CN103448143A - Production method of heavy-load concrete turnout tie - Google Patents
Production method of heavy-load concrete turnout tie Download PDFInfo
- Publication number
- CN103448143A CN103448143A CN201310376735XA CN201310376735A CN103448143A CN 103448143 A CN103448143 A CN 103448143A CN 201310376735X A CN201310376735X A CN 201310376735XA CN 201310376735 A CN201310376735 A CN 201310376735A CN 103448143 A CN103448143 A CN 103448143A
- Authority
- CN
- China
- Prior art keywords
- mold
- model
- production method
- embedded
- arranging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
Abstract
The invention relates to a production method of a heavy-load concrete turnout tie. The method comprises the following steps: A, placing a bottom plate in a mold to fix and strengthening the mold; B, cleaning the mold and spraying a release agent; C, arranging embedded parts in the mold in a combined mode of arranging an embedded iron seat and an embedded bushing; D, feeding reinforcing steel bars in the mold and tensioning; E, injecting concrete in the mold and performing vibratory molding; F, lifting the mold after molding in a curing pool and introducing steam to cure; G, demolding when required compressive strength is required and performing moisture curing after demolding. By using the production method, the mold is strengthened, so that the tension value can be improved; by arranging the embedded parts in the combined mode of arranging the embedded iron seat and the embedded bushing, the purpose of improving the load can be achieved.
Description
Technical field
The present invention relates to a kind of production method of heavily loaded concrete switch sleeper.
Background technology
At present, the production method of heavily loaded concrete switch sleeper is subject to mould stretch-draw value and the restriction of built-in fitting mode is installed, and can only produce the heavily loaded concrete switch sleeper of carrying 50kg/m, 60kg/m, and for the production of the heavily loaded concrete switch sleeper of 75kg/m, helpless.
Summary of the invention
The production method that the purpose of this invention is to provide a kind of heavily loaded concrete switch sleeper that can improve bearing capacity.
The technical scheme that the present invention takes is: a kind of production method of heavily loaded concrete switch sleeper is characterized in that it comprises the following steps: A, that base plate is put into to model is fixing, and model is carried out to consolidation process; B, model is cleaned out to rear spraying releasing agent; C, the mode combined by installation preburied iron base and service sleeve are installed built-in fitting in mould; D, reinforcing bar enter mould and carry out stretch-draw; E, inject concrete vibrating forming in mould; F, the model of forming is hung in to curing pool pass into steam curing; G, the demoulding when reaching needed compression strength, carry out moisture-keeping maintaining and get final product after the demoulding.
Adopt the present invention, because of model is carried out to consolidation process, can promote the stretch-draw value, and by the mode that preburied iron base and service sleeve combine is installed, built-in fitting is installed, just can realize the purpose of raising bearing capacity.
The specific embodiment
Below in conjunction with specific embodiment, invention is described further.It comprises the following steps:
1, base plate is put into to model according to rational arrangement mode fixing, guarantee that base plate is concordant with the face of model, and model is carried out to consolidation process;
2, after model is cleaned out, the spraying releasing agent, releasing agent will spray evenly;
3, the mode combined by installation preburied iron base and service sleeve is installed built-in fitting in mould;
4, reinforcing bar enters mould and carries out stretch-draw, and the stretch-draw value is 705kN ± 5kN;
5, the concrete of the C60 that mixes is injected in model, and vibrating forming, concrete compaction guaranteed;
6, after the clear groove in clear limit, the model of forming is hung in to curing pool and pass into steam curing;
7, carry out the demoulding during compression strength more than reaching needed 45MPa, after the demoulding, moisture-keeping maintaining is 3 days, and product can be used after product inspection is qualified.
Claims (1)
1. the production method of a heavily loaded concrete switch sleeper is characterized in that it comprises the following steps: A, that base plate is put into to model is fixing, and model is carried out to consolidation process; B, model is cleaned out to rear spraying releasing agent; C, the mode combined by installation preburied iron base and service sleeve are installed built-in fitting in mould; D, reinforcing bar enter mould and carry out stretch-draw; E, inject concrete vibrating forming in mould; F, the model of forming is hung in to curing pool pass into steam curing; G, the demoulding when reaching needed compression strength, carry out moisture-keeping maintaining and get final product after the demoulding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310376735XA CN103448143A (en) | 2013-08-15 | 2013-08-15 | Production method of heavy-load concrete turnout tie |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310376735XA CN103448143A (en) | 2013-08-15 | 2013-08-15 | Production method of heavy-load concrete turnout tie |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103448143A true CN103448143A (en) | 2013-12-18 |
Family
ID=49731179
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310376735XA Pending CN103448143A (en) | 2013-08-15 | 2013-08-15 | Production method of heavy-load concrete turnout tie |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103448143A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0035010A1 (en) * | 1980-02-26 | 1981-09-02 | BRAAS & CO. GMBH | Apparatus for the manufacture of profiled plate-like moulded articles of concrete or the like, preferably roof tiles |
CN101058966A (en) * | 2006-04-21 | 2007-10-24 | 上海颉灏机械有限公司 | Embedded sleeve for concrete switch tie and preparation method for screw shell thereof |
CN201778253U (en) * | 2010-08-11 | 2011-03-30 | 中铁工程设计咨询集团有限公司 | Crimping base plate of embedded part |
CN102102314A (en) * | 2010-12-31 | 2011-06-22 | 北京中铁房山桥梁有限公司 | Ballast switch tie for special passenger rail line and manufacturing method thereof |
CN102162209A (en) * | 2010-12-31 | 2011-08-24 | 北京中铁房山桥梁有限公司 | High-speed turnout switch tie for speed of 350km per hour and manufacturing method thereof |
EP2551408A1 (en) * | 2011-07-25 | 2013-01-30 | Vossloh-Werke GmbH | System for fixing a rail to a base |
-
2013
- 2013-08-15 CN CN201310376735XA patent/CN103448143A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0035010A1 (en) * | 1980-02-26 | 1981-09-02 | BRAAS & CO. GMBH | Apparatus for the manufacture of profiled plate-like moulded articles of concrete or the like, preferably roof tiles |
CN101058966A (en) * | 2006-04-21 | 2007-10-24 | 上海颉灏机械有限公司 | Embedded sleeve for concrete switch tie and preparation method for screw shell thereof |
CN201778253U (en) * | 2010-08-11 | 2011-03-30 | 中铁工程设计咨询集团有限公司 | Crimping base plate of embedded part |
CN102102314A (en) * | 2010-12-31 | 2011-06-22 | 北京中铁房山桥梁有限公司 | Ballast switch tie for special passenger rail line and manufacturing method thereof |
CN102162209A (en) * | 2010-12-31 | 2011-08-24 | 北京中铁房山桥梁有限公司 | High-speed turnout switch tie for speed of 350km per hour and manufacturing method thereof |
EP2551408A1 (en) * | 2011-07-25 | 2013-01-30 | Vossloh-Werke GmbH | System for fixing a rail to a base |
Non-Patent Citations (1)
Title |
---|
刘成君: "某大型铁路项目岔枕生产工艺应用", 《铁道建筑技术》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
MY151385A (en) | Method for the production of coated moldings | |
MX340059B (en) | Manufacturing a vehicle trim component via compression and injection molding. | |
CN208543603U (en) | Precast prestressed floor production mould and production equipment | |
CN104801676B (en) | Combined sand mold structure convenient to fix and manufacturing method of combined sand mold | |
CN106217639B (en) | Ladder-type sleepers prefabricated construction device and method | |
CN103448143A (en) | Production method of heavy-load concrete turnout tie | |
CN208277149U (en) | Track plates Production line system | |
CN102699978B (en) | Tamping device for processing wall body building blocks | |
CN202639230U (en) | No-box casting system for bimetallic casting | |
CN104529272A (en) | Production method for light porous ceramsite concrete acoustic board | |
CN204603208U (en) | A kind of combination sand mould structure being convenient to fix | |
CN204209799U (en) | The mould of in-situ precast building roof system ardealite permanent mold shell | |
FI20165851L (en) | Method and apparatus for casting prefabricated concrete products | |
CN102359124A (en) | BMC (dough moulding compound) long glass fiber die pressing well cover | |
CN202241547U (en) | Hollow mould for concrete precast plate girder | |
CN203409881U (en) | Molding die of heavy load concrete switch ties | |
CN103572960B (en) | The preparation method of the fibre-reinforced composite formwork for construction of a kind of orthogonal laminated | |
CN204076456U (en) | Barrel washing machine counterbalance mould | |
CN207888881U (en) | Concrete sleeper concreting pushes away bucket device | |
CN108394014A (en) | Track plates Production line system and method | |
RU2641363C1 (en) | Method of manufacturing products under pressure from high-strength fibrous concrete | |
CN103624873B (en) | A kind of sleeper termination spacing block can fixed and locate | |
KR200191878Y1 (en) | Anchor block for concrete pole molding system | |
RU2534208C2 (en) | Production of heat isolation blocks by counter compaction for erection of guarding structures and buildings | |
CN112606180B (en) | Preparation process of heat-insulating wall for passive house |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20131218 |