CN103593804A - Electric power information communication scheduling and monitoring platform - Google Patents
Electric power information communication scheduling and monitoring platform Download PDFInfo
- Publication number
- CN103593804A CN103593804A CN201310526150.1A CN201310526150A CN103593804A CN 103593804 A CN103593804 A CN 103593804A CN 201310526150 A CN201310526150 A CN 201310526150A CN 103593804 A CN103593804 A CN 103593804A
- Authority
- CN
- China
- Prior art keywords
- data
- layer
- module
- configuration
- management module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310526150.1A CN103593804A (en) | 2013-10-29 | 2013-10-29 | Electric power information communication scheduling and monitoring platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310526150.1A CN103593804A (en) | 2013-10-29 | 2013-10-29 | Electric power information communication scheduling and monitoring platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103593804A true CN103593804A (en) | 2014-02-19 |
Family
ID=50083930
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310526150.1A Pending CN103593804A (en) | 2013-10-29 | 2013-10-29 | Electric power information communication scheduling and monitoring platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103593804A (en) |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104283967A (en) * | 2014-10-23 | 2015-01-14 | 武汉华大优能信息有限公司 | Third-party data service system based on Internet-of-Things data collecting |
CN104658053A (en) * | 2015-03-10 | 2015-05-27 | 国家电网公司 | Automatic inspection auxiliary system for running state of dispatching control system |
CN104868592A (en) * | 2015-03-13 | 2015-08-26 | 国家电网公司 | Inter-network information system application state supervision system |
CN104917803A (en) * | 2014-07-28 | 2015-09-16 | 国家电网公司 | Autonomous inspection system based on user behavior control |
CN105119750A (en) * | 2015-09-08 | 2015-12-02 | 南京联成科技发展有限公司 | Distributed information security operation and maintenance management platform based on massive data |
CN107204884A (en) * | 2017-08-01 | 2017-09-26 | 郑州云海信息技术有限公司 | A kind of cloud system inspection collocation method and device |
CN107769985A (en) * | 2017-12-07 | 2018-03-06 | 浙江润物网络科技有限公司 | A kind of computer network management system |
CN108205569A (en) * | 2016-12-19 | 2018-06-26 | 中国移动通信集团山西有限公司 | For updating the method and apparatus of configuration management database |
CN108683549A (en) * | 2018-06-08 | 2018-10-19 | 湖北鑫英泰系统技术股份有限公司 | A kind of network security applied in electric power monitoring system monitors system |
CN109525433A (en) * | 2018-12-12 | 2019-03-26 | 国网辽宁省电力有限公司信息通信分公司 | A kind of router bgp status information batch monitoring method |
CN109586967A (en) * | 2018-12-12 | 2019-04-05 | 国网辽宁省电力有限公司信息通信分公司 | A kind of active alarm formula safety monitoring system |
CN109683911A (en) * | 2018-12-26 | 2019-04-26 | 上海金融期货信息技术有限公司 | A kind of system for realizing automation application deployment and impact analysis |
CN109873495A (en) * | 2018-11-07 | 2019-06-11 | 国网浙江安吉县供电有限公司 | A kind of power scheduling display systems and method based on big data analysis |
CN109976929A (en) * | 2017-12-28 | 2019-07-05 | 中国电信股份有限公司 | Fault Locating Method, the device of data production process |
CN110557283A (en) * | 2019-08-29 | 2019-12-10 | 海南电网有限责任公司 | power distribution communication network management and control method, server, system and readable storage medium |
CN110636096A (en) * | 2018-06-25 | 2019-12-31 | 中国科学院沈阳自动化研究所 | Power internal and external network information interaction interface service system based on database storage process |
CN111277049A (en) * | 2020-02-24 | 2020-06-12 | 国电南瑞科技股份有限公司 | Monitoring terminal and alarm and graph integrated display method |
CN112311867A (en) * | 2020-10-27 | 2021-02-02 | 国网河北省电力有限公司雄安新区供电公司 | Equipment information monitoring system for power information communication |
CN113128966A (en) * | 2021-04-23 | 2021-07-16 | 广东电网有限责任公司 | Power communication equipment management system |
CN113139658A (en) * | 2021-04-23 | 2021-07-20 | 上海中通吉网络技术有限公司 | Pipeline theory method for processing fault based on change and alarm event stream |
-
2013
- 2013-10-29 CN CN201310526150.1A patent/CN103593804A/en active Pending
Non-Patent Citations (1)
Title |
---|
徐红泉: "电力调度自动化系统综合运维平台设计方案", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
Cited By (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104917803A (en) * | 2014-07-28 | 2015-09-16 | 国家电网公司 | Autonomous inspection system based on user behavior control |
CN104283967B (en) * | 2014-10-23 | 2018-07-13 | 武汉华大优能信息有限公司 | A kind of third party's data service system based on internet of things data acquisition |
CN104283967A (en) * | 2014-10-23 | 2015-01-14 | 武汉华大优能信息有限公司 | Third-party data service system based on Internet-of-Things data collecting |
CN104658053A (en) * | 2015-03-10 | 2015-05-27 | 国家电网公司 | Automatic inspection auxiliary system for running state of dispatching control system |
CN104658053B (en) * | 2015-03-10 | 2017-09-15 | 国家电网公司 | A kind of automatic detecting accessory system for Dispatching Control System running status |
CN104868592A (en) * | 2015-03-13 | 2015-08-26 | 国家电网公司 | Inter-network information system application state supervision system |
CN105119750A (en) * | 2015-09-08 | 2015-12-02 | 南京联成科技发展有限公司 | Distributed information security operation and maintenance management platform based on massive data |
CN105119750B (en) * | 2015-09-08 | 2019-04-19 | 南京联成科技发展股份有限公司 | A kind of safe operation management platform system of distributed information based on big data |
CN108205569A (en) * | 2016-12-19 | 2018-06-26 | 中国移动通信集团山西有限公司 | For updating the method and apparatus of configuration management database |
CN108205569B (en) * | 2016-12-19 | 2020-09-11 | 中国移动通信集团山西有限公司 | Method and apparatus for updating a configuration management database |
CN107204884A (en) * | 2017-08-01 | 2017-09-26 | 郑州云海信息技术有限公司 | A kind of cloud system inspection collocation method and device |
CN107769985A (en) * | 2017-12-07 | 2018-03-06 | 浙江润物网络科技有限公司 | A kind of computer network management system |
CN109976929A (en) * | 2017-12-28 | 2019-07-05 | 中国电信股份有限公司 | Fault Locating Method, the device of data production process |
CN108683549A (en) * | 2018-06-08 | 2018-10-19 | 湖北鑫英泰系统技术股份有限公司 | A kind of network security applied in electric power monitoring system monitors system |
CN110636096B (en) * | 2018-06-25 | 2020-12-08 | 中国科学院沈阳自动化研究所 | Power internal and external network information interaction interface service system based on database storage process |
CN110636096A (en) * | 2018-06-25 | 2019-12-31 | 中国科学院沈阳自动化研究所 | Power internal and external network information interaction interface service system based on database storage process |
CN109873495A (en) * | 2018-11-07 | 2019-06-11 | 国网浙江安吉县供电有限公司 | A kind of power scheduling display systems and method based on big data analysis |
CN109525433A (en) * | 2018-12-12 | 2019-03-26 | 国网辽宁省电力有限公司信息通信分公司 | A kind of router bgp status information batch monitoring method |
CN109586967A (en) * | 2018-12-12 | 2019-04-05 | 国网辽宁省电力有限公司信息通信分公司 | A kind of active alarm formula safety monitoring system |
CN109683911A (en) * | 2018-12-26 | 2019-04-26 | 上海金融期货信息技术有限公司 | A kind of system for realizing automation application deployment and impact analysis |
CN109683911B (en) * | 2018-12-26 | 2022-03-08 | 上海金融期货信息技术有限公司 | System for realizing automatic application deployment and influence analysis |
CN110557283A (en) * | 2019-08-29 | 2019-12-10 | 海南电网有限责任公司 | power distribution communication network management and control method, server, system and readable storage medium |
CN110557283B (en) * | 2019-08-29 | 2022-06-17 | 海南电网有限责任公司 | Power distribution communication network management and control method, server, system and readable storage medium |
CN111277049A (en) * | 2020-02-24 | 2020-06-12 | 国电南瑞科技股份有限公司 | Monitoring terminal and alarm and graph integrated display method |
CN111277049B (en) * | 2020-02-24 | 2022-03-29 | 国电南瑞科技股份有限公司 | Monitoring terminal and alarm and graph integrated display method |
CN112311867A (en) * | 2020-10-27 | 2021-02-02 | 国网河北省电力有限公司雄安新区供电公司 | Equipment information monitoring system for power information communication |
CN113128966A (en) * | 2021-04-23 | 2021-07-16 | 广东电网有限责任公司 | Power communication equipment management system |
CN113139658A (en) * | 2021-04-23 | 2021-07-20 | 上海中通吉网络技术有限公司 | Pipeline theory method for processing fault based on change and alarm event stream |
CN113128966B (en) * | 2021-04-23 | 2023-01-20 | 广东电网有限责任公司 | Power communication equipment management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103593804A (en) | Electric power information communication scheduling and monitoring platform | |
US11627051B2 (en) | Determining asset associations for data center customers | |
CN103348328B (en) | For monitoring and manage the system and method for data center resource in real time | |
CN103532744B (en) | A kind of intelligent grid information communication integral supporting platform | |
KR101059061B1 (en) | Facility Integration System and Method for Smart Grid | |
CN105871605A (en) | Operation and maintenance monitoring platform based on big power marketing data | |
CN102752142B (en) | A kind of method for supervising of the information system based on Conceptual Modeling and supervisory control system | |
CN105119750A (en) | Distributed information security operation and maintenance management platform based on massive data | |
CN102916839A (en) | Automatic monitoring system for agricultural work in sugarhouse | |
CN103514514A (en) | On-line monitoring method for electricity marketing business data | |
CN105631522A (en) | IT system operation and maintenance management system | |
CN104113596A (en) | Cloud monitoring system and method for private cloud | |
CN108092813A (en) | Data center's total management system server hardware Governance framework and implementation method | |
CN106532951A (en) | Transformer substation monitoring system | |
CN106936858A (en) | A kind of cloud platform monitoring system and method | |
CN105868936B (en) | Intelligent operation and maintenance system applied to integrated operation and maintenance of transformer equipment | |
CN105262210A (en) | System and method for analysis and early warning of substation network security | |
CN109905492B (en) | Safety operation management system and method based on distributed modular data center | |
CN114254982A (en) | Smart factory cloud management system | |
CN108777637A (en) | A kind of data center's total management system and method for supporting server isomery | |
CN107910956A (en) | A kind of integrated power network schedule automation operation comprehensive supervision method of main plant stand | |
CN106961367A (en) | Cloud resource monitoring and method based on openstack | |
CN117041251A (en) | Multi-data virtualization cluster management system based on edge computing | |
CN107018026A (en) | Automate main website network monitoring system | |
CN109002901A (en) | A kind of province ground county's integration electric network information total management system and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhao Yongbin Inventor after: Li Wei Inventor after: Chen Shuo Inventor after: Zhao Jinghong Inventor after: Yang Zhuangguan Inventor after: Zhang Shimo Inventor after: Yu Liangliang Inventor before: Liu Shuji Inventor before: Yu Liangliang Inventor before: Yu Honghui Inventor before: Zhao Yongbin Inventor before: Li Wei Inventor before: Deng Zhongyu Inventor before: Chen Shuo Inventor before: Zhao Jinghong Inventor before: Yang Zhuangguan Inventor before: Zhang Shimo |
|
COR | Change of bibliographic data | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140219 |
|
RJ01 | Rejection of invention patent application after publication |