[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN103470935A - Lubricating oil device of gas turbine - Google Patents

Lubricating oil device of gas turbine Download PDF

Info

Publication number
CN103470935A
CN103470935A CN2013103841150A CN201310384115A CN103470935A CN 103470935 A CN103470935 A CN 103470935A CN 2013103841150 A CN2013103841150 A CN 2013103841150A CN 201310384115 A CN201310384115 A CN 201310384115A CN 103470935 A CN103470935 A CN 103470935A
Authority
CN
China
Prior art keywords
oil
jacking
pipeline
valve
pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103841150A
Other languages
Chinese (zh)
Other versions
CN103470935B (en
Inventor
蔡惠忠
田国林
王秋宝
沈存五
唐健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU JIANGHAI RUNYE EQUIPMENT Co Ltd
Shanghai Electric Power Generation Equipment Co Ltd
Original Assignee
JIANGSU JIANGHAI RUNYE EQUIPMENT Co Ltd
Shanghai Electric Power Generation Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU JIANGHAI RUNYE EQUIPMENT Co Ltd, Shanghai Electric Power Generation Equipment Co Ltd filed Critical JIANGSU JIANGHAI RUNYE EQUIPMENT Co Ltd
Priority to CN201310384115.0A priority Critical patent/CN103470935B/en
Publication of CN103470935A publication Critical patent/CN103470935A/en
Application granted granted Critical
Publication of CN103470935B publication Critical patent/CN103470935B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lubrication Of Internal Combustion Engines (AREA)

Abstract

The invention discloses a lubricating oil device of a gas turbine. The lubricating oil device comprises an oil tank. Oil tank height adjusting units are arranged at the bottom of the oil tank, alternating-current oil pump devices, a jacking oil pump device a, a low-pressure double-drum filter, a jacking oil pump device b and a fan device are mounted on the top of the oil tank, the alternating-current oil pump devices are connected with the jacking oil pump device a by an alternating-current oil pump outlet pipeline, a cooler inlet flange is arranged on the top of the alternating-current oil pump outlet pipeline, a cooler outlet flange is arranged at the tail end of the alternating-current oil pump outlet pipeline, a bypass throttle valve is arranged on the alternating-current oil outlet pipeline, a three-way temperature regulating valve is close to the bypass throttle valve, the low-pressure double-drum filter is further connected with a low-pressure filter rear pipeline, and a jacking oil filter rear pipeline is respectively connected with a high-pressure pump outlet pipeline and an electric wiring pipe via a high-pressure double-drum filter. The lubricating oil device of the gas turbine has the advantage that the self-sustaining and circulating lubricating oil device is used for guaranteeing sufficient oil level, oil pressure, oil temperature and cleanliness of a system.

Description

The gas turbine lube plant
Technical field
The present invention relates to a kind of gas turbine lube plant.
Background technique
Along with Gas Turbine Generating Units popularization gradually and operation at home, can its accessory safer and be reliable is host services, has become the first-selected condition of equipment supply.Wherein, the significance of oil system is also more and more paid attention to.Oil system is in unit starting, normal operation and stopping process; each bearing, transmission device and accessory supply quantity to the generator set moved is abundance, lubricant oil that temperature and pressure is suitable, clean; to guarantee that unit safety moves reliably, prevent burn-out of bearing, rotor journal is crossed the accidents such as thermal bending.For guaranteeing that unit runs well and shuts down; oil system has adopted the fuel feeding pattern of " the critical oil pumps of AC electrical lubricant pump+direct current of the using and the reserved "; when accident conditions occurring, continuing provides to unit the lubricant oil met the demands, and with the normal operation or the coasting operation that guarantee unit, shuts down.But the operating mode that above-mentioned fuel feeding scheme exists pressure decreased, flow to reduce in active and standby pump handoff procedure, if switching time is long, oil-break occurs in equipment under the operating mode that runs up, can be to equipment bearing generation considerable damage.
Fuel tank in use, for medium temperature, require to control in the reasonable scope, and require to possess the guarantee condition that plays at any time machine, but existing electric power lubricating utensil electricity consumption Intelligent heater control box is only for controlling the start and stop of electric heater, it is not with the virtual protection circuit, be not with thermometry and temperature to control, opening of electric heater power supply only is provided, close function, the thermometry related to is arranged on the lubricating utensil body, the temperature that relates to control by control DCS realize, the temperature of lubricating utensil is controlled needs temperature measurement equipment, control box, middle control DCS completes jointly, the installation wiring is complicated, the change setting temperature needs the cooperation of DCS, operation and maintenance is extremely inconvenient.
For lube plant oil-feed port pressure, requirement is adjustable in the certain pressure scope, and can realize on-line control and oil-proof, continue to flow, but between current existing throttle valve valve rod and valve gap, adopt screw pair to coordinate, after controlling rod is removed, pressure oil liquid will be emerged from the screw pair gap, can not well play the effect of sealing, can't the on-line control valve opening; And can contract fully between existing throttle valve core and valve body, there is the risk of oil-break, should not be used on the electric power lubricating utensil; And existing throttle valve adopts flange to connect, and the valve length dimension is long.
Therefore, for addressing the above problem, the spy provides a kind of new technological scheme.
Summary of the invention
The purpose of this invention is to provide a kind of gas turbine lube plant.
The technical solution used in the present invention is:
The gas turbine lube plant, comprise fuel tank and the cat ladder of being located at the fuel tank right side, described fuel tank bottom is provided with the fuel tank height adjusting unit, described fuel tank top is equipped with fuel turn manifold pump-unit a, fuel turn manifold pump-unit b, the direct current oil pump device, jacking(oil) pump device a, the low pressure duplex filter, jacking(oil) pump device b, high pressure duplex filter and blower fan apparatus, described fuel turn manifold pump-unit a is connected with the low pressure duplex filter by fuel turn manifold pump discharge pipeline with fuel turn manifold pump-unit b, described fuel turn manifold pump discharge pipeline top is provided with into the cooler inlet flange, tail end is provided with the cooler outlet flange, described fuel turn manifold pump discharge pipeline is provided with the by-pass throttle valve, be provided with the threeway temperature control valve (TCV) near by-pass throttle valve place, be provided with the working connection throttle valve between described threeway temperature control valve (TCV) and low pressure duplex filter, jacking(oil) pump oil filler pipe one end is connected with pipeline after low-pressure filter, the other end is connected with inlet line, described jacking(oil) pump device a all is connected with inlet line with jacking(oil) pump device b, described inlet line inserts fuel tank internal, described inlet line end is provided with the safety check III, described low pressure duplex filter is connected with pipeline after low-pressure filter, after described jacking oil filter, the pipeline top is connected with the jacking oil control module, after described jacking oil filter, the pipeline bottom is connected with the electrical wiring pipe with the high-pressure service pump export pipeline respectively by the high pressure duplex filter.
Described fuel tank top is provided with inspection manhole near fuel turn manifold pump-unit place, and the joint of described fuel turn manifold pump-unit and fuel turn manifold pump discharge pipeline is provided with the safety check I.
Described jacking oil control module also is connected with the jiggering control module, and described jiggering control module is connected with the series flow control valve module, and after the jacking oil filter, pipeline is equipped with the jacking oil instrument panel near jacking oil control module place.
Upper end, described fuel tank left side is provided with the return opening flange, and the upper end, right side is provided with terminal board, liquid level shows detector and Blowoff ball valve, and described fuel tank front side is provided with the Intelligent heater control box.
Described module comprises series flow control valve module, jiggering control module and jacking oil control module, described series flow control valve module, jiggering control module and jacking oil control module are connected successively, described jacking oil control module is connected with pipeline after the jacking oil filter, and after described jacking oil filter, pipeline is equipped with the jacking oil instrument panel near jacking oil control module place.
Described jacking(oil) pump device b and jacking(oil) pump device a include motor, bell jar, coupling, vane pump, safety check II and pressure regulator valve, described outside motor is provided with bell jar, described motor is connected with coupling, described bell jar outside is provided with vane pump, described vane pump top is provided with outlet(discharge) flange, and below is provided with inlet flange, and left side is provided with pressure regulator, front side is provided with the pressure regulator valve flange, is provided with the safety check II between described outlet(discharge) flange and vane pump.
Described blower fan apparatus comprises the blower fan I, the blower fan II, the oil removing day with fog, the blower fan apparatus chassis, ball valve, modulating valve and vacuum table, described blower fan I and blower fan II are fixed on the blower fan apparatus chassis, be provided with export pipeline between described blower fan I and blower fan II, the joint of described export pipeline and blower fan I and blower fan II is provided with the safety check III, described oil removing day with fog bottom is provided with ball valve, described oil removing day with fog one end is connected with pipeline before the oil removing day with fog, the other end is connected with pipeline after the oil removing day with fog, on pipeline, vacuum table is installed after described oil removing day with fog, after described oil removing day with fog, pipeline is connected with the blower fan I, be provided with aflter-fillter between pipeline before described oil removing day with fog and oil removing day with fog, described aflter-fillter bottom is equipped with modulating valve.
After described low-pressure filter, the pipeline top is provided with the lubricating oil outlet flange, temperature is installed on pipeline after described low-pressure filter and shows that detector and pressure show detector.
Described jacking(oil) pump oil filler pipe is connected with the entrance pipe in jacking(oil) pump device b with jacking(oil) pump device a respectively.
Be provided with the intelligent digital temperature controlling instrument in described Intelligent heater control box, A.C. contactor, circuit breaker and electric coupler, described control box casing outside is provided with temperature transducer and electric heater, described temperature transducer is connected with the control box casing by flexible cord, and transmission temperature signal, described A.C. contactor one end is connected with circuit breaker, the other end is connected with power supply by electric coupler, described circuit breaker is connected with electric heater by electric coupler, described intelligent digital temperature controlling instrument matches with temperature transducer, described intelligent digital temperature controlling instrument is controlled circuit breaker and A.C. contactor, described electric heater two ends are provided with the air plug electric coupler.
Described working connection throttle valve comprises valve body, cover plate, valve rod and end cap, described valve body upper end is provided with cover plate, described valve body is wafer type, the joint of described valve rod and cover plate is provided with seal ring, between described valve body and cover plate, be connected by screw, described valve body down either side is respectively equipped with import and outlet, described cover plate center is provided with valve rod, and valve rod is located between the import and outlet of valve body, described valve rod upper end is provided with end cap, be threaded connection between described end cap and cover plate, seal by O type circle between described cover plate and valve body.
Advantage of the present invention is: the gas turbine lube plant adopts be self-sustaining and recirculation type, lubricant oil is forced cooling by the external cooler module, to meet the requirement of oil system to oil temperature supplying; Detector and instrument panel have been comprised, in order to guarantee oil level enough in system, oil pressure, oil temperature and turbidity test; In order to guarantee that oil temperature reaches the oil temperature that unit starting needs when playing machine, be provided with electric heater in system, control by the Intelligent heater control box, can automatically start to the preset temperature post-heater and automatically stop, if the fuel tank oil temperature is lower than playing machine setting value master lubricating oil pump No starting; In power plant, have a power failure suddenly, when lubricating oil pump shuts down, in order to protect unit, avoid damaging, native system is provided with a direct current emergency lubrication pump, when oil system is moved, after main oil pump outage suddenly, straightway pump starts, lubricant oil, without cold filtration, cooling, is directly supplied with in the bearing of combustion machine and generator; Integrated jacking oil control module, series flow control valve module and the jiggering control module of having arranged, conveniently concentrate and adjust and maintenance each axle jacking, jiggering situation; Be provided with by-pass throttle valve and working connection throttle valve, can adjust gas turbine lube plant oil-feed port oil pressure by on-line control pressure reduction, there do not is the cutout phenomenon, by-pass throttle valve and working connection throttle valve be a kind of good sealing effect, can on-line control pressure reduction but do not have the novel wafer type throttle valve of cutout phenomenon, fuel turn manifold pump-unit and direct current oil pump device all adopt the motor-drive pump structure, oil pump is vertical submerged centrifugal pump, and the starting with full load time is no more than the standard permitted value.
The accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
Fig. 1 is structural representation of the present invention.
The rear view that Fig. 2 is Fig. 1.
The plan view that Fig. 3 is Fig. 1.
The left view that Fig. 4 is Fig. 1.
The right elevation that Fig. 5 is Fig. 1.
The structural representation that Fig. 6 is jacking(oil) pump device b in Fig. 1.
The plan view that Fig. 7 is Fig. 6.
The structural representation that Fig. 8 is blower fan apparatus in Fig. 1.
The plan view that Fig. 9 is Fig. 8.
The rear view that Figure 10 is Fig. 8.
The structural representation that Figure 11 is refrigerating module.
The plan view that Figure 12 is Figure 11.
The electrical schematic diagram that Figure 13 is Intelligent heater control box in Fig. 2.
Figure 14 is the relation structure diagram between jacking(oil) pump device a, jacking(oil) pump device b and inlet line in Fig. 3.
The structural representation that Figure 15 is working connection throttle valve in Fig. 3.
Wherein: 1, fuel turn manifold pump-unit a, 2, the safety check I, 3, the cooler inlet flange, 4, the Intelligent heater control box, 5, jacking(oil) pump device a, 6, the cooler outlet flange, 7, the threeway temperature control valve (TCV), 8, the working connection throttle valve, 9, the low pressure duplex filter, 10, the high-pressure service pump export pipeline, 11, the jacking(oil) pump oil filler pipe, 12, jacking(oil) pump device b, 12.1, motor, 12.2, bell jar, 12.3 coupling, 12.4, vane pump, 12.5, the safety check II, 12.6, pressure regulator, 12.7, inlet flange, 12.8, outlet(discharge) flange, 12.9, the pressure regulator valve flange, 13, fuel tank, 14, cat ladder, 15, Blowoff ball valve, 16, liquid level shows detector, 17, terminal board, 18, the fuel tank height adjusting unit, 19, blower fan apparatus, 19.1, the blower fan I, 19.2, the safety check III, 19.3, ball valve, 19.4, the blower fan II, 19.5, the oil removing day with fog, 19.6, pipeline after the oil removing day with fog, 19.7, the blower fan apparatus export pipeline, 19.8, vacuum table, 19.9, aflter-fillter, 19.10, modulating valve, 19.11, the blower fan apparatus chassis, 19.12, pipeline before the oil removing day with fog, 20, the electrical wiring pipe, 21, the high pressure duplex filter, 22, the by-pass throttle valve, 23, fuel turn manifold pump discharge pipeline, 24, pressure shows detector, 25, pipeline after the jacking oil filter, 26, inspection manhole, 27, pipeline after low-pressure filter, 28, the jacking oil instrument panel, 29, the jacking oil control module, 30, the lubricating oil outlet flange, 31, the return opening flange, 32, the series flow control valve module, 33, the jiggering control module, 35, temperature shows detector, 36, , 37, the direct current oil pump device, 38, inlet line, 39, the safety check III, 40, cooler a, 41, cooler b, 42, six direction changeover valve a, 43, six direction changeover valve b, 44, the air plug electric coupler, 45, the intelligent digital temperature controlling instrument, 46, A.C. contactor, 47, circuit breaker, 48, electric coupler, 49, temperature transducer, 50, electric heater, 51, flexible cord, 52, fuel turn manifold pump-unit b, 53, end cap, 54, valve rod, 55, screw, 56, cover plate, 57, seal ring, 58, O type circle, 59, valve body, 60, outlet, 61, import.
Embodiment
In order to deepen the understanding of the present invention, below in conjunction with embodiment and accompanying drawing, to of the present invention, be described in further detail, this embodiment is only of the present invention for explaining, does not form the restriction to protection scope of the present invention.
As shown in Fig. 1-5 and Figure 14, gas turbine lube plant of the present invention, comprise fuel tank 13 and the cat ladder 14 of being located at fuel tank 13 right sides, fuel tank 13 bottoms are provided with fuel tank height adjusting unit 18, fuel tank 13 tops are equipped with fuel turn manifold pump-unit a1, fuel turn manifold pump-unit b52, direct current oil pump device 37, jacking(oil) pump device a5, low pressure duplex filter 9, jacking(oil) pump device b12, high pressure duplex filter 21 and blower fan apparatus 19, fuel turn manifold pump-unit a1 is connected with low pressure duplex filter 9 by fuel turn manifold pump discharge pipeline 23 with fuel turn manifold pump-unit b52, fuel turn manifold pump discharge pipeline 23 tops are provided with into cooler inlet flange 3, tail end is provided with cooler outlet flange 6, fuel turn manifold pump discharge pipeline 23 is provided with by-pass throttle valve 22, be provided with threeway temperature control valve (TCV) 7 near by-pass throttle valve 22 places, be provided with working connection throttle valve 8 between threeway temperature control valve (TCV) 7 and low pressure duplex filter 9, jacking(oil) pump oil filler pipe 11 1 ends are connected with pipeline after low-pressure filter 27, the other end is connected with inlet line 38, jacking(oil) pump device a5 all is connected with inlet line 38 with jacking(oil) pump device b12, inlet line 38 inserts fuel tank 13 inside, inlet line 38 ends are provided with safety check III 39, low pressure duplex filter 9 is connected with pipeline after low-pressure filter 27, after the jacking oil filter, pipeline 25 tops are connected with jacking oil control module 29, after the jacking oil filter, pipeline 25 bottoms are connected with electrical wiring pipe 20 with high-pressure service pump export pipeline 10 respectively by high pressure duplex filter 21.
Fuel tank 13 tops are provided with inspection manhole 26 near fuel turn manifold pump-unit 1 place, and the joint of fuel turn manifold pump-unit and 1 fuel turn manifold pump discharge pipeline 23 is provided with safety check I 2.
As shown in Figure 11 and Figure 12, also comprise refrigerating module, refrigerating module is arranged separately, refrigerating module is installed on cooler inlet flange 3 and cooler outlet flange 6 places, refrigerating module comprises cooler a40, cooler b41, six direction changeover valve a42 and six direction changeover valve b43, between cooler a40 and cooler b41, by six direction changeover valve a42, with six direction changeover valve b43, is connected.
Fuel tank 13 upper ends, left side are provided with return opening flange 31, and the upper end, right side is provided with terminal board 17, liquid level shows detector 16 and Blowoff ball valve 15, and fuel tank 13 front sides are provided with Intelligent heater control box 4.
Jacking oil control module 29 also is connected with jiggering control module 33, and jiggering control module 33 is connected with series flow control valve module 32, and after the jacking oil filter, pipeline 25 is equipped with jacking oil instrument panel 28 near jacking oil control module 29 places.
After low-pressure filter, pipeline 27 tops are provided with lubricating oil outlet flange 30, temperature is installed on pipeline 27 after low-pressure filter and shows that detector 34 and pressure show detector 24.
As shown in Figure 6 and Figure 7, jacking(oil) pump device b12 and jacking(oil) pump device a5 include motor 12.1, bell jar 12.2, coupling 12.3, vane pump 12.4, safety check II 12.5 and pressure regulator valve 12.6, motor 12.1 outsides are provided with bell jar 12.2, motor 12.1 is connected with coupling 12.3, bell jar 12.2 outsides are provided with vane pump 12.4, vane pump 12.4 tops are provided with outlet(discharge) flange 12.8, below is provided with inlet flange 12.7, left side is provided with pressure regulator 12.6, front side is provided with pressure regulator valve flange 12.9, be provided with safety check II 12.5 between outlet(discharge) flange 12.7 and vane pump 12.4.
As shown in Fig. 8-10, blower fan apparatus 19 comprises blower fan I 19.1, blower fan II 19.4, oil removing day with fog 19.5, blower fan apparatus chassis 19.11, ball valve 19.3, modulating valve 19.10 and vacuum table 19.8, blower fan I 19.1 and blower fan II 19.4 are fixed on blower fan apparatus chassis 19.11, be provided with export pipeline 19.7 between blower fan I 19.1 and blower fan II 19.4, export pipeline 19.7 is provided with safety check III 19.2 with the joint of blower fan I 19.1 and blower fan II 19.4, oil removing day with fog 19.5 bottoms are provided with ball valve 19.3, oil removing day with fog 19.5 one ends are connected with pipeline 19.12 before the oil removing day with fog, the other end is connected with pipeline 19.7 after the oil removing day with fog, vacuum table 19.8 is installed on pipeline 19.7 after the oil removing day with fog, after the oil removing day with fog, pipeline 19.6 is connected with blower fan I 19.1, be provided with aflter-fillter 19.9 between pipeline 19.12 before oil removing day with fog 19.6 and oil removing day with fog, aflter-fillter 19.9 bottoms are equipped with modulating valve 19.10.
Jacking(oil) pump oil filler pipe 11 is connected with the entrance pipe 12.7 in jacking(oil) pump device b12 with jacking(oil) pump device a5 respectively.
As shown in figure 13, be provided with intelligent digital temperature controlling instrument 45 in Intelligent heater control box 4, A.C. contactor 46, circuit breaker 47 and electric coupler 48, control box casing 1 outside is provided with temperature transducer 49 and electric heater 50, temperature transducer 49 is connected with control box casing 1 by flexible cord 51, and transmission temperature signal, A.C. contactor 46 1 ends are connected with circuit breaker 47, the other end is connected with power supply by electric coupler 48, circuit breaker 47 is connected with electric heater 50 by electric coupler 48, intelligent digital temperature controlling instrument 45 matches with temperature transducer 49, intelligent digital temperature controlling instrument 45 is controlled circuit breaker 47 and A.C. contactor 46, electric heater 50 two ends are provided with air plug electric coupler 44.
As shown in figure 15, working connection throttle valve 8 comprises valve body 59, cover plate 56, valve rod 54 and end cap 53, valve body 59 upper ends are provided with cover plate 56, valve body 59 is wafer type, valve rod 54 is provided with seal ring 57 with the joint of cover plate 56, between valve body 59 and cover plate 56, by screw 55, be connected, valve body 59 down either side are respectively equipped with import 61 and outlet 60, cover plate 56 centers are provided with valve rod 54, and valve rod 54 is located at the import 61 of valve body 59 and is exported between 60, valve rod rotates and also can move up and down, valve rod 54 upper ends are provided with end cap 53, between end cap 53 and cover plate 56, be threaded connection, between cover plate 56 and valve body 59, by O type circle 58, seal.
Advantage of the present invention is: the gas turbine lube plant adopts be self-sustaining and recirculation type, lubricant oil is forced cooling by the external cooler module, to meet the requirement of oil system to oil temperature supplying; Detector and instrument panel have been comprised, in order to guarantee oil level enough in system, oil pressure, oil temperature and turbidity test; In order to guarantee that oil temperature reaches the oil temperature that unit starting needs when playing machine, be provided with electric heater in system, control by the Intelligent heater control box, can automatically start to the preset temperature post-heater and automatically stop, if the fuel tank oil temperature is lower than playing machine setting value master lubricating oil pump No starting; In power plant, have a power failure suddenly, when lubricating oil pump shuts down, in order to protect unit, avoid damaging, native system is provided with a direct current emergency lubrication pump, when oil system is moved, after main oil pump outage suddenly, straightway pump starts, lubricant oil, without cold filtration, cooling, is directly supplied with in the bearing of combustion machine and generator; Integrated jacking oil control module, series flow control valve module and the jiggering control module of having arranged, conveniently concentrate and adjust and maintenance each axle jacking, jiggering situation; Be provided with by-pass throttle valve and working connection throttle valve, can adjust gas turbine lube plant oil-feed port oil pressure by on-line control pressure reduction, do not have the cutout phenomenon, by-pass throttle valve and working connection throttle valve be a kind of good sealing effect, can on-line control pressure reduction but do not have the novel wafer type throttle valve of cutout phenomenon.

