CN102797264B - Construction method for joints of underground continuous walls - Google Patents

Construction method for joints of underground continuous walls Download PDF

Info

Publication number
CN102797264B
CN102797264B CN201210316375.XA CN201210316375A CN102797264B CN 102797264 B CN102797264 B CN 102797264B CN 201210316375 A CN201210316375 A CN 201210316375A CN 102797264 B CN102797264 B CN 102797264B
Authority
CN
China
Prior art keywords
joint
underground continuous
gathering sill
construction method
brush wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210316375.XA
Other languages
Chinese (zh)
Other versions
CN102797264A (en
Inventor
刘忠池
姚海明
李睿
张中亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Yuanfang Groundwork Engineering Co., Ltd.
Original Assignee
SHANGHAI YUANFANG GROUNDWORK ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI YUANFANG GROUNDWORK ENGINEERING Co Ltd filed Critical SHANGHAI YUANFANG GROUNDWORK ENGINEERING Co Ltd
Priority to CN201210316375.XA priority Critical patent/CN102797264B/en
Publication of CN102797264A publication Critical patent/CN102797264A/en
Application granted granted Critical
Publication of CN102797264B publication Critical patent/CN102797264B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention relates to underground buildings, specifically to a construction method for joints of underground continuous walls. The construction method is provided to effectively solve the water leakage defect of the current joints of underground continuous walls. According to the invention, a joint approximating to a V-shaped steel plate is mounted at the juncture of a unit wall, and a tubular guide protruding rib is formed on the outer surface of a flat plate of the joint to perform the function of guiding; a joint box, a wall brusher and a temping machine with corresponding grooves are matched, so that the joints are closely adhered to the wall in construction. A guide rail can be added to guarantee the cohesive force between later poured concrete and the joint, so as to prevent the concrete from being separated from the joint and reduce the channel which leaks water, and further excellently prevent water leakage. The construction method has the advantage that the water leakage defect of the joints of underground continuous walls can be well solved, so that the underground continuous walls can be integrated more closely to ensure that no water leaks from the joints.

Description

A kind of construction method for underground continuous wall connector
Technical field
The present invention relates to underground building class, be specifically related to a kind of construction method for underground continuous wall connector.
Background technology
Diaphragm wall is the safest structure of Extra-Deep Foundation Pit, along with the reduction of cost, perfect, quick construction, the convenience of technique, applies more and more extensive in the deep foundation pit support such as subway, Fang Jian.Form because diaphragm wall to be interconnected with certain joint form by unit groove one by one, actual is not continuous print, therefore the joint density between underground continuous wall groove segment is extremely important, joint construction quality is if there is problem, engineering underground structure will be caused to occur Seepage, directly have influence on the use of engineering underground structure, seepage not only affects the using function of building but also processes very difficult, but traditional handicraft is difficult to ensure seam quality.Wherein topmost reason is that traditional jointing brush wall technique cannot ensure clear joints, and the concrete especially joint adhered to or cement paste are difficult to remove completely; Meanwhile, also there is uncertain factor in the operation of workman.Therefore must adopt an effective measure when unit wall joint is constructed and problem hidden danger solved in advance, with trouble without offspring.
Summary of the invention
The object of the invention is according to above-mentioned the deficiencies in the prior art part, a kind of construction method for underground continuous wall connector is provided, this construction method by the guiding fin that arranges round tube shape on joint to make joint case, tamper and brush wall device all can along the closely connected work of this guiding rail, make diaphragm wall form an entirety more closely, guarantee that joint is water-tight.
The realization of the object of the invention is completed by following technical scheme:
For a construction method for underground continuous wall connector, be specifically related to reinforcing cage, joint, joint case and brush wall device, it is characterized in that at least comprising the steps:
Arrange the female adapter of described reinforcing cage, wherein said joint is made up of wing plate that is dull and stereotyped, that be positioned at dull and stereotyped both sides and the tuck portion that is positioned at wing plate edge, and the external surface of the flat board of described joint is fixedly installed guiding fin;
Described joint case is set, described joint case is a trapezoidal cabinet, described joint case is on a side of described female adapter, be provided with a matrix gathering sill, the shape of the exterior contour of described guiding fin and the in-profile of described matrix gathering sill, size and relative position are adaptive mutually, and can realize relative sliding therebetween;
Described brush wall device is set, the brush wall of described brush wall device offers a concavity gathering sill, shape, size and relative position between the in-profile of the concavity gathering sill on described brush wall and the exterior contour of described guiding fin are adaptive mutually, and can realize relative sliding therebetween.
Described guiding fin is the pipe that the external surface protruding from described flat board is fixedly installed.
Local on the matrix gathering sill of described joint case is provided with magnet, and offer groove bottom the matrix gathering sill of described joint case, described magnet is embedded in described groove.
Bottom described brush wall device and the back side being positioned at described brush wall is equipped with right-angled triangle fin plate, the low-angle summit of wherein said right-angled triangle fin plate flushes with described brush wall device base.
The present invention compared with prior art, has following beneficial effect: the guiding fin be arranged on joint ensure that good brush wall and the effect of making firm by ramming, extends infiltration path and enhances the adhesion stress of joint and rear fluid concrete; Tamper builds upper and lower withdrawing and the folder mud burning into sand wiped off in guide channel with concrete, ensure that the closely connected of concrete and joint well, effective filling pilot hole inner concrete closely knit.Obviously utilize the present invention can well solve the percolating water defect of underground continuous wall connector, make diaphragm wall form an entirety more closely, guarantee that joint is water-tight.
Accompanying drawing explanation
Fig. 1 is that construction schematic diagram laid by joint of the present invention and joint case;
Fig. 2 is the joint design schematic diagram of the guiding fin of band O shape pipe of the present invention;
Fig. 3 is brush wall device top view of the present invention;
Fig. 4 is brush wall device elevation of the present invention;
Fig. 5 is brush wall device of the present invention construction lateral view;
Fig. 6 is brush wall device of the present invention construction top view;
Fig. 7 is tamper of the present invention construction lateral view;
Fig. 8 is tamper of the present invention construction top view;
Fig. 9 is that construction schematic diagram laid by the preferred joint of the section of groove in advance of the present invention and joint case;
Figure 10 is the joint design schematic diagram of T-shaped of the present invention guiding fin;
Figure 11 is preferred tamper construction top view of the present invention;
Figure 12 is preferred brush wall device construction top view of the present invention.
Detailed description of the invention
Feature of the present invention and other correlated characteristic are described in further detail by embodiment below in conjunction with accompanying drawing, so that the understanding of technician of the same trade:
What in accompanying drawing 1-8, label 1-11 represented is joint 1, joint case 2, magnet 3, reinforcing cage 4, guiding fin 5, matrix gathering sill 6, grouting iron sheet 7, wire brush 8, concavity gathering sill 9, brush wall device 10, hanger 11, fin plate 12, crane 13, tamper 14.
Embodiment: as shown in Fig. 1 ~ 8, the present invention relates to underground building class, is specifically related to a kind of construction method for underground continuous wall connector.The construction of underground continuous wall jointing method that the present embodiment relates to specifically comprises reinforcing cage 4, the joint 1 be welded on reinforcing cage 4, the joint case 2, brush wall device 10 and the tamper 14 that fit tightly with joint 1; Specific construction step of the present invention is as follows:
1. first joint 1 is arranged on the reinforcing cage 4 in first phase groove section, and integral solder is shaping, if when the ground wall degree of depth is darker, install grouting iron sheet 7 in the marginal portion of joint 1, reduces the risk that concrete streams; Wherein said joint 1 is made up of wing plate that is dull and stereotyped, that be positioned at dull and stereotyped both sides and the tuck portion that is positioned at wing plate edge, and on the center line of joint 1, arrange a guiding fin 5, and guiding fin 5 is made up of O shape pipe.
2. thereafter joint case 2 is fitted tightly along guiding fin 5 with joint 1; For ensureing that joint case 2 can as much as possible near tubular guiding rail 5, trapezoidal matrix gathering sill 6 offered by joint case 2 with the binding face of guiding rail 5, and plane bottom trapezoidal matrix gathering sill 6 offers a groove and embedded magnet 3, thus make joint case 2 in decentralization process, magnet 3 is had an effect and joint case 2 and joint 1 can be fitted tightly all the time, ensure the unlikely distortion of joint 1 and affect subsequent construction, effectively preventing streaming concrete enters the second stage of groove section joint simultaneously.The trapezoidal matrix gathering sill 6 that its center tap case 2 is offered, its groove dual-side slopes inwardly, form the gradient slideway when tubular guiding fin 5 be convenient on joint 1 enters, such as, bottom trapezoidal matrix gathering sill 6 wide is about 60cm, and the diameter of tubular guiding fin 5 is about 48cm.
3. then reinforcing cage 4 is transferred in first phase groove section, and carry out concretely building operation, in concrete casting process, joint 1 place of tamper 14 in reinforcing cage 4 is driven to do tamping operation on vertical direction by crane 13, along with the rising of concrete surface, tamper 14 is upwards promoted along guiding fin 5, and 5 ~ 6m below the Transducers Embedded in Concrete face, bottom remaining tamper 14; After concreting to design elevation, tamper 14 is slowly at the uniform velocity extracted.Wherein tamper 14 can wipe the folder mud burning into sand at guiding fin 5 structure place off in upper and lower withdrawing process, ensure that the closely connected of concrete and joint 1 well, and effective filling is led the closely knit of fin 5 inner concrete.
4. when after concrete initial set, joint case 2 is extracted.
5. the second stage of groove section of groover excavation next-door neighbour after; Treat that described the second stage of groove section is dug, the tubular guiding fin 5 inserted by opening O shape concavity gathering sill 9 on brush wall device 10 on joint 1 forms mandatory brush wall, and make the spacing between the brush wall of brush wall device 10 and joint 1 keep being separated by 20 ~ 30cm, ensure that wire brush on brush wall device 10 8 and joint 1 fit tightly and wire brush 8 is applied to frictional force on joint 1; Crane 13 is by catching on hanger 11 in the vertical direction handling brush wall device 10 subsequently, first the mass concrete be attached on joint 1 and silt particle are rooted out moving downward in process the fin plate 12 bottom the brush wall device 10 that leads, the tiny silt particle be attached on joint 1 brushes totally by wire brush 8 subsequently.Its center tap 1 is cleaned with water part for tab portions that is dull and stereotyped and dull and stereotyped both sides by wire brush 8.
6. after wall cleaning process to be brushed terminates, basic skill or training is clearly carried out to described the second stage of groove section and does, then transfer reinforcing cage and carry out concrete building, complete the joint construction that all grooves are intersegmental and so forth.
As shown in Fig. 9,10,11,12, the shape of the guiding rail 5 described in the present invention is not limited to pipe O shape, also can be T steel plate.Along with guiding fin 5 shape becomes T steel plate, the groove of tamper 14 also changes into T-shaped groove thereupon, and the concavity gathering sill 9 of brush wall device 10 also becomes T-shaped concavity gathering sill thereupon.Therefore those skilled in the art obviously understands the alteration of form along with guiding fin 5, and the groove on tamper 14 and brush wall device 10 also will change into the groove shapes matched with it thereupon.
The present invention adds guiding fin 5 relative to traditional handicraft, the guide rail that described guiding fin 5 can be used as later stage brush wall and makes firm by ramming, thus the effect ensureing brush wall better and make firm by ramming; Extend infiltration path, more effectively reduce the risk of percolating water, percolating water can be prevented and treated better; After ensureing, the adhesion stress of pouring concrete and joint 1, prevents the disengaging between concrete and joint 1, reduces the passage of percolating water, prevents the generation of percolating water well.

Claims (3)

1., for a construction method for underground continuous wall connector, be specifically related to reinforcing cage, joint, joint case and brush wall device, it is characterized in that at least comprising the steps:
Arrange the female adapter of described reinforcing cage, wherein said female adapter is made up of wing plate that is dull and stereotyped, that be positioned at dull and stereotyped both sides and the tuck portion that is positioned at wing plate edge, and the external surface of the flat board of described joint is fixedly installed guiding fin;
Described joint case is set, described joint case is a trapezoidal cabinet, described joint case is on a side of described female adapter, be provided with a matrix gathering sill, the shape of the exterior contour of described guiding fin and the in-profile of described matrix gathering sill, size and relative position are adaptive mutually, and can realize relative sliding therebetween;
Described brush wall device is set, the brush wall of described brush wall device offers a concavity gathering sill, shape, size and relative position between the in-profile of the concavity gathering sill on described brush wall and the exterior contour of described guiding fin are adaptive mutually, and can relative sliding be realized therebetween, bottom described brush wall device and the back side being positioned at described brush wall is equipped with right-angled triangle fin plate, the low-angle summit of wherein said right-angled triangle fin plate flushes with described brush wall device base.
2. a kind of construction method for underground continuous wall connector according to claim 1, is characterized in that described guiding fin is the pipe that the external surface protruding from described flat board is fixedly installed.
3. a kind of construction method for underground continuous wall connector according to claim 1, it is characterized in that local on the matrix gathering sill of described joint case is provided with magnet, offer groove bottom the matrix gathering sill of described joint case, described magnet is embedded in described groove.
CN201210316375.XA 2012-08-31 2012-08-31 Construction method for joints of underground continuous walls Active CN102797264B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210316375.XA CN102797264B (en) 2012-08-31 2012-08-31 Construction method for joints of underground continuous walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210316375.XA CN102797264B (en) 2012-08-31 2012-08-31 Construction method for joints of underground continuous walls

Publications (2)

Publication Number Publication Date
CN102797264A CN102797264A (en) 2012-11-28
CN102797264B true CN102797264B (en) 2015-02-25

Family

ID=47196545

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210316375.XA Active CN102797264B (en) 2012-08-31 2012-08-31 Construction method for joints of underground continuous walls

Country Status (1)

Country Link
CN (1) CN102797264B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104912057B (en) * 2015-04-13 2017-03-29 上海远方基础工程有限公司 Construction method of underground continuous wall
CN107700475B (en) * 2017-11-16 2023-07-28 浙江杰立建设集团有限公司 Assembled concrete underground diaphragm wall structure and construction process

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2981632B2 (en) * 1992-11-10 1999-11-22 東急建設株式会社 Construction method of joint of underground wall
JP3867197B2 (en) * 2001-08-01 2007-01-10 株式会社大林組 Method for constructing joint part of underground wall and removal device for joint part forming tool of underground wall
KR101025179B1 (en) * 2008-12-19 2011-03-31 코오롱건설주식회사 Reinforcement assembly and c.i.p. construction method
CN102155010A (en) * 2011-05-28 2011-08-17 上海远方基础工程有限公司 Seaming method of underground diaphragm wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2981632B2 (en) * 1992-11-10 1999-11-22 東急建設株式会社 Construction method of joint of underground wall
JP3867197B2 (en) * 2001-08-01 2007-01-10 株式会社大林組 Method for constructing joint part of underground wall and removal device for joint part forming tool of underground wall
KR101025179B1 (en) * 2008-12-19 2011-03-31 코오롱건설주식회사 Reinforcement assembly and c.i.p. construction method
CN102155010A (en) * 2011-05-28 2011-08-17 上海远方基础工程有限公司 Seaming method of underground diaphragm wall

Also Published As

Publication number Publication date
CN102797264A (en) 2012-11-28

Similar Documents

Publication Publication Date Title
CN104404983B (en) A kind of ride well device and construction method thereof for jacking construction
CN110725302B (en) Construction method of prefabricated cast-in-place combined underground diaphragm wall
CN110700237A (en) Construction method of diaphragm wall for preventing concrete from flowing around
CN102797264B (en) Construction method for joints of underground continuous walls
CN107604933B (en) Leaning type steel sleeve cofferdam
CN105332511A (en) Huge concrete filled steel tubular column core grouting pouring and tamping device and method
CN105064352A (en) Building expanding head anchor rod pile construction technology and anchor rod pile adopting technology
CN103790160A (en) Method for pulling out structural steel and conducting grouting through SMW construction method
CN110241800A (en) Drilling platform construction method under a kind of disorderly Condition of Supercritical Flow of naked rock of high inclination-angle
CN110206071A (en) A kind of diaphram wall seam reinforcement means and device
JP5840891B2 (en) Removal method of retaining members
CN211312489U (en) High rich water faces sea area diaphragm wall and connects sealing device
CN112324990A (en) Method and structure for reinforcing underground straight buried pipe
JP6301769B2 (en) Deep foundation method
CN213839806U (en) Underground direct buried pipe reinforcing structure
CN110387875A (en) Connector cutting device and its construction method
CN202247998U (en) Underground continuous wall joint cleaner
CN202755381U (en) Joint box for underground continuous wall
CN205636744U (en) Position slip casting device is connected with bottom plate in ground even wall
CN213897194U (en) Filling type rubber joint pipe
JP2012214980A (en) Construction method for underground wall and extraction method for core material of the underground wall
TW200930863A (en) Construction method for T-shaped interface connecting case of diaphragm wall and buttress wall or cross wall
CN105714826A (en) Prestressed concrete pipe pile core hole cleaning device and operation method
CN205990627U (en) Bury waterstop in connected entrance and fixing and protection integrated device is installed
CN104727305A (en) Drilling and high-pressure grouting construction method for uplift pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SHANGHAI DISTANCE FOUNDATION ENGINEERING CO.,LTD.

Free format text: FORMER OWNER: LIU ZHONGCHI

Effective date: 20140402

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20140402

Address after: 200436, room 56, No. three, 502 Shanghai Road, Zhabei District, China

Applicant after: Shanghai Yuanfang Groundwork Engineering Co., Ltd.

Address before: 200436, room 56, No. three, 502 Shanghai Road, Zhabei District, China

Applicant before: Liu Zhongchi

C14 Grant of patent or utility model
GR01 Patent grant