[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN103391166B - The mandate of a kind of PUSCH and HARQ transmission method - Google Patents

The mandate of a kind of PUSCH and HARQ transmission method Download PDF

Info

Publication number
CN103391166B
CN103391166B CN201210141346.4A CN201210141346A CN103391166B CN 103391166 B CN103391166 B CN 103391166B CN 201210141346 A CN201210141346 A CN 201210141346A CN 103391166 B CN103391166 B CN 103391166B
Authority
CN
China
Prior art keywords
cell
subframe
scheduled
pusch
configuration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210141346.4A
Other languages
Chinese (zh)
Other versions
CN103391166A (en
Inventor
鲁智
陈哲
池连刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Potevio Institute of Technology Co Ltd
Original Assignee
Potevio Institute of Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Potevio Institute of Technology Co Ltd filed Critical Potevio Institute of Technology Co Ltd
Priority to CN201210141346.4A priority Critical patent/CN103391166B/en
Publication of CN103391166A publication Critical patent/CN103391166A/en
Application granted granted Critical
Publication of CN103391166B publication Critical patent/CN103391166B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The invention provides mandate and the HARQ transmission method of PUSCH, including: according to the scheduling PUSCH HARQ process of Cell and the timing relationship of each HARQ process, described scheduling Cell is carried out described in be scheduled the mandate of PUSCH of Cell non conflicting subframe and HARQ transmission;Pre-set the timing relationship corresponding for PUSCH of the Cell conflict subframe that is scheduled, on scheduling Cell, carry out mandate and the HARQ transmission of the PUSCH of described conflict subframe according to the timing relationship of the described conflict subframe arranged;When according to the described non conflicting subframe arranged or the timing relationship of conflict subframe, this PUSCH does not has corresponding PHICH subframe, then utilize DCI mandate to trigger and retransmit or use the e PHICH being positioned on PDSCH to trigger re-transmission.The application present invention, it is possible to realize mandate and the HARQ transmission of PUSCH during intersection carrier dispatching, and give the design of HARQ process when intersecting carrier dispatching.

Description

The mandate of a kind of PUSCH and HARQ transmission method
Technical field
The present invention relates to the technology of communication system, particularly to mandate and the HARQ transmission method of a kind of PUSCH.
Background technology
At Release10(Rel-10) in, introduce carrier aggregation concept with support broader bandwidth transmission, i.e. two or more Carrier wave is grouped together in together, to support the transmission more than 20MHz of the LTE-A transmission bandwidth.TDD for the carrier aggregation of Rel-10 Scene, (intra-band) scene in a band support, this frequency range (band) is the spendable nothing that International Telecommunication Union determines Line resource frequency spectrum resource, produces serious interference if using different up-downgoing proportionings can make during up and descending transmitting-receiving, because of Each member carrier (component carrier) of this polymerization uses identical TDD up-downgoing proportioning, as it is shown in figure 1, up-downgoing Sub-frame configuration is as shown in table 1.In Rel-10, in order to reduce the interference to control channel of the isomery scene, introduce intersection carrier wave The control channel of scheduling concepts, i.e. a carrier wave can be by another carriers carry, by before Downlink Control Information (DCI) Adding 3bit carrier wave instructions field (CIF) and distinguish the carrier wave being scheduled, as in figure 2 it is shown, CC0 is scheduling carrier wave, CC1 and CC2 is quilt Scheduling carrier wave, the PUSCH on CC0 scheduling CC1 and CC2 carrier wave.In Release11, it is introduced into (inter-band) between frequency range carry Ripple is polymerized, to reach the more flexible utilization of resources.
Table 1
In Rel-8/9/10, a part of resource of PHICH channel occupancy PDCCH, as it is shown on figure 3, may in Rel-11 Introduce and strengthen PHICH(i.e. e-PHICH) channel, this channel is placed in PDSCH region.
In Rel-11 carrier aggregation, different frequency range may use different up-downgoing proportionings.When different frequency range uses During different up-downgoing proportioning, it is possible that the scene that sub-frame of uplink conflicts with descending sub frame, as shown in oval in Fig. 4. This situation can affect the scheduling of intersection carrier wave, and the HARQ of PDSCH and PUSCH, it is therefore desirable to amendment is to adapt to new field Scape.Also defining the concept of Cell in Rel-10, each Cell comprises a descending CC and the up CC being optionally connected.
In Rel-8/9/10, having 0-6 totally seven kinds of subframe proportionings for TDD, wherein for sub-frame configuration 0 and 6, it is up Transmission Loop Round Trip Time (RTT, round-trip time) is not 10ms.For other 5ms switching cycles configuration (configuration 1 and 2) and 10ms switching cycle configuration (configuration 3,4,5), the RTT time is all 10ms.What wherein RTT referred to sends out from a PUSCH transmission Begin, send, to next time, the time interval that this PUSCH retransmits.
When PUSCH is carried out uplink authorization, need to notify UE by descending sub frame.And when intersecting carrier dispatching, when When scheduling Cell is non-10ms RTT, if certain conflict subframe is sub-frame of uplink at scheduling Cell, then be positioned on scheduling Cell should Conflict subframe cannot send the uplink authorization of the Cell that is scheduled.When being mixed with 10ms RTT and non-10msRTT in configuration simultaneously, The HARQ process of PUSCH does not has specification.
Specifically, a HARQ process refers to that base station scheduling carries out a data transfer, then to receiving ACK/NACK letter Breath, HARQ process number refers to concurrent HARQ number.
In a HARQ process, after once transmission sends, need a length of RTT waited could determine to transmit next time It is transmission new data, is also by the re-transmission of legacy data.During this period of time, eNB/UE certainly can not stop transmission and in vain Wait.Therefore, it is necessary to initiate other parallel HARQ processes, to make full use of time-domain resource.
Summary of the invention
The invention provides mandate and the HARQ transmission method of a kind of PUSCH, in the intersection carrier dispatching of Rel-11, energy When enough RTT ensureing scheduling or non-scheduled Cell are non-10ms, mandate and the HARQ transmission of PUSCH are normally carried out.
For achieving the above object, the present invention adopts the following technical scheme that:
The mandate of a kind of PUSCH and HARQ transmission method, when the TDD up-downgoing proportioning of scheduling Cell is in configuration 1~5 Any one, the TDD uplink-downlink configuration of the Cell that is scheduled for configuration 0 or 6 time, the method includes:
According to PUSCH HARQ process and the timing relationship of each HARQ process of scheduling Cell, at described scheduling Cell On carry out described in be scheduled the mandate of PUSCH of Cell non conflicting subframe and HARQ transmission;
According to the descending sub frame position of described scheduling Cell, the PUSCH pre-setting the Cell conflict subframe that is scheduled is corresponding Timing relationship, and described conflict subframe timing relationship ensure corresponding HARQ process RTT be 10ms;Described in arranging The timing relationship of conflict subframe carries out mandate and the HARQ transmission of the PUSCH of described conflict subframe on scheduling Cell;
When according to the described non conflicting subframe arranged or the timing relationship of conflict subframe, this PUSCH does not has corresponding PHICH Subframe, then utilize DCI to authorize and trigger re-transmission or use the e-PHICH triggering being positioned on PDSCH to retransmit.
It is preferred that when the TDD uplink-downlink configuration of scheduling Cell be configuration 1, the TDD uplink-downlink configuration of the Cell that is scheduled is for joining When setting to 0, the timing relationship of the PUSCH of the Cell conflict subframe that is scheduled of setting is:
For the subframe 4 being scheduled on Cell, authorize and the PHICH subframe of its correspondence is the subframe 0 on scheduling Cell;
For the subframe 9 being scheduled on Cell, authorize and the PHICH subframe of its correspondence is the subframe 5 on scheduling Cell.
It is preferred that when the TDD uplink-downlink configuration of scheduling Cell be configuration 2, the TDD uplink-downlink configuration of the Cell that is scheduled is for joining When setting to 0, the timing relationship of the PUSCH of the Cell conflict subframe that is scheduled of setting is:
For the subframe 3 being scheduled on Cell, authorize and the PHICH subframe of its correspondence is the subframe 9 on scheduling Cell;
For the subframe 4 being scheduled on Cell, authorize and the PHICH subframe of its correspondence is the subframe 0 on scheduling Cell;
For the subframe 8 being scheduled on Cell, authorize and the PHICH subframe of its correspondence is the subframe 4 on scheduling Cell;
For the subframe 9 being scheduled on Cell, authorize and the PHICH subframe of its correspondence is the subframe 5 on scheduling Cell.
It is preferred that when the TDD uplink-downlink configuration of scheduling Cell be configuration 1, the TDD uplink-downlink configuration of the Cell that is scheduled is for joining When putting 6, the timing relationship of the PUSCH of the Cell conflict subframe that is scheduled of setting is:
For the subframe 4 being scheduled on Cell, authorize and the PHICH subframe of its correspondence is the subframe 0 on scheduling Cell.
It is preferred that when the TDD uplink-downlink configuration of scheduling Cell be configuration 2, the TDD uplink-downlink configuration of the Cell that is scheduled is for joining When putting 6, the timing relationship of the PUSCH of the Cell conflict subframe that is scheduled of setting is:
For the subframe 3 being scheduled on Cell, authorize and the PHICH subframe of its correspondence is the subframe 9 on scheduling Cell;
For the subframe 4 being scheduled on Cell, authorize and the PHICH subframe of its correspondence is the subframe 0 on scheduling Cell.
For the subframe 8 being scheduled on Cell, authorize and the PHICH subframe of its correspondence is the subframe 4 on scheduling Cell.
The mandate of a kind of PUSCH and HARQ transmission method, when the TDD up-downgoing proportioning of scheduling Cell is in configuration 1~5 Any one, the TDD uplink-downlink configuration of the Cell that is scheduled for configuration 0 or 6 time, or, when the TDD up-downgoing proportioning of scheduling Cell is When configuration 6, the TDD uplink-downlink configuration of the Cell that is scheduled are configuration 0, the method includes:
According to PUSCH HARQ process and the timing relationship of each HARQ process of scheduling Cell, at described scheduling Cell On carry out described in be scheduled the mandate of PUSCH of Cell non conflicting subframe and HARQ transmission;
For the PUSCH of the Cell conflict subframe that is scheduled, do not dispatch.
The mandate of a kind of PUSCH and HARQ transmission method, when the TDD up-downgoing proportioning of scheduling Cell is in configuration 1~5 Any one, the TDD uplink-downlink configuration of the Cell that is scheduled for configuration 0 or 6 time, or, when the TDD up-downgoing proportioning of scheduling Cell is When configuration 6, the TDD uplink-downlink configuration of the Cell that is scheduled are configuration 0, the method includes:
According to PUSCH HARQ process and the timing relationship of each HARQ process of the Cell that is scheduled, in described scheduling Carry out on Cell being scheduled the mandate of PUSCH on Cell and HARQ transmission.
The mandate of a kind of PUSCH and HARQ transmission method, when the TDD up-downgoing proportioning of scheduling Cell is configuration 0 or 6, quilt When the TDD uplink-downlink configuration of scheduling Cell is any one in configuration 1~5, or, when the TDD up-downgoing proportioning of scheduling Cell During for configuration 0, the TDD uplink-downlink configuration of the Cell that is scheduled for configuration 6, the method includes:
According to the timing relationship of each sub-frame of uplink being all sub-frame of uplink in scheduling Cell with the Cell that is scheduled, arrange and adjusted PUSCH HARQ process and the timing relationship of corresponding process on sub-frame of uplink in degree Cell, and according to the timing relationship of this setting, Be scheduled described in carrying out on described scheduling Cell the mandate of Cell each sub-frame of uplink PUSCH and HARQ transmission;
Wherein, the timing relationship of PUSCH HARQ process on arbitrary sub-frame of uplink in the Cell that is scheduled of setting, with scheduling In Cell, on identical sub-frame of uplink, the timing relationship of PUSCH HARQ process is identical.
The mandate of a kind of PUSCH and HARQ transmission method, when the TDD up-downgoing proportioning of scheduling Cell is configuration 0 or 6, quilt When the TDD uplink-downlink configuration of scheduling Cell is any one in configuration 1~5, or, when the TDD up-downgoing proportioning of scheduling Cell During for configuration 0, the TDD uplink-downlink configuration of the Cell that is scheduled for configuration 6, the method includes:
The PUSCH HARQ process on each sub-frame of uplink that will be scheduled in Cell is set to, with identical up son in scheduling Cell On frame, PUSCH HARQ process is identical;
Adjusting according to PUSCH HARQ process on each sub-frame of uplink in the Cell that is scheduled arranged and each described process Timing relationship corresponding in degree Cell, described scheduling Cell is carried out described in be scheduled Cell each sub-frame of uplink PUSCH's Authorize and HARQ transmission;
Wherein, for identical PUSCH HARQ process, under the subframe that PUSCH re-transmission is corresponding is in the Cell that is scheduled During row subframe, postpone to PUSCH next time and retransmit corresponding subframe in the Cell that is scheduled for carrying out described PUSCH during sub-frame of uplink Retransmit.
As seen from the above technical solution, the PUSCH of the present invention authorizes and HARQ transmission method, it is possible to ensure to authorize and HARQ Transmission is normally carried out.
Accompanying drawing explanation
Fig. 1 is that Rel-10 carrier aggregation scene uses identical up-downgoing proportioning schematic diagram;
Fig. 2 is for intersecting carrier dispatching (CC0 is scheduling carrier wave, CC1 and CC2 is the carrier wave that is scheduled) schematic diagram;
Fig. 3 is that Rel-8/9/10 controls channel and the possible ePHICH channel schematic diagram of Rel-11;
Fig. 4 (a) and (b) are respectively the different band of inter-band carrier aggregation with (c) and use rushing of different up-downgoing proportioning Prominent subframe schematic diagram;
Fig. 5 for scheduling Cell in configuration combination (one) method (1) be configuration 1, the Cell that is scheduled for configuration 0 time intersect carrier wave The PUSCH HARQ process of scheduling correspondence and timing relationship schematic diagram;Wherein below sub-frame configuration two behaviors send PHICH and Authorizing the timing of (Grant), a, b are the conflict corresponding process of subframe.
Fig. 6 for scheduling Cell in configuration combination (one) method (1) be configuration 2, the Cell that is scheduled for configuration 0 time intersect carrier wave The PUSCH HARQ process of scheduling correspondence and timing relationship schematic diagram;
Fig. 7 for scheduling Cell in configuration combination (one) method (1) be configuration 1, the Cell that is scheduled for configuration 6 time intersect carrier wave The PUSCH HARQ process of scheduling correspondence and timing relationship schematic diagram;
Fig. 8 for scheduling Cell in configuration combination (one) method (1) be configuration 2, the Cell that is scheduled for configuration 6 time intersect carrier wave The PUSCH HARQ process of scheduling correspondence and timing relationship schematic diagram;
Fig. 9 for scheduling Cell in configuration combination (one) method (2) be configuration 1, the Cell that is scheduled for configuration 0 time intersect carrier wave The PUSCH HARQ process of scheduling correspondence and timing relationship schematic diagram;
Figure 10 for scheduling Cell in configuration combination (one) method (3) be configuration 1, the Cell that is scheduled for configuration 0 time intersect and carry The PUSCH HARQ process of ripple scheduling correspondence and timing relationship schematic diagram;
Figure 11 for scheduling Cell in configuration combination (two) method (1) be configuration 0, the Cell that is scheduled for configuration 1 time intersect and carry The PUSCH HARQ process of ripple scheduling correspondence and timing relationship schematic diagram;
Figure 12 for scheduling Cell in configuration combination (two) method (1) be configuration 0, the Cell that is scheduled for configuration 2 time intersect and carry The PUSCH HARQ process of ripple scheduling correspondence and timing relationship schematic diagram;
Figure 13 for scheduling Cell in configuration combination (two) method (1) be configuration 0, the Cell that is scheduled for configuration 3 time intersect and carry The PUSCH HARQ process of ripple scheduling correspondence and timing relationship schematic diagram;
Figure 14 for scheduling Cell in configuration combination (two) method (1) be configuration 0, the Cell that is scheduled for configuration 4 time intersect and carry The PUSCH HARQ process of ripple scheduling correspondence and timing relationship schematic diagram;
Figure 15 for scheduling Cell in configuration combination (two) method (1) be configuration 0, the Cell that is scheduled for configuration 5 time intersect and carry The PUSCH HARQ process of ripple scheduling correspondence and timing relationship schematic diagram;
Figure 16 for scheduling Cell in configuration combination (two) method (1) be configuration 6, the Cell that is scheduled for configuration 1 time intersect and carry The PUSCH HARQ process of ripple scheduling correspondence and timing relationship schematic diagram;
Figure 17 for scheduling Cell in configuration combination (two) method (1) be configuration 6, the Cell that is scheduled for configuration 2 time intersect and carry The PUSCH HARQ process of ripple scheduling correspondence and timing relationship schematic diagram;
Figure 18 for scheduling Cell in configuration combination (two) method (2) be configuration 0, the Cell that is scheduled for configuration 1 time intersect and carry The PUSCH HARQ process of ripple scheduling correspondence and timing relationship schematic diagram;
Figure 19 combines, for configuration, the PUSCH HARQ process and timing relationship that in (three) method (1), intersection carrier dispatching is corresponding Schematic diagram;
Figure 20 combines, for configuration, the PUSCH HARQ process and timing relationship that in (three) method (2), intersection carrier dispatching is corresponding Schematic diagram;
Figure 21 combines, for configuration, the PUSCH HARQ process and timing relationship that in (four) method (1), intersection carrier dispatching is corresponding Schematic diagram;
Figure 22 combines, for configuration, the PUSCH HARQ process and timing relationship that in (four) method (2), intersection carrier dispatching is corresponding Schematic diagram.
Detailed description of the invention
For making the purpose of the present invention, technological means and advantage clearer, below in conjunction with accompanying drawing the present invention done into One step describes in detail.
When Rel-11 intersects carrier dispatching, when proportioning has 0 or 6, owing to the time of RTT changes to enter PUSCH Journey has an impact, and when the present invention provides TDD difference band different ratio, the HARQ of the PUSCH of RTT non-10ms intersection carrier dispatching enters Journey designs.In the present invention the Cell of carrying scheduling authorization being called dispatching Cell, scheduling authorization transmits on other Cell Cell is referred to as the Cell that is scheduled.
When being different up-downgoing proportioning combinations for scheduling Cell and the Cell that is scheduled separately below, provide the present invention's PUSCH authorizes and HARQ transmission method.Simple for describing, in the example shown, above for scheduling Cell, below for being scheduled Cell。
(1) scheduling Cell is RTT 10ms, and the Cell that is scheduled is the non-10ms of RTT, in other words, on the TDD of scheduling Cell Descending proportioning is any one in configuration 1~5, and the TDD uplink-downlink configuration of the Cell that is scheduled is configuration 0 or 6
Combining for this uplink-downlink configuration, the present invention provides three kinds of PUSCH and authorizes and HARQ transmission method, separately below Introduce.
Method (1):
For the non conflicting subframe of the Cell that is scheduled, by process and the timing relationship of corresponding process of scheduling Cell, adjusting The PUSCH carrying out these non conflicting subframes on degree Cell authorizes and HARQ transmission;
For the conflict subframe of the Cell that is scheduled, redefine PUSCH HARQ process and timing relationship thereof, and ensure right PUSCH HARQ process RTT in each definition is 10ms;According to the process redefined and timing relationship, on scheduling Cell The PUSCH carrying out these conflict subframes authorizes and HARQ transmission.
In the manner described above, for non conflicting subframe, its process is identical with the Cell that is scheduled with timing relationship, the most accordingly The RTT mono-of process is set to 10ms.For conflict subframe, the RTT of each process is also designed as 10ms.Visible, according to this method, The RTT of each PUSCH HARQ process is 10ms such that it is able to ensure that the mandate of PUSCH and HARQ transmission are normally carried out.
By scheduling Cell be configuration 1, the Cell that is scheduled for configuration 0 as a example by, as it is shown in figure 5, give configuration the showing of 0 correspondence There are HARQ process and timing relationship, the existing HARQ process of configuration 1 correspondence and timing relationship thereof and the carrier dispatching pair that intersects HARQ process and timing relationship thereof in the present invention answered.Wherein, the descending sub frame of some point represents under corresponding configuration, this descending son Frame cannot be used for transmitting PHICH;Other descending sub frames represent under corresponding configuration, and this descending sub frame may be used for transmitting PHICH And uplink authorization;1, the numerals such as 2,3,4 and a, b represent PUSCH HARQ process numbering (represent it is to illustrate 1 with a, b here, 2 etc. The design philosophy of digitized representation process, can essentially sort together), the Pn such as P1, P2, P3, P4, Pa, Pb represents process n PHICH position, the Gn such as G1, G2, G3, G4, Ga, Gb represents the uplink authorization position of process n.As Fig. 5 is given in next two columns Intersect shown in the new process of carrier dispatching and timing relationship thereof, in this process and timing relationship, for non conflicting subframe, i.e. son Frame 2,3,7,8, its process and timing relationship are identical with process and the timing relationship of identical subframe in scheduling Cell, utilize in the drawings N, Pn and Gn represent;For conflict subframe, i.e. subframe 4 and subframe 9, redefined process, utilize in the drawings a, b, Pa, Pb, Ga, Gb represent, specifically, uplink authorization corresponding to the process of subframe 4 in subframe 0, corresponding PHICH in the subframe 0 of next frame, The uplink authorization that the process of subframe 9 is corresponding in the subframe 5 of next frame, utilizes arrow table at subframe 5, corresponding PHICH in Figure 5 Show.From above-mentioned Fig. 5, for intersecting carrier dispatching, non conflicting subframe definition 4 HARQ processes, conflict subframe definition 2 Individual HARQ process, includes altogether 6 HARQ processes.
In Figure 5, for subframe 4, its uplink authorization and PHICH are in subframe 0, and subframe 0 is to use in configuration 1 In the transmission uplink authorization of PUSCH and PHICH, say, that the most corresponding according to the timing relationship PUSCH of definition PHICH subframe, for this situation, utilizes DCI to authorize and triggers re-transmission or use the e-PHICH triggering being positioned on PDSCH to retransmit.
Fig. 6 give scheduling Cell be configuration 2, the Cell that is scheduled intersect carrier dispatching corresponding new when being configuration 0 PUSCH HARQ process and timing relationship schematic diagram.As shown in Figure 6, for non conflicting subframe, still entering according to scheduling Cell Journey and timing relationship are carried out;For conflict subframe, except subframe 4 arranges identical with Fig. 5 with the HARQ process of 9 and timing relationship thereof Outward, the newest corresponding new PUSCH HARQ process of definition subframe 3, i.e. process d, the uplink authorization of its correspondence and HARQ transmission In subframe 9, the newly corresponding new PUSCH HARQ process of definition subframe 8, i.e. process c, the uplink authorization of its correspondence and HARQ transmission is in subframe 4.Wherein, process and timing relationship for clearly showing that conflict subframe are arranged, by right to subframe 4 and subframe 9 The timing relationship answered utilizes new timing and authorizes the arrow line below form to represent, by subframe 3 and the timing of subframe 8 correspondence Relation utilizes the arrow line between configuration 2 and configuration 0 to represent.From above-mentioned, for intersecting carrier dispatching, define 6 altogether Process.As hereinbefore, in the process of definition, cannot be used in the subframe position that (i.e. PHICH) is corresponding passing when PUSCH retransmits During defeated PHICH, utilize DCI to authorize and trigger re-transmission or use the e-PHICH triggering being positioned on PDSCH to retransmit.
Fig. 7 and Fig. 8 sets forth be scheduled Cell for configuration 6 scheduling Cell be configuration 1, the Cell that is scheduled be configuration 6 Scheduling Cell is process and the timing relationship schematic diagram of configuration 2.Concrete meaning is same as described above, the most just repeats no more.Above-mentioned About the timing relationship design of conflict subframe in Fig. 5~Fig. 8, it is only an example, it would however also be possible to employ other timing relationship, but Ensure that the RTT of corresponding process is 10ms, simultaneously need to follow PUSCH HARQ process and the general standard of timing relationship setting, Such as: the time interval of n to Pn/Gn and Pn/Gn to n is greater than or equal to 4 subframes, shorten between twice PUSCH transmission as far as possible Time interval.
Method (2):
For the PUSCH of the Cell non conflicting subframe that is scheduled, according to the PUSCH HARQ process of scheduling Cell and each The timing relationship of HARQ process, carries out mandate and the HARQ transmission of the PUSCH of corresponding subframe on scheduling Cell;
For the PUSCH of the Cell conflict subframe that is scheduled, close this conflict subframe, say, that not scheduling conflict subframe.
This method (2) is simple, little on specification impact, but the cell ascending resource that is scheduled is limited, and utilization rate is low.
Fig. 9 for by scheduling Cell be configuration 1, be scheduled Cell for configuration 0 as a example by according to method (2) carry out intersect carrier wave adjust PUSCH HARQ process and timing relationship schematic diagram during the transmission spent.
Method (3):
According to PUSCH HARQ process and the timing relationship of each HARQ process of the Cell that is scheduled, on scheduling Cell Carry out being scheduled the mandate of PUSCH on Cell and HARQ transmission.It is to say, by the timing of the Cell that is scheduled, adjust corresponding Transmitting mandate and the PHICH of PUSCH on the Cell that is scheduled on degree Cell, process is constant.This method is simple, it is not necessary to define new Process, ascending resource can make full use of, but the subframe sending uplink authorization is likely not to have corresponding PHICH resource.
Figure 10 for by scheduling Cell be configuration 1, be scheduled Cell for configuration 0 as a example by according to method (3) carry out intersect carrier wave PUSCH HARQ process and timing relationship schematic diagram during the transmission dispatched.
(2) scheduling Cell be the non-10ms of RTT, the Cell that is scheduled be RTT 10ms, in other words, scheduling Cell TDD on Descending proportioning is configuration 0 or 6, and the TDD uplink-downlink configuration of the Cell that is scheduled is any one in configuration 1~5
Combining for this uplink-downlink configuration, the present invention provides two kinds of PUSCH and authorizes and HARQ transmission method, separately below Introduce.
Method (1):
With reference to the timing of scheduling Cell, define new PUSCH HARQ process.Specifically, according to scheduling Cell in adjusted Degree Cell is all the timing relationship of each sub-frame of uplink of sub-frame of uplink, arranges in the Cell that is scheduled PUSCH HARQ on sub-frame of uplink Process and the timing relationship of corresponding process, and according to the timing relationship of this setting, the Cell that carries out being scheduled on scheduling Cell is each The mandate of individual sub-frame of uplink PUSCH and HARQ transmission.Wherein, HARQ process on arbitrary sub-frame of uplink in the Cell that is scheduled of setting Timing relationship, with scheduling Cell on identical sub-frame of uplink the timing relationship of HARQ process identical.Here timed-shutoff means Time of n to Pn/Gn, do not include the time interval of Pn/Gn to n.When defining new process, as it was previously stated, need to follow The general standard that PUSCH HARQ process and timing relationship are arranged, such as: the time interval of n to Pn/Gn and Pn/Gn to n wants big In or equal to 4 subframes.
By scheduling Cell be configuration 0, be scheduled Cell for configuration 1 as a example by, as shown in figure 11, last group form represent new The PUSCH HARQ process of definition and corresponding timing relationship thereof.Time interval in view of Pn/Gn to n is greater than or equal to 4 Individual subframe, and shorten the time interval between retransmitting, in 5 processes that have been scheduled defined in Cell (if only definition 4 is entered as far as possible Journey, then the re-transmission of process 2 is positioned at subframe 3, and is only separated by 2 subframes between this re-transmission and last PHICH, undesirable).Its In, for the process of each new definition, this process and the time interval of its PHICH are and identical subframe corresponding in scheduling Cell Time interval is identical, say, that the time of n to Pn/Gn is identical.And the time interval for Pn/Gn to n can be with scheduling Difference in Cell.Such as, for the HARQ process 2 of new definition, be positioned in the subframe 3 of the first radio frames, its timing relationship P1 and G1 is identical with mandate and the PHICH position of HARQ process in scheduling Cell subframe 2, is i.e. positioned in the subframe 0 of the second radio frames.? After transferring the data of 5 processes, at each sub-frame of uplink following closely, it is used for successively retransmitting (or new data transmission) definition 5 process data.Based on this, the re-transmission (or new data) of HARQ process 2 is positioned in the subframe 7 of the second radio frames, with scheduling In Cell, the re-transmission position of HARQ process 2 is different.For the HARQ process 2 of this re-transmission, identical with its position in scheduling Cell Subframe is the subframe 7 of the second radio frames, and what this subframe 7 carried is the data of HARQ process 3, therefore, and weight on the Cell that is scheduled The PHICH of HARQ process 2 correspondence passed and uplink authorization, it should with PHICH and the uplink authorization dispatching HARQ process 3 on Cell Position is identical, is i.e. positioned in the subframe 1 of the 3rd radio frames.For each subframe follow-up, determine each process according to above-mentioned rule Re-transmission and PHICH, the position of uplink authorization.
Figure 12 give scheduling Cell be configuration 0, the Cell that is scheduled for configuration 2 time according to the method described above (1) intersect carrier wave The new PUSCH HARQ process of scheduling correspondence and timing relationship schematic diagram.Wherein, two HARQ processes, Mei Gejin are newly defined The timing relationship of journey is as shown in figure 12.
Figure 13 give scheduling Cell be configuration 0, the Cell that is scheduled for configuration 3 time according to the method described above (1) intersect carrier wave The new PUSCH HARQ process of scheduling correspondence and timing relationship schematic diagram.Wherein, 4 HARQ processes, Mei Gejin are newly defined The timing relationship of journey is as shown in figure 13.
Figure 14 give scheduling Cell be configuration 0, the Cell that is scheduled for configuration 4 time according to the method described above (1) intersect carrier wave The new PUSCH HARQ process of scheduling correspondence and timing relationship schematic diagram.Wherein, 3 HARQ processes, Mei Gejin are newly defined The timing relationship of journey is as shown in figure 14.
Figure 15 give scheduling Cell be configuration 0, the Cell that is scheduled for configuration 5 time according to the method described above (1) intersect carrier wave The new PUSCH HARQ process of scheduling correspondence and timing relationship schematic diagram.Wherein, 1 HARQ process, Mei Gejin are newly defined The timing relationship of journey is as shown in figure 15.
Figure 16 give scheduling Cell be configuration 6, the Cell that is scheduled for configuration 1 time according to the method described above (1) intersect carrier wave The new PUSCH HARQ process of scheduling correspondence and timing relationship schematic diagram.Wherein, 5 HARQ processes, Mei Gejin are newly defined The timing relationship of journey is as shown in figure 16.
Figure 17 give scheduling Cell be configuration 6, the Cell that is scheduled for configuration 2 time according to the method described above (1) intersect carrier wave The new PUSCH HARQ process of scheduling correspondence and timing relationship schematic diagram.Wherein, 2 HARQ processes, Mei Gejin are newly defined The timing relationship of journey is as shown in figure 17.
Method (2):
By the process of scheduling Cell, when up available subframe is not had for the Cell re-transmission that is scheduled, ignore this re-transmission, suitable It is extended down to re-transmission next time.Specifically, according in the Cell that is scheduled arranged on each sub-frame of uplink PUSCH HARQ process and each The timing relationship that described process is corresponding in scheduling Cell, carries out, on scheduling Cell, each sub-frame of uplink of Cell that is scheduled The mandate of PUSCH and HARQ transmission.Wherein, for identical PUSCH HARQ process, when PUSCH retransmits corresponding subframe at quilt In scheduling Cell when be descending sub frame, postponing, to retransmit corresponding subframe to PUSCH next time be sub-frame of uplink in the Cell that is scheduled The corresponding PUSCH of Shi Jinhang retransmits.
In the method, the HARQ process being scheduled in Cell keeps and the process one of identical sub-frame of uplink in scheduling Cell Cause.
By scheduling Cell be configuration 0, be scheduled Cell for configuration 1 as a example by, as shown in figure 18, last group form represent quilt Dispatch PUSCH HARQ process new for Cell and corresponding timing relationship thereof.Same the most former for aforementioned HARQ process definition Then, Figure 18 dispatches Cell and include 4 processes.Wherein, the process 1 of the process 1 of the Cell that is scheduled corresponding scheduling Cell, it is scheduled The process 2 of the process 2 of Cell corresponding scheduling Cell, the process 4 of the process 3 of the Cell that is scheduled corresponding scheduling Cell, it is scheduled The process 5 of the process 4 of Cell corresponding scheduling Cell.For the most corresponding process, except being adjusted on position corresponding re-transmission Degree Cell be descending sub frame situation outside, the PUSCH transmission of the Cell that is scheduled, PHICH and uplink authorization all with dispatch Cell Identical.
And for retransmitting the situation that the Cell that is scheduled on position is descending sub frame, ignore this re-transmission, such as, in Figure 18, join When setting to 0, the subframe 4 of the second radio frames is for carrying out the re-transmission of HARQ process 2, and the subframe 4 of the second radio frames is when configuring 1 Descending sub frame, therefore it is not used to the re-transmission of HARQ process 2, and this re-transmission is left in the basket, and the PHICH of this re-transmission accordingly is also Being left in the basket, the subframe 0 of the i.e. the 3rd radio frames need not transmit the PHICH of HARQ process 2, until the subframe 7 of the 3rd radio frames is entered again The re-transmission of row HARQ process 2.
Said method (2) is little on specification impact, but can extend the time delay of data transmission.
(3) scheduling Cell is configuration 6, and the Cell that is scheduled is configuration 0
Under this configuring condition, the sub-frame of uplink number of the scheduling Cell sub-frame of uplink number less than the Cell that is scheduled.This join Put and can apply the method (2) in above-mentioned configuration combination () and method (3), carry out PUSCH mandate and re-transmission.
Specifically:
Method (1):
According to PUSCH HARQ process and the timing relationship of each HARQ process of the Cell that is scheduled, on scheduling Cell Carry out being scheduled the mandate of PUSCH on Cell and HARQ transmission.It is to say, by the timing of the Cell that is scheduled, adjust corresponding Transmitting mandate and the PHICH of PUSCH on the Cell that is scheduled on degree Cell, process is constant.This method is simple, it is not necessary to define new Process, ascending resource can make full use of, but the subframe sending uplink authorization is likely not to have corresponding PHICH resource.
Figure 19 give scheduling Cell be configuration 6, the Cell that is scheduled for configuration 0 time according to the method described above (1) intersect carrier wave The new PUSCH HARQ process of scheduling correspondence and timing relationship schematic diagram.
Method (2):
For the PUSCH of the Cell non conflicting subframe that is scheduled, according to the PUSCH HARQ process of scheduling Cell and each The timing relationship of HARQ process, carries out mandate and the HARQ transmission of the PUSCH of corresponding subframe on scheduling Cell;
For the PUSCH of the Cell conflict subframe that is scheduled, close this conflict subframe, say, that not scheduling conflict subframe.
Figure 20 give scheduling Cell be configuration 6, the Cell that is scheduled for configuration 0 time according to the method described above (2) intersect carrier wave The new PUSCH HARQ process of scheduling correspondence and timing relationship schematic diagram.
(4) scheduling Cell is configuration 0, and the Cell that is scheduled is configuration 6
Under this configuring condition, the sub-frame of uplink number of the scheduling Cell sub-frame of uplink number more than the Cell that is scheduled.This join Put and can apply the method (1) in above-mentioned configuration combination (two) and method (2), carry out PUSCH mandate and re-transmission.
Specifically:
Method (1):
With reference to the timing of scheduling Cell, define new PUSCH HARQ process.Specifically, according to scheduling Cell in adjusted Degree Cell is all the timing relationship of each sub-frame of uplink of sub-frame of uplink, arranges in the Cell that is scheduled PUSCH HARQ on sub-frame of uplink Process and the timing relationship of corresponding process, and according to the timing relationship of this setting, the Cell that carries out being scheduled on scheduling Cell is each The mandate of individual sub-frame of uplink PUSCH and HARQ transmission.
Figure 21 give scheduling Cell be configuration 0, the Cell that is scheduled for configuration 6 time according to the method described above (1) intersect carrier wave The new PUSCH HARQ process of scheduling correspondence and timing relationship schematic diagram.
Method (2):
By the process of scheduling Cell, when up available subframe is not had for the Cell re-transmission that is scheduled, ignore this re-transmission, suitable It is extended down to re-transmission next time.Specifically, according in the Cell that is scheduled arranged on each sub-frame of uplink PUSCH HARQ process and each The timing relationship that process is corresponding in scheduling Cell, carries out being scheduled Cell each sub-frame of uplink PUSCH's on scheduling Cell Authorize and HARQ transmission.Wherein, for identical PUSCH HARQ process, it is being scheduled when PUSCH retransmits corresponding subframe When Cell is descending sub frame, postpone to PUSCH next time retransmit corresponding subframe in the Cell that is scheduled for sub-frame of uplink time enter The corresponding PUSCH of row retransmits.
Figure 22 give scheduling Cell be configuration 0, the Cell that is scheduled for configuration 6 time according to the method described above (2) intersect carrier wave The new PUSCH HARQ process of scheduling correspondence and timing relationship schematic diagram.
The above-mentioned present invention of being implements.Wherein, every kind of HARQ process and the design of timing relationship are being illustrated During method, only it is illustrated as a example by the most several configuration combinations.For other configuration combinations, its specific design mode phase With, do not repeat the most one by one.By the process of the invention described above, it is possible to ensure that the RTT of scheduling or the Cell that is scheduled is non-10ms Time the mandate of PUSCH and HARQ transmission be normally carried out, and give the design of HARQ process when intersecting carrier dispatching.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all essences in the present invention Within god and principle, any modification, equivalent substitution and improvement etc. done, within should be included in the scope of protection of the invention.

Claims (8)

1. the mandate of a PUSCH and HARQ transmission method, it is characterised in that when the TDD up-downgoing proportioning of scheduling Cell is for joining Put any one in 1~5, the Cell that is scheduled TDD uplink-downlink configuration for configuration 0 or 6 time, the method includes:
According to PUSCH HARQ process and the timing relationship of each HARQ process of scheduling Cell, enterprising at described scheduling Cell The mandate of the PUSCH of the Cell non conflicting subframe that is scheduled described in row and HARQ transmission;
According to the descending sub frame position of described scheduling Cell, pre-set corresponding the determining of PUSCH of the Cell conflict subframe that is scheduled Time relation, and described conflict subframe timing relationship ensure corresponding HARQ process RTT be 10ms;According to the described conflict arranged The timing relationship of subframe carries out mandate and the HARQ transmission of the PUSCH of described conflict subframe on scheduling Cell;
When according to the described non conflicting subframe arranged or the timing relationship of conflict subframe, this PUSCH does not has corresponding PHICH Frame, then utilize DCI to authorize and trigger re-transmission or use the e-PHICH triggering being positioned on PDSCH to retransmit.
Method the most according to claim 1, it is characterised in that when the TDD uplink-downlink configuration of scheduling Cell is configuration 1, quilt When the TDD uplink-downlink configuration of scheduling Cell is for configuration 0, the timing relationship of the PUSCH of the Cell conflict subframe that is scheduled of setting is:
For the subframe 4 being scheduled on Cell, authorize and the PHICH subframe of its correspondence is the subframe 0 on scheduling Cell;
For the subframe 9 being scheduled on Cell, authorize and the PHICH subframe of its correspondence is the subframe 5 on scheduling Cell.
Method the most according to claim 1, it is characterised in that when the TDD uplink-downlink configuration of scheduling Cell is configuration 2, quilt When the TDD uplink-downlink configuration of scheduling Cell is for configuration 0, the timing relationship of the PUSCH of the Cell conflict subframe that is scheduled of setting is:
For the subframe 3 being scheduled on Cell, authorize and the PHICH subframe of its correspondence is the subframe 9 on scheduling Cell;
For the subframe 4 being scheduled on Cell, authorize and the PHICH subframe of its correspondence is the subframe 0 on scheduling Cell;
For the subframe 8 being scheduled on Cell, authorize and the PHICH subframe of its correspondence is the subframe 4 on scheduling Cell;
For the subframe 9 being scheduled on Cell, authorize and the PHICH subframe of its correspondence is the subframe 5 on scheduling Cell.
Method the most according to claim 1, it is characterised in that when the TDD uplink-downlink configuration of scheduling Cell is configuration 1, quilt When the TDD uplink-downlink configuration of scheduling Cell is for configuration 6, the timing relationship of the PUSCH of the Cell conflict subframe that is scheduled of setting is:
For the subframe 4 being scheduled on Cell, authorize and the PHICH subframe of its correspondence is the subframe 0 on scheduling Cell.
Method the most according to claim 1, it is characterised in that when the TDD uplink-downlink configuration of scheduling Cell is configuration 2, quilt When the TDD uplink-downlink configuration of scheduling Cell is for configuration 6, the timing relationship of the PUSCH of the Cell conflict subframe that is scheduled of setting is:
For the subframe 3 being scheduled on Cell, authorize and the PHICH subframe of its correspondence is the subframe 9 on scheduling Cell;
For the subframe 4 being scheduled on Cell, authorize and the PHICH subframe of its correspondence is the subframe 0 on scheduling Cell;
For the subframe 8 being scheduled on Cell, authorize and the PHICH subframe of its correspondence is the subframe 4 on scheduling Cell.
6. the mandate of a PUSCH and HARQ transmission method, it is characterised in that when the TDD up-downgoing proportioning of scheduling Cell is for joining Put any one in 1~5, the Cell that is scheduled TDD uplink-downlink configuration for configuration 0 or 6 time, or, when scheduling Cell TDD on When descending proportioning is configuration 6, the TDD uplink-downlink configuration of the Cell that is scheduled is configuration 0, the method includes:
According to PUSCH HARQ process and the timing relationship of each HARQ process of scheduling Cell, enterprising at described scheduling Cell The mandate of the PUSCH of the Cell non conflicting subframe that is scheduled described in row and HARQ transmission;
For the PUSCH of the Cell conflict subframe that is scheduled, do not dispatch.
7. the mandate of a PUSCH and HARQ transmission method, it is characterised in that when the TDD up-downgoing proportioning of scheduling Cell is for joining Set to 0 or time the TDD uplink-downlink configuration of 6, the Cell that is scheduled is any one in configuration 1~5, or, when on the TDD of scheduling Cell When descending proportioning is configuration 0, the TDD uplink-downlink configuration of the Cell that is scheduled is configuration 6, the method includes:
According to the timing relationship of each sub-frame of uplink being all sub-frame of uplink in scheduling Cell with the Cell that is scheduled, setting is scheduled PUSCH HARQ process and the timing relationship of corresponding process on sub-frame of uplink in Cell, and according to the timing relationship of this setting, Be scheduled described in carrying out on described scheduling Cell the mandate of Cell each sub-frame of uplink PUSCH and HARQ transmission;
Wherein, the timing relationship of PUSCH HARQ process on arbitrary sub-frame of uplink in the Cell that is scheduled of setting, with scheduling Cell In on identical sub-frame of uplink the timing relationship of PUSCH HARQ process identical.
8. the mandate of a PUSCH and HARQ transmission method, it is characterised in that when the TDD up-downgoing proportioning of scheduling Cell is for joining Set to 0 or time the TDD uplink-downlink configuration of 6, the Cell that is scheduled is any one in configuration 1~5, or, when on the TDD of scheduling Cell When descending proportioning is configuration 0, the TDD uplink-downlink configuration of the Cell that is scheduled is configuration 6, the method includes:
The PUSCH HARQ process on each sub-frame of uplink that will be scheduled in Cell is set to, and on identical sub-frame of uplink in scheduling Cell PUSCH HARQ process is identical;
Dispatching according to PUSCH HARQ process on each sub-frame of uplink in the Cell that is scheduled arranged and each described process Timing relationship corresponding in Cell, described scheduling Cell is carried out described in be scheduled the awarding of Cell each sub-frame of uplink PUSCH Power and HARQ transmission;
Wherein, for identical PUSCH HARQ process, when PUSCH retransmits corresponding subframe in the Cell that is scheduled for descending son During frame, postpone to PUSCH next time and retransmit corresponding subframe in the Cell that is scheduled for carrying out described PUSCH during sub-frame of uplink heavily Pass.
CN201210141346.4A 2012-05-08 2012-05-08 The mandate of a kind of PUSCH and HARQ transmission method Expired - Fee Related CN103391166B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210141346.4A CN103391166B (en) 2012-05-08 2012-05-08 The mandate of a kind of PUSCH and HARQ transmission method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210141346.4A CN103391166B (en) 2012-05-08 2012-05-08 The mandate of a kind of PUSCH and HARQ transmission method

Publications (2)

Publication Number Publication Date
CN103391166A CN103391166A (en) 2013-11-13
CN103391166B true CN103391166B (en) 2016-08-10

Family

ID=49535333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210141346.4A Expired - Fee Related CN103391166B (en) 2012-05-08 2012-05-08 The mandate of a kind of PUSCH and HARQ transmission method

Country Status (1)

Country Link
CN (1) CN103391166B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105009669A (en) * 2013-12-25 2015-10-28 华为技术有限公司 Method and device for obtaining tdd uplink and downlink ratio
CN104811280B (en) * 2014-01-28 2019-01-08 中国移动通信集团公司 A kind of method and apparatus fed back by physical mixed automatic re-transmission indicating channel
CN107395329A (en) * 2016-05-17 2017-11-24 北京信威通信技术股份有限公司 The method and device that a kind of HARQ-ACK is sent
WO2018137130A1 (en) * 2017-01-24 2018-08-02 广东欧珀移动通信有限公司 Harq process configuration method, apparatus, and device
CN109962750A (en) * 2017-12-25 2019-07-02 普天信息技术有限公司 Signal processing method and system when a kind of reverse link traffic channel and control channel conflict
CN110034862B (en) * 2018-01-12 2021-05-28 维沃移动通信有限公司 Downlink feedback method, mobile communication terminal and network side equipment
US10784997B2 (en) * 2018-02-12 2020-09-22 Mediatek Inc. Techniques of transmitting overlapping uplink channels
CN111130735B (en) * 2019-04-30 2021-11-23 维沃移动通信有限公司 Feedback control method, UE and network equipment

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102084710A (en) * 2008-03-03 2011-06-01 Lg电子株式会社 Method for resolving collision of uplink signals

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010135860A1 (en) * 2009-05-25 2010-12-02 华为技术有限公司 Method and apparatus for allocating the multi-carrier ack channel

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102084710A (en) * 2008-03-03 2011-06-01 Lg电子株式会社 Method for resolving collision of uplink signals

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
Email summary on inter-band TDD CA;Jeju;《3GPP TSG RAN WG1 Meeting #68bis R1-121719》;20120330;第2.2节、Table A1-3、Table A1-5 *
Overall structure of TDD CA with different UL-DL configurations based on half-duplex operation;San Francisco;《3GPP TSG RAN WG1 #67 R1-113973》;20111118;全文 *

Also Published As

Publication number Publication date
CN103391166A (en) 2013-11-13

Similar Documents

Publication Publication Date Title
CN103391166B (en) The mandate of a kind of PUSCH and HARQ transmission method
KR102142580B1 (en) Method and apparatus for supporting synchronous harq transmission
CN103516496B (en) A method of sending HARQ-ACK feedback information
KR102084498B1 (en) Method and apparatus for tranmitting uplink and downlink data in tdd system
CN108111290B (en) PUSCH transmission method and equipment
CN102904698B (en) A kind of method of transmission HARQ ACK feedback informations
CN103368709B (en) A kind of hybrid automatic repeat-request confirms response message sending method and device
CN103460627B (en) For sending/receive method and the device thereof of signal
CN105850070B (en) LTE is layered burst mode
CN108306720A (en) A kind of method and apparatus of transmission UCI information
CN104982000B (en) Method and apparatus in carrier aggregation system for communication
CN109155720A (en) In a wireless communication system to the method and device thereof of the uplink channel access of unauthorized band
CN103188062B (en) Hybrid automatic repeat-request response message sending method and device
CN104348591B (en) A kind of sending method and user equipment, base station of ascending control information
CN102594533B (en) Method, system and device for transmitting and receiving feedback information
CN107079450A (en) Control is seized in transmission for enhanced component carrier
CN108886818A (en) In a wireless communication system to the unauthorized method and device thereof with uplink channel access
CN106160983A (en) A kind of HARQ-ACK transmission method strengthening carrier aggregation system and equipment
CN105264807B (en) Transmission method, base station and the user equipment of ascending control information
CN102571313B (en) Method for scheduling cross carrier in different up-down link matching carrier aggregations
CN103368708A (en) A PUSCH retransmission indication method
CN105207757A (en) Carrier aggregation method and apparatus of communication system
CN102594436B (en) A kind of method and apparatus of data transmission
CN103369695B (en) A kind of uplink dispatch method and device
CN104349475B (en) A kind of method and apparatus of the cross-carrier scheduling of TDD-FDD

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160810

CF01 Termination of patent right due to non-payment of annual fee