CN103171911B - Ship loader installation technology - Google Patents

Ship loader installation technology Download PDF

Info

Publication number
CN103171911B
CN103171911B CN201310065583.1A CN201310065583A CN103171911B CN 103171911 B CN103171911 B CN 103171911B CN 201310065583 A CN201310065583 A CN 201310065583A CN 103171911 B CN103171911 B CN 103171911B
Authority
CN
China
Prior art keywords
door frame
ship loader
ship
lifted
scene
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310065583.1A
Other languages
Chinese (zh)
Other versions
CN103171911A (en
Inventor
陆琪
陈飞
戴伟
钮国平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Zhenhua Heavy Equipment Manufacturing Co Ltd
Original Assignee
SHANGHAI ZHENHUA HEAVY INDUSTRY GROUP (NANTONG) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ZHENHUA HEAVY INDUSTRY GROUP (NANTONG) Co Ltd filed Critical SHANGHAI ZHENHUA HEAVY INDUSTRY GROUP (NANTONG) Co Ltd
Priority to CN201310065583.1A priority Critical patent/CN103171911B/en
Publication of CN103171911A publication Critical patent/CN103171911A/en
Application granted granted Critical
Publication of CN103171911B publication Critical patent/CN103171911B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Ship Loading And Unloading (AREA)

Abstract

The invention discloses a ship loader installation technology. The ship loader installation technology is characterized in that a track is paved between a yard and a cargo ship, and a ship loader is assembled in a ship yard, then is rolled on the ship through the track, and is transported to a client wharf to be installed. Through the mentioned method, the problem of insufficient instruments when transport components are installed at the client wharf, and the operation of rolling the ship loader on the ship is easy, and efficiency is improved.

Description

Ship loader mounting process
Technical field
The present invention relates to a kind of ship loader mounting process, relate in particular to and be directly transported to the ship loader mounting process that user's harbour is installed after a kind of self-contained ship loader.
Background technology
Ship loader, as a kind of instrument of boats and ships loading, is the requisite important tool of shipping boats and ships harbour.When ship loader is installed, because ship loader is bulky, weight is high, and difficulty is installed.
Traditional method is first by the each parts row dress of ship loader, then by each parts by Shipping to client's harbour, finally on client's harbour, carry out the assembly and adjustment of each parts.Such method, the assembly working of ship loader need to carry out on client's harbour, lacks necessary Large-scale Hoisting instrument and relevant apparatus, brings very large difficulty to ship loader erection work.
Summary of the invention
Technical matters to be solved by this invention is to provide a kind of easy to operate, installs and is easy to ship loader mounting process.
For solving the problems of the technologies described above, the technical solution adopted in the present invention is:
A kind of ship loader mounting process, is characterized in that comprising following processing step:
1) deployment rails between place and carrier;
2) lifting of extra large land side door frame is carried out in ground on the scene, then hangs oneself and loads onto door frame crossbeam at door frame;
3) row fills large vehicle walking in orbit, then door frame is lifted on large vehicle walking;
4) machine house is lifted on door frame crossbeam;
5) dress pylon is first arranged in ground on the scene, then by tower hoisting on door frame crossbeam;
6) dress boom and interior jib are arranged respectively in ground on the scene, then by lifting after boom and the assembling of interior jib;
7) connect pitching wire rope;
8) chute device is installed;
9) ship loader complete machine is debugged;
10) roll and take on board along track, be transported to user's harbour and directly install.
Adopt such method, directly carry out the installment and debugging of ship loader complete machine at shipyard, then by track is set between place and boats and ships, the ship loader complete machine assembling is rolled and is filled on ship, be transported to client's harbour and directly install.The big machinery that can make full use of shipyard is like this assembled, and has solved the problem that user harbour lacks installing apparatus, easy to operate, installs easily.
Brief description of the drawings
Fig. 1 is the orbital arrangement schematic diagram of ship loader mounting process of the present invention.
Fig. 2 is the ship loader structural representation of ship loader mounting process of the present invention.
Detailed description of the invention
As shown in Figure 2, ship loader comprises large vehicle walking 3, extra large land side door frame 4, door frame crossbeam 5, machine house 6, pylon 7, boom 8, interior jib 9, pitching wire rope 10 and chute device 11.
First be disposed to roll the track 2 that fills the ship loader assembling to the boats and ships of transport ship loader in the place of shipyard, track 2 extends to the freight house of boats and ships.Then ground on the scene lifts extra large land side door frame 4, then door frame crossbeam 5 is lifted on extra large land side door frame 4, is assembled into complete door frame.
As shown in Figure 1, on track 2, row installs four large vehicle walkings 3, then with door machine, the door frame assembling is lifted on large vehicle walking 3, and is lifted machine house 6 is lifted on door frame crossbeam 5 by two door machine double hooks.
Ground on the scene row's dress pylon 7, after pylon 7 assemblings, coordinates pylon 7 is stood up to righting with two door machines, is then lifted on door frame crossbeam 5.
Ground on the scene row's dress boom 8 and interior jib 9, sling interior jib 9 to be assembled in boom 8 with door machine after row's dress.Then with door machine, the jib structure assembling is lifted on door frame crossbeam 5.
Then, be connected pitching wire rope 10 at jib structure with pylon 7 tops, then install chute device 11 on the top of jib structure.
After ship loader assembling, complete machine is debugged, determine no problem after, along track 2, ship loader is rolled and is taken on board, be then transported to client's harbour and install.
By such method, directly ship loader complete machine is assembled complete in shipyard the inside, can directly use the apparatus such as large-scale door machine of shipyard the inside to carry out assembly working, avoid transporting the problem of assembly in client's harbour assembler tool deficiency, ship loader is installed and become convenient, simultaneously complete machine rolls and takes on board simple to operately, need not use a machine that each assembly is lifted and gone on board respectively, has improved efficiency.

