The method of 500kV charged for replacement synthetic insulator
Technical field
The present invention relates to a kind of method of 500kV charged for replacement synthetic insulator.
Background technology
Because the leading screw on the insulated tension pole top of the used lifting lead of charged for replacement 500kV synthetic insulator promotes and pine to fall distance limited, the operation of traditional 500kV transmission line charged for replacement synthetic insulator differ greatly like different model, length and original synthetic insulator or too much situation under adopt the power failure processing mostly.
Summary of the invention
The technical problem that the present invention will solve provides a kind of method of 500kV charged for replacement synthetic insulator, and this method can realize that charged for replacement different model, length and original synthetic insulator differ greatly or too much synthetic insulator.
In order to solve the problem that prior art exists, the technical scheme that the present invention adopts is:
The method of 500kV charged for replacement synthetic insulator may further comprise the steps:
1. the second protection device is installed: equipotential electrician gets into highfield along insulated flexible ladder, and the hook of buckle-type second protection device is hung on the iron tower cross-arm, and the device that will go offline is buckled on the conductors on quad bundled;
2. adjustable line hanging hook is installed: the tower head leading screw is installed in iron tower cross-arm head; After adjustable insulation arm-tie and adjustable line hanging hook assembled; Adjustable insulation arm-tie reliably is connected with the tower head leading screw, is buckled on the conductors on quad bundled by the equipotential electrician device that will go offline again;
3. change insulator: screw or unscrew the tower head leading screw, make adjustable line hanging hook bear the gravity vertically downward of conductors on quad bundled, old insulator is taken off, again leading screw is screwed or unscrewed to correct position to correct position.
4. second adjustable line hanging hook be installed, the tower head leading screw is transferred to pine or the tightest, the length of regulating adjustable insulation arm-tie then; Make the length of length summation and first adjustable insulation arm-tie of second tower head leading screw and the second insulated arm-tie identical; And then screw or unscrew the second rhizoid thick stick, bear the gravity of conductors on quad bundled with second line hanging hook, it is stressed to be used alternatingly two tower head leading screws repeatedly; Until identical with new synthetic insulator length, i.e. installation.
Advantage and effect that the present invention had are:
The method of 500kV charged for replacement synthetic insulator of the present invention does not receive the tower restriction, does not receive the restriction of insulator length, can realize that charged for replacement different model, length and original synthetic insulator differ greatly or too much synthetic insulator.Can adapt to multiple insulator model, multiple insulation combining form; Two rhizoid thick sticks need not simultaneously stressed, and a rhizoid thick stick is stressed, a rhizoid thick stick is changed joint, another rhizoid thick stick adjustment joint when the leading screw of replacing joint is stressed once more; Accomplish until changing, increase work efficiency.
Description of drawings
Employed instrument in the method for Fig. 1 500kV charged for replacement of the present invention synthetic insulator.
Among the figure: buckle-type second protection device 1; Hook 11; Iron tower cross-arm 2; Device 12 goes offline; Conductors on quad bundled 3; Tower head leading screw 4; Adjustable insulation arm-tie 5; Adjustable line hanging hook 6; Device 61 goes offline; Synthetic insulator 7.
Embodiment
Below in conjunction with accompanying drawing the present invention is made further detailed description:
As shown in Figure 1, the method for 500kV charged for replacement synthetic insulator of the present invention may further comprise the steps:
1. the second protection device is installed: equipotential electrician gets into highfield along insulated flexible ladder, and the hook 11 of buckle-type second protection device 1 is hung on the iron tower cross-arm 2, and the device 12 that will go offline is buckled on the conductors on quad bundled 3;
2. adjustable line hanging hook is installed: tower head leading screw 4 is installed in iron tower cross-arm head; After adjustable insulation arm-tie 5 and adjustable line hanging hook 6 assembled; Adjustable insulation arm-tie 5 reliably is connected with tower head leading screw 4, is buckled on the conductors on quad bundled 3 by the equipotential electrician device 61 that will go offline again;
3. change insulator: according to the length of the insulator that will change; Screw or unscrew the tower head leading screw to correct position; Make adjustable line hanging hook bear the gravity vertically downward of conductors on quad bundled, old insulator is taken off, again leading screw is screwed or unscrewed to correct position.
4. second adjustable line hanging hook be installed, tower head leading screw 4 is transferred to pine or the tightest, the length of regulating adjustable insulation arm-tie 5 then; Make the length of length summation and first adjustable insulation arm-tie 5 of second tower head leading screw and the second insulated arm-tie identical; And then screw or unscrew the second rhizoid thick stick, bear the gravity of conductors on quad bundled 3 with second line hanging hook, it is stressed to be used alternatingly two tower head leading screws repeatedly; Until identical with new synthetic insulator 7 length, i.e. installation.
Below being example under the short situation of the new insulator that will change:
1. the second protection device is installed: equipotential electrician gets into highfield along insulated flexible ladder, and the hook 11 of buckle-type second protection device 1 is hung on the iron tower cross-arm 2, and the device 12 that will go offline is buckled on the conductors on quad bundled 3, prevents lead accidental in the operation.
2. adjustable line hanging hook is installed: tower head leading screw 4 is installed in iron tower cross-arm head; After adjustable insulation arm-tie 5 and adjustable line hanging hook 6 assembled; Adjustable insulation arm-tie 5 reliably is connected with tower head leading screw 4, is buckled on the conductors on quad bundled 3 by the equipotential electrician device 61 that will go offline again;
3. change insulator: the tower head leading screw 4 of screwing makes adjustable line hanging hook 6 bear the gravity vertically downward of conductors on quad bundled 3 to correct position, and old insulator is taken off, and is threaded to tower head leading screw 4 the tightest again.
4. second adjustable line hanging hook be installed, tower head leading screw 4 is transferred to pine, the length of regulating adjustable insulation arm-tie 5 then; Make the length of length summation and first adjustable insulation arm-tie of second tower head leading screw and the second insulated arm-tie identical; And then the second tower head leading screw of screwing, bear the gravity of conductors on quad bundled with second line hanging hook, it is stressed to be used alternatingly two rhizoid thick sticks repeatedly; Until identical with new synthetic insulator length, i.e. installation.