CN103452219A - Honeycomb steel hidden beam composite floor system - Google Patents
Honeycomb steel hidden beam composite floor system Download PDFInfo
- Publication number
- CN103452219A CN103452219A CN2013104228099A CN201310422809A CN103452219A CN 103452219 A CN103452219 A CN 103452219A CN 2013104228099 A CN2013104228099 A CN 2013104228099A CN 201310422809 A CN201310422809 A CN 201310422809A CN 103452219 A CN103452219 A CN 103452219A
- Authority
- CN
- China
- Prior art keywords
- steel
- dark beam
- reinforced concrete
- hidden beam
- concrete floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 78
- 239000010959 steel Substances 0.000 title claims abstract description 78
- 239000002131 composite material Substances 0.000 title claims abstract description 17
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 22
- 230000003014 reinforcing effect Effects 0.000 claims description 12
- 238000003466 welding Methods 0.000 claims description 8
- 238000005553 drilling Methods 0.000 claims description 4
- 230000001413 cellular effect Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 3
- 230000002265 prevention Effects 0.000 abstract description 2
- 230000006835 compression Effects 0.000 abstract 2
- 238000007906 compression Methods 0.000 abstract 2
- 230000007797 corrosion Effects 0.000 abstract 1
- 238000005260 corrosion Methods 0.000 abstract 1
- 239000004567 concrete Substances 0.000 description 6
- 230000002787 reinforcement Effects 0.000 description 4
- 230000008901 benefit Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000005192 partition Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 239000004615 ingredient Substances 0.000 description 1
- 239000011229 interlayer Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 239000011241 protective layer Substances 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
The invention discloses a honeycomb steel hidden beam composite floor system, which comprises a reinforced concrete floor slab, a steel hidden beam, a main beam and a profiled steel sheet; the reinforced concrete floor slab is internally provided with a steel compression plate, the steel hidden beam is vertically overlapped on the main beam, the upper flange and the web plate of the steel hidden beam are embedded in the reinforced concrete floor slab and welded with the intersection of the steel bars in the reinforced concrete floor slab, the wave trough of the steel compression plate is connected with the lower flange of the steel hidden beam, the steel hidden beam is a honeycomb-shaped steel hidden beam, and the web plate of the steel hidden beam is provided with a plurality of holes. The invention improves the stability, fire prevention and corrosion resistance of the steel hidden beam, reduces the height of a structural layer, reduces the self weight of the structure, increases the indoor clearance height, is free from beam protrusion indoors, does not need a suspended ceiling, reduces the comprehensive construction cost of the project, and meets the flexible division of the structural space.
Description
Technical field
The present invention relates to a kind of new builing structure technical field, be specifically related to the dark beam composite floor system of a kind of honeycomb steel.
Background technology
In Residential Building, large bay (being that every cover house is a big room) superstructure can form the space of flexible partition, becomes the optimised form that solves ornament intention and former design function contradiction.But traditional beam and slab structure superstructure modular system can't meet this flexible, various modern functions requirement.To this, there is the scholar to propose the superstructure forms such as the flat beam precast assemble floor of combination, hidden steel beam flat slab, the novel superstructure of self-bearing type.Regrettably, the superstructure of these forms has a common shortcoming: whole superstructure is heavier, and it is relatively poor to combine the globality of flat beam precast assemble floor, and anti-seismic performance is not good enough; And the steel bar girder procedure complexity of the novel superstructure of self-bearing type is time-consuming, and the easy spillage of back plate connections.The superstructure of these forms has only solved the indoor problem exposed without beam, and fails effectively to solve the structure height that reduces the large bay superstructure, effectively reduces the building floor height, reduces dead load and reduce the key issues such as Civil Cost.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, provide a kind of honeycomb steel dark beam composite floor system, Steel Castellated Beams is embedded among profiled sheet and reinforced concrete floor, solve dexterously stability, fire prevention and the Anticorrosion of the dark beam of steel, increase the interlayer headroom, alleviate dead load, effectively reduce the comprehensive cost of engineering.
The technical solution used in the present invention is: the dark beam composite floor system of a kind of honeycomb steel comprises reinforced concrete floor, reinforcing bar, the dark beam of steel, girder and profiled sheet; Described girder and steel column form framework, girder is embedded in party wall, dispose reinforcing bar in described reinforced concrete floor, be provided with profiled sheet below reinforced concrete floor, the dark beam of described steel vertically splices on girder, the top flange of the dark beam of steel and web are embedded in reinforced concrete floor, and intersect the part welding with the reinforcing bar in reinforced concrete floor, the trough of described profiled sheet is connected with the bottom flange of the dark beam of steel, the dark beam of described steel is the dark beam of cellular steel, offers a plurality of holes on the web of the dark beam of steel.
As preferably, the hole on the web of the dark beam of described steel is circular.
As preferably, the hole on the web of the dark beam of described steel is polygon.
As preferably, the bottom flange of the trough of described profiled sheet and the dark beam of steel adopts welding or self-drilling connection.
The dark beam composite floor system of honeycomb fashion steel of the present invention is a kind of space structures jointly be comprised of Steel Castellated Beams, reinforced concrete floor and profiled sheet.It is by being embedded in girder steel among profiled sheet and reinforced concrete floor, utilize adhesion stress between girder steel and concrete to realize the acting in conjunction of the two, utilize and firmly connect and compose reliable support framework between the dark beam of steel mesh reinforcement and steel, utilize profiled sheet to reduce the thickness of reckoning the actual amount after a discount of superstructure, to reach, reduce dead load and the purpose that reduces the engineering comprehensive cost.
Girder in the present invention is embedded in party wall, and according to structural entity, analysis designs, and the dark beam of steel and girder can splice.Because the dark beam of steel is embedded among concrete, and with the steel mesh reinforcement welding, so its monolithic stability and local stability all can be guaranteed, so get final product by Intensity Design.The trough of profiled sheet (bottom flange) welds or self-drilling connection with the bottom flange of the dark beam of steel, and profiled sheet should be depending on the different situations design of composite floor or non-composite floor.The steel mesh reinforcement that the reinforcing bar of the above configuration of the crest of profiled sheet (top flange) forms, with the dark beam of steel, intersecting the part welding, in order to jointly form reliable support framework.The configuration of reinforcing bar should be looked the different situations of composite floor or non-composite floor and designing and calculating is determined.Near the reinforcing bar of the configuration trough of profiled sheet (bottom flange), by structure requirement configuration.Concrete in the present invention and protective layer thickness thereof etc., press the conventional method of Design of Floors and determine.
Beneficial effect: superstructure of the present invention, form of structure is reasonable, and structural span is large, can meet the functional requirement of large bay superstructure, be conducive to the flexible arrangement in room and freely separate, the user can reconfigure usage space according to the indoor partition wall of the random dismounting of the wish of oneself, and is convenient to transformation.
The present invention can increase indoor headroom to greatest extent, reduces the structure floor height, has increased number of floor levels on identical depth of building, also the corresponding expense that reduces space enclosing structure, finishing and pipeline facility.
Girder steel of the present invention wraps in concrete, has greatly improved stability and the anticorrosion fireproof performance of girder steel.
Superstructure of the present invention, owing between steel mesh reinforcement and the dark beam of steel, firmly connecting and composing reliable support framework, and cast-in-situ concrete, so its integral rigidity is large, anti-seismic performance good, shock resistance is good.
Superstructure of the present invention, do not appear secondary beam, smooth at the bottom of plate, without furred ceiling.
The dark web of steel in superstructure of the present invention punches, and both can alleviate deadweight, is convenient to again the traversing pipe lines such as water power, optical cable and lays.
Superstructure of the present invention, easy construction is quick, greatly shortens construction period, reduces the engineering comprehensive cost.
Superstructure of the present invention, given full play to the stress performance advantage of Steel concrete and brought significant economic benefit.
The accompanying drawing explanation
Fig. 1 is the top view of the dark beam composite floor system of honeycomb steel of the present invention;
Fig. 2 is 1-1 sectional drawing in Fig. 1;
Fig. 3 is 2-2 sectional drawing in Fig. 1;
Fig. 4 offers circular hole schematic diagram on the dark web of steel of the present invention;
Fig. 5 offers polygon hole schematic diagram on the dark web of steel of the present invention.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention will be further described.
As Figure 1-5: the dark beam composite floor system of a kind of honeycomb steel comprises reinforced concrete floor 1, reinforcing bar 2, the dark beam 3 of steel, girder 4 and profiled sheet 5, described girder 4 forms framework with steel column, girder 4 is embedded in party wall, dispose reinforcing bar 2 in described reinforced concrete floor 1, be provided with profiled sheet 5 below reinforced concrete floor 1, the dark beam 3 of described steel vertically splices on girder 4, the top flange of the dark beam 3 of steel and web are embedded in reinforced concrete floor 1, and intersect the part welding with the reinforcing bar 2 in reinforced concrete floor 1, the bottom flange of the dark beam 3 of the trough of described profiled sheet 5 and steel adopts welding or self-drilling connection, the dark beam 3 of described steel is the dark beam of cellular steel, offer a plurality of holes on the web of the dark beam 3 of steel, hole is circle or polygon.
It should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention, can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.In the present embodiment not clear and definite each ingredient all available prior art realized.
Claims (4)
1. the dark beam composite floor system of honeycomb steel, is characterized in that: comprise reinforced concrete floor, reinforcing bar, the dark beam of steel, girder and profiled sheet; Described girder and steel column form framework, girder is embedded in party wall, dispose reinforcing bar in described reinforced concrete floor, be provided with profiled sheet below reinforced concrete floor, the dark beam of described steel vertically splices on girder, the top flange of the dark beam of steel and web are embedded in reinforced concrete floor, and intersect the part welding with the reinforcing bar in reinforced concrete floor, the trough of described profiled sheet is connected with the bottom flange of the dark beam of steel, the dark beam of described steel is the dark beam of cellular steel, offers a plurality of holes on the web of the dark beam of steel.
2. the dark beam composite floor system of a kind of honeycomb steel according to claim 1 is characterized in that: the hole on the web of the dark beam of described steel is for circular.
3. the dark beam composite floor system of a kind of honeycomb steel according to claim 1, it is characterized in that: the hole on the web of the dark beam of described steel is polygon.
4. the dark beam composite floor system of a kind of honeycomb steel according to claim 1, is characterized in that: bottom flange employing welding or the self-drilling connection of the trough of described profiled sheet and the dark beam of steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013104228099A CN103452219A (en) | 2013-09-16 | 2013-09-16 | Honeycomb steel hidden beam composite floor system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013104228099A CN103452219A (en) | 2013-09-16 | 2013-09-16 | Honeycomb steel hidden beam composite floor system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103452219A true CN103452219A (en) | 2013-12-18 |
Family
ID=49735023
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013104228099A Pending CN103452219A (en) | 2013-09-16 | 2013-09-16 | Honeycomb steel hidden beam composite floor system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103452219A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106368359A (en) * | 2016-11-17 | 2017-02-01 | 中通钢构股份有限公司 | Honeycomb steel beam rib concrete laminated slab |
CN106677398A (en) * | 2016-12-08 | 2017-05-17 | 青岛蓝天创先科技服务有限公司 | Composite floor jointly stressed by corrugated steel and cast-in-place reinforced concrete |
CN108915084A (en) * | 2018-07-26 | 2018-11-30 | 沈阳建筑大学 | A kind of honeycomb type girder and secondary beam steel-frame beam node |
CN110439122A (en) * | 2019-08-21 | 2019-11-12 | 沈阳建筑大学 | A kind of precast floor slab and H profile steel beam connecting structure and connection method |
CN113585578A (en) * | 2021-08-13 | 2021-11-02 | 西安建筑科技大学 | Prefabricated assembly type prestress combined floor system and construction method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1310276A (en) * | 2000-02-25 | 2001-08-29 | 邱则有 | In-situ deposited steel reinforced concrete hollow roof and its construction process |
EP1512803A1 (en) * | 2003-07-31 | 2005-03-09 | Fimurex | Interlocking moulded formwork |
CN203487676U (en) * | 2013-09-16 | 2014-03-19 | 南京工业大学 | Honeycomb steel hidden beam composite floor system |
-
2013
- 2013-09-16 CN CN2013104228099A patent/CN103452219A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1310276A (en) * | 2000-02-25 | 2001-08-29 | 邱则有 | In-situ deposited steel reinforced concrete hollow roof and its construction process |
EP1512803A1 (en) * | 2003-07-31 | 2005-03-09 | Fimurex | Interlocking moulded formwork |
CN203487676U (en) * | 2013-09-16 | 2014-03-19 | 南京工业大学 | Honeycomb steel hidden beam composite floor system |
Non-Patent Citations (1)
Title |
---|
苏明: "钢-混凝土新型暗梁组合楼盖受力性能研究", 《南京工业大学学位论文库》, 31 May 2010 (2010-05-31) * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106368359A (en) * | 2016-11-17 | 2017-02-01 | 中通钢构股份有限公司 | Honeycomb steel beam rib concrete laminated slab |
CN106677398A (en) * | 2016-12-08 | 2017-05-17 | 青岛蓝天创先科技服务有限公司 | Composite floor jointly stressed by corrugated steel and cast-in-place reinforced concrete |
CN108915084A (en) * | 2018-07-26 | 2018-11-30 | 沈阳建筑大学 | A kind of honeycomb type girder and secondary beam steel-frame beam node |
CN110439122A (en) * | 2019-08-21 | 2019-11-12 | 沈阳建筑大学 | A kind of precast floor slab and H profile steel beam connecting structure and connection method |
CN113585578A (en) * | 2021-08-13 | 2021-11-02 | 西安建筑科技大学 | Prefabricated assembly type prestress combined floor system and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204386002U (en) | A kind of precast assemble floor system | |
CN109372186B (en) | Assembly frame system with steel pipe concrete divides special-shaped post of limb combination and damping wall | |
CN203487676U (en) | Honeycomb steel hidden beam composite floor system | |
CN109797871B (en) | Double-steel-plate composite shear wall connected by supporting angle steel and composite floor slab connecting node | |
CN103452219A (en) | Honeycomb steel hidden beam composite floor system | |
CN206467770U (en) | A kind of lightweight steel frame light gauge cold-formed steel shape wall composite construction building construction system | |
CN103397695A (en) | Concrete filled steel tube combination column high position connected structure provided with bidirectional steel trusses | |
CN105220792A (en) | A kind of prefabricated concealed bracings energy-consuming shear wall and assemble method thereof | |
CN108104345B (en) | Large-span prestressed lightweight aggregate concrete superimposed sheet | |
CN202430876U (en) | Floor system with structure of steel and concrete precast slabs | |
CN110805165A (en) | Assembled row steel pipe concrete composite wall building structure | |
CN203440968U (en) | Solid-web steel hidden-beam composite floor system | |
CN214531068U (en) | Assembled steel structure house | |
CN103452218A (en) | Solid-web steel hidden-beam composite floor system | |
CN211850263U (en) | Through-type full precast floor assembled steel-concrete composite floor system | |
CN103572875A (en) | Steel box hidden beam composite floor system | |
RU80487U1 (en) | SYSTEM precast frame housing (ACS) AND COUPLING NODE trough ribbed plate overlap with monolithic prefabricated beams, floors, INTERFACE UNIT PREFABRICATED CONCRETE COLUMN, National COUPLING NODE-MONOLITHIC crossbars CO precast concrete columns and trough ribbed plate SLABS | |
CN203569759U (en) | Steel box hidden beam composite floor system | |
CN209760435U (en) | assembled steel tube bundle concrete wall type frame structure system | |
CN107355027B (en) | Section steel concrete shear wall assembly type space modularized structural system and construction method | |
CN203347076U (en) | Steel and concrete flitch beam | |
CN110805186B (en) | Assembled light floor connected node structure | |
CN203462575U (en) | Concrete-filled steel tube combination column high-conjoined structure provided with two-way steel trusses | |
CN103541478B (en) | Lattice superposed beam and plate and construction method thereof | |
CN206337691U (en) | A kind of structure with assembled lightweight steel floor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20131218 |