CN102489035A - Pulse extraction tower employing diaphragm metering pump as mechanical pulse generator and method thereof - Google Patents

Pulse extraction tower employing diaphragm metering pump as mechanical pulse generator and method thereof Download PDF

Info

Publication number
CN102489035A
CN102489035A CN2011103593113A CN201110359311A CN102489035A CN 102489035 A CN102489035 A CN 102489035A CN 2011103593113 A CN2011103593113 A CN 2011103593113A CN 201110359311 A CN201110359311 A CN 201110359311A CN 102489035 A CN102489035 A CN 102489035A
Authority
CN
China
Prior art keywords
metering pump
extraction tower
diaphragm
diaphragm metering
pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103593113A
Other languages
Chinese (zh)
Inventor
王学军
徐盛明
谢凌峰
蒋树武
李林艳
曾中贤
赵洪海
徐刚
刘靖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
Original Assignee
Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University filed Critical Tsinghua University
Priority to CN2011103593113A priority Critical patent/CN102489035A/en
Publication of CN102489035A publication Critical patent/CN102489035A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Reciprocating Pumps (AREA)

Abstract

The invention discloses a method of employing a diaphragm metering pump as a mechanical pulse generator of a pulse extraction tower in the field of extraction equipment; an inlet one-way valve ball of the diaphragm metering pump is taken out, the inlet of the diaphragm metering pump is connected with a lower clarifying segment of the pulse extraction tower, the outlet of the diaphragm metering pump is connected with an exhaust pipe through a valve, and the height of the diaphragm metering pump is generally situated at the middle lower part of an upper clarifying segment; the metering pump works in a pulse manner, and the diaphragm metering pump is used as the mechanical pulse generator of the pulse extraction tower so as to simplify the system and to increase the reliability of the system; furthermore, the corrosion resistance is better, the system is free from leakage, and the extraction tower works more stably.

Description

With pulsed extraction tower and the method thereof of diaphragm metering pump as the mechanical pulsing generator
Technical field
The invention belongs to the extraction equipment field, be specifically related to the pulsed extraction tower and the method thereof of diaphragm metering pump as the mechanical pulsing generator.
Background technology
The pulse perforated-plate extraction tower (Wang Jiading, Chen Jiayong. the solvent extraction handbook. Chemical Industry Press, 2001; 237 pages), pulsed packed tower (Wang Jiading; Chen Jiayong. solvent extraction handbook, Chemical Industry Press, 2001; 257 pages) and the pulse baffle extraction tower be three kinds of common pulsed extraction towers, the input of its power is all accomplished by impulse generator.The classification of impulse generator can be distinguished by the power transmission medium, can distinguish by gas pulses or mechanical pulsing again.Mechanical pulsing generator in the past generally uses the piston type impulse generator; Because this kind working method piston directly contacts with the extraction tower working media; So just have two serious problems, the 1. corrosion-resistant problem of piston system is 2. because the fricative leakage problem of mechanical movement.
Summary of the invention
To the problems referred to above, the invention provides a kind ofly with the pulsed extraction tower and the method thereof of diaphragm metering pump as the mechanical pulsing generator, the present invention makes the mechanical pulsing generator work operation of pulsed extraction tower more stable, and corrosion resistance is stronger, applicable system is wider.The present invention uses diaphragm metering pump as impulse generator, and the extraction tower working media can only contact barrier film, does not therefore also just have corrosion and the leakage problem as the piston pulse generator, as long as the periodic replacement barrier film is just passable.
With the pulsed extraction tower of diaphragm metering pump as the mechanical pulsing generator, the unidirectional valve ball of the import of said diaphragm metering pump is removed, and the import of diaphragm metering pump links to each other with the following settling section of pulsed extraction tower, and the metering diaphragm delivery side of pump links to each other with blast pipe through valve.
The setting height(from bottom) of said diaphragm metering pump generally will be in the middle and lower part of last settling section, and the position should not be low excessively.
With the method for diaphragm metering pump as pulsed extraction tower mechanical pulsing generator, this method comprises the steps:
1) metering diaphragm pump inlet check valve ball is taken out (make check valve ineffective);
2) valve is installed in adjacent diaphragm metering pump exit, the valve top connects a blast pipe;
3) height of measuring pump installation is in last settling section middle and lower part;
4) the metering diaphragm pump inlet is connected with following settling section;
5) discharge whole air in the diaphragm metering pump cavity before the operation.
Diaphragm metering pump itself is with pulse mode work, with diaphragm metering pump as pulse-column mechanical pulsing generator with compare with reciprocating machine impulse generator mode, have following beneficial effect: 1. make the reliability of system increase stable equipment operation; 2. system's corrosion resistance is strong; 3. it is wide to be suitable for extraction system; 4. be not easy to leak.
Description of drawings
Fig. 1 is a system of the present invention connection layout
Label among the figure: the 1. diaphragm metering pump pump housing; 2. measuring pump barrier film; 3. measuring pump cavity; 4. valve (being air bleeding valve); 5. pump material inlet; 6. burst transmissions pipe; 7. pulse tube tower entrance; 8. light phase materials tower entrance; 9. the heavy phase material goes out Ta Kou; 10. descend settling section; 11. extraction tower column plate or filler; 12. extraction tower tower body; 13. heavy phase material tower entrance; 14. last settling section; 15. light phase materials outlet.
The specific embodiment
The present invention will be described below in conjunction with embodiment:
Embodiment 1: system is as shown in Figure 1; Pulsed extraction tower comprises tower body 12 and is arranged at the last settling section 14 and following settling section 10 of tower body upper and lower end respectively; Extraction tower column plate or filler 11 are equipped with in tower body 12 inside; Following settling section 10 is provided with pulse tube tower entrance 7, light phase materials tower entrance 8 and heavy phase material and goes out tower mouth 9, and last settling section 14 is provided with heavy phase material tower entrance 13 and light phase materials outlet 15.
Diaphragm metering pump mainly is made up of the pump head and the diaphragm metering pump pump housing 1; The unidirectional valve ball of the import of said diaphragm metering pump is removed; The pump material inlet 5 of diaphragm metering pump links to each other with the pulse tube tower entrance 7 of the following settling section 10 of pulsed extraction tower through burst transmissions pipe 6, and the metering diaphragm delivery side of pump links to each other with blast pipe through valve (being air bleeding valve) 4.
The said diaphragm metering pump pump housing 1 comprises motor and mechanical driving part and piston etc.The metering diaphragm pump housing 3 that is positioned at pump head is a flat arc-shaped cavity, and measuring pump barrier film 2 is positioned in the middle of two and half arcs, and measuring pump barrier film 2 connects with piston, and the reciprocating motion of piston has driven the reciprocating motion of barrier film 2, thereby has driven the reciprocating motion of liquid in the tower.
The setting height(from bottom) of said diaphragm metering pump is in the middle and lower part of last settling section 14, and making can be a little more than air bleeding valve 4 from the liquid level of burst transmissions pipe.Setting height(from bottom) is in the reason of the middle and lower part of last settling section 14: the too high words in measuring pump installation site can cause from the liquid level of burst transmissions pipe low excessively, thereby can't discharge the gas in the metering diaphragm pump housing 3 fully; The measuring pump installation site is low excessively, and it is excessive to make measuring pump barrier film 2 bear pressure, influences service life.
Corresponding with the method for diaphragm metering pump as pulsed extraction tower mechanical pulsing generator, this method may further comprise the steps:
1) metering diaphragm pump inlet check valve ball is taken out (make check valve ineffective);
2) valve 4 is installed in adjacent diaphragm metering pump exit, valve 4 tops connect a blast pipe;
3) height of measuring pump installation is in the middle and lower part of last settling section 14;
4) the pump material inlet 5 with diaphragm metering pump is connected with the pulse tube tower entrance 7 of the following settling section 10 of pulsed extraction tower through burst transmissions pipe 6;
5) when adopting the heavy phase consecutive hours, the heavy phase material gets into extraction tower through extraction tower heavy phase material tower entrance 13, opens air bleeding valve 4, and all gas in emptied of exhaust gases valve 4 to the metering diaphragm pump housing 3 is closed air bleeding valve 4 then, and extraction tower is undertaken by routine operation afterwards.
Embodiment 2: the present embodiment system and device is identical with embodiment 1; When adopting light phase consecutive hours, light phase materials gets into extraction tower through the light phase materials tower entrance 8 of extraction tower, opens air bleeding valve 4; All gas in emptied of exhaust gases valve 4 to the metering diaphragm pump housing 3;, close air bleeding valve 4 then, extraction tower is undertaken by routine operation afterwards.

Claims (3)

1. pulsed extraction tower; It is characterized in that: pulsed extraction tower comprises tower body (12) and is arranged at the last settling section (14) and the following settling section (10) of tower body upper and lower end respectively; With the mechanical pulsing generator of diaphragm metering pump as pulsed extraction tower; The unidirectional valve ball of the import of said diaphragm metering pump is removed, and the import of diaphragm metering pump (5) links to each other with the following settling section (10) of pulsed extraction tower, and the metering diaphragm delivery side of pump links to each other with blast pipe through valve (4).
2. pulsed extraction tower according to claim 1 is characterized in that: the setting height(from bottom) of said diaphragm metering pump is in the middle and lower part of last settling section (14).
3. with the method for diaphragm metering pump as pulsed extraction tower mechanical pulsing generator, pulsed extraction tower comprises tower body (12) and is arranged at the last settling section (14) and the following settling section (10) of tower body upper and lower end respectively that it is characterized in that: this method may further comprise the steps:
1) metering diaphragm pump inlet check valve ball is taken out;
2) valve (4) is installed in adjacent diaphragm metering pump exit, valve (4) top connects a blast pipe;
3) height of measuring pump installation is in last settling section (14) middle and lower part;
4) metering diaphragm pump inlet (5) is connected with following settling section (10);
5) discharge whole air in the diaphragm metering pump cavity (3) before the operation.
CN2011103593113A 2011-11-11 2011-11-11 Pulse extraction tower employing diaphragm metering pump as mechanical pulse generator and method thereof Pending CN102489035A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103593113A CN102489035A (en) 2011-11-11 2011-11-11 Pulse extraction tower employing diaphragm metering pump as mechanical pulse generator and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103593113A CN102489035A (en) 2011-11-11 2011-11-11 Pulse extraction tower employing diaphragm metering pump as mechanical pulse generator and method thereof

Publications (1)

Publication Number Publication Date
CN102489035A true CN102489035A (en) 2012-06-13

Family

ID=46180920

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103593113A Pending CN102489035A (en) 2011-11-11 2011-11-11 Pulse extraction tower employing diaphragm metering pump as mechanical pulse generator and method thereof

Country Status (1)

Country Link
CN (1) CN102489035A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103252110A (en) * 2013-06-06 2013-08-21 苏州市金翔钛设备有限公司 Pulse sieve-plate tower for acetic acid extraction device
JP2018015754A (en) * 2016-07-28 2018-02-01 ケプコ ニュークリア フューエル カンパニー リミテッド Pulsation feeding device and pulsation supply method for solvent extraction process extraction tower
CN112354210A (en) * 2020-09-24 2021-02-12 清华大学 Air pulse generating device of nuclear pulse extraction column
CN113309891A (en) * 2021-05-27 2021-08-27 中国原子能科学研究院 Exhaust valve for pulse extraction column and pulse extraction device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87208724U (en) * 1987-06-04 1988-10-12 清华大学 Pneumatic-diaphragm type metering pump
CN2477245Y (en) * 2001-04-12 2002-02-20 浙江大学 Pulse generator for extraction tower
CN202342942U (en) * 2011-11-11 2012-07-25 清华大学 Pulsed extraction column with diaphragm metering pump as mechanical pulse generator

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87208724U (en) * 1987-06-04 1988-10-12 清华大学 Pneumatic-diaphragm type metering pump
CN2477245Y (en) * 2001-04-12 2002-02-20 浙江大学 Pulse generator for extraction tower
CN202342942U (en) * 2011-11-11 2012-07-25 清华大学 Pulsed extraction column with diaphragm metering pump as mechanical pulse generator

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
汪家鼎等: "《溶剂萃取手册》", 31 January 2001 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103252110A (en) * 2013-06-06 2013-08-21 苏州市金翔钛设备有限公司 Pulse sieve-plate tower for acetic acid extraction device
CN103252110B (en) * 2013-06-06 2015-07-29 苏州市金翔钛设备有限公司 A kind of for the pulsed perforated-plate tower in Extraction of Acetic Acid device
JP2018015754A (en) * 2016-07-28 2018-02-01 ケプコ ニュークリア フューエル カンパニー リミテッド Pulsation feeding device and pulsation supply method for solvent extraction process extraction tower
CN112354210A (en) * 2020-09-24 2021-02-12 清华大学 Air pulse generating device of nuclear pulse extraction column
CN113309891A (en) * 2021-05-27 2021-08-27 中国原子能科学研究院 Exhaust valve for pulse extraction column and pulse extraction device

Similar Documents

Publication Publication Date Title
CN201215073Y (en) Hydraulic profile control and water shutoff pump
CN202342942U (en) Pulsed extraction column with diaphragm metering pump as mechanical pulse generator
CN101543825B (en) Closed self-circulation hydraulic pipeline flusher
CN201241806Y (en) Hydraulic gas compressor
CN102489035A (en) Pulse extraction tower employing diaphragm metering pump as mechanical pulse generator and method thereof
CN201972872U (en) Large discharge diaphragm metering pump with oil filling limit and automatic deflation system
CN103925200B (en) A kind of pneumatic diaphragm pump
CN104214407B (en) One kind flows draining valve
CN100520659C (en) Fluid level control measuring systems used for gas dynamic type pulse fluidic jet pump and method thereof
CN101936857B (en) Confining pressure keeping system of rock triaxial creep testing machine
CN211783682U (en) Gas eliminator for petrochemical system
CN209444480U (en) A kind of fuel filter, fuel filter assembly and engine assembly
CN210565400U (en) In-line explosion-proof gas transmission pressure cylinder
CN105547729A (en) Device for detecting working performance of underground gas-liquid separation device
CN203051024U (en) Flow-adjusting injection pump
CN202229797U (en) Novel control device for measuring tank
CN107191354B (en) A kind of fluid lifts device that can be counted automatically and its promote counting mechanism
CN101144466B (en) Differential constant flow pump
CN1210741C (en) Hydraulic operation device
CN107269502A (en) A kind of linear high precision peristaltic pump
CN103161725A (en) Piston-type pressure pump
CN104747545A (en) Reverse osmosis system pressurizing and energy recycling device and pressurizing and energy recycling method
CN203906994U (en) Automatic-alarming composite-type exhaust valve
CN203624613U (en) Hydraulic device of fast and quantitative automobile loading station
CN110454379B (en) Hydraulic end mounting structure with cleaning structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120613