CN102635239A - Method for anchoring welding wire-mesh reinforcement on floorslab bottom into support - Google Patents

Method for anchoring welding wire-mesh reinforcement on floorslab bottom into support Download PDF

Info

Publication number
CN102635239A
CN102635239A CN2012101490210A CN201210149021A CN102635239A CN 102635239 A CN102635239 A CN 102635239A CN 2012101490210 A CN2012101490210 A CN 2012101490210A CN 201210149021 A CN201210149021 A CN 201210149021A CN 102635239 A CN102635239 A CN 102635239A
Authority
CN
China
Prior art keywords
reinforcing bar
bent
steel fabric
reinforcement
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101490210A
Other languages
Chinese (zh)
Inventor
孟凡林
孟祥瑞
付萍
孟锦
Original Assignee
孟凡林
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 孟凡林 filed Critical 孟凡林
Priority to CN2012101490210A priority Critical patent/CN102635239A/en
Publication of CN102635239A publication Critical patent/CN102635239A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention relates to a method for anchoring welding wire-mesh reinforcement on a floorslab bottom into a support, which belongs to the constructional engineering structure type. The limitation of the longitudinal reinforcement of a beam or a wall is avoided, the end part of the reinforcement of the welding wire-mesh reinforcement on the floorslab bottom is upwards bent to be anchored into the support, the welding wire-mesh reinforcement on the reinforced concrete floorslab bottom can be conveniently put to the proper position, so that the wire-mesh reinforcement is integrally used in one piece of plate, the later-stage supplementing and binding workload can be cancelled or reduced, the use amount of the reinforcement is saved, the floorslab wire-mesh reinforcement is conveniently applied in the engineering, and the commercial reinforcement is accelerated to popularize so as to achieve the effect on shortening the work period and lowering the engineering construction cost.

Description

The floor slab bottoms welded steel fabric anchors into the method for bearing
Technical field
The present invention relates to the building engineering structure class; The reinforcement structure that particularly relates to reinforced concrete floor; Especially refer to in-situ reinforced concrete slab bottom reinforcement bars welded mesh is anchored into the improvement of bearing method; Can make things convenient for floor slab bottoms welded steel fabric placed in position, can cancel or reduce the later stage and replenish the colligation workload, the floor slab bottoms welded steel fabric of saving amount of reinforcement anchors into the method for bearing.
Background technology
At present; The method that the reinforced concrete floor reinforcing bar anchors into bearing is the straight bearing that stretches into of bottom reinforcement bars, sees " Code for design of concrete structures " (GB50010-2010) 9.1.4 bar and " whole method for expressing cartographic convention of concrete structure construction plan and constructional detail " (11G101-1) the 92nd page.The problem that this method exists is; When bottom reinforcement bars adopts the full wafer welded steel fabric; The placement of welded steel fabric can receive the restriction of longitudinal reinforcement present position in bearing place beam or the wall; Welded steel fabric can't straightly stretch into bearing; Welded steel fabric can't be used by full wafer in a floor, the mode that can only take to block overlap joint or set up a diffusing reinforcing bar, way is seen " welded steel fabric concrete structure tecnical regulations " (JGJ 114-2003) 5.1.11 bar and " welded steel fabric concrete floor and shear wall constructional detail " (04SG309).
The problem of above-mentioned existence needs further to improve.
Summary of the invention
The present invention is directed to when the reinforced concrete floor bottom reinforcement bars adopts the full wafer welded steel fabric; The placement of welded steel fabric can receive the restriction of longitudinal reinforcement present position in bearing place beam or the wall; Welded steel fabric can't straightly stretch into the deficiency of bearing; Take after floor slab bottoms welded steel fabric end reinforced upwards having been bent, to anchor into the method for bearing, make welded steel fabric can stretch into bearing near support position.
Technical scheme of the present invention is: avoid the restriction of longitudinal reinforcement in beam or the wall; Anchor into bearing after reinforced concrete floor bottom reinforcement bars welded mesh end reinforced upwards bent, can make things convenient for reinforced concrete floor bottom reinforcement bars welded mesh placed in position, realize that welded steel fabric full wafer in a plate uses; Can cancel or reduce the later stage and replenish the colligation workload; Save amount of reinforcement, make things convenient for the floor bar welded mesh, promote the popularization of commercialization reinforcing bar in application in engineering; Reach the effect of reduction of erection time, reduction engineering construction cost, the method that floor slab bottoms welded steel fabric of the present invention anchors into bearing is:
A, the end reinforced of reinforced concrete floor bottom reinforcement bars welded mesh upwards bent;
B, reinforcing bar have been bent the inflection point and have been adjusted according to the needs of its structure design to the size of the distance at bearing edge;
C, the every end reinforced welded mesh of having bent of floor slab bottoms can adopt the full wafer welded steel fabric, also can adopt the burst welded steel fabric;
Artificial having bent or mechanical bending adopted in having bent of d, reinforcing bar.
Wherein, reinforcing bar is the listed any kind reinforcing bar of existing Code for design of concrete structures.
The present invention can make things convenient for reinforced concrete floor bottom reinforcement bars welded mesh placed in position; Realize that welded steel fabric full wafer in a plate uses; Can cancel or reduce the later stage and replenish the colligation workload, save amount of reinforcement, make things convenient for the floor bar welded mesh in application in engineering; Promote the popularization of commercialization reinforcing bar, reach the reduction of erection time, save steel, reduce the artificial effect of measuring, reducing the engineering construction cost.
Description of drawings
Fig. 1 for existing floor plate at the bottom of reinforcing bar anchor into the method front view of bearing.
Fig. 2 anchors into the method vertical view of bearing for existing floor bar welded mesh.
Fig. 3 anchors into the method sketch map of bearing for floor slab bottoms welded steel fabric of the present invention.
The figure number implication: 1. bearing, 2. the long span reinforcing bar, 3. loose a reinforcing bar, 4. another long span reinforcing bar, 4a. bend the long span reinforcing bar, have 5. shortly striden reinforcing bar, 6. another short reinforcing bar, 6a. of striding has been bent and located that weak point is striden reinforcing bar, 7. portion has been bent in the welded steel fabric end.
The specific embodiment
Shown in accompanying drawing 1 and accompanying drawing 2; For reinforcing bar at the bottom of the existing floor plate anchors into the method sketch map of bearing; As can be seen from the figure; Stride reinforcing bar 5 and the short reinforcing bar 6 of striding when adopting the full wafer welded steel fabrics when bottom long span reinforcing bar 2 and long span reinforcing bar 4 and short, the placement of welded steel fabric can receive the restriction of longitudinal reinforcement present position in beam or the wall place bearing 1, and welded steel fabric can't straightly stretch into beam or the bearing 1 of portion has been bent in wall welded steel fabric end; Welded steel fabric can't be used by full wafer in a floor, can only take the mode of blocking overlap joint or setting up a reinforcing bar 3 that looses.
Shown in accompanying drawing 3; Be employed near bearing 1 position the end reinforced of floor slab bottoms welded steel fabric upwards bent its this bottom long span reinforcing bar 4a; Become by having bent the welded steel fabric end that the long span reinforcing bar constitutes and bent portion 7 together with having bent the short reinforcing bar 6a that strides in place; After anchor into the method for bearing, make welded steel fabric can stretch into the bearing 1 of beam or wall.

Claims (2)

1. a floor slab bottoms welded steel fabric anchors into the method for bearing, it is characterized in that: avoid the restriction of longitudinal reinforcement in beam or the wall, anchor into bearing after reinforced concrete floor bottom reinforcement bars welded mesh end reinforced upwards bent; Can make things convenient for reinforced concrete floor bottom reinforcement bars welded mesh placed in position; Realize that welded steel fabric full wafer in a plate uses, can cancel or reduce the later stage and replenish the colligation workload, save amount of reinforcement; Make things convenient for the floor bar welded mesh in application in engineering; Promote the popularization of commercialization reinforcing bar, reach the effect of reduction of erection time, reduction engineering construction cost, concrete grammar is:
A, the end reinforced of reinforced concrete floor bottom reinforcement bars welded mesh upwards bent;
B, reinforcing bar have been bent the inflection point can be according to the needs adjustment of structure design to the position of the distance of bearing;
C, the every end reinforced welded mesh of having bent of floor slab bottoms can adopt the full wafer welded steel fabric, also can adopt the burst welded steel fabric;
Artificial having bent or mechanical bending adopted in having bent of d, reinforcing bar.
2. anchor into the method for bearing according to the described floor slab bottoms welded steel fabric of claim 1, it is characterized in that: described reinforcing bar is the listed any kind reinforcing bar of existing Code for design of concrete structures.
CN2012101490210A 2012-05-15 2012-05-15 Method for anchoring welding wire-mesh reinforcement on floorslab bottom into support Pending CN102635239A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101490210A CN102635239A (en) 2012-05-15 2012-05-15 Method for anchoring welding wire-mesh reinforcement on floorslab bottom into support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101490210A CN102635239A (en) 2012-05-15 2012-05-15 Method for anchoring welding wire-mesh reinforcement on floorslab bottom into support

Publications (1)

Publication Number Publication Date
CN102635239A true CN102635239A (en) 2012-08-15

Family

ID=46619803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101490210A Pending CN102635239A (en) 2012-05-15 2012-05-15 Method for anchoring welding wire-mesh reinforcement on floorslab bottom into support

Country Status (1)

Country Link
CN (1) CN102635239A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153467A (en) * 2014-05-15 2014-11-19 华南理工大学建筑设计研究院 Device for connecting shear wall and concrete floor in construction structure and arranging method thereof
CN107605095A (en) * 2017-08-15 2018-01-19 浙江省建设投资集团股份有限公司 Benzvalene form muscle overlapping prefabricated board and preparation method thereof
CN108301565A (en) * 2018-02-26 2018-07-20 吉林建筑大学 Three kinds of deformed bar welded mesh and preparation method
CN115306022A (en) * 2022-08-16 2022-11-08 上海核工程研究设计院有限公司 Connecting node and method for reinforced concrete floor and steel plate concrete wall

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000336841A (en) * 1999-05-28 2000-12-05 Taisei Corp Wire mesh reinforcement
CN101845850A (en) * 2010-06-22 2010-09-29 中国建筑第二工程局有限公司 Stiff concrete frame structure and construction method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000336841A (en) * 1999-05-28 2000-12-05 Taisei Corp Wire mesh reinforcement
CN101845850A (en) * 2010-06-22 2010-09-29 中国建筑第二工程局有限公司 Stiff concrete frame structure and construction method thereof

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
中国建筑科学研究院: "《钢筋焊接网混凝土结构技术规程》", 1 September 2003 *
李亭: "钢筋焊接网施工监控", 《山西建筑》 *
苏飞舟: "钢筋焊接网在北京百荣世贸商城工程中的应用", 《建筑技术》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153467A (en) * 2014-05-15 2014-11-19 华南理工大学建筑设计研究院 Device for connecting shear wall and concrete floor in construction structure and arranging method thereof
CN104153467B (en) * 2014-05-15 2016-07-20 华南理工大学建筑设计研究院 The device of shear wall and concrete floor and method to set up thereof in a kind of connecting building structure
CN107605095A (en) * 2017-08-15 2018-01-19 浙江省建设投资集团股份有限公司 Benzvalene form muscle overlapping prefabricated board and preparation method thereof
CN108301565A (en) * 2018-02-26 2018-07-20 吉林建筑大学 Three kinds of deformed bar welded mesh and preparation method
CN115306022A (en) * 2022-08-16 2022-11-08 上海核工程研究设计院有限公司 Connecting node and method for reinforced concrete floor and steel plate concrete wall

Similar Documents

Publication Publication Date Title
CN103806546B (en) A kind of method of attachment of precast concrete plank
CN103850352B (en) A kind of method of attachment of precast plate
CN103572873B (en) Assembled integral floor and construction method thereof
CN104405041B (en) The prefabricated floor connector of steel building and mounting method thereof
CN102635239A (en) Method for anchoring welding wire-mesh reinforcement on floorslab bottom into support
CN103388408A (en) External pre-stressed tendon reinforcing steering block for building structure
CN204199330U (en) The overall steel plate for sealing water in a kind of ater-casting
CN204225277U (en) The prefabricated floor connector of steel building
CN103806539B (en) A kind of method of attachment of precast rc slab
RU2380483C1 (en) Foundation
CN109208785B (en) Assembled superposed structure system
CN103806537B (en) The method of attachment of sleeper formula precast unit
CN202767286U (en) Connection joint of precast concrete shear wall and main steel structure
CN207079605U (en) The prefabricated concrete gridiron of highway slope protection
CN201915411U (en) Soil nailing wall supporting structure
CN202000686U (en) Composite steel structure for concrete reinforcement
CN204001280U (en) A kind of fabricated shear wall of novel embedded i iron
CN203007960U (en) Novel side slope shotcreting-bolting support structure
CN201943071U (en) Implantable steel tube anchor rod with stabs
RU2447232C1 (en) Method of shallow strip foundation reinforcement
CN204151902U (en) The syndeton of a kind of non-prestressed superimposed sheet and bearing
CN204356958U (en) A kind of fixing floor spiced benefit roof beam structure
CN110984235B (en) Construction method of post-cast strip water stop structure
RU2380484C1 (en) Foundation
WO2019097471A1 (en) Anchoring device for structural profiles

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120815