[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN103234080A - Construction method for shared supporting and hanging frame for comprehensive arrangement of pipes - Google Patents

Construction method for shared supporting and hanging frame for comprehensive arrangement of pipes Download PDF

Info

Publication number
CN103234080A
CN103234080A CN2013101653119A CN201310165311A CN103234080A CN 103234080 A CN103234080 A CN 103234080A CN 2013101653119 A CN2013101653119 A CN 2013101653119A CN 201310165311 A CN201310165311 A CN 201310165311A CN 103234080 A CN103234080 A CN 103234080A
Authority
CN
China
Prior art keywords
suspension
support
supporting
hanging frame
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101653119A
Other languages
Chinese (zh)
Inventor
李雪飞
于明
丼谢谢
张永军
袁雄飞
马政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
INNER MONGOLIA XINGTAI CONSTRUCTION CO Ltd
Original Assignee
INNER MONGOLIA XINGTAI CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by INNER MONGOLIA XINGTAI CONSTRUCTION CO Ltd filed Critical INNER MONGOLIA XINGTAI CONSTRUCTION CO Ltd
Priority to CN2013101653119A priority Critical patent/CN103234080A/en
Publication of CN103234080A publication Critical patent/CN103234080A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a construction method for a shared supporting and hanging frame for comprehensive arrangement of pipes. The method comprises the steps of construction preparation, comprehensive arrangement of pipes to draw a profile map, selection of the model of the supporting and hanging frame through calculation, manufacturing and mounting of a sample supporting and hanging frame, overload test of the sample supporting and hanging frame, large-area mounting of the supporting and hanging frame, correction of the supporting and hanging frame and ending. According to the method, a plurality of supporting and hanging frames are changed into a comprehensive supporting and hanging frame, and compared with the traditional construction method, the method has the advantages of being simple and convenient to construct, capable of improving the working efficiency and the like.

Description

A kind of pipeline is comprehensively arranged and is shared the suspension and support method of construction
Technical field
The present invention relates to the construction and decoration field.
Background technique
Along with economic rapid development, the fast development of building industry, the function of building is constantly increasing.Because sticking to one's old way of doing things to lack, the Designer between each specialty links up, so cause the pipeline between each specialty intricate.If, by former figure construction, will cause pipeline to arrange in a jumble, so not only due to many consumption suspension and supports, having increased pipeline, to turn over the curved cost consumption that causes huge; And can cause the whole reduction of absolute altitude; More affected the aesthetic measure of engineering.
Summary of the invention
For the problems referred to above, the inventor has invented pipeline and has comprehensively arranged and share the suspension and support method of construction, comprise step: preparation of construction, the pipeline cross hatching of comprehensively arranging, carry out the suspension and support type selecting by calculating, and the model suspension and support is made and installed, model suspension and support overload test, the suspension and support large size is installed, and suspension and support is proofreaied and correct, ending.
The advantage that described method has is:
1, a plurality of suspension and supports change a comprehensive suspension and support into, with conventional construction method, compare easy construction, have improved working efficiency.
2, reduce suspension and support, avoided turning over curved, reduced the consumption of steel, with conventional construction method, relatively saved cost.
3, the pipeline of reasonably having arranged, effectively utilize space, with conventional construction method, relatively increased the furred ceiling absolute altitude.
4, each special pipeline, through comprehensively arranging, owing to share suspension and support, becomes clear bright and clear with conventional construction method comparison pipeline trend.
5, suspension and support when design, consider all stacks while being hung the thing maximum stress, with the reliable coefficient of conventional construction method, increase.
Pipeline is comprehensively arranged and is shared the suspension and support method of construction to be applicable to building functions many, and intricate and concentrated place ,Xiang hospital, complex building, the office building of arranging of each special pipelines, in market, corridor, hotel furred ceiling.
Pipeline is comprehensively arranged and shared the suspension and support method of construction is the pipeline for each professional crisscross recurrence, at first according to designing requirement, standard and on-the-spot actual conditions, comprehensively arranges, and draws pipeline and comprehensively arranges and share the suspension and support sectional drawing.Calculate again to be propped up and hang the thing maximum stress, by looking into the Steel Type of handbook choose reasonable suspension and support.Last blanking, making, installation share suspension and support.
The accompanying drawing explanation
Fig. 1 has shown a kind of construction technology process of the present invention.
Fig. 2 has shown a kind of pipeline comprehensive layout viewing of suspension and support that lingers.
Fig. 3 has shown a kind of corridor pipeline suspension and support figure that comprehensively arranges.
Light current crane span structure 1, fan coil unit water pipe 2, fan coil unit return pipe 3, fan coil unit condensate pipe 4, spray is registered one's residence and is managed 5, and new wind is registered one's residence and is managed 6, fresh air pipeline 7, spray supervisor 8.
Embodiment
Embodiment 1:
1, the pipeline cross hatching of comprehensively arranging
1), the key of comprehensive suspension and support construction technology is to be familiar with the characteristic of each special pipelines, pressure conduit, crane span structure move towards relatively unrestricted, as long as with due regard to save, and for high-line conduits such as draining, air conditioner condensate waters, the gradient is the factor that must consider, and should not be subject to other pipeline to affect its route, reasonable to guarantee the gradient, draining is unobstructed.
2), consider the height that arranges of insulation, thermal insulating pad.
3), air channel is the space hold maximum, can consider to establish the way that two layers of support are high the air channel frame on support, can also have like this space of pipeline below air channel.
4), the support of understanding each special pipelines arranges requirement, determines rational rack arrangement spacing, form, material and specifications and models.
5), consider the setting of the ceiling joist condition of construction, particularly main joist of decoration construction, clear and definite its position, height dimension.
6), the comp comprehensive layout of clear and definite support, determine the rack arrangement spacing, utilize computer to draw the pipeline layout planimetric map of arranging.
2, carry out the suspension and support type selecting by calculating
1), basis
" building plumbing system and heating engineering construction and acceptance specification " GB50242-2002
" the building engineering construction quality is unified the Acceptance criteria standard " GB50300-2001
" construction of building HV&AC engineering and acceptance specification " GB50243-2002
" building electric installation engineering construction and acceptance specification " GB50303-2002
" Construction of Steel Structure and acceptance specification " GB50205-2001
National building standard design atlas " interior conduit support and suspension bracket " 03S402
National building standard design atlas " suppot hanger of duct " 03K132
National building standard design atlas " cable testing bridge installation " 04D701-3
05 series engineering is built the accurate design in other shore atlas
" support of pipelines, suspension bracket " 05YS9
" interior lines engineering " 05YD5
" heating ventilation and air-conditioning engineering " 05N4
" industrial pipeline and equipment are installed and acceptance specification " GB50235-1998.
Former design drawing building body suspension and support preburied iron part mounting plane figure.
Existing locality laws and regulations
2) technical specifications of, calculating
(1) the suspension and support spacing of pipeline
Table 1 piping support and hanger spacing table
Figure BSA00000889955400041
Figure BSA00000889955400051
(2) weight determines
A equipment, air channel, cable testing bridge, various pipes deadweight
Conduct oneself with dignity with reference to equipment product certificate and the concrete data of examining report in equipment, air channel; The cable testing bridge deadweight is with reference to " the five metals handbook is calculated; All kinds of steel pipe deadweights, caliber DN15~DN150 is according to the common steel tube of standard GB/T/T3092-93 " low-pressure fluid carry use welded steel pipe ", and caliber DN200~DN500 is according to the minimum wall thickness (MINI W.) pipe re-computation of standard GB/T 8163-87 " conveying fluid seamless steel pipe) ".Plastic pipe deadweight, caliber 20mm-caliber 315mm is according to the pipe re-computation of standard GB/T/T10002.1-1996 " feedwater hard polyvinyl chloride pipe) ".
The B erection weight is calculated
Equipment calculates by the dynamic load load-bearing; Air channel is pressed from re-computation in air channel; Cable testing bridge is pressed adding up to of load-bearing cable weight and crane span structure deadweight and is calculated, and various pipes weight is pressed thermal insulation pipe and not two kinds of situations calculating of thermal insulation pipe.
The a insulation pipe: self weight of pipeline, the full packages water by the design pipe rack space is heavy, 60mm thickness thermal insulation layer is heavy and 12% the impost of closing of above three calculates.The thermal insulating material capacity calculates by rock wool 100kg/m3.
B is insulation pipe not: self weight of pipeline, the full packages water by design in pipe rack space heavily reaches 14% the impost of closing of above two and calculates.
The various spacing between pipes pipe of c weight average, for counting valve weight (bend pipe bracket Guan Chong comprises valve weight), while in pipe support, valve being arranged, should be taked strengthening measure at valve section.
3) method of, calculating
(1) 10kg that press of the heavy not enough 10kg of pipe support computer tube calculates, over 10kg to press the 10kg carryization whole) as whole as 23.7 changes be 30kg.
(2) design load
The A vertical load
Consider the factors such as manufacture, installation, adopt the proof load of pipe rack space to take advantage of 1.4 partial safety factor for load.
The B horizontal loading
Press 0.41 times of calculating of vertical load.
The C seismic load
Press seismic fortification intensity≤8 degree and calculate geological process.Do not consider wind load.
(3) suspension rod
Suspension rod is calculated by a member by axle center, and has considered certain corrosion allowance.Suspension rod net area An is calculated as follows, and meets GB GB/T17116.3.The maximum service load of suspension rod sees the following form.
An ≥ 1 . 5 N 0.85 f
In formula: (mm2) amassed in An-suspension rod net section
N-steeve tension design load (N)
F-steel strength design load (N/mm2)
The maximum service load table of table 2 suspension rod
(4) crossbeam
A crossbeam resistance to flexure is calculated
1.5 Mx rxWnx + 1.5 My ryWny ≤ 0.85 f
In formula: rx, ry-plastic ratio of member section
Mx, cross section that My-checks are around the x axle with around the moment of flexure (N-mm) of y axle
Wnx, cross section that Wny-checks are to the x axle with to the net section resistance moment (mm3) of y axle
F-steel strength design load (N/mm2)
The B-crossrail shear Strength Calculation
r = 1.5 VS Ixtw ≤ 0.85 fv
In formula: r-shearing strength (N/mm2)
V-calculates the shearing (N) of cross section along the web plane effect
S-calculates the area moment (mm3) of the above gross cross-sectional in shearing place to natural axis
Ix-gross cross-sectional moment of inertia (mm4)
Tw-web thickness (mm)
The shearing strength design load (N/mm2) of fv-steel
(5) connect and calculate
Be welded to connect and bolt connects the Related Formula by Code for design of steel structures, calculate required fusion length and connecting bolt size.
(6) be subject to the regulation of camber beam winding degree and compression member slenderness ratio
Be subject to the camber beam winding degree should not be greater than L/200 (span that L is flexural member is two times of length of overhanging to overhang and cantilever beam).
The permission slenderness ratio of compression member should not surpass 120.
4), selection requirements
(1) the design, as indicated without special, all calculates by weight design.Meeting under the condition of 2.1.3, can directly use the design.When shockproof the requirement arranged, should be at the rubber layer of liner 3mm on every side at pipe clamp position.
(2) pipeline elevator is comprised of suspension bracket root, suspension rod, cross-arm and pipe clamp four parts, can combine and select as required, it shall yet further be noted that the suspension rod diameter of suspension bracket root must be identical with the suspension rod diameter of each suspension bracket cross-arm simultaneously.
(3) the design only considers the strength and deformation of suspension and support itself.When caliber is larger, relevant suspension and support, for the impact of the structural strengths such as beam, plate, post, steelframe, must check through the structure discipline designer.
(4) standard piece that suspension and support is used should be specialized factory and produces, and the pipe support of self manufacture loses steel used should all adopt Q235~B steel, and during making, boring must not be used gas cutting, and welding rod all adopts E4300~No. E4313.
3, the model suspension and support is made, is installed
1) rust cleaning of steel and anticorrosion: steel are marched into the arena after managing examination, adopt electric angle grinder to be eliminated rust to steel; After having eliminated rust, adopt air compressor to steel spray paint carry out anticorrosion.
2) processing and fabricating of the root of comprehensive suspension and support: the root of comprehensive suspension and support adopts [10 channel-section steel processing and fabricatings, making method is as follows: adopt oxygen, acetylene to be blocked channel-section steel, adopt oxygen, the acetylene side opening in the channel-section steel section, openings of sizes is 50mm * 13mm again; Finally, adopt electric angle grinder to carry out polishing treatment to manufactured root.
3) welding of comprehensive suspension and support root: after the root completion of processing, itself and original reserved suspension and support preburied iron part are welded, they are connected firmly.Suspension and support top should be concordant with embedded part, must not exceed or lower than embedded part, throat depth must not be less than 4mm, the overall length full weld.
4) comprehensive suspension and support root is anticorrosion: after root weld completes, after welding slag is cleaned out, adopt red lead anti-corrosive paint to carry out preservative treatment to it.
5) processing and fabricating of hanging beam: after the root weld of comprehensive suspension and support completes, according to the design and construction drawing of cable testing bridge, airduct, water pipe, in conjunction with the job site actual conditions; Adopt abrasive wheel cutting machine and bench drill, the angle steel of ∠ 40 * 4, ∠ 50 * 5, ∠ 63 * 6 is carried out to processing and fabricating.Prop up, hang, carriage will unify processing, form is consistent.Hang, the angle steel of carriage, the pipe clamp eye of channel-section steel, adopt without exception machine drilling, strictly forbid the electrogas welding punching.
6) installation of suspension rod: by hanger erection in the bar hole of root.
7) installation of hanging beam: by the hanging beam of various different purposes, according to the requirement of design proposal, be arranged on different absolute altitudes.The angle steel of prop up, hang, carriage is used, channel-section steel opening are towards should be consistent.
4, model suspension and support overload test
Use load-bearing material to hang on suspension and support, 2.2 times of the sum total that load is equipment, air channel, cable testing bridge, various pipes and suspension and support deadweight and working load, the suspension time is 24 hours.Test result answer embedded part firmly, that the suspension bracket root weld is tight, suspension and support is not deformed into is qualified.
5, suspension and support is proofreaied and correct
After the comprehensive suspension and support installation in each zone, adopt level instrument and theodolite to suspension rod and the hanging beam of comprehensive suspension and support aligned, leveling.
Material and equipment requirement:
1, material requirements
The material that this comprehensive suspension and support adopts has channel-section steel, angle bar, suspension rod, nut, circular washer, spring washer, setscrew etc., must pass through strict check during materials arrival, and leave detection record.Also must guarantee that material has complete certificate of quality file.The keeping of material will be established special storehouse, special messenger's keeping.
2, equipment requirement
Institute adopts to such an extent that equipment pass through and be up to the standards and can use in engineering, and the non-conforming equipment material is forbidden using in making comprehensive suspension and support.
Table 3 machinery table
Sequence number Title Unit Quantity Remarks
1 Electric welding machine Platform 2 ?
2 Cutting machine Platform 2 ?
3 Electric hammer ? 5 ?
4 Bench drill Platform 2 ?
5 Tape measure Individual 1 ?
6 Spanner Individual 1 ?
7 Spirit level Individual 1 ?
8 Angle square Individual 1 ?
Quality control
1, must weld and carry out detailed inspection and guarantee even weld suspension and support, without phenomenons such as rosin joint sand holes;
2, suspension and support is obtained to size and carefully measure, guarantee that size is accurate;
3, suspension and support is obtained to the handy angle square in turning and measure, to guarantee suspension and support, accuracy is installed to obtain;
4, mounted suspension and support is measured to test, guarantee that suspension and support obtains bearing power and soundness.
Safety measure
To correctly implement the policy of " safety is in order to produce; produce must safety " to reach " and put prevention first " in construction, in construction, except the rules and my corporate security managerial system that must observe the relevant safety in production of country, the characteristics that also should install for suspension and support are formulated corresponding safety management system:
1 electrician, welder must take appointment with certificate, and should carry out examination on the spot before entering scene, and qualified rear just giving enters on-the-spot practical operation.
2 expert engineers tackle the workman and carry out that safety technique is written tells somebody what one's real intentions are, and every day, pre-shift meeting emphasized to sum up security situation the previous day, pointed out the contingent safety problem of working the same day, and full-time safety supervisor is responsible for on-the-spot follow-up investigations, eliminates safe hidden trouble in time.
It is all ascend operation basically that 3 suspension and supports are installed, and while on distance ground, surpassing 4 meters, must set up operating platform with portal frame, and platform must be sturdy and durable, after safety supervisor's acceptance(check), can use.The platform operating personnel must wear the protection articles for use such as safety strip, safety helmet in addition.
Environmental practice
1 suspension and support is unified to be made, unified carry out antirust, rinse paint and process, avoid metope, ground to Civil Specialities to cause secondary pollution.
2 in suspension and support fabrication and installation process, is simple assembling process, does not have waste material to produce.
The used material of 3 finished product protection, after the Civil Specialities wall construction, effectively reclaim in time, and it is appropriate that construction rubbish is cleared up processing in time, guarantees environmental hygiene.
4 strengthen construction and installation workman's environmental protection education, improve workman's environmental consciousness.
Performance analysis
1 comprehensive suspension and support is compared with conventional construction method, construction install convenience, shortens project progress, can improve the utilization ratio in space, and attractive in appearance clear and definite after installing, orderliness is clear.
2 by the comparative analysis of relevant technologies economic indicator, and comprehensive suspension and support can be cost-saving, improves engineering efficiency, reaches the energy-conservation purpose of engineering.Through incomplete pairwise comparison, comprehensive suspension and support is compared common suspension and support saving steel and is not less than 23%, removes planning and technical management expense, cost-saving 19%.
If 3 certain engineering site are established comprehensive support 792 covers altogether, average every cover weighs 28.5 kilograms.As need be established angle steel or channel-section steel or round steel suspension and support 6336 covers according to common construction.Comprehensive suspension and support adds up to materials: 792 * 28.5 kilograms=22572 kilograms, covers; Usually construction bracket, by average 5 kilograms of calculating, adds up to materials :=31680 kilograms, 5 kilograms/cover * 6336 cover.Save altogether the 31680-22572=9108 kilogram.Calculate fabrication and installation expense: 9108kg * 1327 yuan/100kg (the quota base price is installed and sees table " Discourse of Enterprise's ration (installation of indoor comprehensive suspension and support) ")=120863 yuan with " the comprehensive base price of Inner Mongolia Autonomous Region installing engineering " (2003 editions); The steel valency is calculated as 5300 yuan/tons * 9.108 tons=48272 yuan by market price at that time, amounts to and saves as 120863+48272=169135 unit.

Claims (1)

1. a pipeline is comprehensively arranged and is shared the suspension and support method of construction, it is characterized in that comprising step: preparation of construction, the pipeline cross hatching of comprehensively arranging, carry out the suspension and support type selecting by calculating, the model suspension and support is made and is installed, model suspension and support overload test, and the suspension and support large size is installed, suspension and support is proofreaied and correct, ending.
CN2013101653119A 2013-05-08 2013-05-08 Construction method for shared supporting and hanging frame for comprehensive arrangement of pipes Pending CN103234080A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101653119A CN103234080A (en) 2013-05-08 2013-05-08 Construction method for shared supporting and hanging frame for comprehensive arrangement of pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101653119A CN103234080A (en) 2013-05-08 2013-05-08 Construction method for shared supporting and hanging frame for comprehensive arrangement of pipes

Publications (1)

Publication Number Publication Date
CN103234080A true CN103234080A (en) 2013-08-07

Family

ID=48882132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101653119A Pending CN103234080A (en) 2013-05-08 2013-05-08 Construction method for shared supporting and hanging frame for comprehensive arrangement of pipes

Country Status (1)

Country Link
CN (1) CN103234080A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104141824A (en) * 2014-07-04 2014-11-12 江苏海纬集团有限公司 Installation technology of spring supports and hangers
CN106351362A (en) * 2016-08-30 2017-01-25 江苏嘉洋华联建筑装饰股份有限公司 Ultra-high and lightweight steel keel paper gypsum board partition wall and construction method thereof
CN106907525A (en) * 2017-04-20 2017-06-30 中天西北建设投资集团有限公司 A kind of para-seismic support installation engineering method
CN111428400A (en) * 2020-03-09 2020-07-17 北京住总第一开发建设有限公司 Design method of electromechanical comprehensive support and hanger based on BIM technology
CN112081237A (en) * 2020-09-21 2020-12-15 重庆建工第一市政工程有限责任公司 Construction method of composite support and hanger of comprehensive overhead pipe gallery based on BIM technology
CN114057094A (en) * 2021-12-03 2022-02-18 中建八局第二建设有限公司 C-shaped steel combined support and hanger and construction method thereof
CN114251516A (en) * 2021-12-21 2022-03-29 中铁三局集团建筑安装工程有限公司 Comprehensive support and hanger system and construction method thereof
CN114962785A (en) * 2022-02-07 2022-08-30 北京城建集团有限责任公司 Construction method of anti-seismic support
CN116127673A (en) * 2023-04-18 2023-05-16 中建安装集团有限公司 Intelligent support and hanger analysis management system and method based on big data

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3191098B2 (en) * 1998-10-27 2001-07-23 新菱冷熱工業株式会社 Piping construction method by wire
JP2005240864A (en) * 2004-02-25 2005-09-08 Kyoshin Denki Koji:Kk Support fitting for cable routing
CN201723853U (en) * 2010-07-16 2011-01-26 平煤建工集团有限公司土建处 Integrated supporting and hanging frame with comprehensive pipeline arrangement technology for large public building installation project
CN202469251U (en) * 2011-12-27 2012-10-03 上海建工七建集团有限公司 Combined support hanger

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3191098B2 (en) * 1998-10-27 2001-07-23 新菱冷熱工業株式会社 Piping construction method by wire
JP2005240864A (en) * 2004-02-25 2005-09-08 Kyoshin Denki Koji:Kk Support fitting for cable routing
CN201723853U (en) * 2010-07-16 2011-01-26 平煤建工集团有限公司土建处 Integrated supporting and hanging frame with comprehensive pipeline arrangement technology for large public building installation project
CN202469251U (en) * 2011-12-27 2012-10-03 上海建工七建集团有限公司 Combined support hanger

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
周银翠: "高层建筑中给水排水管道的施工技术", 《甘肃科技》, vol. 24, no. 18, 30 September 2008 (2008-09-30) *
国家技术监督局: "《管道支吊架第1部分:技术规范》", 1 December 1997, article "支吊架间距", pages: 38-39 *
孟程等: "综合支吊架的应用技术", 《科技信息》, no. 36, 31 December 2008 (2008-12-31), pages 136 - 138 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104141824A (en) * 2014-07-04 2014-11-12 江苏海纬集团有限公司 Installation technology of spring supports and hangers
CN106351362A (en) * 2016-08-30 2017-01-25 江苏嘉洋华联建筑装饰股份有限公司 Ultra-high and lightweight steel keel paper gypsum board partition wall and construction method thereof
CN106351362B (en) * 2016-08-30 2019-06-07 江苏嘉洋华联建筑装饰股份有限公司 Superelevation lightgage steel joist Thistle board partition wall and its construction method
CN106907525A (en) * 2017-04-20 2017-06-30 中天西北建设投资集团有限公司 A kind of para-seismic support installation engineering method
CN111428400A (en) * 2020-03-09 2020-07-17 北京住总第一开发建设有限公司 Design method of electromechanical comprehensive support and hanger based on BIM technology
CN112081237A (en) * 2020-09-21 2020-12-15 重庆建工第一市政工程有限责任公司 Construction method of composite support and hanger of comprehensive overhead pipe gallery based on BIM technology
CN114057094A (en) * 2021-12-03 2022-02-18 中建八局第二建设有限公司 C-shaped steel combined support and hanger and construction method thereof
CN114251516A (en) * 2021-12-21 2022-03-29 中铁三局集团建筑安装工程有限公司 Comprehensive support and hanger system and construction method thereof
CN114251516B (en) * 2021-12-21 2023-12-29 中铁三局集团建筑安装工程有限公司 Comprehensive support and hanger system and construction method thereof
CN114962785A (en) * 2022-02-07 2022-08-30 北京城建集团有限责任公司 Construction method of anti-seismic support
CN116127673A (en) * 2023-04-18 2023-05-16 中建安装集团有限公司 Intelligent support and hanger analysis management system and method based on big data

Similar Documents

Publication Publication Date Title
CN103234080A (en) Construction method for shared supporting and hanging frame for comprehensive arrangement of pipes
CN109614723B (en) Comprehensive construction method based on BIM technology
CN106989211B (en) Assembled architecture pipeline hanger system installation method based on BIM
CN106624639A (en) Manufacturing and hoisting method for pre-spliced short joint of large valve and large-diameter pipeline
CN111981200A (en) Integrated construction method for designing and constructing complex pipeline comprehensive support system
CN110440054B (en) Subway station refrigerating machine room pipeline assembling construction method
CN110440429A (en) Subway arch top ventilation shaft assembling constructing method
CN105421211A (en) Manufacturing method for large-span single-arch-rib steel box arch
CN107990052A (en) A kind of pipeline assembled hanger installation method
CN110566720A (en) construction method of arc corridor pipeline
CN111400804A (en) A construction method for prefabricated installation of large air ducts under BIM model
CN103791227A (en) Construction method of centralized medical liquid oxygen supply system
CN103321324B (en) A kind of panel point district super-thick steel plate wall and construction method thereof
CN206815640U (en) A kind of suspension type acoustic(al)absorbent ceiling suspension system
CN110130551B (en) Bolting method unit GRC curtain wall structure and construction method thereof
CN210152028U (en) Bolt joint method cell cube GRC curtain wall construction
WO2017070987A1 (en) Construction method for gas pipeline system
CN110173121A (en) Rapid installation method of steel sleeve
CN202023298U (en) Roof truss-sectioned roof girder structure capable of being hoisted by cross type tower crane
CN103334524B (en) Construction method for spherical glass curtain wall with aluminum alloy hidden frame
CN211830140U (en) Cable trench cable laying device
CN114251514A (en) Pipeline installation method in nuclear power construction
CN203383353U (en) Super-thick steel plate wall in truss joint area
WO2021046849A1 (en) Seismic optimization method for building supports and hangers
CN111927534B (en) Construction method for connection of super-large heavy-duty fan and silencer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130807