CN102570347A - Work method for overhauling suspension clamp with electricity on 110kv line - Google Patents

Work method for overhauling suspension clamp with electricity on 110kv line Download PDF

Info

Publication number
CN102570347A
CN102570347A CN 201110450784 CN201110450784A CN102570347A CN 102570347 A CN102570347 A CN 102570347A CN 201110450784 CN201110450784 CN 201110450784 CN 201110450784 A CN201110450784 A CN 201110450784A CN 102570347 A CN102570347 A CN 102570347A
Authority
CN
China
Prior art keywords
electrician
insulating
suspension clamp
clamp
people
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110450784
Other languages
Chinese (zh)
Inventor
张新伟
耿大明
张葆青
田江波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Baoding Power Supply Co Ltd
Original Assignee
Baoding Power Supply Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoding Power Supply Co Ltd filed Critical Baoding Power Supply Co Ltd
Priority to CN 201110450784 priority Critical patent/CN102570347A/en
Publication of CN102570347A publication Critical patent/CN102570347A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention discloses a work method for overhauling a suspension clamp on a 100kv line, which comprises the following steps: 1, determining an on-site worker; 2, defining positions of a first electrician and a second electrician on towers; 3, defining position for installing an insulation transferring rope; 4, transferring work tools by workers on ground; 5, installing two sets of insulating pulley blocks with insulating ropes on a pole arm and using two hooks at the lower ends of the two sets of insulating pulley blocks to hook wires oppositely; 6, frapping a lifting tool to separate a wire clamp from an insulator; 7, hooking and pulling the suspension clamp through an insulating operation lever by the second electrician and overturning the suspension clamp through an insulating operation lever by the first electrician; 8, assembling parts through the insulating operation lever by the second electrician; 9, and recovering the suspending connection between the wire and the insulator, removing the insulating tools, and ending after the electricians go down the tower. With the adoption of the work method provided by the invention, the high-risk work can be performed safely and reliability under standard specification.

Description

The operational method of 110kV circuit hotline maintenance suspension clamp
Technical field
The present invention relates to the high-voltage hot-line work technology in the electric power system, relate in particular to a kind of operational method of 110kV circuit hotline maintenance suspension clamp.
Background technology
110kV transmission line in the electric power system; It is the important transmission and distribution networks of city and farming region power supply; Because of the equipment fault and the overhaul of the equipments of transmission line brings power failure; Can bring great inconvenience and loss to the user, the high-tension line live line working can reduce power outage, improves the quality of power supply.Adopt live line working, the operating personnel must accept special training, and through pass the examination, enterprise's written authorization, can participate in corresponding operation; Operation must guarantee that also electrician's utensil is complete complete, and insulation is good, must guarantee the safe distance of operating personnel and electrified body.Owing to receive the restriction of live line working condition, service kit etc.; Not all maintenance can chargedly be carried out, and the operation of 110kV transmission line hotline maintenance suspension clamp is a constantly charged operation technique method of safety of expansion; Can reduce power failure, improve the reliability of power supply.
Summary of the invention
The object of the present invention is to provide a kind of operational method of 110kV circuit hotline maintenance suspension clamp, realize the practical approach of hotline maintenance suspension clamp.
The inventive method realizes through following steps:
The first step, clear and definite site safety monitoring personnel 1 people, first operation electrician 1 people, second operation electrician 1 people, ground cooperate personnel 2 people, clear and definite operation procedure and method, clear and definite safe distance and points for attention;
In second step, first and second electrician climbs shaft tower in succession, chooses job position, first electrician above the lead cross-arm, second electrician on shaft tower with the wire clamp horizontal level, obtain safety custody people permission after, can begin operation;
In the 3rd step, first electrician installs insulation with the second electrician upright position and transmits rope on cross-arm, and fixing behind length to the ground of adjustment rope;
In the 4th step, cooperate personnel upwards to transmit the insulating tool that operation is used with insulation ropes by ground;
In the 5th step, the insulating block group or the two cover insulation pull-rod type lifting gears of two cover tape insulations ropes are installed in both sides vertical with suspension clamp on cross-arm, and the lower end hook of two insulating block groups is used for hooking in opposite directions lead;
In the 6th step, the cooperation personnel tighten up lifting gear by ground, and wire clamp and insulator are broken away from;
In the 7th step, the second electrician operating personnel drags suspension clamp with the insulating bar hook, and the operating personnel on the cross-arm pushes suspension clamp with insulating bar, makes 90 ° of suspension clamp upsets, and the side of wire clamp hull upwards;
In the 8th step, after second operating personnel installs plain cushion, pin with insulating bar, and the opening pin is separated into 60-90 °;
In the 9th step, the recovery lead is connected with the insulator suspension and installs spring catch, removes insulating tool, shaft tower under operating personnel's safety on the shaft tower.
Adopt method of the present invention, can realize the hotline maintenance suspension clamp, safe.Can reduce power failure, improve the reliability of power supply.
Description of drawings
Fig. 1 hooks lead in opposite directions for insulating block group lower end hook and insulator breaks away from sketch map.
Embodiment
Below the inventive method is done further explain, this method mainly is divided into eight steps:
The first step, clear and definite site safety monitoring personnel 1 people, first operation electrician 1 people, second operation electrician 1 people, ground cooperate personnel 2 people, clear and definite operation procedure and method, clear and definite safe distance and points for attention;
In second step, first and second electrician climbs shaft tower in succession, chooses job position, first electrician above the lead cross-arm, second electrician on shaft tower with the wire clamp horizontal level, obtain safety custody people permission after, can begin operation;
In the 3rd step, first electrician installs insulation with the second electrician upright position and transmits rope on cross-arm, and fixing behind length to the ground of adjustment rope;
In the 4th step, cooperate personnel upwards to transmit the insulating tool that operation is used with insulation ropes by ground;
In the 5th step, the insulating block group or the two cover insulation pull-rod type lifting gears of two cover tape insulations ropes are installed in both sides vertical with suspension clamp on cross-arm, and the lower end hook of two insulating block groups is used for hooking in opposite directions lead;
In the 6th step, the cooperation personnel tighten up lifting gear by ground, and wire clamp and insulator are broken away from; During operation, second electrician utilizes insulating bar to take off the spring pin at suspension clamp place bowl head and composite insulator place, and the ground electrician suitably tightens up the insulation tackle pulley; Or first the electrician on cross-arm, tighten up pull-rod type lifting gear, lead is promoted about 300mm, after second electrician utilizes insulating bar to make bowl head and composite insulator disengaging; The ground electrician loosens about the about 200mm of insulation tackle pulley; The bulb of bowl head and composite insulator is separated from fully, and will the insulate tail rope of tackle pulley of ground electrician fixes, or first electrician locks pull-rod type hoisting hook; See that Fig. 1 insulating block group lower end hook hooks lead in opposite directions and insulator breaks away from sketch map;
In the 7th step, the second electrician operating personnel drags suspension clamp with the insulating bar hook, and the operating personnel on the cross-arm pushes suspension clamp with insulating bar, makes 90 ° of suspension clamp upsets, and the side of wire clamp hull upwards;
In the 8th step, after second operating personnel installs plain cushion, pin with insulating bar, and the opening pin is separated into 60-90 °;
During operation, second electrician uses insulating bar to catch on suspension clamp, rotates suspension clamp, makes suspension clamp outside gyroaxis closed pin installing hole high-visible.Use action bars that plain cushion and closed pin are installed then;
In the 9th step, the recovery lead is connected with the insulator suspension and installs spring catch, removes insulating tool, shaft tower under operating personnel's safety on the shaft tower.
Implement this method, on-the-spot in live line working, the requirement of safety operation and points for attention, strictness is carried out by relevant electric power safety regulations and live line working rules, in the method, does not elaborate.

Claims (1)

1. the operational method of a 110kV circuit hotline maintenance suspension clamp; It is characterized in that; Said method comprising the steps of: the first step; Clear and definite site safety monitoring personnel 1 people, first operation electrician 1 people, second operation electrician 1 people, ground cooperate personnel 2 people, clear and definite operation procedure and method, clear and definite safe distance and points for attention;
In second step, first and second electrician climbs shaft tower in succession, chooses job position, first electrician above the lead cross-arm, second electrician on shaft tower with the wire clamp horizontal level, obtain safety custody people permission after, can begin operation;
In the 3rd step, first electrician installs insulation with the second electrician upright position and transmits rope on cross-arm, and fixing behind length to the ground of adjustment rope;
In the 4th step, cooperate personnel upwards to transmit the insulating tool that operation is used with insulation ropes by ground;
In the 5th step, the insulating block group or the two cover insulation pull-rod type lifting gears of two cover tape insulations ropes are installed in both sides vertical with suspension clamp on cross-arm, and the lower end hook of two insulating block groups is used for hooking in opposite directions lead;
In the 6th step, the cooperation personnel tighten up lifting gear by ground, and wire clamp and insulator are broken away from;
In the 7th step, the second electrician operating personnel drags suspension clamp with the insulating bar hook, and the operating personnel on the cross-arm pushes suspension clamp with insulating bar, makes 90 ° of suspension clamp upsets, and the side of wire clamp hull upwards;
The 8th step, after second operating personnel installs plain cushion, pin with insulating bar, and the opening pin is separated into 60~
90°;
In the 9th step, the recovery lead is connected with the insulator suspension and installs spring catch, removes insulating tool, shaft tower under operating personnel's safety on the shaft tower.
CN 201110450784 2011-12-29 2011-12-29 Work method for overhauling suspension clamp with electricity on 110kv line Pending CN102570347A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110450784 CN102570347A (en) 2011-12-29 2011-12-29 Work method for overhauling suspension clamp with electricity on 110kv line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110450784 CN102570347A (en) 2011-12-29 2011-12-29 Work method for overhauling suspension clamp with electricity on 110kv line

Publications (1)

Publication Number Publication Date
CN102570347A true CN102570347A (en) 2012-07-11

Family

ID=46415092

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110450784 Pending CN102570347A (en) 2011-12-29 2011-12-29 Work method for overhauling suspension clamp with electricity on 110kv line

Country Status (1)

Country Link
CN (1) CN102570347A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104201616A (en) * 2014-09-26 2014-12-10 陕西省地方电力(集团)有限公司南郑县供电分公司 Low-voltage power distribution overhead line strain power pole fitting connecting structure and connecting method
CN106099811A (en) * 2016-06-24 2016-11-09 国网辽宁省电力有限公司葫芦岛供电公司 A kind of electric power pylon wire connects with elastic suspension clamp
CN110601077A (en) * 2019-10-24 2019-12-20 国网青海省电力公司西宁供电公司 Lifting assistor tool for insulated operating rod

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104201616A (en) * 2014-09-26 2014-12-10 陕西省地方电力(集团)有限公司南郑县供电分公司 Low-voltage power distribution overhead line strain power pole fitting connecting structure and connecting method
CN106099811A (en) * 2016-06-24 2016-11-09 国网辽宁省电力有限公司葫芦岛供电公司 A kind of electric power pylon wire connects with elastic suspension clamp
CN106099811B (en) * 2016-06-24 2018-01-12 国网辽宁省电力有限公司葫芦岛供电公司 A kind of elastic suspension clamp of electric power pylon wire connection
CN110601077A (en) * 2019-10-24 2019-12-20 国网青海省电力公司西宁供电公司 Lifting assistor tool for insulated operating rod

Similar Documents

Publication Publication Date Title
CN101640391B (en) Live-wire operation method for replacing insulator for 35kV distribution circuit
CN201408939Y (en) Electrified arc extinguishing tool for dismounting and jointing cable tail wires with 10 kV
CN110120643B (en) Uninterrupted power operation method for power line of ground potential distribution network
CN102185265A (en) Construction method for replacing cross arm of 35kV line linear rod
CN102570347A (en) Work method for overhauling suspension clamp with electricity on 110kv line
CN101546894B (en) Method for replacing 220KV steel pipe tower composite insulator electrifiedly
CN104767050B (en) Hook type personal security line
CN105162028A (en) Method for replacing linear insulator of 220kV steel pipe tower in live working state
CN101888075A (en) 10kV wire lifting operational method for insulating tool of crane
CN102623927B (en) Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method
CN205489259U (en) Automatically, step on lever apparatus based on unmanned aerial vehicle
CN104967026A (en) Line connector insulation separator plate
CN106451231B (en) A kind of method of quick mounting power distribution network ice-melt connecting wire
CN202602171U (en) A tool for power-on replacing multi-loop double split conductor insulator of 220kV line
CN201398034Y (en) Electroscopy grounding device
CN202405695U (en) Lifting tool for overhead ground wire of steel pipe pole
CN201774208U (en) Suspension counter weight for stabilizing lead jumper of high-voltage line tension corner tower
CN204679527U (en) Telescopic high altitude test wire connector
CN205429386U (en) Quick connecting device of high altitude construction wire
CN206022675U (en) Universal shaped cable clamp earth lead
CN201466565U (en) Wire lifting device of vehicle with insulating boom
CN205882560U (en) Special circulation cord rack device of distribution live working earth potential
CN103986043A (en) Ground lead
CN201312079Y (en) Clamping apparatus for live line replacement of suspended insulator in middle of 500KV untypical tangent tower via splicing method
CN104377598A (en) Straightening device for double-insulator-suspended yoke plates on electric transmission line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: HEBEI ELECTRIC POWER CORPORATION STATE ELECTRIC NE

Effective date: 20130216

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130216

Address after: 071051 No. 138 sunny north street, new urban district, Hebei, Baoding

Applicant after: Baoding Power Supply Company

Applicant after: Hebei Electric Power Corporation

Applicant after: State Grid Corporation of China

Address before: 071051 No. 138 sunny north street, new urban district, Hebei, Baoding

Applicant before: Baoding Power Supply Company

C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication