[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN102313629B - Outfit for detecting plugging and choking of sewage pipelines and inspection wells by full air bag method - Google Patents

Outfit for detecting plugging and choking of sewage pipelines and inspection wells by full air bag method Download PDF

Info

Publication number
CN102313629B
CN102313629B CN 201110204734 CN201110204734A CN102313629B CN 102313629 B CN102313629 B CN 102313629B CN 201110204734 CN201110204734 CN 201110204734 CN 201110204734 A CN201110204734 A CN 201110204734A CN 102313629 B CN102313629 B CN 102313629B
Authority
CN
China
Prior art keywords
air bag
inspection well
pipeline
tested
detected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201110204734
Other languages
Chinese (zh)
Other versions
CN102313629A (en
Inventor
孙杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Urban Construction Group Co Ltd
Original Assignee
Jinan Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Urban Construction Group Co Ltd filed Critical Jinan Urban Construction Group Co Ltd
Priority to CN 201110204734 priority Critical patent/CN102313629B/en
Publication of CN102313629A publication Critical patent/CN102313629A/en
Application granted granted Critical
Publication of CN102313629B publication Critical patent/CN102313629B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pipe Accessories (AREA)
  • Examining Or Testing Airtightness (AREA)

Abstract

The invention provides an outfit for detecting plugging and choking of sewage pipelines and inspection wells by a full air bag method, which structurally comprises a detected sewage inspection well, a sewage inspection well to be detected, a detected sewage pipeline, a sewage pipeline to be detected and an air compressor. The detected sewage pipeline is connected between the detected sewage inspection well and the sewage inspection well to be detected. The inner wall of a wellhead of the detected sewage inspection well is coated with a sealing medium. A wellhead air bag plugging device is arranged at the position coated with the sealing medium. An air bag plugging device for the pipeline to be detected is arranged at the end port of the sewage pipeline to be detected at the bottom of the detected sewage inspection well. An air bag plugging device for the detected pipeline is arranged at one end of the detected sewage pipeline at the bottom of the sewage inspection well to be detected. The plugging and choking detection outfit has the beneficial effects that 1, the plugging and choking detection outfit accords with the scientific ideal of low carbon and environment protection, water is not used, and the waste on the water and the hazard of emission on the environment can be reduced; 2, the test period is short, the effect of completing test work of more than one well section in half of a working day can be achieved, test data can be shown immediately so that the leakproofness is verified; and 3, the outfit is simple to operate, the test speed is high, and equipment has high sealing performance.

Description

Full air-bag method is to the outfit for detecting plugging of sewer line and inspection chamber
Technical field
The present invention relates to the Municipal Engineering Construction technical field, specifically a kind of full air-bag method is to the outfit for detecting plugging of sewer line and inspection chamber.
Background technology
Current, the Air-tight Test technology is immature, often has the phenomenons such as test failure, through research, is not all to be that having much is that the obturating system bad sealing causes because inspection chamber and pipeline leakproofness are bad.The present stage leak test of sewage drainage pipeline mainly is closed-water test.
Existing inspection specification is about the regulation of inspection chamber leakproofness check aspect, in standard C ECS19:1990 " concrete drain tile lineman journey hold one's breath test stone ", only Air-tight Test and the method for pipeline made regulation.In practice of construction, often leakproofness is bad for pipeline and inspection chamber junction.In this patent, we have summed up the method that a cover pipeline and inspection chamber carry out Air-tight Test simultaneously by test.
Closed-water test has following shortcoming in municipal works are used: (1) water resource waste is more serious, and each closed-water test institute water consumption is very large; (2) machinery expenses that causes such as fortune water, draining is higher; (3) to the pollution of environment, the municipal works work place is in the urban district, and the volume of traffic is large, and in newly built construction, most of old pipeline can not meet the demands or destroy in construction, and the water after finishing test does not often have local discharging, contaminated environment.(4) used cycle of closed-water test longer, need to manage and the special messenger of unit in charge of construction guarded record 24 hours.For the call of response state guarantee environment, energy-saving and emission-reduction, so should carry out energetically Air-tight Test.
Summary of the invention
The purpose of this invention is to provide a kind of full air-bag method to the outfit for detecting plugging of sewer line and inspection chamber.
Technical scheme of the present invention realizes in the following manner, comprise tested sewage inspection well, sewage inspection well to be checked, tested sewer line, sewer line to be checked and air compressor machine, tested sewer line is connected between tested sewage inspection well and the sewage inspection well to be checked, well head inwall at tested sewage inspection well scribbles sealing medium, air bag well head plugging device is set at the position that scribbles sealing medium, the port of the sewer line to be checked bottom tested sewage inspection well arranges pipeline air bag plugging device to be checked, one end of the tested sewer line bottom sewage inspection well to be checked arranges tested pipeline air bag plugging device, scribble sealing medium at the sewer line port inner wall that tested pipeline air bag plugging device and pipeline air bag plugging device to be checked are set, wherein:
The shaft mouth air bag plugging device, pipeline air bag plugging device to be checked is identical with the structure of tested pipeline air bag plugging device, its structure is by wheel hub, air bag, connecting rod, tensioning screw and L shaped claw form, the centre of wheel hub is welded with the shutoff steel plate, air bag is arranged on the cylindrical of wheel hub, the inner circle of wheel hub is provided with the L-type connecting rod, the L-type connecting rod connects L shaped claw by tensioning screw, L shaped claw is connected with the well head of sewage inspection well or the pipeline opening of sewer line, be provided with rubber mount between wheel hub and the air bag, the cylindrical of air bag is connected with sewage inspection well inwall or sewer line inwall, also be provided with valve inside on the air bag, being provided with air inlet at the shutoff steel plate chews, air inlet is chewed by pipeline and is connected with air compressor machine, is connected with T-valve and rain glass on the admission line.
Tested sewer line and sewer line to be checked are plastic tube, steel pipe or concrete prefabricated pipe.
Tested sewage inspection well, sewage inspection well to be checked are brick or concrete prefabricated making.
Full air-bag method of the present invention has following outstanding beneficial effect to the outfit for detecting plugging of sewer line and inspection chamber:
1) meet the scientific idea of national low-carbon environment-friendly, water can not reduce the waste of water and the harm that discharging causes environment.
2) the test period weak point can be accomplished to finish the experiment work of an above well section, and can provide test figure then and there within half working day, the checking tightness.
3) simple to operate, test speed is fast, the equipment good seal performance.
4) energy-saving and cost-reducing, reduce cost.Compare with closed-water test, saved water filling, effluent cost, saved installation and the removal costs such as brick setting, cement sand plaster, reduced the expense that the building waste outward transport causes.
Description of drawings
Fig. 1 is the one-piece construction synoptic diagram of outfit for detecting plugging;
Fig. 2 is the local structure for amplifying synoptic diagram of well head or pipeline air bag plugging device;
Mark in the accompanying drawing represents respectively: rain glass 1, T-valve 2, air compressor machine 3, shaft mouth air bag plugging device 4, sealing medium 5, tested sewage inspection well 6, pipeline air bag plugging device 7 to be checked, sewer line to be checked 8, tested sewer line 9, tested pipeline air bag plugging device 10, sewage inspection well to be checked 11, air bag 12, rubber gasket 13, shutoff steel plate 14, rim 15, air inlet chew 16, L-type connecting rod 17, tensioning screw 18, L shaped claw 19, valve inside 20.
Embodiment
Below in conjunction with accompanying drawing the outfit for detecting plugging of full air-bag method of the present invention to sewer line and inspection chamber is described in further detail.
Full air-bag method of the present invention is to the outfit for detecting plugging of sewer line and inspection chamber, its structure comprises tested sewage inspection well 6, sewage inspection well 11 to be checked, tested sewer line 9, sewer line 8 to be checked and air compressor machine 3, tested sewer line 9 is connected between tested sewage inspection well 6 and the sewage inspection well to be checked 11, well head inwall at tested sewage inspection well 6 scribbles sealing medium 5, scribbling sealing Jie, 5 position arranges air bag well head plugging device 4, port at the sewer line to be checked 9 of tested sewage inspection well 11 bottoms arranges pipeline air bag plugging device 7 to be checked, end at the tested sewer line 9 of sewage inspection well to be checked 11 bottoms arranges tested pipeline air bag plugging device 10, scribble sealing medium 5 at the sewer line port inner wall that tested pipeline air bag plugging device 10 and pipeline air bag plugging device 11 to be checked are set, wherein:
Shaft mouth air bag plugging device 4, pipeline air bag plugging device 7 to be checked is identical with the structure of tested pipeline air bag plugging device 10, its structure is by wheel hub 15, air bag 12, connecting rod 17, tensioning screw 18 and claw 19 form, the centre of wheel hub 15 is welded with shutoff steel plate 14, air bag 12 is arranged on the cylindrical of wheel hub 15, be provided with rubber mount 13 between wheel hub 15 and the air bag 12, the inner circle of wheel hub 15 is provided with L-type connecting rod 17, L-type connecting rod 17 connects L shaped claw 19 by tensioning screw 18, the well head of L shaped claw 19 and tested or sewage inspection well to be checked, by between or the pipeline opening of sewer line to be checked connect, the cylindrical of air bag 12 is connected with plastic-embedded pipe 5 or sewer line inwall on the sewage inspection well inwall, also be provided with valve inside 20 on the air bag 12, be provided with air inlet at shutoff steel plate 14 and chew 16, air inlet is chewed 16 and is connected with air compressor machine 3 by pipeline, is connected with T-valve 2 and rain glass 1 on the admission line.
Tested sewer line 7 and sewer line to be checked 10 are plastic tube, steel pipe or concrete prefabricated pipe.
Tested sewage inspection well 5, sewage inspection well to be checked 9 are brick, concrete prefabricated or heavy-caliber plastic pipe is made.
Sealing medium is vaseline or water.
Embodiment:
Inspection chamber is smeared sealing medium → the lay equipment of the holding one's breath → air that adds high pressure and is carried out Air-tight Test → venting and dismounting equipment hold one's breath major equipment and preparation:
1, pressure bladder adopts annular air-pocket, and the pit shaft place gets pumping valve inside and tensimeter are installed on the air bag intermediate plate.
2, inflation and air pressure opertaing device mainly are air compressor machines.
The Specific construction step is as follows:
1, sewer line install one section (or multistage) inspection chamber build by laying bricks or stones finish after, to carry out leakproofness test by the quality inspection requirement.The place that first inspection chamber and pipeline junction, cover plate installation place etc. is leaked air easily checks that range estimation is without the gas leakage suspicious points.
2, the sealing of the sewer line mouth of pipe: about 0.3 meter of homonymy pipeline opening in adjacent two inspection chambers (in the pipe), at tube wall water spray or coat vaseline, pressure bladder is installed, four L shaped claws are stuck on the mouth of pipe, give airbag aeration with air compressor (or using inflator), be forced into 0.15-0.20MPa, with pipe sealing.Tighten 4 fastening screws on the wheel hub inwall, guarantee that air bag is unshift when pressurization detects.L shaped claw and plastic conduit contact point adopt rubber blanket, hinder plastic tube in case stop loss.
3, the sealing of sewage inspection well mouth: in the middle of the plastic conduit in pit shaft, pressure bladder is installed, with air compressor to airbag aeration to requiring atmospheric pressure value to good seal.Connect the middle valve inside of pit shaft air bag, be inflated to 1.5 atmospheric pressure with air compressor machine, see if there is gas leak phenomenon.If without gas leak phenomenon, continue to be pressurized to 3KPa, close gas check valve, air pressure is tended towards stability, air pressure is down to 2KPa from 3KPa, must not last less than 5 minutes.Air pressure descends too fast, suitably tonifying Qi, and it is slow to descend, suitably venting.
5, press regulation in the pneumatic test standard scale 2, determine different holding one's breath the time according to different tube diameters.The minute atmospheric pressure value is from 2KPa, and the time used when air pressure drops to 1.5KPa must not be less than the regulation of minute.
6, the disqualified upon inspection of holding one's breath should carry out leak test, repairing, reinspection.
7, pipeline hold one's breath the check complete, the gases at high pressure in first discharge line and the inspection chamber, the again gas in the vent pipe gas shutoff capsule.Detaching equipment, disposal data.

Claims (3)

1. full air-bag method is to the outfit for detecting plugging of sewer line and inspection chamber, comprise tested sewage inspection well, sewage inspection well to be checked, tested sewer line, sewer line to be checked and air compressor machine, it is characterized in that, tested sewer line is connected between tested sewage inspection well and the sewage inspection well to be checked, well head inwall at tested sewage inspection well scribbles sealing medium, air bag well head plugging device is set at the position that scribbles sealing medium, the port of the sewer line to be checked bottom tested sewage inspection well arranges pipeline air bag plugging device to be checked, one end of the tested sewer line bottom sewage inspection well to be checked arranges tested pipeline air bag plugging device, scribble sealing medium at the sewer line port inner wall that tested pipeline air bag plugging device and pipeline air bag plugging device to be checked are set, wherein:
The shaft mouth air bag plugging device, pipeline air bag plugging device to be checked is identical with the structure of tested pipeline air bag plugging device, its structure is by wheel hub, air bag, the L-type connecting rod, tensioning screw and L shaped claw form, the centre of wheel hub is welded with the shutoff steel plate, air bag is arranged on the cylindrical of wheel hub, the inner circle of wheel hub is provided with the L-type connecting rod, the L-type connecting rod connects L shaped claw by tensioning screw, L shaped claw is connected with the well head of sewage inspection well or the pipeline opening of sewer line, be provided with rubber mount between wheel hub and the air bag, the cylindrical of air bag is connected with sewage inspection well inwall or sewer line inwall, also be provided with valve inside on the air bag, being provided with air inlet at the shutoff steel plate chews, air inlet is chewed by pipeline and is connected with air compressor machine, is connected with T-valve and rain glass on the admission line.
2. outfit for detecting plugging according to claim 1 is characterized in that tested sewer line and sewer line to be checked are plastic tube, steel pipe or concrete prefabricated pipe.
3. outfit for detecting plugging according to claim 1 is characterized in that tested sewage inspection well, sewage inspection well to be checked are brick or concrete prefabricated making.
CN 201110204734 2011-07-21 2011-07-21 Outfit for detecting plugging and choking of sewage pipelines and inspection wells by full air bag method Expired - Fee Related CN102313629B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110204734 CN102313629B (en) 2011-07-21 2011-07-21 Outfit for detecting plugging and choking of sewage pipelines and inspection wells by full air bag method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110204734 CN102313629B (en) 2011-07-21 2011-07-21 Outfit for detecting plugging and choking of sewage pipelines and inspection wells by full air bag method

Publications (2)

Publication Number Publication Date
CN102313629A CN102313629A (en) 2012-01-11
CN102313629B true CN102313629B (en) 2013-02-06

Family

ID=45426990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110204734 Expired - Fee Related CN102313629B (en) 2011-07-21 2011-07-21 Outfit for detecting plugging and choking of sewage pipelines and inspection wells by full air bag method

Country Status (1)

Country Link
CN (1) CN102313629B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2741067B1 (en) * 2012-12-07 2017-03-29 Michael Keil Testing system and method for testing the seal of a glove which is installed in the port of an insulator
CN105014940A (en) * 2015-07-28 2015-11-04 昆明理工大学 Correcting and repairing device and method for leather bag type plastic check well
CN109029866B (en) * 2018-06-27 2023-11-10 江西汇丰管业有限公司 Water-closing test well and manufacturing process thereof
CN111594088B (en) * 2020-06-20 2022-03-01 中国石油天然气股份有限公司 Injection well head plugging device
CN114199476A (en) * 2020-09-17 2022-03-18 中国电建集团华东勘测设计研究院有限公司 Rapid plugging digitalization device for non-pressure pipeline water closing test and test method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0582531A2 (en) * 1992-08-03 1994-02-09 Constructions Sewerin Materiel Reseaux Cmr Smr S.A. Method for testing the tightness of a drain channel or a network of drain channels and installation for carrying out the method
GB2327759A (en) * 1997-07-22 1999-02-03 British Gas Plc Pipeline leak detector system
BE1014255A6 (en) * 2001-06-20 2003-07-01 Vliegen Danny Detection method for leaks in e.g. pipes, by generating underpressure in inspection area and measuring any flow of fluid into tank from this area
CN101886969A (en) * 2010-06-08 2010-11-17 天津泰邦管材有限公司 Device for detecting leakproofness of plastic pipe joints

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0582531A2 (en) * 1992-08-03 1994-02-09 Constructions Sewerin Materiel Reseaux Cmr Smr S.A. Method for testing the tightness of a drain channel or a network of drain channels and installation for carrying out the method
GB2327759A (en) * 1997-07-22 1999-02-03 British Gas Plc Pipeline leak detector system
BE1014255A6 (en) * 2001-06-20 2003-07-01 Vliegen Danny Detection method for leaks in e.g. pipes, by generating underpressure in inspection area and measuring any flow of fluid into tank from this area
CN101886969A (en) * 2010-06-08 2010-11-17 天津泰邦管材有限公司 Device for detecting leakproofness of plastic pipe joints

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
市政污水管道闭水试验新方法的探讨;陈志伟;《给水排水》;20081231;第34卷;318-320 *
陈志伟.市政污水管道闭水试验新方法的探讨.《给水排水》.2008,第34卷318-320.
陈明,等.一种实用新型污水管道封堵装置.《中国给水排水》.2008,第24卷(第6期),71. *

Also Published As

Publication number Publication date
CN102313629A (en) 2012-01-11

Similar Documents

Publication Publication Date Title
CN102313629B (en) Outfit for detecting plugging and choking of sewage pipelines and inspection wells by full air bag method
CN110645440A (en) Trenchless repairing device and method for large-diameter concrete drain pipe disjointing
CN111456196B (en) Grouting structure for repairing sewage pipeline and pipeline grouting repairing method
CN202153172U (en) Device for detecting plugging and sealing of sewage pipeline and inspection well by all-air-bag method
CN110617381A (en) Drainage pipeline cracking local plugging structure, plugging method and repairing method
CN210529889U (en) Temporary discharge pipe with air bag expansion plug for repairing inspection well
CN104390093A (en) Water closing and air closing test method and used water closing and air closing dual-purpose blockage test airbag
CN204343330U (en) A kind of plastic drain-pipe and manhole sealing and connecting device
CN107763362A (en) Interior piston ring method pipe joint method for repairing and constructing
CN202188946U (en) Tool using air bag to carry out sealing closed air detection of plastic sewage pipeline and inspection well
CN202188945U (en) Plugging and gas-closing detection tool for plastic sewage wellhead and pipeline by using air bag and steel plate respectively
CN202329946U (en) Air bag and steel plate combined plugging and sealing detection kit for sewage inspection well and pipeline
CN202599630U (en) Plugging choke detection device used for sewage wellhead and pipeline by using steel plate and air bag combination
CN104196108B (en) The servicing unit that a kind of pipeline is connected with manhole well seat
CN202166504U (en) All-steel-plate plugging air closure detection device for sewage well mouth and pipeline
CN101538891B (en) Non-excavation fiber glass reinforced plastics inspection well and construction method thereof
CN210462146U (en) Circular pipeline repairing structure
CN106958240A (en) Air-cushion type batch vacuum pipe well and apply its soft foundation Yield rainfall relation method
CN202188311U (en) Device for detecting blocking and closing of sewage pipeline by using steel plate
CN214305883U (en) Be applied to interim drainage device of pipeline of sponge city transformation project
KR101254464B1 (en) Non-digging sewerage mending apparatus and its manufacturing method
KR200334790Y1 (en) Rapairing device of the damage part of a pipe for part-reparing method of non-diggnig filling index
CN102288368B (en) Plugging airtightness detecting tool using full steel plate method for sewage inspection well and sewage pipeline
CN210194598U (en) Foundation support engineering ground is wall construction joint case device even
CN209495149U (en) Subterranean pipe line leak source detection system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130206

Termination date: 20160721