[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN102923491A - Container wharf operation and management method - Google Patents

Container wharf operation and management method Download PDF

Info

Publication number
CN102923491A
CN102923491A CN2012104663419A CN201210466341A CN102923491A CN 102923491 A CN102923491 A CN 102923491A CN 2012104663419 A CN2012104663419 A CN 2012104663419A CN 201210466341 A CN201210466341 A CN 201210466341A CN 102923491 A CN102923491 A CN 102923491A
Authority
CN
China
Prior art keywords
container
wharf
bridge crane
bank bridge
buffer area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012104663419A
Other languages
Chinese (zh)
Inventor
张彦
梁承姬
张建霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Maritime University
Original Assignee
Shanghai Maritime University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Maritime University filed Critical Shanghai Maritime University
Priority to CN2012104663419A priority Critical patent/CN102923491A/en
Publication of CN102923491A publication Critical patent/CN102923491A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Ship Loading And Unloading (AREA)

Abstract

The invention discloses a container wharf operation and management method. Fields of the method comprise a wharf front edge, a buffering region, a pit road and a storage yard; a shore side bridge crane is arranged on the wharf front edge, and the buffering region is provided with horizontal lifting equipment; the pit road is provided with a collection card; and the storage yard is provided with a storage yard gantry crane. The method comprises box unloading operation, box loading work and outer card collection work; when the shore side bridge crane carries out box unloading operation, the shore side bridge crane places cargoes in the buffering region; when a free collection card arrives, a container is placed on the collection card through the horizontal lifting equipment to finish the whole box unloading task operation; when the box loading work is carried out, the collection card directly places the container on the buffering region after reaching to the wharf front edge, and then leaves away; and when the shore side bridge crane comes to take the container, the horizontal lifting equipment is used for transporting the container to the position needed by the shore side bridge crane. According to the container wharf operation and management method, under the condition of increasing the least cost of the existing container wharf, the loading/unloading efficiency of a container task is improved, and the operation difficulty of wharf workers is reduced at the same time.

