CN102477737A CN2010105626668A CN201010562666A CN102477737A CN 102477737 A CN102477737 A CN 102477737A CN 2010105626668 A CN2010105626668 A CN 2010105626668A CN 201010562666 A CN201010562666 A CN 201010562666A CN 102477737 A CN102477737 A CN 102477737A
Authority
CN
China
Prior art keywords
pile
cfg
construction
highway
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105626668A
Other languages
Chinese (zh)
Inventor
白汉民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN2010105626668A priority Critical patent/CN102477737A/en
Publication of CN102477737A publication Critical patent/CN102477737A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a construction method of a cement fly ash gravel pile on a collapsible loess foundation of a road, which comprises the following steps: the shaft line control pile and CFG pile position are released according to a pile bitmap; secondly, placing a drill rod in place by using the drilling machine, adjusting the verticality of the drill rod, ensuring that the deviation of the verticality of the drill rod is not more than 1%, drilling by using the drilling machine, and idling and clearing soil after the designed depth is reached; thirdly, drilling and forming all pile positions all the time by adopting a mode of piling at intervals; fourthly, after all CFG pile positions are drilled to the designed elevation, directly sliding the cement fly ash gravel mixture into the hole by a concrete tank truck through a string cylinder, and then vibrating by using an insertion type concrete vibrating rod; and inspecting and accepting the cement fly ash and gravel mixture and the composite pile after the vibrating is finished. The method can obviously reduce the construction cost, shorten the construction time, improve the construction efficiency, needs less construction machinery in unit construction time, and is a construction method of the cement fly ash gravel pile on the collapsible loess foundation of the highway with high pile forming efficiency.

Description

CFG job practices on the highway collapsible loess foundation
Technical field
The present invention relates to the pile foundation construction field, CFG job practices on especially a kind of highway collapsible loess foundation.
Background technology
The English name of CFG is Cement Fly-ash Gravel, and it is abbreviated as CFG, means CFG, adds water by rubble, aggregate chips, sand, flyash mixed cement and mixes and stirs, the variable intensity stake of processing with various pile machineries.Through adjustment cement mixing content and proportioning, its strength grade changes between C5-C25, is a kind of type between rigid pile and flexible pile.CFG stake and inter-pile soil form CFG pile composite foundation co-operation through mattress layer, so can carry out engineering design according to composite foundation proterties and calculating together.The scope of application of CFG stake is very wide, is widely used in grounds such as sand, silt, clay, mucky soil, miscellaneous fill, collapsible loess, and the CFG stake all is suitable for single footing, strip foundation, raft foundation, and is widely used in the highway soft foundation; At present the general job practices of CFG stake is following: a pile foundation is holed and pump pressure in pipe compound perfusion pile, and vibration sinking tube perfusion pile is then holed to next pile foundation and is poured into to the last a pile foundation and accomplish; This kind form of construction work equipment power consumption is big, and required distribution line is longer, sets transformer at the construction field (site); The power supply expense is bigger, and at building-site agitator is set, and the configuration concrete transfer pump; The concrete consumption is little, and the equipment amortization charge is big, and is long in time limit; It is more that holding time is built in distribution and station, and the construction daily output is little, also need accomplish the telephone-moving of concrete pouring ability behind the pile mechanical piling; In case concrete or delivery pump have problem, pile machinery also need stop, and pile efficient is low.
Summary of the invention
The objective of the invention is to overcome the deficiency of prior art; CFG job practices on a kind of highway collapsible loess foundation is provided; This method can significantly reduce construction cost, shortens the engineering time, improves efficiency of construction; Unit in the engineering time required construction machinery few, pile efficient is high.
The present invention solves its technical problem and realizes through following technical scheme:
CFG job practices on a kind of highway collapsible loess foundation, the step of its job practices is:
⑴. emit axial line control stake and CFG stake position according to piling foundation plan, represent stake position, the high 0.5m of construction stake top mark height ratio design elevation with bamboo pricker under lime point or the nail;
⑵. the long-spiral drilling machine drilling rod of transferring in place, make drill bit stake site, adjustment drilling rod verticality guarantees that the deviation of drilling rod verticality is not more than 1%, starts rig boring then, reaches the clear soil of idle running after the projected depth;
⑶. repeating step ⑵ adopts the mode of piling at interval always with the boring moulding of all piles position;
⑷. all CFG stake position pore-formings begin the cement, flyash and crushed stone compound is sent into the hole with tumbling barrel by direct slide of concrete tank car after design elevation, vibrate with plug-in type concrete vibrating head then;
⑸. vibrating finishes the back to cement, flyash and crushed stone compound and composite pile inspection and acceptance.
And described long-spiral drilling machine rig when construction promotes speed controlling at 2~3m/min.
And described long-spiral drilling machine is a diesel hammer immersed tube pile driver.
Advantage of the present invention and beneficial effect are:
1, the CFG job practices is first with all piles position pore-forming on this highway collapsible loess foundation; Then the stake of all pore-formings is being poured into cement, flyash and crushed stone; This kind method pile, concrete are built mechanical separation; Be convenient to bring into play the professed machine intrinsic advantage, pile, concrete are built intensive separately batch process, and efficient improves.
2, the CFG job practices is not owing to need use concrete transfer pump on this highway collapsible loess foundation, and it is about 50% that total electricity consumption reduces, and both reduced energy consumption, makes field work more convenient again, and overall construction cost reduces.
3, therefore CFG job practices stake hole quality can avoid necking down, the irregular phenomenon in stake hole to take place through visual inspection on this highway collapsible loess foundation, guaranteed to pile quality.
4, the slide of CFG job practices tank car is sent on this highway collapsible loess foundation, and machinery vibrates, and can accurately control a top mark height, can not produce laitance, therefore can practice thrift concrete amount.
5, the present invention can significantly reduce construction cost, shortens the engineering time, improves efficiency of construction, unit in the engineering time required construction machinery few, be CFG job practices on the high highway collapsible loess foundation of a kind of pile efficient.
The specific embodiment
Through specific embodiment the present invention is made further detailed description below, following examples are descriptive, are not determinate, can not limit protection scope of the present invention with this.
CFG job practices on a kind of highway collapsible loess foundation, the step of its job practices is:
⑴. emit axial line control stake and CFG stake position according to piling foundation plan, represent stake position, the high 0.5m of construction stake top mark height ratio design elevation with bamboo pricker under lime point or the nail;
⑵. the diesel hammer immersed tube pile driver drilling rod of transferring in place makes drill bit stake site, adjustment drilling rod verticality; The deviation of guaranteeing the drilling rod verticality is not more than 1%, starts rig boring then, should be slow earlier back fast during pore-forming; Can avoid drilling rod to rock like this; Also can in time check and correct the difference of drilling rod off normal, reach the clear soil of idle running after the projected depth, rig promotes speed controlling at 2~3m/min when construction;
⑶. repeating step ⑵ adopts the mode of piling at interval always with the boring moulding of all piles position;
⑷. all CFG stake position pore-formings begin the cement, flyash and crushed stone compound is sent into the hole with tumbling barrel by direct slide of concrete tank car after design elevation, vibrate with plug-in type concrete vibrating head then;
⑸. vibrating finishes the back to cement, flyash and crushed stone compound and composite pile inspection and acceptance.
Select diesel hammer immersed tube pile driver, as long as distribution satisfies the hydraulic machinery running gear, general power load is no more than 30KW, adopts the method for piling pore-forming at interval, can concentrate pore-forming in batches.In work progress, also can pour into a mould a row or the stake that arrange pore-forming, by the direct hand-hole of concrete tank car, in addition plug-in type concrete vibrating head vibrates with tumbling barrel more, vibrates to finish afterwards to the examination of testing of cement, flyash and crushed stone compound and composite pile.
After pile construction finished, the construction of next pile was carried out in the rig displacement in addition.Native more owing to what discharge during construction, the stake position that often will close on covers, and also can be moved because of the rig feet is pressed in the other stake position of former demarcation that make, a position sometimes.During therefore to next pile construction, also should check the stake position of need construction, guarantee the stake position accurately according to the position of axis or stake on every side.

Claims (3)

1. CFG job practices on the highway collapsible loess foundation, it is characterized in that: the step of this job practices is:
⑴. emit axial line control stake and CFG stake position according to piling foundation plan, represent stake position, the high 0.5m of construction stake top mark height ratio design elevation with bamboo pricker under lime point or the nail;
⑵. the long-spiral drilling machine drilling rod of transferring in place, make drill bit stake site, adjustment drilling rod verticality guarantees that the deviation of drilling rod verticality is not more than 1%, starts rig boring then, reaches the clear soil of idle running after the projected depth;
⑶. repeating step ⑵ adopts the mode of piling at interval always with the boring moulding of all piles position;
⑷. all CFG stake position pore-formings begin the cement, flyash and crushed stone compound is sent into the hole with tumbling barrel by direct slide of concrete tank car after design elevation, vibrate with plug-in type concrete vibrating head then;
⑸. vibrating finishes the back to cement, flyash and crushed stone compound and composite pile inspection and acceptance.
2. CFG job practices on the highway collapsible loess foundation according to claim 1 is characterized in that: described long-spiral drilling machine rig when construction promotes speed controlling at 2~3m/min.
3. CFG job practices on the highway collapsible loess foundation according to claim 1 is characterized in that: described long-spiral drilling machine is a diesel hammer immersed tube pile driver.
CN2010105626668A 2010-11-29 2010-11-29 Construction Method of Cement Fly Ash Gravel Pile on Collapsible Loess Foundation of Highway Pending CN102477737A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105626668A CN102477737A (en) 2010-11-29 2010-11-29 Construction Method of Cement Fly Ash Gravel Pile on Collapsible Loess Foundation of Highway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105626668A CN102477737A (en) 2010-11-29 2010-11-29 Construction Method of Cement Fly Ash Gravel Pile on Collapsible Loess Foundation of Highway

Publications (1)

Publication Number Publication Date
CN102477737A true CN102477737A (en) 2012-05-30

Family

ID=46090508

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105626668A Pending CN102477737A (en) 2010-11-29 2010-11-29 Construction Method of Cement Fly Ash Gravel Pile on Collapsible Loess Foundation of Highway

Country Status (1)

Country Link
CN (1) CN102477737A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590391A (en) * 2013-11-27 2014-02-19 温州宏源水电建设有限公司 Cement-fly-ash-gravel pile foundation reinforcing construction method
CN112281820A (en) * 2020-10-19 2021-01-29 中铁六局集团有限公司 Cement fly ash gravel pile construction method
CN112458809A (en) * 2020-10-19 2021-03-09 中交一公局集团有限公司 Treatment method for collapsible loess subgrade

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001036753A1 (en) * 1999-11-18 2001-05-25 Cementation Foundations Skanska Limited Pile forming
CN1370893A (en) * 2002-04-04 2002-09-25 中国建筑科学研究院 Pile end mortar pre-pressing construction method and apparatus for long screw auger drilling deposited pile and CFG pile
CN1740457A (en) * 2005-09-15 2006-03-01 贵阳铝镁设计研究院 Vibration process of eliminating wet foundation falling for CFG pile
CN101440622A (en) * 2008-12-17 2009-05-27 何志红 CFG pile, pipe pile embankment reinforcement system and construction method thereof
CN101761073A (en) * 2010-01-19 2010-06-30 广东省长大公路工程有限公司 Improved construction technology of CFG (cement fIying-ash gravel) pile

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001036753A1 (en) * 1999-11-18 2001-05-25 Cementation Foundations Skanska Limited Pile forming
CN1370893A (en) * 2002-04-04 2002-09-25 中国建筑科学研究院 Pile end mortar pre-pressing construction method and apparatus for long screw auger drilling deposited pile and CFG pile
CN1740457A (en) * 2005-09-15 2006-03-01 贵阳铝镁设计研究院 Vibration process of eliminating wet foundation falling for CFG pile
CN101440622A (en) * 2008-12-17 2009-05-27 何志红 CFG pile, pipe pile embankment reinforcement system and construction method thereof
CN101761073A (en) * 2010-01-19 2010-06-30 广东省长大公路工程有限公司 Improved construction technology of CFG (cement fIying-ash gravel) pile

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
周续业等: "CFG桩的基本原理及其在公路软基处理上的应用", 《西部探矿工程》, no. 3, 31 March 2003 (2003-03-31), pages 151 - 153 *
田玉春等: "水泥-粉煤灰-碎石桩复合地基分析", 《粉煤灰综合利用》, no. 3, 30 June 2002 (2002-06-30), pages 8 - 10 *
范弘等: "浅谈CFG 桩复合地基的应用", 《山西建筑》, no. 10, 31 October 2002 (2002-10-31), pages 25 - 26 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590391A (en) * 2013-11-27 2014-02-19 温州宏源水电建设有限公司 Cement-fly-ash-gravel pile foundation reinforcing construction method
CN103590391B (en) * 2013-11-27 2016-05-25 温州宏源水电建设有限公司 A kind of CFG foundation stabilization construction method
CN112281820A (en) * 2020-10-19 2021-01-29 中铁六局集团有限公司 Cement fly ash gravel pile construction method
CN112458809A (en) * 2020-10-19 2021-03-09 中交一公局集团有限公司 Treatment method for collapsible loess subgrade

Similar Documents

Publication Publication Date Title
CN104929114A (en) High pressure jet grouting pile waterproof curtain construction device and method
CN106368214B (en) A kind of casing formula cement mixing method at pile operation method
CN102011399B (en) PHC pile-based multiple high jet pedestal pile construction method
CN104404838B (en) The above railway collapsible loess subgrade substrate treating method of speed 200km
CN102021906A (en) Method for reinforcing soft soil foundation at deep mixing pile
CN104846810A (en) Self-circulating posterior grouting bored pile construction method
CN101487254A (en) Construction method of vibrating immersed tube gravel slip-casting pile
CN204753574U (en) High pressure jet grouting pile stagnant water curtain construction equipment
CN103556631A (en) Pile-forming operation method for stirring pile
CN101761073A (en) Improved construction technology of CFG (cement fIying-ash gravel) pile
CN105113496A (en) Construction method for soil-cement mixing piles
CN102322057A (en) Grouting type cement fly-ash gravel (CFG) pile construction method with continuous construction operation function
CN105297712A (en) Construction method for composite pile of auger-bored high-pressure-jetting cemented soil composite variable-cross-section concrete pile
CN105040683A (en) Informatization construction method for cement mixing piles
CN110409435A (en) A kind of novel concrete mixing pile construction method
CN105297710A (en) High-pressure-jetting cement soil twist drill and reamed reinforced concrete grouting combined pile and manufacturing method
CN205348160U (en) Novel cement flour spouts two -way stirring stake machine construction equipment
CN105780762B (en) Construction method for chiseling-free pile head
CN111676987A (en) Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method
CN102477737A (en) Construction Method of Cement Fly Ash Gravel Pile on Collapsible Loess Foundation of Highway
CN111101510A (en) Method for manufacturing stirring rock-entering precast pile and stirring rock-entering precast pile
CN1029518C (en) Superfluid concrete and its pouring pile-forming method and drilling machine used by said method
CN211816208U (en) Stirring rock-entering precast pile
CN101514550A (en) Method using belled mixing piles for treating double-layer soft foundation
CN104005416A (en) Method for processing major-diameter hole pile collapsed holes under high and steep slope plain fill back-pressing condition

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination