CN103448143A - Production method of heavy-load concrete turnout tie - Google Patents

Production method of heavy-load concrete turnout tie Download PDF

Info

Publication number
CN103448143A
CN103448143A CN201310376735XA CN201310376735A CN103448143A CN 103448143 A CN103448143 A CN 103448143A CN 201310376735X A CN201310376735X A CN 201310376735XA CN 201310376735 A CN201310376735 A CN 201310376735A CN 103448143 A CN103448143 A CN 103448143A
Authority
CN
China
Prior art keywords
mold
model
production method
embedded
arranging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310376735XA
Other languages
Chinese (zh)
Inventor
黄文俊
马军委
闫冠先
彭连生
方宇恒
张慧明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGMING RAILWAY HOLDING CO Ltd
Original Assignee
GUANGMING RAILWAY HOLDING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGMING RAILWAY HOLDING CO Ltd filed Critical GUANGMING RAILWAY HOLDING CO Ltd
Priority to CN201310376735XA priority Critical patent/CN103448143A/en
Publication of CN103448143A publication Critical patent/CN103448143A/en
Pending legal-status Critical Current

Links

Landscapes

  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

The invention relates to a production method of a heavy-load concrete turnout tie. The method comprises the following steps: A, placing a bottom plate in a mold to fix and strengthening the mold; B, cleaning the mold and spraying a release agent; C, arranging embedded parts in the mold in a combined mode of arranging an embedded iron seat and an embedded bushing; D, feeding reinforcing steel bars in the mold and tensioning; E, injecting concrete in the mold and performing vibratory molding; F, lifting the mold after molding in a curing pool and introducing steam to cure; G, demolding when required compressive strength is required and performing moisture curing after demolding. By using the production method, the mold is strengthened, so that the tension value can be improved; by arranging the embedded parts in the combined mode of arranging the embedded iron seat and the embedded bushing, the purpose of improving the load can be achieved.

Description

A kind of production method of heavily loaded concrete switch sleeper
Technical field
The present invention relates to a kind of production method of heavily loaded concrete switch sleeper.
Background technology
At present, the production method of heavily loaded concrete switch sleeper is subject to mould stretch-draw value and the restriction of built-in fitting mode is installed, and can only produce the heavily loaded concrete switch sleeper of carrying 50kg/m, 60kg/m, and for the production of the heavily loaded concrete switch sleeper of 75kg/m, helpless.
Summary of the invention
The production method that the purpose of this invention is to provide a kind of heavily loaded concrete switch sleeper that can improve bearing capacity.
The technical scheme that the present invention takes is: a kind of production method of heavily loaded concrete switch sleeper is characterized in that it comprises the following steps: A, that base plate is put into to model is fixing, and model is carried out to consolidation process; B, model is cleaned out to rear spraying releasing agent; C, the mode combined by installation preburied iron base and service sleeve are installed built-in fitting in mould; D, reinforcing bar enter mould and carry out stretch-draw; E, inject concrete vibrating forming in mould; F, the model of forming is hung in to curing pool pass into steam curing; G, the demoulding when reaching needed compression strength, carry out moisture-keeping maintaining and get final product after the demoulding.
Adopt the present invention, because of model is carried out to consolidation process, can promote the stretch-draw value, and by the mode that preburied iron base and service sleeve combine is installed, built-in fitting is installed, just can realize the purpose of raising bearing capacity.
The specific embodiment
Below in conjunction with specific embodiment, invention is described further.It comprises the following steps:
1, base plate is put into to model according to rational arrangement mode fixing, guarantee that base plate is concordant with the face of model, and model is carried out to consolidation process;
2, after model is cleaned out, the spraying releasing agent, releasing agent will spray evenly;
3, the mode combined by installation preburied iron base and service sleeve is installed built-in fitting in mould;
4, reinforcing bar enters mould and carries out stretch-draw, and the stretch-draw value is 705kN ± 5kN;
5, the concrete of the C60 that mixes is injected in model, and vibrating forming, concrete compaction guaranteed;
6, after the clear groove in clear limit, the model of forming is hung in to curing pool and pass into steam curing;
7, carry out the demoulding during compression strength more than reaching needed 45MPa, after the demoulding, moisture-keeping maintaining is 3 days, and product can be used after product inspection is qualified.

Claims (1)

1. the production method of a heavily loaded concrete switch sleeper is characterized in that it comprises the following steps: A, that base plate is put into to model is fixing, and model is carried out to consolidation process; B, model is cleaned out to rear spraying releasing agent; C, the mode combined by installation preburied iron base and service sleeve are installed built-in fitting in mould; D, reinforcing bar enter mould and carry out stretch-draw; E, inject concrete vibrating forming in mould; F, the model of forming is hung in to curing pool pass into steam curing; G, the demoulding when reaching needed compression strength, carry out moisture-keeping maintaining and get final product after the demoulding.
CN201310376735XA 2013-08-15 2013-08-15 Production method of heavy-load concrete turnout tie Pending CN103448143A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310376735XA CN103448143A (en) 2013-08-15 2013-08-15 Production method of heavy-load concrete turnout tie

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310376735XA CN103448143A (en) 2013-08-15 2013-08-15 Production method of heavy-load concrete turnout tie

Publications (1)

Publication Number Publication Date
CN103448143A true CN103448143A (en) 2013-12-18

Family

ID=49731179

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310376735XA Pending CN103448143A (en) 2013-08-15 2013-08-15 Production method of heavy-load concrete turnout tie

Country Status (1)

Country Link
CN (1) CN103448143A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0035010A1 (en) * 1980-02-26 1981-09-02 BRAAS & CO. GMBH Apparatus for the manufacture of profiled plate-like moulded articles of concrete or the like, preferably roof tiles
CN101058966A (en) * 2006-04-21 2007-10-24 上海颉灏机械有限公司 Embedded sleeve for concrete switch tie and preparation method for screw shell thereof
CN201778253U (en) * 2010-08-11 2011-03-30 中铁工程设计咨询集团有限公司 Crimping base plate of embedded part
CN102102314A (en) * 2010-12-31 2011-06-22 北京中铁房山桥梁有限公司 Ballast switch tie for special passenger rail line and manufacturing method thereof
CN102162209A (en) * 2010-12-31 2011-08-24 北京中铁房山桥梁有限公司 High-speed turnout switch tie for speed of 350km per hour and manufacturing method thereof
EP2551408A1 (en) * 2011-07-25 2013-01-30 Vossloh-Werke GmbH System for fixing a rail to a base

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0035010A1 (en) * 1980-02-26 1981-09-02 BRAAS & CO. GMBH Apparatus for the manufacture of profiled plate-like moulded articles of concrete or the like, preferably roof tiles
CN101058966A (en) * 2006-04-21 2007-10-24 上海颉灏机械有限公司 Embedded sleeve for concrete switch tie and preparation method for screw shell thereof
CN201778253U (en) * 2010-08-11 2011-03-30 中铁工程设计咨询集团有限公司 Crimping base plate of embedded part
CN102102314A (en) * 2010-12-31 2011-06-22 北京中铁房山桥梁有限公司 Ballast switch tie for special passenger rail line and manufacturing method thereof
CN102162209A (en) * 2010-12-31 2011-08-24 北京中铁房山桥梁有限公司 High-speed turnout switch tie for speed of 350km per hour and manufacturing method thereof
EP2551408A1 (en) * 2011-07-25 2013-01-30 Vossloh-Werke GmbH System for fixing a rail to a base

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘成君: "某大型铁路项目岔枕生产工艺应用", 《铁道建筑技术》 *

Similar Documents

Publication Publication Date Title
MY151385A (en) Method for the production of coated moldings
MX340059B (en) Manufacturing a vehicle trim component via compression and injection molding.
CN208543603U (en) Precast prestressed floor production mould and production equipment
CN104801676B (en) Combined sand mold structure convenient to fix and manufacturing method of combined sand mold
CN106217639B (en) Ladder-type sleepers prefabricated construction device and method
CN103448143A (en) Production method of heavy-load concrete turnout tie
CN208277149U (en) Track plates Production line system
CN102699978B (en) Tamping device for processing wall body building blocks
CN202639230U (en) No-box casting system for bimetallic casting
CN104529272A (en) Production method for light porous ceramsite concrete acoustic board
CN204603208U (en) A kind of combination sand mould structure being convenient to fix
CN204209799U (en) The mould of in-situ precast building roof system ardealite permanent mold shell
FI20165851L (en) Method and apparatus for casting prefabricated concrete products
CN102359124A (en) BMC (dough moulding compound) long glass fiber die pressing well cover
CN202241547U (en) Hollow mould for concrete precast plate girder
CN203409881U (en) Molding die of heavy load concrete switch ties
CN103572960B (en) The preparation method of the fibre-reinforced composite formwork for construction of a kind of orthogonal laminated
CN204076456U (en) Barrel washing machine counterbalance mould
CN207888881U (en) Concrete sleeper concreting pushes away bucket device
CN108394014A (en) Track plates Production line system and method
RU2641363C1 (en) Method of manufacturing products under pressure from high-strength fibrous concrete
CN103624873B (en) A kind of sleeper termination spacing block can fixed and locate
KR200191878Y1 (en) Anchor block for concrete pole molding system
RU2534208C2 (en) Production of heat isolation blocks by counter compaction for erection of guarding structures and buildings
CN112606180B (en) Preparation process of heat-insulating wall for passive house

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131218