Claims (11)

1. gas turbine lube plant, comprise fuel tank and the cat ladder of being located at the fuel tank right side, it is characterized in that: described fuel tank bottom is provided with the fuel tank height adjusting unit, described fuel tank top is equipped with fuel turn manifold pump-unit a, fuel turn manifold pump-unit b, the direct current oil pump device, jacking(oil) pump device a, the low pressure duplex filter, jacking(oil) pump device b, high pressure duplex filter and blower fan apparatus, described fuel turn manifold pump-unit a is connected with the low pressure duplex filter by fuel turn manifold pump discharge pipeline with fuel turn manifold pump-unit b, described fuel turn manifold pump discharge pipeline top is provided with into the cooler inlet flange, tail end is provided with the cooler outlet flange, described fuel turn manifold pump discharge pipeline is provided with the by-pass throttle valve, be provided with the threeway temperature control valve (TCV) near by-pass throttle valve place, be provided with the working connection throttle valve between described threeway temperature control valve (TCV) and low pressure duplex filter, jacking(oil) pump oil filler pipe one end is connected with pipeline after low-pressure filter, the other end is connected with inlet line, described jacking(oil) pump device a all is connected with inlet line with jacking(oil) pump device b, described inlet line inserts fuel tank internal, described inlet line end is provided with the safety check III, described low pressure duplex filter is connected with pipeline after low-pressure filter, after described jacking oil filter, the pipeline top is connected with the jacking oil control module, after described jacking oil filter, the pipeline bottom is connected with the electrical wiring pipe with the high-pressure service pump export pipeline respectively by the high pressure duplex filter.
2. gas turbine lube plant according to claim 1 is characterized in that: described fuel tank top is provided with inspection manhole near fuel turn manifold pump-unit place, and the joint of described fuel turn manifold pump-unit and fuel turn manifold pump discharge pipeline is provided with the safety check I.
3. gas turbine lube plant according to claim 1, it is characterized in that: also comprise refrigerating module, described refrigerating module is arranged separately, described refrigerating module is installed on cooler inlet flange and cooler outlet flange, described refrigerating module comprises cooler a, cooler b, six direction changeover valve a and six direction changeover valve b, between described cooler a and cooler b, by six direction changeover valve a, with six direction changeover valve b, is connected.
4. gas turbine lube plant according to claim 1, it is characterized in that: upper end, described fuel tank left side is provided with the return opening flange, the upper end, right side is provided with terminal board, liquid level shows detector and Blowoff ball valve, and described fuel tank front side is provided with the Intelligent heater control box.
5. gas turbine lube plant according to claim 1, it is characterized in that: described jacking oil control module also is connected with the jiggering control module, described jiggering control module is connected with the series flow control valve module, and after the jacking oil filter, pipeline is equipped with the jacking oil instrument panel near jacking oil control module place.
6. gas turbine lube plant according to claim 1, it is characterized in that: described jacking(oil) pump device b and jacking(oil) pump device a include motor, bell jar, coupling, vane pump, safety check II and pressure regulator valve, described outside motor is provided with bell jar, described motor is connected with coupling, described bell jar outside is provided with vane pump, described vane pump top is provided with outlet(discharge) flange, below is provided with inlet flange, left side is provided with pressure regulator, front side is provided with the pressure regulator valve flange, is provided with the safety check II between described outlet(discharge) flange and vane pump.
7. gas turbine lube plant according to claim 1, it is characterized in that: described blower fan apparatus comprises the blower fan I, the blower fan II, the oil removing day with fog, the blower fan apparatus chassis, ball valve, modulating valve and vacuum table, described blower fan I and blower fan II are fixed on the blower fan apparatus chassis, be provided with export pipeline between described blower fan I and blower fan II, the joint of described export pipeline and blower fan I and blower fan II is provided with the safety check III, described oil removing day with fog bottom is provided with ball valve, described oil removing day with fog one end is connected with pipeline before the oil removing day with fog, the other end is connected with pipeline after the oil removing day with fog, on pipeline, vacuum table is installed after described oil removing day with fog, after described oil removing day with fog, pipeline is connected with the blower fan I, be provided with aflter-fillter between pipeline before described oil removing day with fog and oil removing day with fog, described aflter-fillter bottom is equipped with modulating valve.
8. gas turbine lube plant according to claim 1, it is characterized in that: after described low-pressure filter, the pipeline top is provided with the lubricating oil outlet flange, temperature is installed on pipeline after described low-pressure filter and shows that detector and pressure show detector.
9. according to the described gas turbine lube plant of claim 1 or 6, it is characterized in that: described jacking(oil) pump oil filler pipe is connected with the entrance pipe in jacking(oil) pump device b with jacking(oil) pump device a respectively.
10. gas turbine lube plant according to claim 4, it is characterized in that: in described Intelligent heater control box, be provided with the intelligent digital temperature controlling instrument, A.C. contactor, circuit breaker and electric coupler, described control box casing outside is provided with temperature transducer and electric heater, described temperature transducer is connected with the control box casing by flexible cord, and transmission temperature signal, described A.C. contactor one end is connected with circuit breaker, the other end is connected with power supply by electric coupler, described circuit breaker is connected with electric heater by electric coupler, described intelligent digital temperature controlling instrument matches with temperature transducer, described intelligent digital temperature controlling instrument is controlled circuit breaker and A.C. contactor, described electric heater two ends are provided with the air plug electric coupler.
11. gas turbine lube plant according to claim 1, it is characterized in that: described working connection throttle valve comprises valve body, cover plate, valve rod and end cap, described valve body upper end is provided with cover plate, described valve body is wafer type, the joint of described valve rod and cover plate is provided with seal ring, between described valve body and cover plate, be connected by screw, described valve body down either side is respectively equipped with import and outlet, described cover plate center is provided with valve rod, and valve rod is located between the import and outlet of valve body, described valve rod upper end is provided with end cap, between described end cap and cover plate, be threaded connection, between described cover plate and valve body, by O type circle, seal.
CN201310384115.0A 2013-08-30 2013-08-30 Gas turbine lube plant Active CN103470935B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310384115.0A CN103470935B (en) 2013-08-30 2013-08-30 Gas turbine lube plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310384115.0A CN103470935B (en) 2013-08-30 2013-08-30 Gas turbine lube plant

Publications (2)

Publication Number Publication Date
CN103470935A true CN103470935A (en) 2013-12-25
CN103470935B CN103470935B (en) 2015-11-18

Family

ID=49795911

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310384115.0A Active CN103470935B (en) 2013-08-30 2013-08-30 Gas turbine lube plant

Country Status (1)

Country Link
CN (1) CN103470935B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104315321A (en) * 2014-09-12 2015-01-28 江苏江海润液设备有限公司 Novel lubricating oil device of gas turbine
CN104819372A (en) * 2015-04-17 2015-08-05 江苏江海润液设备有限公司 Novel electric lubricating system
CN105539117A (en) * 2014-10-24 2016-05-04 Zf腓德烈斯哈芬股份公司 Hybrid driveline for a motor vehicle
CN106051435A (en) * 2016-06-24 2016-10-26 江苏江海润液设备有限公司 Auxiliary oil system of gas turbine
CN106246350A (en) * 2016-09-13 2016-12-21 上海电气燃气轮机有限公司 A kind of self adaptation negative pressure oil smoke emission system
CN107202241A (en) * 2017-06-26 2017-09-26 江苏江海润液设备有限公司 A kind of phase modulation lubricating oil system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003083005A (en) * 2001-09-13 2003-03-19 Ishikawajima Harima Heavy Ind Co Ltd Lubricating oil supplying device
CN2750208Y (en) * 2004-11-30 2006-01-04 中国南方航空动力机械公司 Combustion turbine gas regulating device
JP2013079633A (en) * 2011-10-05 2013-05-02 Toshiba Corp Steam turbine lubricating oil supply device and steam turbine system
CN103089454A (en) * 2013-02-04 2013-05-08 哈尔滨东安发动机(集团)有限公司 Digital control apparatus of micro gas turbine
CN203517261U (en) * 2013-08-30 2014-04-02 江苏江海润液设备有限公司 Gas turbine lubricating oil device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003083005A (en) * 2001-09-13 2003-03-19 Ishikawajima Harima Heavy Ind Co Ltd Lubricating oil supplying device
CN2750208Y (en) * 2004-11-30 2006-01-04 中国南方航空动力机械公司 Combustion turbine gas regulating device
JP2013079633A (en) * 2011-10-05 2013-05-02 Toshiba Corp Steam turbine lubricating oil supply device and steam turbine system
CN103089454A (en) * 2013-02-04 2013-05-08 哈尔滨东安发动机(集团)有限公司 Digital control apparatus of micro gas turbine
CN203517261U (en) * 2013-08-30 2014-04-02 江苏江海润液设备有限公司 Gas turbine lubricating oil device

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104315321A (en) * 2014-09-12 2015-01-28 江苏江海润液设备有限公司 Novel lubricating oil device of gas turbine
CN104315321B (en) * 2014-09-12 2017-05-10 江苏江海润液设备有限公司 Novel lubricating oil device of gas turbine
CN105539117A (en) * 2014-10-24 2016-05-04 Zf腓德烈斯哈芬股份公司 Hybrid driveline for a motor vehicle
CN105539117B (en) * 2014-10-24 2019-12-10 Zf腓德烈斯哈芬股份公司 Hybrid power driving device for motor vehicle
CN104819372A (en) * 2015-04-17 2015-08-05 江苏江海润液设备有限公司 Novel electric lubricating system
CN104819372B (en) * 2015-04-17 2017-04-12 江苏江海润液设备有限公司 Novel electric lubricating system
CN106051435A (en) * 2016-06-24 2016-10-26 江苏江海润液设备有限公司 Auxiliary oil system of gas turbine
CN106246350A (en) * 2016-09-13 2016-12-21 上海电气燃气轮机有限公司 A kind of self adaptation negative pressure oil smoke emission system
CN106246350B (en) * 2016-09-13 2018-04-03 上海电气燃气轮机有限公司 A kind of adaptive negative pressure oil smoke emission system
CN107202241A (en) * 2017-06-26 2017-09-26 江苏江海润液设备有限公司 A kind of phase modulation lubricating oil system
CN107202241B (en) * 2017-06-26 2023-02-14 江苏江海润液设备有限公司 Phase modifier oil system

Also Published As

Publication number Publication date
CN103470935B (en) 2015-11-18

Similar Documents

Publication Publication Date Title
CN103470935B (en) Gas turbine lube plant
CN101169058B (en) Heavy gas turbine set lubricant oil and jacking oil system
CN110571684B (en) Electrical switch cabinet cooling system and control method
CN203517261U (en) Gas turbine lubricating oil device
CN104908629A (en) Emergent mobile power van for offshore nuclear station
CN104315321A (en) Novel lubricating oil device of gas turbine
CN204227004U (en) A kind of gas turbine lube plant
CN203023070U (en) XBZ vehicle-mounted fire pump sledge
CN206093462U (en) Lubricating system with multiple emergent function
CN103591431A (en) Outer circulation oil lubricating device for bearings of water-turbine generator sets
CN105806146A (en) Water supplementing constant-pressure system of pipe type heat exchanger and abnormal operation control method
CN204227003U (en) A kind of gas turbine lube plant
CN206754775U (en) Motor and lubricating system
CN205827261U (en) A kind of pure water cooling control system
CN204774868U (en) Offshore nuclear power plant is with emergent portable power source car
CN204014384U (en) Vehicle-mounted explosion-proof hydrologic cycle cooling system
CN205135816U (en) Gas turbine power generation unit oil feeding system
CN215764542U (en) Constant-temperature monitoring system for lubricating oil of cigarette making and plug assembling machine
CN103032337A (en) XBZ vehicle mounted fire pump skid
CN212154881U (en) Novel top shaft device for preventing bearing bush of turbonator from being damaged
CN205136394U (en) Horizontal hydrogenerator is external from flowing back oily cooling device
CN204942992U (en) Two high-tension lubrication station
CN209293939U (en) Bimotored fuel oil supply system
CN202274075U (en) Cooling device used for reduction gearbox of scrapper conveyor
CN113882953A (en) Flexible self-adaptive high-low pressure lubricating oil system for gas turbine generator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant