CN102518450A - Method for grouting ordinary cement rather than ultra-fine cement when reinforcing stratum by adopting shallow excavation method - Google Patents
Method for grouting ordinary cement rather than ultra-fine cement when reinforcing stratum by adopting shallow excavation method Download PDFInfo
- Publication number
- CN102518450A CN102518450A CN2011104064884A CN201110406488A CN102518450A CN 102518450 A CN102518450 A CN 102518450A CN 2011104064884 A CN2011104064884 A CN 2011104064884A CN 201110406488 A CN201110406488 A CN 201110406488A CN 102518450 A CN102518450 A CN 102518450A
- Authority
- CN
- China
- Prior art keywords
- grouting
- cement
- injection
- soil
- superfine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
在浅埋暗挖法地层加固时需要对地基进行注浆处理,第一次注浆采用普通水泥,而在第二次采用超细水泥进行补注。本发明所述的浅埋暗挖法地层加固普通水泥注浆取代超细水泥注浆方法,在第二次补注时,采用普通水泥代替超细水泥进行注浆以改良土壤,对开挖轮廓线外一定范围内淤泥质粘土进行针对性改良,保证了安全开挖。采用普通水泥注浆在强度上不仅与超细水泥注浆相当,而且节约了工程造价,具有良好的经济、社会效益。When the ground is reinforced by the shallow buried excavation method, the foundation needs to be grouted. The first grouting uses ordinary cement, and the second time uses ultra-fine cement for supplementary injection. In the shallow-buried underground excavation method of the present invention, ordinary cement grouting replaces superfine cement grouting method for ground reinforcement. During the second supplementary injection, ordinary cement is used instead of superfine cement for grouting to improve the soil, and the excavation profile is improved. The silty clay within a certain range outside the line was improved in a targeted manner to ensure safe excavation. The strength of ordinary cement grouting is not only equivalent to ultra-fine cement grouting, but also saves engineering cost and has good economic and social benefits.
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110406488.4A CN102518450B (en) | 2011-12-09 | 2011-12-09 | Method for grouting ordinary cement rather than ultra-fine cement when reinforcing stratum by adopting shallow excavation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110406488.4A CN102518450B (en) | 2011-12-09 | 2011-12-09 | Method for grouting ordinary cement rather than ultra-fine cement when reinforcing stratum by adopting shallow excavation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102518450A true CN102518450A (en) | 2012-06-27 |
CN102518450B CN102518450B (en) | 2014-06-18 |
Family
ID=46289488
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110406488.4A Expired - Fee Related CN102518450B (en) | 2011-12-09 | 2011-12-09 | Method for grouting ordinary cement rather than ultra-fine cement when reinforcing stratum by adopting shallow excavation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102518450B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103321245B (en) * | 2013-06-18 | 2016-01-13 | 中铁十六局集团地铁工程有限公司 | The construction method of the protective device of underground utilities during a kind of shield driving |
CN110734264A (en) * | 2019-10-10 | 2020-01-31 | 重庆市园林建筑工程(集团)股份有限公司 | Reinforcing material for historic building, preparation method and grouting reinforcement method |
CN113901678A (en) * | 2021-12-10 | 2022-01-07 | 成都理工大学 | Evaluation device and evaluation method for condensation quality of cement slurry for engineering grouting |
CN114292071A (en) * | 2022-01-10 | 2022-04-08 | 中国电建集团中南勘测设计研究院有限公司 | Quasi-colloidal slurry and preparation method thereof |
CN116606119A (en) * | 2023-05-30 | 2023-08-18 | 武汉科技大学 | Expansive slurry for rock mass grouting reinforcement and preparation method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001019528A (en) * | 1999-07-09 | 2001-01-23 | Showa Mining Co Ltd | Grout material composition, cured product and method of applying the same |
JP2005163478A (en) * | 2003-12-05 | 2005-06-23 | Kanazawa Univ | Shotcrete |
CN101624910A (en) * | 2009-07-31 | 2010-01-13 | 广州市建筑机械施工有限公司 | Method for reinforcing concealed tunnel |
CN101844894A (en) * | 2010-05-31 | 2010-09-29 | 郑州筑邦建材有限公司 | Flexible grout material for concrete pavement |
CN101993225A (en) * | 2010-08-26 | 2011-03-30 | 卢建华 | Cement asphalt (CA) mortar for polymer cement substrate type ballastless track and preparation method thereof |
CN102031795A (en) * | 2010-06-12 | 2011-04-27 | 中铁十六局集团有限公司 | Short pile reinforcing technology in narrow space |
CN102030508A (en) * | 2010-11-24 | 2011-04-27 | 潘林有 | Muddy soil cement grout applied to vertical shaft part of pedestrian underpass in saturated soft clay region |
-
2011
- 2011-12-09 CN CN201110406488.4A patent/CN102518450B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001019528A (en) * | 1999-07-09 | 2001-01-23 | Showa Mining Co Ltd | Grout material composition, cured product and method of applying the same |
JP2005163478A (en) * | 2003-12-05 | 2005-06-23 | Kanazawa Univ | Shotcrete |
CN101624910A (en) * | 2009-07-31 | 2010-01-13 | 广州市建筑机械施工有限公司 | Method for reinforcing concealed tunnel |
CN101844894A (en) * | 2010-05-31 | 2010-09-29 | 郑州筑邦建材有限公司 | Flexible grout material for concrete pavement |
CN102031795A (en) * | 2010-06-12 | 2011-04-27 | 中铁十六局集团有限公司 | Short pile reinforcing technology in narrow space |
CN101993225A (en) * | 2010-08-26 | 2011-03-30 | 卢建华 | Cement asphalt (CA) mortar for polymer cement substrate type ballastless track and preparation method thereof |
CN102030508A (en) * | 2010-11-24 | 2011-04-27 | 潘林有 | Muddy soil cement grout applied to vertical shaft part of pedestrian underpass in saturated soft clay region |
Non-Patent Citations (2)
Title |
---|
沈洪忠: "浅埋暗挖法施工地下人行通道初探", 《市政技术》, vol. 27, no. 6, 30 November 2009 (2009-11-30) * |
贾雪丽: "高性能水泥基灌浆材料的制备与性能研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》, no. 9, 18 August 2011 (2011-08-18) * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103321245B (en) * | 2013-06-18 | 2016-01-13 | 中铁十六局集团地铁工程有限公司 | The construction method of the protective device of underground utilities during a kind of shield driving |
CN110734264A (en) * | 2019-10-10 | 2020-01-31 | 重庆市园林建筑工程(集团)股份有限公司 | Reinforcing material for historic building, preparation method and grouting reinforcement method |
CN113901678A (en) * | 2021-12-10 | 2022-01-07 | 成都理工大学 | Evaluation device and evaluation method for condensation quality of cement slurry for engineering grouting |
CN113901678B (en) * | 2021-12-10 | 2022-04-15 | 成都理工大学 | A device and method for evaluating the setting quality of cement slurry for engineering grouting |
CN114292071A (en) * | 2022-01-10 | 2022-04-08 | 中国电建集团中南勘测设计研究院有限公司 | Quasi-colloidal slurry and preparation method thereof |
CN114292071B (en) * | 2022-01-10 | 2023-02-24 | 中国电建集团中南勘测设计研究院有限公司 | Quasi-colloidal slurry and preparation method thereof |
CN116606119A (en) * | 2023-05-30 | 2023-08-18 | 武汉科技大学 | Expansive slurry for rock mass grouting reinforcement and preparation method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN102518450B (en) | 2014-06-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109578021B (en) | Grouting reinforcement method for soft rock tunnel | |
CN114180930B (en) | Double-liquid grouting slurry and technology and application of high water pressure and super large diameter underwater shield tunnel | |
Du et al. | A novel fluid for use in oil and gas well construction to prevent the oil and gas leak from the wellbore | |
CN107698226A (en) | A kind of cement-silicate injecting paste material | |
CN102518450B (en) | Method for grouting ordinary cement rather than ultra-fine cement when reinforcing stratum by adopting shallow excavation method | |
CN105174886B (en) | A grouting reconstruction material for limestone aquifers suitable for ultra-long-distance pumping | |
CN1810915A (en) | Comprehensive performace regulator for well cementing cement slurry and its prepn | |
CN101439950B (en) | Flexible coal powder foam concrete and preparation thereof | |
CN105062442A (en) | Thickened oil thermal recovery channeling sealing agent, channeling sealing agent thick liquid, preparation method of thick liquid and thickened oil thermal recovery profile control channeling sealing method | |
CN106220126A (en) | A kind of grouting material of foundation stabilization | |
CN103833294A (en) | Single-liquid-stabilized cement-based slurry for surrounding rock consolidation of 1000-meter-depth horizontal roadway | |
CN109384439A (en) | The high-strength fast gravity die gunite concrete of one kind and soft rock tunnel country rock closed reinforcing method | |
CN105000830A (en) | Double-expansion filling mortar | |
CN106673541B (en) | Grouting material for preventing outburst in shield construction of mylonite crushed zone and preparation method thereof | |
CN117843304A (en) | Marine soft soil toughening nanocomposite material and application method thereof | |
CN117263646A (en) | Solid waste-based phosphate grouting reinforcement material and preparation method and application thereof | |
CN103964809A (en) | Curing agent for hydraulic filling of marine mud and curing method thereof | |
CN104591613B (en) | A kind of Magnesium Acrylate Prepared-superfine cement biliquid composite grouting material | |
CN106869853A (en) | A kind of " two steps " grouting water blocking method of application ultrahigh water material and cement | |
Liu et al. | Sulfoaluminate cement-based double-liquid material grouting in fractured rock | |
Cui et al. | Slurry and technology optimization for grouting fissures in Earthen Sites with quicklime | |
CN113004000B (en) | Polymer type double-liquid grouting material suitable for quick leaking stoppage of underground engineering, preparation method and use method | |
JP2011059044A (en) | Injection material construction method | |
CN102557562A (en) | Underwater rapid-hardening flexible concrete | |
Zhu et al. | Analysis of failure and optimization study of stoppage ring opening mechanism in sleeve valve casing material |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: WENZHOU UNIVERSITY Free format text: FORMER OWNER: WANG JUN Effective date: 20121129 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20121129 Address after: 325035 Zhejiang province Chashan Wenzhou Higher Education Park Applicant after: Wenzhou University Address before: 325035 Zhejiang province Chashan Wenzhou Higher Education Park of Wenzhou University School of architecture and civil engineering building No. 7 room B211 Applicant before: Wang Jun |
|
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: The East Road, economic development zone of Wenzhou city Zhejiang province 325000 No. 38 (Wenzhou University of science and Technology Park) Applicant after: Wenzhou University Address before: 325035 Zhejiang province Wenzhou Chashan Higher Education Park Applicant before: Wenzhou University |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140618 |