Claims (1)

1. a ship loader mounting process, is characterized in that comprising following processing step:
1) deployment rails (2) between place and carrier (1);
2) lifting of extra large land side door frame (4) is carried out in ground on the scene, then hangs oneself and loads onto door frame crossbeam (5) at door frame (4);
3) at the upper row's dress large vehicle walking of track (2) (3), then door frame (4) is lifted on large vehicle walking (3);
4) machine house (6) is lifted on door frame crossbeam (5);
5) dress pylon (7) is first arranged in ground on the scene, then pylon (7) is lifted on door frame crossbeam (5);
6) dress boom (8) and interior jib (9) are arranged respectively in ground on the scene, then by lifting after boom (8) and interior jib (9) assembling;
7) connect pitching wire rope (10);
8) chute device (11) is installed;
9) ship loader complete machine is debugged;
10) roll and take on board along track (2), be transported to client's harbour and directly install.
CN201310065583.1A 2013-03-01 2013-03-01 Ship loader installation technology Active CN103171911B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310065583.1A CN103171911B (en) 2013-03-01 2013-03-01 Ship loader installation technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310065583.1A CN103171911B (en) 2013-03-01 2013-03-01 Ship loader installation technology

Publications (2)

Publication Number Publication Date
CN103171911A CN103171911A (en) 2013-06-26
CN103171911B true CN103171911B (en) 2014-12-10

Family

ID=48632203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310065583.1A Active CN103171911B (en) 2013-03-01 2013-03-01 Ship loader installation technology

Country Status (1)

Country Link
CN (1) CN103171911B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106143808B (en) * 2015-04-22 2018-12-14 华夏海洋能源工程(天津)股份有限公司 Assembled crane for container ship and assembling mode thereof
CN105084045A (en) * 2015-07-02 2015-11-25 中国神华能源股份有限公司 Shoring device and method for ship loader
CN111015216B (en) * 2019-12-26 2021-10-01 中交一航局安装工程有限公司 Crossed three-tail vehicle installation process of stacker-reclaimer
CN117842729A (en) * 2023-12-26 2024-04-09 南通港菱机械有限公司 Ship loader and application thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101293599A (en) * 2007-04-27 2008-10-29 上海振华港口机械(集团)股份有限公司 Method for discharging boat to dock basin with dock yard trestle crane set
CN102530582A (en) * 2012-01-21 2012-07-04 中交一航局安装工程有限公司 Method for landing large-size ship loader entirely
CN202716009U (en) * 2012-08-02 2013-02-06 上海振华重工集团(南通)有限公司 Butt joint tool special for dock ship loader telescoping mechanism rail production

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006123848A1 (en) * 2005-05-20 2006-11-23 Dong-A University A dock type harbor cargo loading and unloading apparatus

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101293599A (en) * 2007-04-27 2008-10-29 上海振华港口机械(集团)股份有限公司 Method for discharging boat to dock basin with dock yard trestle crane set
CN102530582A (en) * 2012-01-21 2012-07-04 中交一航局安装工程有限公司 Method for landing large-size ship loader entirely
CN202716009U (en) * 2012-08-02 2013-02-06 上海振华重工集团(南通)有限公司 Butt joint tool special for dock ship loader telescoping mechanism rail production

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴智建.浅析装船机整机上岸.《安装》.2011,第30-32页. *
浅析装船机整机上岸;吴智建;《安装》;20110915;第30-32页 *

Also Published As

Publication number Publication date
CN103171911A (en) 2013-06-26

Similar Documents

Publication Publication Date Title
CN102464273B (en) Offshore fan installing platform and fan integral installation rotary holding and lifting mechanism
CN103171911B (en) Ship loader installation technology
CN102019998B (en) Erection embarking method of upper and lower water side cabins
CN201206342Y (en) Rapid integration communication device
CN101880006B (en) Roll-on device and method for large fixed type rotary crane
CN202967914U (en) Hydraulic hoisting equipment of mine shaft
CN105417403A (en) Method for installing ultrahigh ultra-large type floating crane in dock
CN103693170A (en) Floating type offshore wind power assembly platform and method using floating type offshore wind power assembly platform for assembly offshore wind turbine
CN107653856B (en) The construction folding method of jack-up unit
CN105799890B (en) A kind of underwater towed-body arranging device and its application method
CN102564792B (en) Loading device for entirely applying simulative load to ocean work-over rig
CN102530582A (en) Method for landing large-size ship loader entirely
CN208394650U (en) A kind of underground mine use upending frame
CN102219156B (en) Method of serving a complex including two and more mobile wharf boom cranes
CN206220565U (en) A kind of marine Simple module metaplasia work building of achievable integral hoisting
CN102071652B (en) Method and device for dragging large-tonnage object ashore
CN103395478A (en) Special whole set equipment for offshore wind turbine complete transportation and mounting
CN203903515U (en) Rotary type linear traveling ship loader
CN203669879U (en) Down-hole hydraulic support assembling chamber
CN106760558A (en) A kind of suspension type boiler-steam dome aerial aligning method after installing
CN202765875U (en) Oversized rail gauge crane transportation equipment
CN206279527U (en) A kind of deep concrete mixture ship pile frame system
CN102101629B (en) Hierarchical synchronous hydraulic jacking process for large-tonnage ocean engineering structure
CN205187698U (en) Ship unloaders overheadhoist
CN205294657U (en) Portable simple truck-mounted crane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170425

Address after: The 226000 farm of Jiangsu province Nantong Development Zone Riverview Road No. 1

Patentee after: Nantong Zhenhua Heavy Equipment Manufacturing Co., Ltd.

Address before: 226010 Zhenhua Road, Nantong Development Zone, Jiangsu, Nantong, China, 1

Patentee before: Shanghai Zhenhua Heavy Industry Group (Nantong) Co., Ltd.