CN103395407A CN2013103811827A CN201310381182A CN103395407A CN 103395407 A CN103395407 A CN 103395407A CN 2013103811827 A CN2013103811827 A CN 2013103811827A CN 201310381182 A CN201310381182 A CN 201310381182A CN 103395407 A CN103395407 A CN 103395407A
Authority
CN
China
Prior art keywords
water
sludge
slag
sewage
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103811827A
Other languages
Chinese (zh)
Other versions
CN103395407B (en
Inventor
胡湘冬
陈孟鸿
许宁
吴雄辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN201310381182.7A priority Critical patent/CN103395407B/en
Publication of CN103395407A publication Critical patent/CN103395407A/en
Application granted granted Critical
Publication of CN103395407B publication Critical patent/CN103395407B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The invention discloses an automatic cleaning system of a construction site muck vehicle and an application method thereof. The automatic cleaning system comprises a collecting device used for collecting underground water and natural rainfall, a settling pond, a high-pressure pump room and an automatic vehicle washing shed, wherein a water outlet pipeline of the water collecting device is communicated with the settling pond, a water outlet pipeline of the settling pond is communicated with the high-pressure pump room, and a water outlet pipeline of the high-pressure pump room is communicated with a cleaning pipe network of the automatic vehicle washing shed. Construction sewage collected by the collecting device is settled by the multi-stage settling pond to reach reclaimed water standard and then pressurized and sent to the cleaning pipe network of the automatic vehicle washing shed for thoroughly cleaning all parts of the muck vehicle, the cleaned sewage is re-collected and then recycled, thus the natural rainfall and underground water, which are collected, are converted into reclaimed water to be recycled to clean the muck vehicle, and the purposes of saving labor and material resources and improving the efficiency are achieved.

Description

Building ground slag-soil truck automatic cleaning system and application process thereof
Technical field
The present invention relates to a kind of building ground slag-soil truck automatic cleaning system and application process thereof.
Background technology
Larger to water resource waste, labour power consumption is large, labour intensity is large, developing cost is high, each car carwash length consuming time etc.
The cleaning of building ground slag-soil truck is that slag-soil truck is parked in automobile-washing groove basically at present, by the hand-held bath rifle of operating personal, slag-soil truck is rinsed, and what wash by water the rifle utilization is the urban water supply tap water.There is the defect of the following aspects in such purging method: 1, the car washing water consumption is large, and water resource waste is larger.Tradition automobile-washing groove water all uses urban water supply to rinse car, rinses sewage and mostly from ditch, directly drains, and does not collect and again utilizes, and wash water belongs to disposable consumption.2, labour power consumption is large.The tradition automobile-washing groove is to utilize 4-6 the hand-held hydraulic giant of workman to rinse each face of vehicle body, and the per car dregs is transported outward out building site all needs to arrange the workman to rinse each face of vehicle body, and labour power consumption is very large.3, labour intensity is large.The tradition automobile-washing groove, when dregs is transported outward, needs the workman ceaselessly to rinse vehicle, and the dregs outward transport all concentrates on night, and workman's daily schedule and mediocrity put upside down, and car cleaner's working time and intensity are large.Artificial flushing has the tired and sordid possibility of vehicle flushing.4, developing cost is high.Low because of the degree of utilization of water resource, labour power consumption is relatively high, and in labour power wage growing today, traditional automobile-washing groove car-cleaning cost is constantly increasing.5, each car carwash length consuming time.The tradition automobile-washing groove utilizes the artificial flushing vehicle, rinses position and can't launch rapidly comprehensively, needs position one by one to go to rinse according to priority, each car rinses length consuming time, and per hour the car quantity by automobile-washing groove is few, directly affects dregs outward transport efficiency, otherwise, affect city image.
Summary of the invention
The object of the present invention is to provide a kind of building ground slag-soil truck automatic cleaning system and application process thereof of efficient energy-saving.
The invention discloses a kind of building ground slag-soil truck automatic cleaning system, this system comprises be used to the gathering-device of collecting earthing water and natural precipitation, sludge pan, high pressure pump house and automatic car washing shed, the outlet pipeline of water collecting device is communicated with sludge pan, the outlet pipeline of sludge pan is communicated with the high pressure pump house, and the cleaning pipe network of the outlet pipeline of high pressure pump house and automatic car washing shed is communicated with.
Described gathering-device comprises some earthing water collecting tubes, collecting pipe and collection well, and the earthing water collecting tube is distributed in the foundation pit construction stage needs precipitation, drainage position, and the exit end of each underground water collection pipe is connected to collecting pipe; Collect in well sewage water pump is arranged, collecting pipe is connected to the pump mouth of sewage water pump.
Described sludge pan is one-level sludge pan, second-level settling pond and the three grades of sludge pans that are divided into partition wall in a large square pond body, three grades of sludge pans are positioned at an end of square pond body, one end of one-level sludge pan and second-level settling pond is positioned at the inboard of three grades of sludge pans side by side, between adjacent, have along square pond body partition wall longitudinally, the length of second-level settling pond is less than the length of this partition wall, the degree of depth of three grades of sludge pans strengthens successively, and the partition wall height between adjacent sludge pan is less than the exterior wall height of square pond body; The bottom surface of one-level sludge pan is the inclined-plane of sediment deposition for the benefit of, in second-level settling pond, has the twice wire net at least, be used to intercepting silt and slowing down water velocity, in three grades of sludge pans, lift pump is arranged.
Described automatic car washing shed is that front and back end and end face are the cuboid box bodies of opening surface, its bottom surface is the integrated stand that the steel pipe tiling forms, left side plate is the integrally closed plate, there is the sewage collecting pool of geomery and its coupling the below of bottom surface, the upper surface of sewage collecting pool is fixed in bottom surface, and sewage collecting pool is communicated with described one-level sludge pan by pipeline.
Described cleaning pipe network comprises the bottom flushing line fixing with described sewage collecting pool upper inside wall, along the side flushing line of described automatic car washing shed side plate and be positioned at the end face flushing line of automatic car washing shed front and back end; It is inboard along vertical, the corresponding slag-soil truck of described sewage collecting pool both sides wheel and along the main-supply of described sewage collecting pool longitudinal side wall that the bottom flushing line comprises, middle main-supply upside is connected with vertical distributive pipe, the left and right sides in parallel and is connected with perpendicular horizontal distributive pipe, along the upside of the main-supply of described sewage collecting pool longitudinal side wall, is connected with vertical distributive pipe in parallel; The side flushing line comprises the some L shaped distributive pipe that is connected in along the main-supply outside of described sewage collecting pool longitudinal side wall, and the vertical section side plate along described automatic car washing shed of each L shaped distributive pipe makes progress and fix with it; The end face flushing line comprises four distributive pipes that vertically are connected in respectively along the main-supply end of described sewage collecting pool longitudinal side wall; On each distributive pipe, all be furnished with the different shower nozzle of setting angle.
Described main-supply is communicated with the outlet pipeline of described high pressure pump house.
The invention also discloses a kind of method of utilizing above-mentioned building ground slag-soil truck automatic cleaning system to clean slag-soil truck, comprise the following steps:
(1), in the earth excavation stage, the precipitation hole is set in foundation ditch, in the precipitation hole, insert diameter less than the diameter in precipitation hole, the drain hose that sidewall is evenly equipped with water seepage hole, then will between each drain hose and precipitation hole, with stone, fill with reality;
(2), each drain hose is communicated to total collecting pipe, collecting pipe is communicated to the sewage water pump in pump well, by sewage water pump, natural precipitation and the earthing water in foundation ditch in each drain hose, collected is evacuated in pump well;
(3), utilize lift pump that the water in pump well is evacuated to the one-level sludge pan, then flow through successively second-level settling pond and three grades of sludge pans, after in three grades of sludge pans, forming middle water up to standard, by lift pump wherein, middle water is delivered to the high pressure pump house, the cleaning pipe network of then delivering to automatic car washing shed cleans each position of slag-soil truck;
(4), the sewage after cleaning pipeline cleaning slag-soil truck flows into sewage collecting pool automatically;
(5), the sewage in sewage collecting pool is flowed back to the one-level sludge pan by pipeline, after three grades of sludge pan precipitations, from three grades of sludge pans, discharge recycle, realization is converted into middle water circulation use cleaning slag-soil truck by natural precipitation and the earthing water of collecting, and reaches the purpose that uses manpower and material resources sparingly, raises the efficiency.
The present invention is by arranging the earthing water collecting tube in foundation ditch, natural precipitation in foundation ditch and earthing water are collected in the collection well, the sewage water pump of collecting in well is precipitated to water in rear formation to multistage sludge pan, reach the foundation pit construction dewatering effect, for middle water, collect source is provided again, this water saving measures greatly reduces the use of earth excavation stage urban water supply.The cleaning pipe network of delivering to automatic car washing shed after pressurizeing for middle water cleans slag-soil truck automatically, cleaning the different shower nozzle of each setting angle of pipe network rinses each position of slag-soil truck well, without arranging again the workman to rinse, reduced the consumption of labour power, greatly shortened each car and cleaned required time.Sewage after carwash enters recycle after the sludge pan precipitation again after collecting pit is collected, greatly reduce operating personal, and saving water resource, improve dregs every day outward transport side and measure and then accelerated construction speed, also just reduced building cost.
The accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Fig. 2 is the floor plan schematic diagram between sludge pan and automatic car washing shed in Fig. 1.
Fig. 3 is the A-A schematic diagram in Fig. 2.
Fig. 4 is the B-B schematic diagram in Fig. 2.
Fig. 5 is the C-C schematic diagram in Fig. 1.
Fig. 6 is the schematic top plan view that automatic car washing shed cleans pipe network.
Fig. 7 is the D-D schematic diagram in Fig. 6.
Fig. 8 is workflow schematic diagram of the present invention.
The specific embodiment
As shown in Figures 1 to 7, the invention discloses a kind of building ground slag-soil truck automatic cleaning system, this system comprises be used to the gathering-device 1 of collecting earthing water and natural precipitation, sludge pan 2, high pressure pump house 3 and automatic car washing shed 4.The outlet pipeline of water collecting device 1 is communicated with sludge pan 2, and the outlet pipeline of sludge pan 2 is communicated with high pressure pump house 3, and the cleaning pipe network 6 of the outlet pipeline of high pressure pump house 3 and automatic car washing shed 4 is communicated with.
Gathering-device 1 comprises some earthing water collecting tubes 11, collecting pipe 12 and collects well 13.Earthing water collecting tube 11 is distributed in the foundation pit construction stage needs precipitation, drainage position, on its sidewall, be evenly equipped with water seepage hole, the exit end of each underground water collection pipe 11 is connected to collecting pipe 12, collects in well 13 sewage water pump 14 is arranged, and collecting pipe 13 is connected to the pump mouth of sewage water pump 14.
Sludge pan 2 is one-level sludge pan 21, second-level settling pond 22 and the three grades of sludge pans 23 that are divided into partition wall in a large square pond body.Three grades of sludge pans 23 are positioned at an end of square pond body, one end of one-level sludge pan 21 and second-level settling pond 22 is positioned at the inboard of three grades of sludge pans 23 side by side, between adjacent, have along square pond body partition wall longitudinally, the length of second-level settling pond 22 is less than the length of this partition wall, the degree of depth of three grades of sludge pans strengthens successively, and the partition wall height between adjacent sludge pan is less than the exterior wall height of square pond body; The bottom surface of one-level sludge pan 21 is the inclined-plane of sediment deposition for the benefit of, and twice wire net 24 is arranged in second-level settling pond 22, be used to intercepting silt and slowing down water velocity, in three grades of sludge pans 23, lift pump 25 is arranged.
Automatic car washing shed 4 is that front and back end and end face are the cuboid box bodies of opening surface, the integrated stand that its bottom surface 41 forms for the steel pipe tiling, left side plate 42 is the integrally closed plate, there is the sewage collecting pool 5 of geomery and its coupling the below of bottom surface 41, the upper surface of sewage collecting pool 5 is fixed in bottom surface 41, and sewage collecting pool 5 is communicated with one-level sludge pan 21 by pipeline.
The cleaning pipe network 6 of automatic car washing shed 4 comprises the bottom flushing line 61 fixing with sewage collecting pool 5 upper inside wall, along the side flushing line 62 of automatic car washing shed side plate and be positioned at the end face flushing line 63 of automatic car washing shed front and back end; It is inboard along vertical, the corresponding slag-soil truck of sewage collecting pool 5 both sides wheel and along the main-supply 611 of sewage collecting pool 5 longitudinal side walls that bottom flushing line 61 comprises, middle main-supply 611 upsides are connected with vertical distributive pipe 612, the left and right sides in parallel and are connected with perpendicular horizontal distributive pipe 613, along the upside of the main-supply 611 of sewage collecting pool 5 longitudinal side walls, are connected with vertical distributive pipe 612 in parallel; Side flushing line 62 comprises the L shaped distributive pipe that is connected in along main-supply 611 outsides of sewage collecting pool 5 longitudinal side walls, and the vertical section side plate along automatic car washing shed 4 42 of L shaped distributive pipe makes progress and fix with it; End face flushing line 63 comprises four distributive pipes that vertically are connected in respectively along main-supply 611 ends of sewage collecting pool 5 longitudinal side walls; On each distributive pipe, all be furnished with the different shower nozzle of setting angle 7, to meet each position.
The application concrete steps of above-mentioned washing system are as follows: at first in the earth excavation stage, the precipitation hole is set in foundation ditch, in the precipitation hole, insert diameter less than the diameter in precipitation hole, the earthing water collecting tube 11 that sidewall is evenly equipped with water seepage hole, then will between each underground water collection pipe 11 and precipitation hole, with stone, fill with real; Then each underground water collection pipe is communicated to total collecting pipe 12, collecting pipe 12 is communicated to the sewage water pump 14 in pump well 13, by sewage water pump 14, natural precipitation and the earthing water in foundation ditch in each underground water collection pipe 11, collected are evacuated in pump well 13; Can also when construction, weep drain or intercepting ditch be set below bottom plate rear pouring tape, then weep drain or intercepting ditch be connected with pump well 13, water is imported and collects in well 13; Recycling water pump 8 is evacuated to one-level sludge pan 21, then flow through successively second-level settling pond 22 and three grades of sludge pans 23 by the sewage of collecting in pump well 13.after in three grades of sludge pans 23, forming middle water up to standard, by lift pump 25 wherein, middle water is delivered to high pressure pump house 3, after pressurization, delivering to each position of 6 pairs of slag-soil trucks of cleaning pipe network of automatic car washing shed 4 cleans: the outlet pipeline of high pressure pump house 3 and automatic car washing shed 4 belows, bottom surface, the bottom of sewage collecting pool 5 upper ends is rinsed pipe network 61 and is communicated with, the middle water sent of high pressure pump house 3 first flows into the main-supply 611 that pipe network 61 is rinsed in bottom like this, then branch to each vertical distributive pipe 612 and horizontal distributive pipe 613 and side flushing line 62 and end face flushing line 63, finally in the shower nozzle by different angles installation on each pipeline, spray and simultaneously each position of slag-soil truck is rinsed, reach the purpose of high-efficiency rinsing.Sewage after flushing flows in sewage collecting pool 5 automatically, and then flow back to 21 recycles of one-level sludge pan by pipeline, realization is converted into middle water circulation use cleaning slag-soil truck by natural precipitation and the earthing water of collecting, and reaches the purpose that uses manpower and material resources sparingly, raises the efficiency.
The quantity of shower nozzle 7 and each distributive pipe and installing space determine as required, to meet vehicle, leans to one side, car is anterior, the inside and outside of afterbody and wheel is cleaned without dead angle as criterion.
Slag-soil truck enters automatic car washing shed 4 after crossing the preliminary cleaning in tank, clean the shower nozzle 7 of pipe network 5 and vehicle body, wheel can be rinsed well, without arranging the workman to rinse, has reduced the consumption of labour power again, has greatly shortened each car and has cleaned required time.The cleaning of whole slag-soil truck only partly consumes a small amount of urban water supply at the mistake tank, and water resource has been saved in the sewage collecting recycle after middle water rinses greatly.

Claims (7)

1. building ground slag-soil truck automatic cleaning system, it is characterized in that: this system comprises be used to the gathering-device of collecting earthing water and natural precipitation, sludge pan, high pressure pump house and automatic car washing shed, the outlet pipeline of water collecting device is communicated with sludge pan, the outlet pipeline of sludge pan is communicated with the high pressure pump house, and the cleaning pipe network of the outlet pipeline of high pressure pump house and automatic car washing shed is communicated with.
2. building ground as claimed in claim 1 slag-soil truck automatic cleaning system, it is characterized in that: described gathering-device comprises some earthing water collecting tubes, collecting pipe and collection well, the earthing water collecting tube is distributed in the foundation pit construction stage needs precipitation, drainage position, and the exit end of each underground water collection pipe is connected to collecting pipe; Collect in well sewage water pump is arranged, collecting pipe is connected to the pump mouth of sewage water pump.
3. building ground as claimed in claim 1 slag-soil truck automatic cleaning system, it is characterized in that: described sludge pan is the one-level sludge pan that is divided into partition wall in a large square pond body, second-level settling pond and three grades of sludge pans, three grades of sludge pans are positioned at an end of square pond body, one end of one-level sludge pan and second-level settling pond is positioned at the inboard of three grades of sludge pans side by side, between adjacent, have along square pond body partition wall longitudinally, the length of second-level settling pond is less than the length of this partition wall, the degree of depth of three grades of sludge pans strengthens successively, partition wall height between adjacent sludge pan is less than the exterior wall height of square pond body, the bottom surface of one-level sludge pan is the inclined-plane of sediment deposition for the benefit of, in second-level settling pond, has the twice wire net at least, be used to intercepting silt and slowing down water velocity, in three grades of sludge pans, lift pump is arranged.
4. building ground as claimed in claim 3 slag-soil truck automatic cleaning system, it is characterized in that: described automatic car washing shed is that front and back end and end face are the cuboid box bodies of opening surface, its bottom surface is the integrated stand that the steel pipe tiling forms, left side plate is the integrally closed plate, there is the sewage collecting pool of geomery and its coupling the below of bottom surface, the upper surface of sewage collecting pool is fixed in bottom surface, and sewage collecting pool is communicated with described one-level sludge pan by pipeline.
5. building ground as claimed in claim 4 slag-soil truck automatic cleaning system is characterized in that: described cleaning pipe network comprises the bottom flushing line fixing with described sewage collecting pool upper inside wall, along the side flushing line of described automatic car washing shed side plate and be positioned at the end face flushing line of automatic car washing shed front and back end; It is inboard along vertical, the corresponding slag-soil truck of described sewage collecting pool both sides wheel and along the main-supply of described sewage collecting pool longitudinal side wall that the bottom flushing line comprises, middle main-supply upside is connected with vertical distributive pipe, the left and right sides in parallel and is connected with perpendicular horizontal distributive pipe, along the upside of the main-supply of described sewage collecting pool longitudinal side wall, is connected with vertical distributive pipe in parallel; The side flushing line comprises the some L shaped distributive pipe that is connected in along the main-supply outside of described sewage collecting pool longitudinal side wall, and the vertical section sidewall paneling with described automatic car washing shed of each L shaped distributive pipe makes progress and fix with it; The end face flushing line comprises four distributive pipes that vertically are connected in respectively along the main-supply end of described sewage collecting pool longitudinal side wall; On each distributive pipe, all be furnished with the different shower nozzle of setting angle.
6. building ground as claimed in claim 5 slag-soil truck automatic cleaning system, it is characterized in that: described main-supply is communicated with the outlet pipeline of described high pressure pump house.
7. method of utilizing the described building ground of claim 1 slag-soil truck automatic cleaning system to clean slag-soil truck comprises the following steps:
(1), in the earth excavation stage, the precipitation hole is set in foundation ditch, in the precipitation hole, insert diameter less than the diameter in precipitation hole, the drain hose that sidewall is evenly equipped with water seepage hole, then will between each drain hose and precipitation hole, with stone, fill with reality;
(2), each drain hose is communicated to total collecting pipe, collecting pipe is communicated to the sewage water pump in pump well, by sewage water pump, natural precipitation and the earthing water in foundation ditch in each drain hose, collected is evacuated in pump well;
(3), utilize lift pump that the water in pump well is evacuated to the one-level sludge pan, then flow through successively second-level settling pond and three grades of sludge pans, after in three grades of sludge pans, forming middle water up to standard, by lift pump wherein, middle water is delivered to the high pressure pump house, the cleaning pipe network of then delivering to automatic car washing shed cleans each position of slag-soil truck;
(4), the sewage after cleaning pipeline cleaning slag-soil truck flows into sewage collecting pool automatically;
(5), the sewage in sewage collecting pool is flowed back to the one-level sludge pan by pipeline, after three grades of sludge pan precipitations, from three grades of sludge pans, discharge recycle, realization is converted into middle water circulation use cleaning slag-soil truck by natural precipitation and the earthing water of collecting, and reaches the purpose that uses manpower and material resources sparingly, raises the efficiency.
CN201310381182.7A 2013-08-29 2013-08-29 Automatic cleaning system of construction site muck vehicle and application method thereof Active CN103395407B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310381182.7A CN103395407B (en) 2013-08-29 2013-08-29 Automatic cleaning system of construction site muck vehicle and application method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310381182.7A CN103395407B (en) 2013-08-29 2013-08-29 Automatic cleaning system of construction site muck vehicle and application method thereof

Publications (2)

Publication Number Publication Date
CN103395407A true CN103395407A (en) 2013-11-20
CN103395407B CN103395407B (en) 2014-05-21

Family

ID=49559213

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310381182.7A Active CN103395407B (en) 2013-08-29 2013-08-29 Automatic cleaning system of construction site muck vehicle and application method thereof

Country Status (1)

Country Link
CN (1) CN103395407B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104875721A (en) * 2015-04-21 2015-09-02 常熟市圣峰建筑安装工程有限公司 Automatic cleaning system for engineering vehicle
CN106335475A (en) * 2016-08-30 2017-01-18 浙江坤德创新岩土工程有限公司 Car washing pool and assembling method thereof
CN109204240A (en) * 2018-07-24 2019-01-15 北京天恒建设集团有限公司 It is a kind of to wash wheel device systems for the water-saving of construction place
CN109469093A (en) * 2018-11-26 2019-03-15 芜湖取智电子科技有限公司 A kind of construction method on engineering truck cleaning equipment in-site installation basis
CN110775024A (en) * 2019-10-18 2020-02-11 中建一局集团建设发展有限公司 Car washing system for narrow deep foundation pit field and construction method of car washing system
CN114904329A (en) * 2022-05-20 2022-08-16 滕州建工建设集团有限公司 Large-scale foundation ditch precipitation recycling system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3795254A (en) * 1972-09-20 1974-03-05 N Blosser Salt removal spray device
US6358330B1 (en) * 2000-03-07 2002-03-19 Mcgraw John P. Truck tire washing apparatus and method
CN2678980Y (en) * 2004-01-02 2005-02-16 徐东亮 Car washing house using circulation water
CN2868786Y (en) * 2005-06-28 2007-02-14 杨泽红 Drges-soil vehicle washing platform
CN201357815Y (en) * 2009-02-25 2009-12-09 陶敏川 Car-washing equipment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3795254A (en) * 1972-09-20 1974-03-05 N Blosser Salt removal spray device
US6358330B1 (en) * 2000-03-07 2002-03-19 Mcgraw John P. Truck tire washing apparatus and method
CN2678980Y (en) * 2004-01-02 2005-02-16 徐东亮 Car washing house using circulation water
CN2868786Y (en) * 2005-06-28 2007-02-14 杨泽红 Drges-soil vehicle washing platform
CN201357815Y (en) * 2009-02-25 2009-12-09 陶敏川 Car-washing equipment

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104875721A (en) * 2015-04-21 2015-09-02 常熟市圣峰建筑安装工程有限公司 Automatic cleaning system for engineering vehicle
CN106335475A (en) * 2016-08-30 2017-01-18 浙江坤德创新岩土工程有限公司 Car washing pool and assembling method thereof
CN106335475B (en) * 2016-08-30 2019-02-22 浙江坤德创新岩土工程有限公司 Carwash pond and its assembly method
CN109204240A (en) * 2018-07-24 2019-01-15 北京天恒建设集团有限公司 It is a kind of to wash wheel device systems for the water-saving of construction place
CN109204240B (en) * 2018-07-24 2023-10-20 北京天恒建设集团有限公司 Water-saving wheel washing equipment system for construction site
CN109469093A (en) * 2018-11-26 2019-03-15 芜湖取智电子科技有限公司 A kind of construction method on engineering truck cleaning equipment in-site installation basis
CN110775024A (en) * 2019-10-18 2020-02-11 中建一局集团建设发展有限公司 Car washing system for narrow deep foundation pit field and construction method of car washing system
CN114904329A (en) * 2022-05-20 2022-08-16 滕州建工建设集团有限公司 Large-scale foundation ditch precipitation recycling system

Also Published As

Publication number Publication date
CN103395407B (en) 2014-05-21

Similar Documents

Publication Publication Date Title
CN103395407B (en) Automatic cleaning system of construction site muck vehicle and application method thereof
CN203450093U (en) Self-vibration type automatic car washing facility
CN208469761U (en) Fully-automatic vehicle cleaning system based on PLC control
CN107130663A (en) Construction site water recycling system and method
CN203427765U (en) Slag car automatic cleaning system at construction site
CN202516413U (en) Circulating water system for engineering vehicle cleaning tank
CN204689755U (en) The comprehensive treating pond of construction site Water Sproading cyclic utilization system and construction site Water Sproading cyclic utilization system
CN204139302U (en) One can self-cleaning rectangle storm detention tank
CN202882105U (en) Gantry self-flushing device for rainwater storage tank
CN205440296U (en) Simple and easy automatic vehicle washing system
CN104032696B (en) A kind of road purging method and rinse-system
CN104909482A (en) Construction site water recovery and recycling system comprehensive purification tank and manufacturing method thereof
CN204974629U (en) Metallurgical stove stove outer covering cooling water circulation water pipe washing unit
CN101332446A (en) Device and method for washing stones with circulating water on construction site
CN109263611A (en) A kind of scouring table and construction method
CN206815504U (en) A kind of self-cleaning storm detention tank based on water-jet
CN208152220U (en) A kind of carwash pond and its vehicle washing system
CN210971004U (en) Muck vehicle washing device suitable for large-scale earth and stone engineering
CN208931313U (en) A kind of scouring table
CN104309585A (en) Environment-friendly and energy-saving assembling type automatic car washing equipment in building site
CN213477127U (en) Rainwater regulation and storage system
CN203795512U (en) Rainwater recycling device
CN203358545U (en) Water circulation automatic car washing system
CN202762214U (en) Desilting and water-saving device of industrial cooling water
CN207608998U (en) A kind of PP modules rain water reservoir sewage backwash device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant