CN103243651A - 桥梁护栏金属立柱底座的安装固定及调平方法 - Google Patents
桥梁护栏金属立柱底座的安装固定及调平方法 Download PDFInfo
- Publication number
- CN103243651A CN103243651A CN201310145211XA CN201310145211A CN103243651A CN 103243651 A CN103243651 A CN 103243651A CN 201310145211X A CN201310145211X A CN 201310145211XA CN 201310145211 A CN201310145211 A CN 201310145211A CN 103243651 A CN103243651 A CN 103243651A
- Authority
- CN
- China
- Prior art keywords
- leveling
- frame
- levelling device
- steel plate
- reinforcement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
本发明公开了一种桥梁护栏金属立柱底座的安装固定及调平方法,它是利用一种调平装置将底座调平,并通过短钢筋焊接固定于钢筋骨架上;撤出底座施工调平装置并将相应底座固定装置安装于底板上;待混凝土浇注成型后安装金属梁柱式护栏。本发明施工过程简单易学,调平的精度高,锚固强度满足要求,底座调平装置可以重复使用,提高施工速度、质量,降低施工成本。
Description
技术领域
本发明涉及桥梁护栏,尤其涉及桥梁护栏金属立柱底座的施工方法。
背景技术
随着近些年大中型桥梁的出现,金属梁柱式护栏在桥梁上应用不断增加。金属梁柱式护栏结构能有效防护失控车辆,有效降低上述事故发生的概率,减少事故造成的损失,提高高速公路的交通安全水平。另外,护栏结构具有自防眩功能,可有效节省防眩板费用,同时护栏结构方便安装LED灯照明设备,可有效节省灯杆费用。
桥梁护栏金属立柱在桥体上安装后应保证竖直,一方面可使其外观美观大方且可诱导视线,另一方面使其处于良好受力状态。竖向偏心可导致因其自身重力、竖向荷载及偶然因素作用而产生偏心压力,进而产生截面产生相对较大弯矩,不能保证立柱具有足够的能力抵抗风荷载、汽车撞击等水平外力,使其在使用过程中可能发生倾斜或失稳,形成安全隐患。桥梁护栏金属立柱抵抗水平荷载设计值较大,要求底座必须有足够的强度、刚度来维持金属立柱的侧向及竖向稳定。因此,桥梁护栏金属立柱底座的施工安装对其正常使用有很大影响。
目前,桥梁护栏金属立柱底座的施工安装方法是,在桥梁护栏上预埋螺栓,将桥梁护栏金属立柱底座安装在预埋螺栓上;为了保证金属立柱垂直,一般普遍采用水平尺、吊锤前后矫正的方法来保证竖直度。该方法安装固定不牢,没有足够的承受力来抵抗风荷载、汽车撞击等外力,极易被风力刮倒和外力拔出;而且施工调平操作过程繁琐麻烦,耗费了大量人力、物力和时间,施工速度低下,也很难保证垂直度。
发明内容
为了解决现有技术的上述不足,本发明提供一种桥梁护栏金属立柱底座的安装固定及调平方法。
为达到上述目的,本发明采取的方法是:
一种桥梁护栏金属立柱底座的安装固定及调平方法,其特征在于,采取以下步骤:
第一步:首先制作一个调平装置;调平装置构造是,它是由一个竖向的侧框和一个水平的顶框固定连接而成的直角架;所述的侧框是一个封闭框,在侧框的两个腿底部分别设有调平螺栓;所述的顶框是一个开口框,也就是说顶框的末端是敞口的,在顶框的两根横杆上设有一根加强纵杆,在顶框末端与加强纵杆之间的顶框横杆两侧下底面上分别设有两个向内侧伸出的支撑爪,四个支撑爪形成一个水平支撑面;在顶框末端搭接有一个向外探出的U形架;在直角架两侧设有斜撑杆。
准备好一块调平钢板、两块锚固钢板和四根固定螺栓;其中调平钢板和锚固钢板上均加工有与金属立柱底座安装孔对应的光孔;四根固定螺栓的长度要大于护栏顶面高度,以备金属立柱底座的后期安装;
第二步:在桥梁护栏混凝土结构浇筑前,将调平装置放置在桥梁护栏混凝土结构的钢筋骨架上面,调平装置的U形架搭接在桥体外侧混凝土护栏的外侧模板上;
第三步:将锚固钢板置于调平装置之下桥梁护栏混凝土结构的钢筋骨架顶层纵向钢筋下面,通过光孔从锚固钢板下面穿上四根固定螺栓;四根固定螺栓的底端支撑在桥梁面上,四根固定螺栓的顶端从调平装置顶框的水平面上垂直露出,调整固定螺栓上的螺母把锚固钢板托住并与钢筋骨架靠紧;
第四步,将调平钢板的光孔对准四根固定螺栓,对准后下放至调平装置顶框的支撑爪上,由支撑爪临时托住,在调平钢板上面放置一个水准气泡,然后调节调平装置两个腿上的调平螺栓,使调平钢板上表面与外侧模板顶部处于同一高度直至调平;
第五步:调平后,根据调平钢板与钢筋骨架之间的间隙大小现场配制短段钢筋,通过短段钢筋用焊接方式将调平钢板焊接在钢筋骨架上;随后取下调平装置;
第六步:然后浇筑桥梁护栏混凝土结构,将四根固定螺栓和锚固钢板与混凝土结构浇筑成一体,浇筑后使调平钢板的顶面与桥梁护栏表面抹平一致,四个露出的固定螺栓头用于安装金属立柱底座。
本发明的积极效果是,安装金属立柱底座时,不用繁琐地前后矫正来保证垂直度,只要将底座孔对准四个露出的固定螺栓头,拧上螺母即可,所以安装起来简单快捷;由于该装置与钢筋骨架焊接在一起,所以金属立柱固定牢固,不易被拔出。本方法操作过程简便,调平装置可重复利用,施工精度较高,施工速度与质量高,可有效降低施工成本。
附图说明
图1是本发明所用部件及位置关系图。
图2是图1中调平装置的侧视图;
图3是图1中调平装置的俯视图。
图中:1-调平螺栓;2-侧框;3-顶框;4-U形架;5-斜撑杆;6-锚固钢板;7-调平钢板;8-固定螺栓;9-调整螺母;10-钢筋骨架顶层纵向钢筋;11-短段钢筋;12-金属立柱底座;13-锁紧螺母;14-水准气泡;15-外侧模板;16-桥梁护栏混凝土结构,17-支撑爪,18-钢筋骨架,19-加强纵杆。
具体实施方式
参照附图,对本发明进一步详细说明。
一种桥梁护栏金属立柱底座的安装固定及调平方法,采取以下步骤:
第一步:首先制作一个调平装置;调平装置构造见图1-3,它是由一个竖向的侧框2和一个水平的顶框3固定连接而成的直角架;所述的侧框2是一个封闭框,在侧框2的两个腿底部分别设有调平螺栓1;所述的顶框3是一个开口框,也就是说顶框3的末端是敞口的,在顶框3的两根横杆上设有一根加强纵杆19(见图3),在顶框3末端与加强纵杆19之间的顶框横杆两侧下底面上分别设有两段向内侧伸出的支撑钢筋作为支撑爪17,四个支撑爪17形成一个水平支撑面;在顶框3末端搭接有一个向外探出的U形架4;在直角架两侧设有斜撑杆5。
准备好一块调平钢板7、两块锚固钢板6和四根固定螺栓8;其中调平钢板7和锚固钢板6上加工有与金属立柱底座12安装孔对应的光孔;四根固定螺栓8的长度要大于护栏顶面高度,以备金属立柱底座12的后期安装;
第二步:在桥梁护栏混凝土结构16浇筑前,将调平装置放置在桥梁护栏混凝土结构的钢筋骨架18的顶层纵向钢筋10上,调平装置的U形架4搭接在桥体外侧混凝土护栏的外侧模板15上;
第三步:将锚固钢板6置于钢筋骨架18的顶层纵向钢筋10下面,通过光孔从锚固钢板6下面穿上四根固定螺栓8;四根固定螺栓8的底端支撑在桥梁面上,四根固定螺栓8的顶端从调平装置顶框3水平面上垂直露出,调整固定螺栓8上的调整螺母9把锚固钢板6托住并与钢筋骨架18的顶层纵向钢筋10靠紧;
第四步,将调平钢板7的光孔对准四根固定螺栓8,对准后下放至调平装置顶框3的支撑爪17上,由支撑爪17临时托住,在调平钢板7上面放置一个水准气泡14,然后调节调平装置两个腿上的调平螺栓1,使调平钢板7上表面与外侧模板15顶部处于同一高度直至调平;
第五步:调平后,根据调平钢板7与钢筋骨架18的顶层纵向钢筋10之间的间隙大小配制短段钢筋11,通过短段钢筋11用焊接方式将调平钢板7焊接在钢筋骨架18上;随后平行横桥向外抽并取下调平装置;
第六步:然后浇筑桥梁护栏混凝土结构16,将四根固定螺栓2和锚固钢板6与混凝土结构16浇筑成一体,浇筑后使调平钢板7的顶面与桥梁护栏表面抹平一致,四个露出的固定螺栓头用于安装金属立柱底座12。
安装金属立柱底座12时,只要将底座孔对准四个露出的固定螺栓头,拧上锁紧螺母13即可。
本发明中涉及装置的参数最佳要求:
1、所述调平装置中,调平螺栓1直径应大于8mm,长度不小于300mm,以保证有足够的强度保持整体结构稳定,以及足够的调节空间;顶框3和侧框2的杆件直径不宜小于16mm,斜撑杆5直径不应小于12mm;顶框3长度不宜小于550mm,侧框2高度宜为600~1000mm(视施工高度而定),直角架宽度不宜小于300mm;U形架4与顶框3的搭接长度不宜小于150mm,U形架4伸出长度应为100~200mm。
2、所述固定螺栓8直径18~40mm,锚固钢板6厚度为12~20mm;固定螺栓8露出金属立柱底座12的高度满足安装锁紧螺母13。
Claims (1)
1.一种桥梁护栏金属立柱底座的安装固定及调平方法,其特征在于,采取以下步骤:
第一步:首先制作一个调平装置;调平装置构造是,它是由一个竖向的侧框和一个水平的顶框固定连接而成的直角架;所述的侧框是一个封闭框,在侧框的两个腿底部分别设有调平螺栓;所述的顶框是一个开口框,也就是说顶框的末端是敞口的,在顶框的两根横杆上设有一根加强纵杆,在顶框末端与加强纵杆之间的顶框横杆两侧下底面上分别设有两个向内侧伸出的支撑爪,四个支撑爪形成一个水平支撑面;在顶框末端搭接有一个向外探出的U形架;在直角架两侧设有斜撑杆;
准备好一块调平钢板、两块锚固钢板和四根固定螺栓;其中调平钢板和锚固钢板上均加工有与金属立柱底座安装孔对应的光孔;四根固定螺栓的长度要大于护栏顶面高度,以备金属立柱底座的后期安装;
第二步:在桥梁护栏混凝土结构浇筑前,将调平装置放置在桥梁护栏混凝土结构的钢筋骨架上面,调平装置的U形架搭接在桥体外侧混凝土护栏的外侧模板上;
第三步:将锚固钢板置于调平装置之下桥梁护栏混凝土结构的钢筋骨架顶层纵向钢筋下面,通过光孔从锚固钢板下面穿上四根固定螺栓;四根固定螺栓的底端支撑在桥梁面上,四根固定螺栓的顶端从调平装置顶框的水平面上垂直露出,调整固定螺栓上的螺母把锚固钢板托住并与钢筋骨架靠紧;
第四步,将调平钢板的光孔对准四根固定螺栓,对准后下放至调平装置顶框的支撑爪上,由支撑爪临时托住,在调平钢板上面放置一个水准气泡,然后调节调平装置两个腿上的调平螺栓,使调平钢板上表面与外侧模板顶部处于同一高度直至调平;
第五步:调平后,根据调平钢板与钢筋骨架之间的间隙大小现场配制短段钢筋,通过短段钢筋用焊接方式将调平钢板焊接在钢筋骨架上;随后取下调平装置;
第六步:然后浇筑桥梁护栏混凝土结构,将四根固定螺栓和锚固钢板与混凝土结构浇筑成一体,浇筑后使调平钢板的顶面与桥梁护栏表面抹平一致,四个露出的固定螺栓头用于安装金属立柱底座。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310145211.XA CN103243651B (zh) | 2013-04-24 | 2013-04-24 | 桥梁护栏金属立柱底座的安装固定及调平方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310145211.XA CN103243651B (zh) | 2013-04-24 | 2013-04-24 | 桥梁护栏金属立柱底座的安装固定及调平方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103243651A true CN103243651A (zh) | 2013-08-14 |
CN103243651B CN103243651B (zh) | 2015-02-25 |
Family
ID=48923503
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310145211.XA Active CN103243651B (zh) | 2013-04-24 | 2013-04-24 | 桥梁护栏金属立柱底座的安装固定及调平方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103243651B (zh) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105716015A (zh) * | 2016-03-30 | 2016-06-29 | 龚婉婷 | 一种led路灯用固定装置 |
CN105716016A (zh) * | 2016-03-30 | 2016-06-29 | 龚婉婷 | 一种用于led路灯的固定装置 |
CN105737049A (zh) * | 2016-03-30 | 2016-07-06 | 龚婉婷 | 一种可密封防尘的led路灯用固定装置 |
CN105841048A (zh) * | 2016-03-30 | 2016-08-10 | 龚婉婷 | 一种防尘led路灯用固定装置 |
CN105841050A (zh) * | 2016-03-30 | 2016-08-10 | 龚婉婷 | 一种稳固led路灯用固定装置 |
CN105841049A (zh) * | 2016-03-30 | 2016-08-10 | 龚婉婷 | 一种园林路灯用底座装置 |
CN106702907A (zh) * | 2016-12-19 | 2017-05-24 | 中交路桥建设有限公司 | 一种桥梁护栏底座可调节法兰盘施工方法 |
CN111981998A (zh) * | 2020-07-22 | 2020-11-24 | 山东电力设备有限公司 | 一种变压器油箱变形量测量组件、测量系统及测量方法 |
CN112647412A (zh) * | 2021-01-05 | 2021-04-13 | 南京同力建设集团股份有限公司 | 一种老桥出新栏杆结构及其施工方法 |
CN112726403A (zh) * | 2020-12-24 | 2021-04-30 | 中国建筑第八工程局有限公司 | 防撞墙钢板和螺杆的定位结构及其定位方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2273310A (en) * | 1992-12-10 | 1994-06-15 | Thomas Steel Craik | Improvements relating to buildings |
JP3445129B2 (ja) * | 1997-12-01 | 2003-09-08 | 阪神高速道路公団 | 地中柱の耐震補強方法 |
CN1934320A (zh) * | 2004-04-02 | 2007-03-21 | 艾劳埃斯·乌本 | 建塔方法 |
CN101514541A (zh) * | 2009-03-25 | 2009-08-26 | 中铁二十一局集团第三工程有限公司 | 大型桥梁支座安装可一次性调平的方法 |
CN202073113U (zh) * | 2011-04-07 | 2011-12-14 | 华锐风电科技(集团)股份有限公司 | 地脚螺栓基础后灌浆支撑装置 |
CN102758445A (zh) * | 2011-04-27 | 2012-10-31 | 华锐风电科技(集团)股份有限公司 | 风力发电机塔架基础调平装置、基础总成及基础成型方法 |
CN103015325A (zh) * | 2012-12-24 | 2013-04-03 | 中铁十七局集团第二工程有限公司 | 带挂檐现浇混凝土防撞护栏的施工方法 |
-
2013
- 2013-04-24 CN CN201310145211.XA patent/CN103243651B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2273310A (en) * | 1992-12-10 | 1994-06-15 | Thomas Steel Craik | Improvements relating to buildings |
JP3445129B2 (ja) * | 1997-12-01 | 2003-09-08 | 阪神高速道路公団 | 地中柱の耐震補強方法 |
CN1934320A (zh) * | 2004-04-02 | 2007-03-21 | 艾劳埃斯·乌本 | 建塔方法 |
CN101514541A (zh) * | 2009-03-25 | 2009-08-26 | 中铁二十一局集团第三工程有限公司 | 大型桥梁支座安装可一次性调平的方法 |
CN202073113U (zh) * | 2011-04-07 | 2011-12-14 | 华锐风电科技(集团)股份有限公司 | 地脚螺栓基础后灌浆支撑装置 |
CN102758445A (zh) * | 2011-04-27 | 2012-10-31 | 华锐风电科技(集团)股份有限公司 | 风力发电机塔架基础调平装置、基础总成及基础成型方法 |
CN103015325A (zh) * | 2012-12-24 | 2013-04-03 | 中铁十七局集团第二工程有限公司 | 带挂檐现浇混凝土防撞护栏的施工方法 |
Non-Patent Citations (1)
Title |
---|
潘梅胤: "钢结构柱安装基座一次性调平施工技术", 《中华民居》 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105716015A (zh) * | 2016-03-30 | 2016-06-29 | 龚婉婷 | 一种led路灯用固定装置 |
CN105716016A (zh) * | 2016-03-30 | 2016-06-29 | 龚婉婷 | 一种用于led路灯的固定装置 |
CN105737049A (zh) * | 2016-03-30 | 2016-07-06 | 龚婉婷 | 一种可密封防尘的led路灯用固定装置 |
CN105841048A (zh) * | 2016-03-30 | 2016-08-10 | 龚婉婷 | 一种防尘led路灯用固定装置 |
CN105841050A (zh) * | 2016-03-30 | 2016-08-10 | 龚婉婷 | 一种稳固led路灯用固定装置 |
CN105841049A (zh) * | 2016-03-30 | 2016-08-10 | 龚婉婷 | 一种园林路灯用底座装置 |
CN106702907A (zh) * | 2016-12-19 | 2017-05-24 | 中交路桥建设有限公司 | 一种桥梁护栏底座可调节法兰盘施工方法 |
CN106702907B (zh) * | 2016-12-19 | 2018-05-01 | 中交路桥建设有限公司 | 一种桥梁护栏底座可调节法兰盘施工方法 |
CN111981998A (zh) * | 2020-07-22 | 2020-11-24 | 山东电力设备有限公司 | 一种变压器油箱变形量测量组件、测量系统及测量方法 |
CN112726403A (zh) * | 2020-12-24 | 2021-04-30 | 中国建筑第八工程局有限公司 | 防撞墙钢板和螺杆的定位结构及其定位方法 |
CN112647412A (zh) * | 2021-01-05 | 2021-04-13 | 南京同力建设集团股份有限公司 | 一种老桥出新栏杆结构及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103243651B (zh) | 2015-02-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103243651B (zh) | 桥梁护栏金属立柱底座的安装固定及调平方法 | |
CN103243654B (zh) | 斜拉桥钢锚梁的安装方法及所使用的拼装胎架和索塔安装平台 | |
CN104532735B (zh) | 一种装配式钢桥梁及其搭建方法 | |
CN109403456B (zh) | 一种钢牛腿预埋结构及其施工方法 | |
CN104033166B (zh) | 一种隧道衬砌台车的门架系统 | |
CN210134353U (zh) | 一种用于盖梁施工的牛腿式抱箍托架 | |
CN105040591A (zh) | 一种波形钢腹板的定位装置及其定位方法 | |
CN111691300A (zh) | 一种用于钢混结合梁的混凝土浇筑支架装置 | |
JP3156486U (ja) | 防護柵の支柱構造 | |
CN212376021U (zh) | 一种钢牛腿及包含该钢牛腿的免支撑安装连接节点 | |
CN203188117U (zh) | 桥梁护栏金属立柱底座的固定装置 | |
CN113216014A (zh) | 高架桥调坡高接高顶升结构的施工方法 | |
CN111608091A (zh) | 一种现浇箱梁悬臂支架及其安装方法 | |
CN209816665U (zh) | 一种适用于圆端形墩柱的盖梁托架 | |
CN104310234B (zh) | 外悬爬塔式起重机支护系统 | |
JP3189564U (ja) | コンクリート構造物用転落防止柵 | |
CN212714580U (zh) | 一种现浇箱梁悬臂支架 | |
CN203222734U (zh) | 桥梁护栏金属立柱底座施工调平装置 | |
CN209816676U (zh) | 一种牛腿式抱箍 | |
CN209226364U (zh) | 一种电梯井道调节装置 | |
JP2012097431A (ja) | 太陽光発電パネルを備えた傾斜型防音壁 | |
JP6108512B1 (ja) | 吊り足場及びその設置方法 | |
CN213772981U (zh) | 一种桥塔装配式水平临时横撑 | |
JP2001311247A (ja) | コンクリート構造体の建築工法 | |
CN205742210U (zh) | Z型钢牛腿 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |