | |
CN103306682B (en) | Long-span and high-side-wall underground space building and excavation support method thereof | |
CN103742157A (en) | Method of newly building underground space under ground by pipe jacking method | |
CN204984424U (en) | Prevent submerged cushion device of opening shield tail pipe piece | |
CN204002832U (en) | A kind of shield tunnel portal structure | |
CN102865083A (en) | Working well free shield arrival engineering method and structure of existing basement structure | |
CN202416324U (en) | Beam and slab structure superposed through top-down beam and down-top slab construction of foundation pit project | |
CN204849777U (en) | Tilting board double row pile supporting construction that bears down on one | |
CN204941551U (en) | A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction | |
CN204266216U (en) | Bamboo beam anchoring and supporting structure of side slope | |
CN204386617U (en) | Consolidation grouting structure of low waterhead diversion tunnel | |
CN103774676A (en) | Construction method for dismounting foundation pit waist beam | |
CN204212180U (en) | A kind of reinforcing cage for basement plugging dewatering well | |
CN104047273B (en) | Power station dissipation and scouring wall and construction method thereof | |
CN202108030U (en) | Cave dwelling type arch dam abutment groove structure | |
CN201574401U (en) | Underground continuous wall | |
CN204825820U (en) | Pressure regulating well structure using traffic hole as upper chamber | |
CN101363317A (en) | Developing method for large-scale strip mine | |
CN204139577U (en) | Embedment means formula wall-connecting piece after a kind of | |
CN203321523U (en) | Large-span high-side-wall underground space building | |
CN103850246A (en) | End part protective shoe sleeve of steel plate pile | |
CN102877850B (en) | Construction method of weak structural surface displacement of grotto surrounding rocks of underground power plant | |
CN203411981U (en) | Foundation pit horizontal support component deformation control structure | |
CN203514325U (en) | Foundation pit stair support system with gravity type cement cob wall in combination with single rank of piles |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140507 |