CN103216240B - Hydroextraction equipment and method of tailings - Google Patents

Hydroextraction equipment and method of tailings Download PDF

Info

Publication number
CN103216240B
CN103216240B CN201310152131.7A CN201310152131A CN103216240B CN 103216240 B CN103216240 B CN 103216240B CN 201310152131 A CN201310152131 A CN 201310152131A CN 103216240 B CN103216240 B CN 103216240B
Authority
CN
China
Prior art keywords
tailings
equipment
hydraulic mining
mining
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310152131.7A
Other languages
Chinese (zh)
Other versions
CN103216240A (en
Inventor
白荣林
屠建春
成建
王晓宇
郭普堂
杨松华
邱兆莹
余艳萍
吴东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming Metallurgical Research Institute
Original Assignee
Kunming Metallurgical Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming Metallurgical Research Institute filed Critical Kunming Metallurgical Research Institute
Priority to CN201310152131.7A priority Critical patent/CN103216240B/en
Publication of CN103216240A publication Critical patent/CN103216240A/en
Application granted granted Critical
Publication of CN103216240B publication Critical patent/CN103216240B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

本发明公开了一种用于尾矿水力开采的设备及水力开采方法,尾矿水力开采设备包括浮筒、钢架、排矿口、潜水搅拌器、滑杆、潜水重载渣浆泵、球轴、导流环、叶轮、电机和固定件。水力开采方法包括以下步骤:安装调试好尾矿水力开采的设备,将排矿管与排矿口连接;将两根绳索分别栓在滑杆上;在尾矿库开挖;将尾矿水力开采的设备放入吸浆池中,启动电机3-5分钟后,启动潜水重载渣浆泵,开始冲采;调节栓在滑杆上的绳索,移动尾矿水力开采的设备,开采分布于尾矿库中的尾矿;对尾矿水力开采设备加冲洗水,冲洗3-5分钟后,停止潜水搅拌器,3-5分钟后,停止潜水重载渣浆泵,完成冲采。本发明结构简单,使用方便,为尾矿开采提供了很大的便利。

The invention discloses equipment and a hydraulic mining method for hydraulic mining of tailings. The hydraulic mining equipment for tailings includes a buoy, a steel frame, an ore discharge port, a submersible agitator, a slide rod, a submersible heavy-duty slurry pump, and a ball shaft , guide ring, impeller, motor and fixing parts. The hydraulic mining method includes the following steps: installing and debugging equipment for hydraulic mining of tailings; Put the equipment into the slurry suction tank, start the motor for 3-5 minutes, start the submersible heavy-duty slurry pump, and start flushing; adjust the rope bolted on the slide bar, move the tailings hydraulic mining equipment, and the mining is distributed in the tailings Tailings in the mine pool; add flushing water to the hydraulic mining equipment for tailings, after flushing for 3-5 minutes, stop the submersible agitator, and after 3-5 minutes, stop the submersible heavy-duty slurry pump to complete flushing. The invention has simple structure and convenient use, and provides great convenience for mining tailings.

Description

一种用于尾矿水力开采的设备及水力开采方法Equipment and hydraulic mining method for hydraulic mining of tailings

技术领域 technical field

本发明属于砂矿开采技术领域,具体涉及一种用于尾矿水力开采的设备及水力开采方法。 The invention belongs to the technical field of placer mining, and in particular relates to equipment and a hydraulic mining method for hydraulic mining of tailings.

背景技术 Background technique

目前,砂矿开采的方法有三种,1、机械开采,直接用挖掘机进行挖掘来开采砂矿;2、高压水枪冲采,利用水的高压喷射把砂矿冲入集矿池,再用渣浆泵将集矿池中的矿浆泵送到选矿厂;3、采砂船开采,利用采砂船开采河床中的砂矿。 At present, there are three methods of placer mining. 1. Mechanical mining, directly digging with excavators to mine placer; The slurry pump pumps the ore slurry in the ore collection pool to the beneficiation plant; 3. Mining by sand dredger, using the sand dredger to mine the placer in the river bed.

尾矿是选矿厂选矿后产生的废渣,粒度一般在-200目占50~90%,从选矿厂出来的尾矿质量浓度一般在15%-45%,从选矿厂出来的尾矿堆存在尾矿库中,经过自然沉降,大部分水通过尾矿回水系统排走,剩下的尾矿水分含量在10~30%,在尾矿库中,尾矿的水分含量从地表向库底依次升高。 Tailings are the waste slag produced after mineral processing in the mineral processing plant. The particle size is generally -200 mesh, accounting for 50-90%. The mass concentration of the tailings from the mineral processing plant is generally 15%-45%. In the mine pool, after natural settlement, most of the water is drained through the tailings return system, and the moisture content of the remaining tailings is 10-30%. In the tailings pool, the moisture content of the tailings is from the surface to the bottom of the pool. raised.

随着资源的枯竭,尾矿再选成为目前资源替代的一种方式,目前国内外应用较多的回采工艺是机械开采、水力开采和采砂船开采,这三种回采工艺的共同特点是都需要人在工作面上操作设备以回采尾矿砂,而尾矿的特点是力学强度低,稳定性差,尾矿库浸润线以下的尾矿砂处于饱和状态,其力学强度更低和稳定性更差,这也导致以上三种回采方法回采尾矿时有较大的安全隐患。 With the depletion of resources, tailings re-selection has become a way to replace resources. At present, the mining processes that are widely used at home and abroad are mechanical mining, hydraulic mining and sand mining. The common feature of these three mining processes is that they are all It is necessary for people to operate equipment on the working face to recover the tailings sand, and the tailings are characterized by low mechanical strength and poor stability. The tailings sand below the infiltration line of the tailings pond is in a saturated state, and its mechanical strength is lower and its stability is worse. This also causes the above three mining methods to have greater potential safety hazards when mining the tailings.

为此,研制开发一种安全的尾矿开采设备和开采方法具有十分重要的意义。 For this reason, it is of great significance to develop a safe tailings mining equipment and mining method.

发明内容 Contents of the invention

本发明第一目的在于提供一种用于尾矿水力开采的设备;第二目的在于提供一种安全的水力开采方法。 The first purpose of the present invention is to provide a device for hydraulic mining of tailings; the second purpose is to provide a safe hydraulic mining method.

本发明第一目的这样实现的,包括浮筒、钢架、排矿口、潜水搅拌器、滑杆、潜水重载渣浆泵、球轴、导流环、叶轮、电机和固定件,所述浮筒卡在钢架内部,所述滑杆栓接在钢架的两侧,所述潜水重载渣浆泵铆接在钢架下部,所述滑杆下部铆接有潜水搅拌器,所述潜水重载渣浆泵上部开有排矿口。 The first object of the present invention is achieved in this way, including a buoy, a steel frame, an ore discharge port, a submersible mixer, a slide bar, a submersible heavy-duty slurry pump, a ball shaft, a guide ring, an impeller, a motor and a fixing member, the buoy Stuck inside the steel frame, the slide bar is bolted to both sides of the steel frame, the submersible heavy-duty slurry pump is riveted to the lower part of the steel frame, the lower part of the slide bar is riveted with a submersible mixer, and the submersible heavy-duty slurry pump is riveted to the lower part of the steel frame. There is an ore discharge port on the upper part of the slurry pump.

本发明中,所述潜水搅拌器由球轴、导流环、叶轮、电机和固定件组成,所述叶轮焊接在球轴上,所述叶轮外侧安装有导流环,所述导流环焊接在电机的外壳上,所述球轴与电机通过轴连接,所述电机后部安装有固定件。 In the present invention, the submersible mixer is composed of a ball shaft, a guide ring, an impeller, a motor and a fixing piece, the impeller is welded on the ball shaft, a guide ring is installed on the outside of the impeller, and the guide ring is welded On the casing of the motor, the ball shaft is connected to the motor through a shaft, and a fixing piece is installed at the rear of the motor.

本发明第二目的是这样实现的,包括以下步骤: Second object of the present invention is achieved like this, comprises the following steps:

第一步:安装调试好该尾矿水力开采设备,将排矿管与排矿口连接;将两根绳索分别栓在滑杆上; Step 1: Install and debug the tailings hydraulic mining equipment, connect the ore discharge pipe to the ore discharge port; tie the two ropes to the slide bar respectively;

第二步:在尾矿库开挖吸浆池,吸浆池长4~6m,宽1~3m,高1~3m; Step 2: Excavate the slurry suction pool in the tailings pond, the slurry suction pool is 4~6m long, 1~3m wide, and 1~3m high;

第三步:将该尾矿水力开采的设备放入矿池中,启动电机,3~5分钟后,启动潜水重载渣浆泵,开始冲采; Step 3: Put the tailings hydraulic mining equipment into the mine pool, start the motor, and after 3 to 5 minutes, start the submersible heavy-duty slurry pump to start flushing;

第四步:调节栓在滑杆上的绳索,移动该尾矿水力开采设备,开采分布于尾矿库中的尾矿; Step 4: Adjust the rope tied on the slide rod, move the tailings hydraulic mining equipment, and mine the tailings distributed in the tailings pond;

第五步:当需要停止开采时,对该尾矿水力开采设备处加冲洗水,冲洗3~5分钟后,停止潜水搅拌器,3~5分钟后,停止潜水重载渣浆泵,完成冲采。 Step 5: When it is necessary to stop mining, add flushing water to the tailings hydraulic mining equipment. After flushing for 3 to 5 minutes, stop the submersible mixer. After 3 to 5 minutes, stop the submersible heavy-duty slurry pump to complete flushing. Pick.

本发明结构简单,使用方便,为尾矿开采提供了很大的便利。 The invention has the advantages of simple structure and convenient use, and provides great convenience for mining tailings.

附图说明 Description of drawings

图1为本发明的结构示意图; Fig. 1 is a structural representation of the present invention;

图2为本发明的潜水搅拌器的平面图; Fig. 2 is the plan view of submersible mixer of the present invention;

图3为本发明的潜水搅拌器的剖面图。 Fig. 3 is a sectional view of the submersible mixer of the present invention.

图中:1-浮筒,2-钢架,3-排矿口,4-潜水搅拌器,5-滑杆,6-潜水重载渣浆泵,7-球轴,8-导流环,9-叶轮,10-电机,11-固定件。 In the figure: 1-pontoon, 2-steel frame, 3-row ore port, 4-submersible mixer, 5-sliding rod, 6-submersible heavy-duty slurry pump, 7-ball shaft, 8-guiding ring, 9 -impeller, 10-motor, 11-fixer.

具体实施方式 Detailed ways

下面结合附图对本发明作进一步说明,但不以任何方式对本发明加以限制,基于本发明教导所作的任何变换,均落入本发明保护范围。 The present invention will be further described below in conjunction with the accompanying drawings, but the present invention is not limited in any way, and any transformation made based on the teaching of the present invention falls within the protection scope of the present invention.

如图1所示,一种用于尾矿水力开采的设备,包括浮筒1、钢架2、排矿口3、潜水搅拌器4、滑杆5、潜水重载渣浆泵6、球轴7、导流环8、叶轮9、电机10和固定件11,所述浮筒1卡在钢架2内部,所述滑杆5栓接在钢架2的两侧,所述潜水重载渣浆泵6铆接在钢架2下部,所述滑杆5下部铆接有潜水搅拌器4,所述潜水重载渣浆泵6上部开有排矿口3。 As shown in Figure 1, a device for hydraulic mining of tailings, including a buoy 1, a steel frame 2, an ore discharge port 3, a submersible mixer 4, a slide rod 5, a submersible heavy-duty slurry pump 6, and a ball shaft 7 , guide ring 8, impeller 9, motor 10 and fixture 11, the buoy 1 is stuck inside the steel frame 2, the slide bar 5 is bolted to both sides of the steel frame 2, and the submersible heavy-duty slurry pump 6 is riveted to the lower part of the steel frame 2, the lower part of the slide bar 5 is riveted with a submersible agitator 4, and the upper part of the submersible heavy-duty slurry pump 6 is provided with an ore discharge port 3.

参见图2、图3,一种用于尾矿水力开采的设备潜水搅拌器的平面图,一种用于尾矿水力开采的设备潜水搅拌器的剖面图,所述潜水搅拌器4由球轴7、导流环8、叶轮9、电机10和固定件11组成,所述叶轮9焊接在球轴7上,所述叶轮9外侧安装有导流环8,所述导流环8焊接在电机10的外壳上,所述球轴7与电机10通过轴连接,所述电机10后部安装有固定件11。 Referring to Fig. 2 and Fig. 3, a plan view of an equipment submersible mixer for hydraulic mining of tailings, and a cross-sectional view of a submersible mixer for equipment for hydraulic mining of tailings, the submersible mixer 4 is composed of a ball shaft 7 , a guide ring 8, an impeller 9, a motor 10 and a fixing member 11, the impeller 9 is welded on the ball shaft 7, a guide ring 8 is installed on the outside of the impeller 9, and the guide ring 8 is welded on the motor 10 On the shell of the motor, the ball shaft 7 is connected to the motor 10 via a shaft, and a fixing member 11 is installed at the rear of the motor 10 .

一种用于尾矿水力开采方法,包括以下步骤:安装调试好一种用于尾矿水力开采的设备,将排矿管与排矿口3连接;将两根绳索分别栓在滑杆5上,在尾矿库开好矿池,矿池长4~6m,宽1~3m,高1~3m;优选长5m,宽2m,高2m;将一种用于尾矿水力开采的设备放入矿池中,启动电机10,3~5分钟后,启动潜水重载渣浆泵6,开始冲采;调节栓在滑杆5上的绳索,移动一种用于尾矿水力开采的设备,开采分布于尾矿库中的尾矿;当需要停止开采时,对一种用于尾矿水力开采的设备处加冲洗水,冲洗3~5分钟后,停止潜水搅拌器4,3~5分钟后,停止潜水重载渣浆泵6,完成冲采。 A method for hydraulic mining of tailings, comprising the following steps: installing and debugging a device for hydraulic mining of tailings, connecting the ore discharge pipe with the ore discharge port 3; respectively tying two ropes to the slide bar 5 , Open a mine pool in the tailings pond, the mine pool is 4-6m long, 1-3m wide, and 1-3m high; preferably 5m long, 2m wide, and 2m high; put a kind of equipment for hydraulic mining of tailings into In the mine pool, start the motor 10, and after 3 to 5 minutes, start the submersible heavy-duty slurry pump 6 to start flushing; adjust the rope bolted on the slide bar 5 to move a kind of equipment for hydraulic mining of tailings, and mine Tailings distributed in the tailings pond; when it is necessary to stop mining, add flushing water to an equipment used for hydraulic mining of tailings, after flushing for 3 to 5 minutes, stop the submersible mixer 4, after 3 to 5 minutes , stop the submersible heavy-duty slurry pump 6 to complete flushing.

Claims (2)

1. the equipment for mine tailing hydraulic mining, comprise floating drum (1), steelframe (2), gape (3), submersible agitator (4), slide bar (5), heavily loaded Pulp pump (6) of diving under water, it is characterized in that described floating drum (1) is stuck in steelframe (2) inner, described slide bar (5) bolt is in the both sides of steelframe (2), the heavily loaded Pulp pump of described diving (6) is riveted on steelframe (2) bottom, the riveted joint of described slide bar (5) bottom has submersible agitator (4), and the heavily loaded Pulp pump of described diving (6) top has gape (3); Described submersible agitator (4) is made up of ball axle (7), guide ring (8), impeller (9), motor (10) and fixture (11), described impeller (9) is welded on ball axle (7), described impeller (9) outside is provided with guide ring (8), described guide ring (8) is welded on the shell of motor (10), described ball axle (7) is connected by axle with motor (10), and described motor (10) rear portion is provided with fixture (11).
2. the equipment for mine tailing hydraulic mining according to claim 1, is characterized in that the method utilizing this equipment to carry out mine tailing hydraulic mining comprises the following steps:
The first step: Installation and Debugging are used on the equipment of mine tailing hydraulic mining, is connected ore discharge pipe with gape (3); By two ropes difference bolts on slide bar (5);
Second step: in Tailings Dam excavation midge pond, midge pond long 4 ~ 6m, wide 1 ~ 3m, high 1 ~ 3m;
3rd step: the equipment being used for mine tailing hydraulic mining is put into midge pond, starter motor (10), after 3 ~ 5 minutes, starts the heavily loaded Pulp pump of diving (6), starts punching and adopt;
4th step: the rope of regulation cock on slide bar (5), the mobile equipment being used for mine tailing hydraulic mining, exploits the mine tailing be distributed in Tailings Dam;
5th step: when needs stop exploitation, flushing water is added to the equipment place for mine tailing hydraulic mining, rinses after 3 ~ 5 minutes, stop submersible agitator (4), after 3 ~ 5 minutes, stop the heavily loaded Pulp pump of diving (6), complete punching and adopt.
CN201310152131.7A 2013-04-27 2013-04-27 Hydroextraction equipment and method of tailings Active CN103216240B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310152131.7A CN103216240B (en) 2013-04-27 2013-04-27 Hydroextraction equipment and method of tailings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310152131.7A CN103216240B (en) 2013-04-27 2013-04-27 Hydroextraction equipment and method of tailings

Publications (2)

Publication Number Publication Date
CN103216240A CN103216240A (en) 2013-07-24
CN103216240B true CN103216240B (en) 2015-06-03

Family

ID=48814355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310152131.7A Active CN103216240B (en) 2013-04-27 2013-04-27 Hydroextraction equipment and method of tailings

Country Status (1)

Country Link
CN (1) CN103216240B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603666B (en) * 2013-11-11 2015-06-17 铜陵有色设计研究院 Tailing pond sand excavation method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH606763A5 (en) * 1975-12-16 1978-11-15 Sulzer Ag
JPS5288501A (en) * 1976-01-20 1977-07-25 Saito Chiyuuji Device for pulling up submarine ore by circulating water due to level difference
CN201521452U (en) * 2009-09-30 2010-07-07 宜兴市宙斯泵业有限公司 Floating submerged pump
CN201722723U (en) * 2010-05-14 2011-01-26 中冶长天国际工程有限责任公司 Self-stirring silt cleaner and silt cleaning system thereof
CN101942849B (en) * 2010-09-25 2012-10-03 张建平 Silt extraction machine
CN102211056B (en) * 2011-06-10 2013-03-27 云南大红山管道有限公司 Ore dressing equipment and method

Also Published As

Publication number Publication date
CN103216240A (en) 2013-07-24

Similar Documents

Publication Publication Date Title
CN103510957B (en) A kind of combined type coal uncovering method
CN104405436A (en) Method for improving orebody rate of supporting pit roof
CN204370458U (en) Open cut foundation ditch drainage device
CN205329702U (en) Building engineering foundation ditch precipitation is with from towards formula step -down well
CN105862862B (en) A kind of large diameter pile buries hammer Refloatation method
CN106400822B (en) Deep foundation pit precipitation well shut-in well construction method
CN110374673A (en) A kind of suction road downlink layer-through drilling is calmed the anger drainage and hole sealing method
CN103216240B (en) Hydroextraction equipment and method of tailings
CN102296617A (en) Post-grouting reinforcement construction method of flexible joints of diaphragm walls
Kang et al. Research on a coupled system design for mineral lifting and wastewater drainage in deep-sea mining applications
CN205857173U (en) A kind of Novel steel casing sheath applying bored concrete pile on the water
CN100554597C (en) A method for sealing the bottom of a borehole retaining wall and making a large-diameter hollow concrete pile
CN105256132B (en) A kind of rare earth ore in-situ leaching ore deposit auxiliary leak device and its application method
CN119531770A (en) A mining method for resource utilization of abandoned mines based on sludge solidification
CN201843135U (en) Composite foundation pile in power transmission line
CN101161947A (en) Integration method of lagging pile and dewatering well for foundation ditch support
CN106089295B (en) A kind of filling template of coal mine underground exploitation
CN205224063U (en) High -efficient precipitation device of hypotonicity clay
CN203374309U (en) Inverted truncated cone type large hydraulic pressure mine waterproof gate chamber
CN204152529U (en) A kind of anchor cable rack tunnel cut-off equipment for mine dynamic water sealing
CN102913121B (en) Flexible swing pipe vibrator boring machine
CN204941597U (en) A kind of mine coal slime cleaning plant
CN208073542U (en) One body swimming qi leel for pernicious gas tunnel is from four-way box
CN202055248U (en) Pile foundation mud pit
CN106223351A (en) Self priming pump reduces local groundwater level construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 650031 No. 86 Yuantong North Road, Yunnan, Kunming

Patentee after: Kunming Metallurgical Research Institute Co., Ltd

Address before: 650031 No. 86 Yuantong North Road, Yunnan, Kunming

Patentee before: Kunming Metallurgical Research Institute

CP01 Change in the name or title of a patent holder