CN102363259A - Molding method for casting and forging structure piece of wheelchair frame - Google Patents
Molding method for casting and forging structure piece of wheelchair frame Download PDFInfo
- Publication number
- CN102363259A CN102363259A CN2011102833923A CN201110283392A CN102363259A CN 102363259 A CN102363259 A CN 102363259A CN 2011102833923 A CN2011102833923 A CN 2011102833923A CN 201110283392 A CN201110283392 A CN 201110283392A CN 102363259 A CN102363259 A CN 102363259A
- Authority
- CN
- China
- Prior art keywords
- forging
- casting
- blank
- strand
- stainless steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005242 forging Methods 0.000 title claims abstract description 116
- 238000005266 casting Methods 0.000 title claims abstract description 34
- 238000000034 method Methods 0.000 title claims abstract description 18
- 238000000465 moulding Methods 0.000 title claims abstract description 11
- 238000010438 heat treatment Methods 0.000 claims abstract description 18
- 238000003825 pressing Methods 0.000 claims abstract description 18
- 238000005406 washing Methods 0.000 claims abstract description 15
- 229910052782 aluminium Inorganic materials 0.000 claims abstract description 9
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 claims abstract description 9
- 239000000463 material Substances 0.000 claims abstract description 9
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 40
- 239000010935 stainless steel Substances 0.000 claims description 20
- 229910001220 stainless steel Inorganic materials 0.000 claims description 20
- 238000004140 cleaning Methods 0.000 claims description 19
- 238000009413 insulation Methods 0.000 claims description 19
- 230000000630 rising effect Effects 0.000 claims description 18
- 230000002950 deficient Effects 0.000 claims description 17
- 239000004411 aluminium Substances 0.000 claims description 8
- 230000003628 erosive effect Effects 0.000 claims description 8
- 239000007788 liquid Substances 0.000 claims description 5
- 238000004519 manufacturing process Methods 0.000 claims description 5
- 238000005498 polishing Methods 0.000 claims description 5
- GRYLNZFGIOXLOG-UHFFFAOYSA-N Nitric acid Chemical compound O[N+]([O-])=O GRYLNZFGIOXLOG-UHFFFAOYSA-N 0.000 claims description 4
- 230000032683 aging Effects 0.000 claims description 4
- 239000003513 alkali Substances 0.000 claims description 4
- 238000000137 annealing Methods 0.000 claims description 4
- 239000003795 chemical substances by application Substances 0.000 claims description 4
- 238000002844 melting Methods 0.000 claims description 4
- 230000008018 melting Effects 0.000 claims description 4
- 229910017604 nitric acid Inorganic materials 0.000 claims description 4
- 238000012856 packing Methods 0.000 claims description 4
- 238000005554 pickling Methods 0.000 claims description 4
- 238000012546 transfer Methods 0.000 claims description 4
- 238000001816 cooling Methods 0.000 claims description 3
- 238000011010 flushing procedure Methods 0.000 claims description 3
- 238000005520 cutting process Methods 0.000 abstract description 3
- 230000007547 defect Effects 0.000 abstract description 3
- 238000010923 batch production Methods 0.000 abstract description 2
- 238000003723 Smelting Methods 0.000 abstract 1
- 238000005530 etching Methods 0.000 abstract 1
- 239000006104 solid solution Substances 0.000 abstract 1
- 238000007669 thermal treatment Methods 0.000 abstract 1
- 239000000203 mixture Substances 0.000 description 5
- HEMHJVSKTPXQMS-UHFFFAOYSA-M Sodium hydroxide Chemical compound [OH-].[Na+] HEMHJVSKTPXQMS-UHFFFAOYSA-M 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- CWYNVVGOOAEACU-UHFFFAOYSA-N Fe2+ Chemical compound [Fe+2] CWYNVVGOOAEACU-UHFFFAOYSA-N 0.000 description 2
- 238000000748 compression moulding Methods 0.000 description 2
- 229910052751 metal Inorganic materials 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000009749 continuous casting Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 239000000976 ink Substances 0.000 description 1
- 230000003137 locomotive effect Effects 0.000 description 1
- 239000000314 lubricant Substances 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 230000035882 stress Effects 0.000 description 1
Images
Landscapes
- Forging (AREA)
Abstract
The invention provides a molding method for casting and forging a structure piece of a wheelchair frame, which comprises the steps of: sawing and cutting an aluminum cast ingot with the outer circle of phi 200mm with a material trade mark of 6061 into blank with the length of 800mm; smelting; pouring; modeling; cutting a dead head; charging a casting blank, heating and fixing the temperature at 530 DEG C; forging and pressing the casting blank by a 5000-ton oil press and a forging mould; forging and pressing to obtain a forged piece; etching and washing; treating with solid solution; and manually correcting the specific deformation degree of the forged piece. The precast blank is cast and molded by the method, the shape of the blank is good in consistency, the shape of a curved surface is easy to control, a casting material can be cyclically utilized, and the material utilization can be furthest improved; and the batch production practice proves that the finished forged piece produced by a casting and forging technological process has no forging defects, the thermal treatment performance meets the demand, and the final status of the forged piece completely accords with user demand.
Description
(1) technical field
The present invention relates to casting and forge process technology, is exactly a kind of wheelchair frame structural member casting and forging molding method specifically.
(2) background technology
Forging is widely used in the important force structure position on the various device with its superior mechanical performance; Wherein aluminum alloy forge piece becomes the maximum forging of application in the non-ferrous metal forging with its in light weight, corrosion-resistant advantage such as good again; In fields such as automobile, Aero-Space, locomotive, shipbuildings application is very widely arranged all, its output is only second to the ferrous metal forging.The wheelchair frame structural member is the important stress members on a kind of wheelchair; The former employing steel pipe of offshore company is welded; But weight is heavier; Profile is common not to have sight, problem such as the forging that the structural parts whole forging molding process of domestic research and development and Technology for Heating Processing are produced exists material use low than rate, and operation is loaded down with trivial details.
(3) summary of the invention
The object of the present invention is to provide a kind of wheelchair frame structural member casting and forging molding method.
The objective of the invention is to realize like this: step is following:
Step 1: blanking: with material trademark is that 6061 cylindrical φ 200mm aluminium ingot casting sawing becomes the long blank of 800mm;
Step 2: melting: place crucible to heat blank, constant temperature is heated to fusing for 650 ℃;
Step 3: mould assembly: rising head and mold cavity surface at casting mould are smeared releasing agent, close tight casting mould, urgent geometrical clamp;
Step 4: cast: contain 4.5 kilograms of the liquid aluminium get after the blank fusing with crucible, be poured into die cavity to die cavity from the sprue gate and be full of fully;
Step 5: removing from mould: open geometrical clamp, molded blank is taken out in the casting mould die sinking;
Step 6: cut rising head: utilize toothless saw excision rising head, obtain strand;
Step 7: cleaning defective: cleaning finishing strand rising head position and blemish;
Step 8: homogenizing annealing: 530 ℃ of strand shove charge heating constant temperatures; Insulation: 4 hours, insulation finished can carry out mold pressing production after the back strand is cooled to 470 ℃ with stove;
Step 9: forging mold preheating: heating constant temperature: 400 ℃; Insulation: 4 hours;
Step 10: mold pressing: utilize 5000 tons of hydraulic presses and forging mold that the strand that step 8 obtains is forged and pressed, obtain forging after the forging and pressing;
Step 11: cut edge: utilize 800 tons of punch presses and edger that forging is carried out cold-trim(ming) after the forging cooling;
Step 12: erosion is washed: 1: ungrease treatment: with the forging stock stainless steel framework of packing into, immersed the alkali groove 10-15 minute, tank liquor temperature: 50-60 ℃; 2: the warm water washing: the stainless steel framework that forging stock will be housed immersed warm water tank 1-4 minute, water temperature: 50-60 ℃; 3: cold water washing: the stainless steel framework that forging stock will be housed immersed cold rinse bank 1-4 minute, water temperature: room temperature; 4: pickling: the stainless steel framework that forging stock will be housed immerses nitric acid groove 0.5-3min till the light; 5: cold water washing: the stainless steel framework that forging stock will be housed immerses cold rinse bank flushing 1-4 minute, water temperature: room temperature; 6: oven dry naturally;
Step 13: cleaning defective: cleaning polishing forging blemish;
Step 14: solution treatment: heating constant temperature: 530 ℃; Insulation: 1.5 hours; Entry immediately after forging is come out of the stove, forging time of staying in water is not less than 15 minutes, is not more than 17 seconds transfer time; Water temperature: 30-50 ℃;
Step 15: proofread and correct: the forging after utilizing 5000 tons of hydraulic presses and straightening die to solution treatment is proofreaied and correct;
Step 10 six: artificial aging: forging shove charge heating, constant temperature: 155 ℃; Insulation: 10 hours;
Step 10 seven: manual synchronizing: carry out manual synchronizing to the concrete deformation extent of forging;
Step 10 eight: erosion is washed: forging is lost wash the acquisition clean Surface, operate same step 12;
Step 10 nine: cleaning defective: forging is carried out monolithic finish eliminate the burr or the defective of colliding with.
A kind of wheelchair frame structural member of the present invention casting and forging molding method for solving the production problem of prefabricated blank, adopts casting and forging molding; Be that prefabricated blank adopts casting; Obtain the finished product forging through compression molding then, the shape high conformity of blank like this, curve form is easy to control; Simultaneously the casting process material can recycle, has improved stock utilization to greatest extent; In order to eliminate forging defect, adopt compression molding at twice, certain under-voltage amount is reserved in mold pressing for the first time, thoroughly repaiies wound after the mold pressing; The forging warpage is serious in the forging process, adopts twice correcting process to eliminate the forging buckling deformation here.Batch process facts have proved that the finished product forging of under this cast forging process flow process, being produced does not have forging defect, and heat treatment performance meets the requirements, and the forging end-state meets user's request fully.
(4) description of drawings:
Fig. 1 is a wheelchair frame structural member forging profile sketch map;
Fig. 2 is a wheelchair frame structural member forging strand profile sketch map;
Fig. 3 is that wheelchair frame structural member forging model cavity is arranged sketch map;
Fig. 4 is that wheelchair frame structural member forging straightening die die cavity is arranged sketch map;
Fig. 5 is a wheelchair frame structural member forging edger structural representation;
Fig. 6 is a wheelchair frame structural member forging strand casting mould structure sketch map.
(5) specific embodiment
For example the present invention is described further below in conjunction with accompanying drawing.
Embodiment 1: combine Fig. 1-Fig. 6, and a kind of wheelchair frame structural member of the present invention casting and forging molding method, step is following:
Step 1: blanking: with material trademark is that 6061 cylindrical φ 200mm aluminium ingot casting sawing becomes the long blank of 800mm;
Step 2: melting: place crucible to heat blank, constant temperature is heated to fusing for 650 ℃;
Step 3: mould assembly: rising head and mold cavity surface at casting mould are smeared releasing agent, close tight casting mould, urgent geometrical clamp;
Step 4: cast: contain 4.5 kilograms of the liquid aluminium get after the blank fusing with crucible, be poured into die cavity to die cavity from the sprue gate and be full of fully;
Step 5: removing from mould: open geometrical clamp, molded blank is taken out in the casting mould die sinking;
Step 6: cut rising head: utilize toothless saw excision rising head, obtain strand;
Step 7: cleaning defective: cleaning finishing strand rising head position and blemish;
Step 8: homogenizing annealing: 530 ℃ of strand shove charge heating constant temperatures; Insulation: 4 hours, insulation finished can carry out mold pressing production after the back strand is cooled to 470 ℃ with stove;
Step 9: forging mold preheating: heating constant temperature: 400 ℃; Insulation: 4 hours;
Step 10: mold pressing: utilize 5000 tons of hydraulic presses and forging mold that the strand that step 8 obtains is forged and pressed, obtain forging after the forging and pressing;
Step 11: cut edge: utilize 800 tons of punch presses and edger that forging is carried out cold-trim(ming) after the forging cooling;
Step 12: erosion is washed: 1: ungrease treatment: with the forging stock stainless steel framework of packing into, immersed the alkali groove 10-15 minute, tank liquor temperature: 50-60 ℃; 2: the warm water washing: the stainless steel framework that forging stock will be housed immersed warm water tank 1-4 minute, water temperature: 50-60 ℃; 3: cold water washing: the stainless steel framework that forging stock will be housed immersed cold rinse bank 1-4 minute, water temperature: room temperature; 4: pickling: the stainless steel framework that forging stock will be housed immerses nitric acid groove 0.5-3min till the light; 5: cold water washing: the stainless steel framework that forging stock will be housed immerses cold rinse bank flushing 1-4 minute, water temperature: room temperature; 6: oven dry naturally;
Step 13: cleaning defective: cleaning polishing forging blemish;
Step 14: solution treatment: heating constant temperature: 530 ℃; Insulation: 1.5 hours; Entry immediately after forging is come out of the stove, forging time of staying in water is not less than 15 minutes, is not more than 17 seconds transfer time; Water temperature: 30-50 ℃;
Step 15: proofread and correct: the forging after utilizing 5000 tons of hydraulic presses and straightening die to solution treatment is proofreaied and correct;
Step 10 six: artificial aging: forging shove charge heating, constant temperature: 155 ℃; Insulation: 10 hours;
Step 10 seven: manual synchronizing: carry out manual synchronizing to the concrete deformation extent of forging;
Step 10 eight: erosion is washed: forging is lost wash the acquisition clean Surface, operate same step 12;
Step 10 nine: cleaning defective: forging is carried out monolithic finish eliminate the burr or the defective of colliding with.
Embodiment 2: combine Fig. 1-Fig. 6, and a kind of wheelchair frame structural member of the present invention casting and forging molding method, step is following:
Step 1: blanking: with material trademark is that 6061 cylindrical φ 200mm ingot casting sawing becomes the long blank of 800mm;
Step 2: melting: place crucible to heat constant temperature blank: 650 ℃, be heated to fusing fully;
Step 3: mould assembly: smear releasing agent at casting mould (Fig. 6) rising head and mold cavity surface, close tight casting mould, urgent geometrical clamp;
Step 4: cast: 1 (Fig. 6) is poured into die cavity and is full of fully from the sprue gate to contain 4.5 kilograms of the liquid aluminium get after the blank fusing with crucible, is poured into the rising head die cavity from rising head 2,3 successively again and is full of liquid aluminium;
Step 5: removing from mould: open geometrical clamp, slowly separately, take out molded blank with the casting mould upper and lower mould;
Step 6: cut rising head: utilize toothless saw to cut redundance acquisition strands (Fig. 2) such as rising head;
Step 7: cleaning defective: cleaning finishing strand rising head cutting part and casting billet surface defective;
Step 8: homogenizing annealing: constant temperature is heated in the strand shove charge: 530 ℃, insulation: 4 hours, insulation finished can carry out mold pressing production after the back strand is cooled to 470 ℃ with stove;
Step 9: forging mold preheating: with forging mold shove charge heating, constant temperature: 400 ℃, be incubated 4 hours;
Step 10: mold pressing: utilize 5000 tons of hydraulic presses and forging die (Fig. 6) to carry out mold pressing, mold pressing front mold die cavity and forging surface spray oil foundation stone China ink lubricant, lubricated promptly need the spraying evenly obtains the forging of band burr after the mold pressing;
Step 11: cut edge: after treating that forging with burr at room temperature cools off, utilize 800 tons of punch presses and edger (Fig. 5) to cut edge;
Step 12: erosion is washed: 1: ungrease treatment: with the forging stock stainless steel framework of packing into, immerse alkali groove (composition: NaOH concentration: 80-120g/L, Na
2CO
3Concentration: 25-30g/L), soak time 10-15 minute, tank liquor temperature: 50-60 ℃; 2: the warm water washing: the stainless steel framework that forging stock will be housed immerses warm water tank (composition: water for industrial use), soaked water temperature: 50-60 ℃ 1-4 minute; 3: cold water washing: the stainless steel framework that forging stock will be housed immerse cold rinse bank (composition: mobile water for industrial use), washing time 1-4 minute, water temperature: room temperature; 4: pickling: the stainless steel framework that forging stock will be housed immerses nitric acid groove (composition: HNO
3, concentration: 200-300g/L), soak time: 0.5-3min is till the light; 5: cold water washing: the stainless steel framework that forging stock will be housed immerse cold rinse bank (composition: mobile water for industrial use), washing time 1-4 minute, water temperature: room temperature; 6: oven dry naturally;
Step 13: cleaning defective: remaining burr and forging blemish when polishing finishing forging is cut edge;
Step 14: solution treatment: heating constant temperature: 530 ℃; Insulation: 1.5 hours; Entry immediately after forging is come out of the stove moves up and down in water and is no less than 6 times,, forging can not surface in the whipping process, and forging time of staying in water is not less than 15 minutes, is not more than 17 seconds transfer time; Water temperature: 30-50 ℃;
Step 15: proofread and correct: utilize 5000 tons of hydraulic presses and straightening die (Fig. 4) that forging is proofreaied and correct to eliminate part torsional deformation and buckling deformation;
Step 10 six: artificial aging: forging shove charge heating, constant temperature: 155 ℃; Insulation: 10 hours;
Step 10 seven: manual synchronizing: proofread and correct to eliminate the residual deformation after straightening die is proofreaied and correct to the different deformation extent of each forging, obtain the forging of The profile;
Step 10 eight: erosion is washed: forging is lost wash the acquisition clean surface, operate same step 12;
Step 10 nine: cleaning defective: forging is carried out monolithic finish eliminate the burr or the defective of colliding with, and polishing forging surface.
Claims (1)
1. wheelchair frame structural member casting and forging molding method, it is characterized in that: step is following:
Step 1: blanking: with material trademark is that 6061 cylindrical φ 200mm aluminium ingot casting sawing becomes the long blank of 800mm;
Step 2: melting: place crucible to heat blank, constant temperature is heated to fusing for 650 ℃;
Step 3: mould assembly: rising head and mold cavity surface at casting mould are smeared releasing agent, close tight casting mould, urgent geometrical clamp;
Step 4: cast: contain 4.5 kilograms of the liquid aluminium get after the blank fusing with crucible, be poured into die cavity to die cavity from the sprue gate and be full of fully;
Step 5: removing from mould: open geometrical clamp, molded blank is taken out in the casting mould die sinking;
Step 6: cut rising head: utilize toothless saw excision rising head, obtain strand;
Step 7: cleaning defective: cleaning finishing strand rising head position and blemish;
Step 8: homogenizing annealing: 530 ℃ of strand shove charge heating constant temperatures; Insulation: 4 hours, insulation finished can carry out mold pressing production after the back strand is cooled to 470 ℃ with stove;
Step 9: forging mold preheating: heating constant temperature: 400 ℃; Insulation: 4 hours;
Step 10: mold pressing: utilize 5000 tons of hydraulic presses and forging mold that the strand that step 8 obtains is forged and pressed, obtain forging after the forging and pressing;
Step 11: cut edge: utilize 800 tons of punch presses and edger that forging is carried out cold-trim(ming) after the forging cooling;
Step 12: erosion is washed: 1: ungrease treatment: with the forging stock stainless steel framework of packing into, immersed the alkali groove 10-15 minute, tank liquor temperature: 50-60 ℃; 2: the warm water washing: the stainless steel framework that forging stock will be housed immersed warm water tank 1-4 minute, water temperature: 50-60 ℃; 3: cold water washing: the stainless steel framework that forging stock will be housed immersed cold rinse bank 1-4 minute, water temperature: room temperature; 4: pickling: the stainless steel framework that forging stock will be housed immerses nitric acid groove 0.5-3min till the light; 5: cold water washing: the stainless steel framework that forging stock will be housed immerses cold rinse bank flushing 1-4 minute, water temperature: room temperature; 6: oven dry naturally;
Step 13: cleaning defective: cleaning polishing forging blemish;
Step 14: solution treatment: heating constant temperature: 530 ℃; Insulation: 1.5 hours; Entry immediately after forging is come out of the stove, forging time of staying in water is not less than 15 minutes, is not more than 17 seconds transfer time; Water temperature: 30-50 ℃;
Step 15: proofread and correct: the forging after utilizing 5000 tons of hydraulic presses and straightening die to solution treatment is proofreaied and correct;
Step 10 six: artificial aging: forging shove charge heating, constant temperature: 155 ℃; Insulation: 10 hours;
Step 10 seven: manual synchronizing: carry out manual synchronizing to the concrete deformation extent of forging;
Step 10 eight: erosion is washed: forging is lost wash the acquisition clean Surface, operate same step 12;
Step 10 nine: cleaning defective: forging is carried out monolithic finish eliminate the burr or the defective of colliding with.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110283392 CN102363259B (en) | 2011-09-22 | 2011-09-22 | Molding method for casting and forging structure piece of wheelchair frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110283392 CN102363259B (en) | 2011-09-22 | 2011-09-22 | Molding method for casting and forging structure piece of wheelchair frame |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102363259A true CN102363259A (en) | 2012-02-29 |
CN102363259B CN102363259B (en) | 2013-01-23 |
Family
ID=45689867
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110283392 Expired - Fee Related CN102363259B (en) | 2011-09-22 | 2011-09-22 | Molding method for casting and forging structure piece of wheelchair frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102363259B (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102699636A (en) * | 2012-06-18 | 2012-10-03 | 西南大学 | Liquid die-forging and rolling composite forming method for 6082 aluminum alloy special-section large ring piece |
CN104694723A (en) * | 2013-12-05 | 2015-06-10 | 北京航星机器制造有限公司 | Rapid correction method for deformation due to heat treatment of exocentric casting aluminum alloy member |
CN104741592A (en) * | 2015-03-19 | 2015-07-01 | 新荣株式会社 | Continuous casting-forging device for manufacturing aluminous automobile component and manufacturing method with use of continuous forging device |
CN105234634A (en) * | 2015-10-22 | 2016-01-13 | 苏州胜利精密制造科技股份有限公司 | Machining method of liquid crystal television set support |
CN105401018A (en) * | 2015-11-14 | 2016-03-16 | 合肥标兵凯基新型材料有限公司 | High-strength high-toughness ultra-fine grain wrought aluminum alloy and preparation method thereof |
CN104694857B (en) * | 2013-12-05 | 2016-08-24 | 北京航星机器制造有限公司 | Thin-walled inlets structure Cast aluminium alloy gold cabin section method for controlling heat treatment deformation |
CN107697855A (en) * | 2017-08-30 | 2018-02-16 | 宁波韧霸货叉有限公司 | A kind of high rigidity fork of forklift truck |
CN108746469A (en) * | 2018-05-17 | 2018-11-06 | 湖北三环锻造有限公司 | The cold and hot joint trimming technology of aluminum alloy forge piece |
CN115194083A (en) * | 2022-06-29 | 2022-10-18 | 中国第一汽车股份有限公司 | Production method of aluminum alloy rear steering knuckle of casting and forging combined passenger car |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1050512A (en) * | 1989-09-29 | 1991-04-10 | 天津大学机电分校 | Al-Zn-Mg is an alloy casting-die forging assembling process |
JPH11286758A (en) * | 1998-04-02 | 1999-10-19 | Nippon Light Metal Co Ltd | Production of forged product using aluminum casting material |
JP2002361399A (en) * | 2001-06-07 | 2002-12-17 | Aisin Seiki Co Ltd | Casting and forging method for aluminum alloy, and aluminum alloy for casting and forging |
CN1861288A (en) * | 2005-05-10 | 2006-11-15 | 徐名钧 | Procedure for processing aluminium alloy products |
CN101486087A (en) * | 2009-02-11 | 2009-07-22 | 江苏大学 | Casting and forging combined technique of aluminum alloy linkage rod |
-
2011
- 2011-09-22 CN CN 201110283392 patent/CN102363259B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1050512A (en) * | 1989-09-29 | 1991-04-10 | 天津大学机电分校 | Al-Zn-Mg is an alloy casting-die forging assembling process |
JPH11286758A (en) * | 1998-04-02 | 1999-10-19 | Nippon Light Metal Co Ltd | Production of forged product using aluminum casting material |
JP2002361399A (en) * | 2001-06-07 | 2002-12-17 | Aisin Seiki Co Ltd | Casting and forging method for aluminum alloy, and aluminum alloy for casting and forging |
CN1861288A (en) * | 2005-05-10 | 2006-11-15 | 徐名钧 | Procedure for processing aluminium alloy products |
CN101486087A (en) * | 2009-02-11 | 2009-07-22 | 江苏大学 | Casting and forging combined technique of aluminum alloy linkage rod |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102699636A (en) * | 2012-06-18 | 2012-10-03 | 西南大学 | Liquid die-forging and rolling composite forming method for 6082 aluminum alloy special-section large ring piece |
CN102699636B (en) * | 2012-06-18 | 2015-08-19 | 西南大学 | The liquid forging Rolling compund manufacturing process of 6082 aluminium alloy different cross section large rings |
CN104694723A (en) * | 2013-12-05 | 2015-06-10 | 北京航星机器制造有限公司 | Rapid correction method for deformation due to heat treatment of exocentric casting aluminum alloy member |
CN104694857B (en) * | 2013-12-05 | 2016-08-24 | 北京航星机器制造有限公司 | Thin-walled inlets structure Cast aluminium alloy gold cabin section method for controlling heat treatment deformation |
CN104741592A (en) * | 2015-03-19 | 2015-07-01 | 新荣株式会社 | Continuous casting-forging device for manufacturing aluminous automobile component and manufacturing method with use of continuous forging device |
CN105234634A (en) * | 2015-10-22 | 2016-01-13 | 苏州胜利精密制造科技股份有限公司 | Machining method of liquid crystal television set support |
CN105401018A (en) * | 2015-11-14 | 2016-03-16 | 合肥标兵凯基新型材料有限公司 | High-strength high-toughness ultra-fine grain wrought aluminum alloy and preparation method thereof |
CN105401018B (en) * | 2015-11-14 | 2018-05-15 | 合肥市易远新材料有限公司 | A kind of high-strength tenacity ultrafine crystal deformed aluminium alloy and preparation method thereof |
CN107697855A (en) * | 2017-08-30 | 2018-02-16 | 宁波韧霸货叉有限公司 | A kind of high rigidity fork of forklift truck |
CN108746469A (en) * | 2018-05-17 | 2018-11-06 | 湖北三环锻造有限公司 | The cold and hot joint trimming technology of aluminum alloy forge piece |
CN115194083A (en) * | 2022-06-29 | 2022-10-18 | 中国第一汽车股份有限公司 | Production method of aluminum alloy rear steering knuckle of casting and forging combined passenger car |
Also Published As
Publication number | Publication date |
---|---|
CN102363259B (en) | 2013-01-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102363259B (en) | Molding method for casting and forging structure piece of wheelchair frame | |
CN106756334B (en) | A kind of production method of aero-engine labyrinth precision die forgings | |
CN104439219B (en) | A kind of casting technique of steel loop base based on casting and rolling composite forming | |
CN100453206C (en) | Process of making oil cylinder body and cover with aluminium alloy | |
CN103266238B (en) | High-zinc-copper alloy cutting bus and processing method thereof | |
CN102019353A (en) | Precision casting molding method for complex thin-walled member | |
CN104131202B (en) | The short process making method of 6061 aluminum alloy die forgings | |
CN107186139B (en) | The H profile steel manufacturing method of nuclear fusion stack magnet support | |
CN107523707A (en) | The founding aluminium bar smelting technology of aluminium section bar | |
CN102335704B (en) | Method for forging and forming structural parts of wheel chair rack | |
CN102965576B (en) | Preparation method of pump shaft of oil feed pump | |
CN103088266A (en) | Forging method for foundation bolt | |
CN105202275A (en) | Titanium alloy TC4 hot-rolled pipe and preparation method thereof | |
CN103741083A (en) | Cast pipe blank rolling method for preparing high-performance, large-size and high-precision beryllium copper pipe | |
CN106947852B (en) | A method of it improves to cast and squeezes combined shaping large-sized heavy-wall tube performance | |
CN104476128A (en) | Method of manufacturing high-temperature alloy pipe blanks | |
CN108580574B (en) | Three-dimensional near-solid pressure forming method for tee part blank | |
CN102689159A (en) | Liquid die forging and rolling compound formation method for 6061 aluminum alloy irregular-section large ring piece | |
CN107214318A (en) | A kind of metal liquid die forging process system | |
CN110129626A (en) | Aerial blade die-casting process | |
CN101817073B (en) | Process for manufacturing cadmium plate and cadmium alloy plate | |
CN102689155A (en) | Liquid die forging and rolling compound formation method for aluminum alloy irregular-section large ring piece | |
CN102689152B (en) | Liquid die forging rolling compound forming method for 2014 aluminium alloy large ring member with different cross sections | |
CN102861903A (en) | Connecting rod liquid-state die forging process | |
CN101456058B (en) | Forming method of highway, railway basin type bearing metal structure piece |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130123 |
|
CF01 | Termination of patent right due to non-payment of annual fee |