Description

The container wharf operation management method
Technical field
The present invention relates to a kind of operation management method, particularly relate to a kind of container wharf operation management method.
Background technology
The most domestic China's ports container quantity increases substantially at present, and existing harbour place size and capacity of equipment become the restraining factors of harbour capacity rating.In the research that existing harbour is optimized, research concentrates on again the research to single harbour factor, can't obtain the effect of optimization of the overall situation.For improving the harbour global efficiency, more existing scholars and enterprise propose to set up novel full-automatic harbour.But novel full-automatic harbour is more suitable for newly-built harbour, for existing built container wharf, if remove to build full-automatic harbour, implement difficulty inevitable very large, the effect of equipment purchasing expense and improvement expenses costliness and practical application is still unknowable.
In the tradition container handling technology, adopt three grades of formula operating processes, handling equipment comprise that bank bridge crane, container yard gantry hang and level is lifted fortune equipment, and the respective activity scope is the wharf apron, stockyard and an interior road.When unloading case, the bank bridge crane is got case from ship, transfers to the wharf apron, freight container is placed on the truck again.If this moment, truck did not arrive, then the bridge crane truck of will having to wait in bank will cause the waste of bridge crane resource, reduces work efficiency.During vanning, the truck that freight container is housed must arrive the wharf apron in advance, waits for that then the bank bridge crane of free time is got case, and then truck just can leave.When bank bridge crane task was many, this will cause truck to wait in the wharf apron always, delays the work efficiency of truck, causes simultaneously dock safety hidden danger.And when carrying out outer truck operation, the situation that outer truck arrives not to be had idle bridge crane to operate afterwards and have to wait under the bank bridge also might appear, this not only easily produces safety misadventure but also has affected the scheduling of truck, easily causes the reduction of whole work efficiency.As seen, in traditional container handling technology flow process, no matter unload case or case and all may cause the wait of equipment, delay production time, affect work efficiency, cause great difficulty for simultaneously the harbour dispatcher.
Summary of the invention
Technical matters to be solved by this invention provides a kind of container wharf operation management method, and it reduces longshore work personnel operation difficulty simultaneously so that existing container wharf in the minimum situation of the cost that increases, improves the handling efficiency of freight container task.
The present invention solves above-mentioned technical matters by following technical proposals: a kind of container wharf operation management method, it is characterized in that, the place that the method adopts comprises wharf apron, buffer area, an interior road, stockyard, the wharf apron is provided with the bank bridge crane, buffer area is provided with level and lifts fortune equipment, road is provided with truck in, and the stockyard is provided with container yard gantry and hangs; The method comprises unloads case operation, stuffing, outer truck operation, when the bank bridge crane unloaded the case operation, the bank bridge crane was placed on buffer area with goods, after available free truck arrives, lift fortune equipment by level freight container is put on the truck, finish the whole case task operating that unloads; When carrying out stuffing, truck leaves directly freight container is placed on buffer area after arriving the wharf apron after, having the bank bridge crane to come collection dress when getting case, level lift fortune equipment with Container Transport to the position that the bank bridge crane needs, guaranteed that the bank bridge crane can continuous working; After road arrives the wharf apron in outer truck passes through the field, can lift fortune equipment by the level in the buffer area freight container of institute's carrying is discharged at buffer area, finish and to leave after unloading the case task, when available free bank bridge comes to get freight container, level is lifted fortune equipment Container Transport is arrived the position that the bank bridge crane needs, guarantee the continuous working of bank bridge crane, finished whole task.
Preferably, described level act fortune equipment is gauntry crane or carries out the empty container stacking machine that empty van operates.
Preferably, described buffer area is positioned at the next door of wharf apron.
Positive progressive effect of the present invention is: the present invention can weaken the coupled relation between bank bridge crane, stockyard and the truck, so that loading and unloading operation can be carried out more swimmingly, increase the service efficiency of equipment, improved the level of service of harbour, also provide convenience to the wharf master.The present invention can make finishing of freight container task more smooth and easy, improve the efficiency of service of harbour, reduce the coupled relation of each operation link, reduced influencing each other between each operation link, guaranteed that each link can finish separately the task of burden smoothly, brought convenience to the dispatcher simultaneously.The present invention is more suitable in existing container wharf, and the improvement cost that not only increases is few, and the benefit highly significant, can better satisfy and come the port to carry out the requirement of the boats and ships of operation.
Description of drawings
Fig. 1 is the place of container wharf operation management method employing of the present invention and the principle schematic of equipment.
Fig. 2 is the principle schematic of container wharf operation management method of the present invention when specifically using.
The specific embodiment
Provide preferred embodiment of the present invention below in conjunction with accompanying drawing, to describe technical scheme of the present invention in detail.
As shown in Figure 1, the place that container wharf operation management method of the present invention adopts comprises wharf apron, buffer area, an interior road, stockyard, the wharf apron is provided with the bank bridge crane, buffer area is provided with level and lifts fortune equipment, road is provided with truck (container vehicle) in, and the stockyard is provided with container yard gantry and hangs.Level act fortune equipment can be gauntry crane or carry out the empty container stacking machine that empty van operates, level is lifted the level act fortune operation that fortune equipment can carry out separately freight container, also can utilize in the wharf apron existing railroad track, that had both carried out freight container unloads case and incasement operation, the needs that also can cooperate railway transportation are simultaneously realized water iron (molten iron) through transport.Wherein, empty container stacking machine is mainly used in carrying out the empty van operation, and its efficient will be higher than gauntry crane.Buffer area can be positioned at the next door of wharf apron, but buffer area is positioned at bank bridge opereating specification like this, to make things convenient for the operation of bank bridge.
Container wharf operation management method of the present invention comprises and unloads case operation, stuffing, outer truck operation, when the bank bridge crane unloads the case operation, the bank bridge crane can be placed on buffer area with goods, and do not need to wait for the arrival of truck, after available free truck arrives, lift fortune equipment by the level of buffer area freight container is put on the truck, finish the whole case task operating that unloads; When carrying out stuffing, truck leaves can directly freight container be placed on buffer area after arriving the wharf apron after, and do not need to wait for and leave again after the bank bridge crane is walked container crane, being arranged, the bank bridge crane comes collection dress when getting case, the level of buffer area lift fortune equipment with Container Transport to the position that the bank bridge crane needs, guaranteed that the bank bridge crane can continuous working; After road arrives the wharf apron in outer truck passes through the field, can lift fortune equipment by the level in the buffer area freight container of institute's carrying is discharged at buffer area, finish and to leave after unloading the case task, need to not wait under the bank bridge that the bank bridge comes to get case, when available free bank bridge comes to get freight container, level is lifted fortune equipment Container Transport is arrived the position that the bank bridge crane needs, and has guaranteed the continuous working of bank bridge crane, finishes whole task.
As shown in Figure 2, the below specifically describes the working process of four freight containers.
The task of the first freight container 1 is for unloading the case task.The first bank bridge crane 11 is discharged at buffer area with the first freight container 1, and the position is below the second freight container 2.Then bridge crane carries out next task, and the act fortune equipment of the level in the buffer area (such as gauntry crane) installs to the first freight container 1 on the second truck 22, and the second truck 22 namely leaves goes to the stockyard.The task of the first freight container 1 is finished.
The task of the second freight container 2 is the vanning task, calls the second freight container 2 away shipment by the gauntry crane of the buffer area that is in same position, finishes the task of the second freight container 2.
The task of the 3rd freight container 3 is the vanning task, according to task layout table, loaded onto ship by the bank bridge, then the 3rd truck 23 can directly drive to the position of buffer area bank bridge handled easily, then there is the buffer area level to lift fortune equipment and unloads case, the 3rd truck 23 can leave and carry out next task, and the 3rd freight container 3 can carry out ship-loading operation the bank bridge crane free time, finish the 3rd freight container 3 tasks.
The 4th freight container 4 is for unloading the case task.The 4th freight container 4 is unloaded to buffer area by the 3rd bank bridge crane 13, and the 3rd bank bridge crane 13 goes to carry out the arrival that other tasks need not waited for truck.And the first truck 21 drives to buffer area, can lift fortune equipment (for example can utilize empty container stacking machine) by the level of buffer area, and the 4th freight container 4 is installed on the first truck 21, and the first truck 21 leaves and goes to the stockyard, and the 4th freight container 4 tasks are finished.
Whole charge and discharge operations process by the diagram task can find out, because the existence that level is lifted fortune equipment in buffer area and the district, in freight container task handling process, bank bridge and truck have all guaranteed continuous duty, and device resource is fully utilized.
In sum, the present invention can weaken the coupled relation between bank bridge crane, stockyard and the truck, so that loading and unloading operation can be carried out more swimmingly, has increased the service efficiency of equipment, has improved the level of service of harbour, also provides convenience to the wharf master.The present invention can make finishing of freight container task more smooth and easy, improve the efficiency of service of harbour, reduce the coupled relation of each operation link, reduced influencing each other between each operation link, guaranteed that each link can finish separately the task of burden smoothly, brought convenience to the dispatcher simultaneously.The present invention is more suitable in existing container wharf, and the improvement cost that not only increases is few, and the benefit highly significant, can better satisfy and come the port to carry out the requirement of the boats and ships of operation.
Those skilled in the art can carry out various remodeling and change to the present invention.Therefore, the present invention has covered various remodeling and the change in the scope that falls into appending claims and equivalent thereof.

Claims (3)

1. a container wharf operation management method is characterized in that, the place that the method adopts comprises wharf apron, buffer area, an interior road, stockyard, the wharf apron is provided with the bank bridge crane, buffer area is provided with level and lifts fortune equipment, and road is provided with truck in, and the stockyard is provided with container yard gantry and hangs; The method comprises unloads case operation, stuffing, outer truck operation, when the bank bridge crane unloaded the case operation, the bank bridge crane was placed on buffer area with goods, after available free truck arrives, lift fortune equipment by level freight container is put on the truck, finish the whole case task operating that unloads; When carrying out stuffing, truck leaves directly freight container is placed on buffer area after arriving the wharf apron after, having the bank bridge crane to come collection dress when getting case, level lift fortune equipment with Container Transport to the position that the bank bridge crane needs, guaranteed that the bank bridge crane can continuous working; After road arrives the wharf apron in outer truck passes through the field, can lift fortune equipment by the level in the buffer area freight container of institute's carrying is discharged at buffer area, finish and to leave after unloading the case task, when available free bank bridge comes to get freight container, level is lifted fortune equipment Container Transport is arrived the position that the bank bridge crane needs, guarantee the continuous working of bank bridge crane, finished whole task.
2. container wharf operation management method as claimed in claim 1 is characterized in that, described level act fortune equipment is gauntry crane or carries out the empty container stacking machine that empty van operates.
3. container wharf operation management method as claimed in claim 1 is characterized in that, described buffer area is positioned at the next door of wharf apron.
CN2012104663419A 2012-11-19 2012-11-19 Container wharf operation and management method Pending CN102923491A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012104663419A CN102923491A (en) 2012-11-19 2012-11-19 Container wharf operation and management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012104663419A CN102923491A (en) 2012-11-19 2012-11-19 Container wharf operation and management method

Publications (1)

Publication Number Publication Date
CN102923491A true CN102923491A (en) 2013-02-13

Family

ID=47638457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012104663419A Pending CN102923491A (en) 2012-11-19 2012-11-19 Container wharf operation and management method

Country Status (1)

Country Link
CN (1) CN102923491A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107128700A (en) * 2017-06-20 2017-09-05 上海振华重工(集团)股份有限公司 Dock container induction system
CN109230588A (en) * 2018-08-20 2019-01-18 汽解放汽车有限公司 A kind of port vehicle automatic scheduling method
CN112731947A (en) * 2021-03-31 2021-04-30 上海海勃物流软件有限公司 Method, system and terminal for distributing interaction points of bridge crane and automatic guided vehicle
CN114455338A (en) * 2022-01-06 2022-05-10 东风柳州汽车有限公司 Port loading and unloading control system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004071911A1 (en) * 2003-02-14 2004-08-26 Rotterdam Short Sea Terminals B.V. Transshipment system for containers
EP1616822A1 (en) * 2004-07-06 2006-01-18 Perpetuma A method and system for transferring cargo
CN1903684A (en) * 2005-07-29 2007-01-31 包起帆 Automatization piling yard of containers and piling yard loading unloading process
CN200967678Y (en) * 2006-04-20 2007-10-31 上海振华港口机械(集团)股份有限公司 Container wharf
JP2012166869A (en) * 2011-02-10 2012-09-06 Mitsubishi Heavy Ind Ltd Container terminal, and operation method and cargo handling management device of the same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004071911A1 (en) * 2003-02-14 2004-08-26 Rotterdam Short Sea Terminals B.V. Transshipment system for containers
EP1616822A1 (en) * 2004-07-06 2006-01-18 Perpetuma A method and system for transferring cargo
CN1903684A (en) * 2005-07-29 2007-01-31 包起帆 Automatization piling yard of containers and piling yard loading unloading process
CN200967678Y (en) * 2006-04-20 2007-10-31 上海振华港口机械(集团)股份有限公司 Container wharf
JP2012166869A (en) * 2011-02-10 2012-09-06 Mitsubishi Heavy Ind Ltd Container terminal, and operation method and cargo handling management device of the same

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107128700A (en) * 2017-06-20 2017-09-05 上海振华重工(集团)股份有限公司 Dock container induction system
CN109230588A (en) * 2018-08-20 2019-01-18 汽解放汽车有限公司 A kind of port vehicle automatic scheduling method
CN112731947A (en) * 2021-03-31 2021-04-30 上海海勃物流软件有限公司 Method, system and terminal for distributing interaction points of bridge crane and automatic guided vehicle
CN112731947B (en) * 2021-03-31 2021-07-13 上海海勃物流软件有限公司 Method, system and terminal for distributing interaction points of bridge crane and automatic guided vehicle
CN114455338A (en) * 2022-01-06 2022-05-10 东风柳州汽车有限公司 Port loading and unloading control system
CN114455338B (en) * 2022-01-06 2023-06-23 东风柳州汽车有限公司 Port loading and unloading control system

Similar Documents

Publication Publication Date Title
CN104108611B (en) Automated container terminal handling system and handling method thereof
EP1798169A2 (en) A low frame bridge type system with carriers for transferring containers between a shore side crane and a stacking area crane
CN102114985A (en) Bulk loading and unloading method
CN109409779A (en) A kind of container hargour Production Scheduling System
CN109160294B (en) River and sea combined transport container transportation system and method based on rail collection truck
CN105174072B (en) Solve handling method and the gantry crane that automated container terminal AGV mutually waits with gantry crane
CN109132610B (en) Automatic wharf loading and unloading system and method for single-box span yard crane
CN109523173A (en) A kind of container hargour production scheduling method
CN102923491A (en) Container wharf operation and management method
CN108275476A (en) Container terminal horizontal transport vehicle dispatch system
CN101920852A (en) Container automatic yard
KR101298895B1 (en) Container terminal system
CN109160296B (en) River and sea combined transport container transit transportation system and method based on rail truck
CN205661892U (en) Load and unload formula container by oneself
CN100341771C (en) Dual-dan container crane capable of hoisting dual 40-foot box
CN203359826U (en) Bank crane with three sets of trolleys
CN201092516Y (en) Novel container gantry crane
CN1288053C (en) Container yard high-low crane relay type loading-unloading system
US20070090075A1 (en) Container crane with two carriers for lifting two 40 foot containers
CN103523679A (en) Container loading and unloading system with double-layer sea-crossing trestle bridge
CN212981745U (en) Directly get novel bulk cargo export wharf structure of formula
CN203740623U (en) Novel ferry crane for quayside container handling
CN108147146B (en) Closed transfer facility suitable for bridge type grab ship unloader operation
CN100462298C (en) Double pony truck container crane capable of hoisting two 40-feet containers simultaneously
CN208813990U (en) Goods yard structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130213