CN102182323A - 低纬度高原蒸压加气砼砌块干法砌筑施工工艺 - Google Patents
低纬度高原蒸压加气砼砌块干法砌筑施工工艺 Download PDFInfo
- Publication number
- CN102182323A CN102182323A CN2011100330281A CN201110033028A CN102182323A CN 102182323 A CN102182323 A CN 102182323A CN 2011100330281 A CN2011100330281 A CN 2011100330281A CN 201110033028 A CN201110033028 A CN 201110033028A CN 102182323 A CN102182323 A CN 102182323A
- Authority
- CN
- China
- Prior art keywords
- mortar
- wall
- building block
- building
- stones
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Finishing Walls (AREA)
Abstract
一种低纬度高原蒸压加气砼砌块干法砌筑施工工艺,施工步骤为:砌体表面进行基层清理和找平处理,刷界面剂,砌筑上墙,抹第一道砂浆,抹第二道砂浆,由于使用界面剂,砌筑蒸压加气混凝土填充墙砌体时不需在砌筑面浇水,直接在经喷涂界面处理剂的干燥的墙面上抹灰,无须浇水保湿养护,砌块不用浇水,既节约用水,又可以有效防止墙面使用中的开裂;适用于所有采用蒸压加气混凝土砌块的非承重砌体砌筑施工。
Description
技术领域
本发明是一种适合低纬度高海拔地区蒸压加气砼砌块的干法砌筑施工工艺。
背景技术
蒸压加气混凝土砌块干缩值较大,且砌块吸水时具有吸水量大、先快后缓、延续干缩时间长的特点。目前蒸压加气混凝土砌块的砌筑多沿用传统的墙体砌筑、抹灰和饰面的施工工艺,由于加气混凝土砌块材料吸水率高,而传统施工工艺要求砌筑完成后浇水养护,砌块大量吸水,增大了砌块墙体的含水率,砌块墙体在干燥过程中收缩产生干缩裂缝,从而造成砌块墙体开裂等一系列质量通病。
发明内容
本发明提出一种低纬度高原蒸压加气砼砌块干法砌筑施工工艺,尤其适合低纬度高原气候条件下施工,有效地避免了砌块墙体开裂等质量通病,具有较好的经济效益和社会效益。本发明的上述目的通过以下技术方案实现:
一种低纬度高原蒸压加气砼砌块干法砌筑施工工艺,其特征在于施工步骤为:
一、对砌筑墙体表面进行基层清理和找平处理;
二、选用龄期超过28天、含水率小于15%的蒸压加气砼砌块,在砌块的每一面都涂刷市场购买的HB-421加气混凝土界面剂,砌筑时在砌块的端面抹上市场购买的加气混凝土抹灰砂浆,采用挤浆法砌筑上墙;墙面抹灰砂浆的厚度在15㎜以内,先抹厚度为5mm~7mm的第一层砂浆,待凝固后抹第二层砂浆;
加气混凝土抹灰砂浆搅拌均匀后按使用说明比例加水,机械搅拌时间不少于3分钟,砂浆稠度70mm~100mm,拌好的砂浆应在2~3小时内用完,已干结的砂浆不能使用;
三、水平灰缝饱满度要达到90%以上,宽度为4mm;竖向灰缝饱满度不小于80%,宽度为6mm。
上述步骤(二)砌筑中,砌块放置上墙后,把砌块一次性校平摆正,对难以顶压挤浆的竖向灰缝,应在灰缝压浆面预先批抹上砂浆,再拼接砌筑,以保证该部位的粘结质量。
砌筑时应从墙体转角处或构造柱马牙槎处开始。
本发明提供的这种施工工艺对传统湿法砌筑施工工艺进行改良,由于使用界面剂,砌筑蒸压加气混凝土填充墙砌体时不需在砌筑面浇水,直接在经喷涂界面处理剂的干燥的墙面上抹灰,无须浇水保湿养护,砌块不用浇水,既节约用水,又可以有效防止墙面使用中的开裂。适用于所有采用蒸压加气混凝土砌块的非承重砌体砌筑施工。有利于保证和提高墙体的整体强度,并有效降低了砌块墙体发生外墙空鼓、干缩裂缝、漏水的通病。
具体实施方式
施工要点:
1、基层清理和找平:将加气混凝土墙体部位的楼地面剔除凝结灰浆,清扫干净。对于厕浴间、露台、外阳台等与砌体接触部位等经常受干湿交替作用的墙体根部,浇筑宽度同墙厚、高度不小于0.2m的C20素混凝土墙垫;对于其它墙体,用蒸压灰砂砖在其根部砌筑高度不小于0.2m的墙垫。
2、砌块准备:选用龄期超过28天的砌块,控制其含水率小于15%,涂刷市场购买的HB-421界面剂,确保每一面都涂到,不得有漏涂的。
3、砂浆配制:
1)市场购买的加气混凝土抹灰砂浆集中搅拌:搅拌站应集中在一个地点,以免与其他普通砂浆混淆。
2)专用加气混凝土抹灰砂浆与中砂、普通硅酸盐水泥(32.5级)现场配置使用。搅拌均匀后按使用说明比例加水,不能加水过量,以免干缩引起开裂,机械搅拌时间不少于3分钟,砂浆稠度70mm~100mm。拌好的砂浆应在2~3小时内用完,已干结的砂浆不能使用。
4、墙体砌筑:
1)应预先进行放样、排砖、设置皮数标志,控制灰缝厚度及门窗洞口、过梁、拉结筋位置、顶部预留高度等。
2)砌筑时,直接用涂刷过界面剂的干砖砌筑墙体,从转角或定位砌块处开始向一侧进行,内外墙同时砌筑。砌筑时在砌块的端面上抹上加气混凝土抹灰砂浆,采用“挤浆法”砌筑上墙,砌块放置上墙后,对准皮数杆,配合锤子敲击把砌块一次性校平摆正,对难以顶压挤浆的竖向灰缝,其压浆面应预先批抹上砂浆,再拼接砌筑,以保证这一部位的粘结质量。
3)水平灰缝饱满度要达到90%以上,宽度宜为4mm;竖向灰缝应填满、刮平,饱满度不应小于80%,宽度宜为6mm。
4)严禁用水冲浆灌缝。没达到要求的 ,必须用砌筑砂浆填补、勾缝,以防日后抹灰出现空鼓。
5)墙体砌至梁、板底应留一定空隙,待砌体收缩稳定后(停歇至少7天),采用配套小砌块挤浆法斜砌,其倾斜度宜为60°~75°左右,砌筑砂浆饱满。
5、细部构造处理:
1)埋入砌体内部的拉结筋应按设计要求设置正确、平直,与结构柱、构造柱拉接牢靠,形成整体。砌筑时应从墙体转角处或构造柱马牙槎处开始。
2)门窗洞口安装构造要求:内外墙门窗洞口两侧应预埋 C20 细石混凝土块,按照@600的间距设置。混凝土块的尺寸根据砌块模数、门窗锚固要求确定,或现浇混凝土构造柱,然后用尼龙锚栓或射钉将塑钢、铝合金门窗连接铁件与预制混凝土块固定,框与砌体之间缝隙用柔性材料填充。
3)重型门的洞口应按设计要求施工,当设计无要求时,应沿门两侧现浇混凝土构造柱。对于直接与混凝土墙柱相连的砖垛,宽度小于 200mm 时,改用钢筋混凝土构造柱。
4)砌块墙体与钢筋混凝土柱(墙)间:应预留10mm~15mm间隙,待墙体砌筑完成后,采用PU发泡剂嵌平实。
6、其他应注意的问题:
1)加气砼砌块切锯时,应采用专用锯子切锯、严禁采用瓦刀砍凿。
2)水电管线的暗敷工作,必须待墙体完成并达到一定强度后方能进行。
3)应使用轻型电动切割机并辅以手工镂槽器,严禁锤斧剔凿。施工中严禁在加气混凝土承重墙上随意开洞;必须开洞时应与设计部门协商。
4)开槽深度不宜超过墙厚的1/3,墙厚<120㎜的墙体不得双向对开管线槽。管线开槽应距门窗洞口300㎜外为宜。
5)预埋在现浇楼板中的管线弯进墙体时,应贴近墙面敷设,且垂直段高度宜低于一皮砌块的高度。
6)敷设管线后的槽应用掺入加气砼碎屑的加气混凝土抹灰砂浆填实,宜比墙面微凹2㎜,再用粘结剂补平,沿槽长外侧粘贴宽度不小于100㎜的耐碱玻璃纤维网格布增强。
7)在墙体上预埋铁件时,应用电钻在砌块上钻取所需孔洞,铁件在钻孔内用水玻璃或结构胶粘接。穿过墙体的铁件应做防腐处理。
、抹灰工程
1)抹灰施工宜在墙顶空隙嵌填作业完成后7天进行。
2)作业前,应将墙面基层清理干净,灰缝孔洞填补密实。
3)抹灰前,不同材料基体交接处、门窗等洞口角部、暗埋管线孔槽处及抹灰厚度超过35mm等处均应铺设≥250㎜宽耐碱玻璃纤维网格布或热镀锌钢丝网片。窗台板、表具箱、配电箱、消火栓箱等与砌体交接处的缝隙应用柔性材料封填。
4)墙面抹灰前,基层应清扫干净后再抹界面剂处理,界面剂厚度宜为2mm~3mm,界面剂处理后应及时养护,待浆面凝结达到一定强度后,方可根据抹灰层厚度做灰饼、冲筋。界面剂施工作业应在3℃以上的气温环境中进行。
5)墙面抹灰宜控制在15㎜以内,并应分层、分次进行。先抹第一层作为过渡层,每层厚度宜为5mm~7mm,下一层抹灰层应待前一层抹灰终凝后进行。抹灰分层接槎处,先施工的抹灰层应稍薄,要均匀结合,接槎不应过多,防止面层凸凹不平。罩面灰应边抹边用钢抹子抹平、抹光。
6)门窗、各种箱盒侧壁分层填实抹严,避免框体侧壁与砌体交接处空鼓、裂缝。需要打密封胶的框体周围,抹灰时应留出深7mm、宽5mm的缝隙,以便嵌缝打胶。
7)墙面经实体检测无明显的缺陷,如空鼓、开裂、起皮等,方可进行饰面的处理:凡连续墙面的面积﹥30m2时设分隔缝,深度5mm,以释放应力避免造成裂缝。
8)墙面批腻子宜分底、面两道工序。面层腻子批刮应待底层腻子批刮施工完毕并干燥后方能进行。面层腻子干燥后应打磨平整方可进行涂料或墙纸施工。
9)铺贴墙面瓷砖或面砖前,应将基层清理干净,并满刷一道防水剂。粘贴时,用齿状泥板或其他工具将粘结剂涂抹在墙面或瓷砖面砖背面按方案进行有序铺贴,铺贴后经24h进行嵌缝作业。
10)墙面做饰面涂料,宜待砌体达到自然干燥状态下进行。外墙饰面不得直接在加气混凝土砌体上吊挂石材。玻璃幕墙等外墙装饰应按有关设计文件和相关规定执行。
Claims (3)
1.一种低纬度高原蒸压加气砼砌块干法砌筑施工工艺,其特征在于施工步骤为:
(一)、对砌筑墙体表面进行基层清理和找平处理;
(二)、选用龄期超过28天、含水率小于15%的蒸压加气砼砌块,在砌块的每一面都涂刷市场购买的HB-421加气混凝土界面剂,砌筑时在砌块的端面抹上市场购买的加气混凝土抹灰砂浆,采用挤浆法砌筑上墙;墙面抹灰砂浆的厚度在15㎜以内,先抹厚度为5mm~7mm的第一层砂浆,待凝固后抹第二层砂浆;
加气混凝土抹灰砂浆搅拌均匀后按使用说明比例加水,机械搅拌时间不少于3分钟,砂浆稠度70mm~100mm,拌好的砂浆应在2~3小时内用完,已干结的砂浆不能使用;
(三)、水平灰缝饱满度要达到90%以上,宽度为4mm;竖向灰缝饱满度不小于80%,宽度为6mm。
2.根据权利要求1所述的砌筑施工工艺,其特征在于:上述步骤(二)砌筑中,砌块放置上墙后,把砌块一次性校平摆正,对难以顶压挤浆的竖向灰缝,应在灰缝压浆面预先批抹上砂浆,再拼接砌筑,以保证该部位的粘结质量。
3.根据权利要求1所述的砌筑施工工艺,其特征在于:砌筑时应从墙体转角处或构造柱马牙槎处开始。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100330281A CN102182323A (zh) | 2011-01-31 | 2011-01-31 | 低纬度高原蒸压加气砼砌块干法砌筑施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100330281A CN102182323A (zh) | 2011-01-31 | 2011-01-31 | 低纬度高原蒸压加气砼砌块干法砌筑施工工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102182323A true CN102182323A (zh) | 2011-09-14 |
Family
ID=44568600
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011100330281A Pending CN102182323A (zh) | 2011-01-31 | 2011-01-31 | 低纬度高原蒸压加气砼砌块干法砌筑施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102182323A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103321340A (zh) * | 2013-07-09 | 2013-09-25 | 嘉兴市博宏新型建材有限公司 | 加气块砌体用砌筑砂浆 |
CN106013509A (zh) * | 2016-07-22 | 2016-10-12 | 湖北神州建材有限责任公司 | 一种高性能砂加气混凝土砌块墙体的干法施工方法 |
CN106049887A (zh) * | 2016-06-17 | 2016-10-26 | 广州发展环保建材有限公司 | 一种高精砌块薄浆干砌的方法 |
CN110644626A (zh) * | 2019-08-22 | 2020-01-03 | 金鹏建筑产业有限公司 | 一种绿色环保建筑施工方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1687548A (zh) * | 2005-05-18 | 2005-10-26 | 何玉成 | 一种新型砌块墙体的干法施工方法 |
CN101691290A (zh) * | 2009-08-25 | 2010-04-07 | 江其东 | Ptb加气混凝土砌块砌筑与抹面砂浆及其使用方法 |
-
2011
- 2011-01-31 CN CN2011100330281A patent/CN102182323A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1687548A (zh) * | 2005-05-18 | 2005-10-26 | 何玉成 | 一种新型砌块墙体的干法施工方法 |
CN101691290A (zh) * | 2009-08-25 | 2010-04-07 | 江其东 | Ptb加气混凝土砌块砌筑与抹面砂浆及其使用方法 |
Non-Patent Citations (4)
Title |
---|
全国一级建造师执业资格考试用书编委会: "《建筑工程与实务(第二版)》", 30 April 2010, 中国建筑工业出版社 * |
徐金豪: "蒸压砂加气混凝土干法施工成套技术的应用", 《山西建筑》 * |
海南省建设标准定额站等: "《DBJ 06-2006.干法砌筑蒸压加气混凝土砌块砌体应用技术规程(试行)》", 29 November 2006, 海南省建设厅 * |
赵亮等: "砌块墙体干法施工技术", 《中国高新技术企业》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103321340A (zh) * | 2013-07-09 | 2013-09-25 | 嘉兴市博宏新型建材有限公司 | 加气块砌体用砌筑砂浆 |
CN106049887A (zh) * | 2016-06-17 | 2016-10-26 | 广州发展环保建材有限公司 | 一种高精砌块薄浆干砌的方法 |
CN106013509A (zh) * | 2016-07-22 | 2016-10-12 | 湖北神州建材有限责任公司 | 一种高性能砂加气混凝土砌块墙体的干法施工方法 |
CN110644626A (zh) * | 2019-08-22 | 2020-01-03 | 金鹏建筑产业有限公司 | 一种绿色环保建筑施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104018598B (zh) | 一种外墙结构及施工安装方法 | |
CN109838065B (zh) | 一种地砖地面铺贴施工方法 | |
CN104358341B (zh) | 一种建筑砌体及施工砌筑方法 | |
CN101565997A (zh) | 大面积不规则地面砖施工方法 | |
CN103938764A (zh) | 室内二次轻质隔墙的快速施工方法及该隔墙 | |
CN106049539A (zh) | 一种建筑工程施工方法 | |
CN106284706A (zh) | 外墙外保温岩棉板的施工方法 | |
CN112267628A (zh) | 建筑工程内墙装修免抹灰系统施工方法 | |
CN105464243A (zh) | 蒸压加气精确砌块的薄层砂浆砌筑法 | |
CN104746772A (zh) | 灰渣混凝土空心隔墙板的防裂施工方法 | |
CN106013509A (zh) | 一种高性能砂加气混凝土砌块墙体的干法施工方法 | |
CN106121231A (zh) | 一种高层建筑穿插流水施工方法 | |
CN107447893A (zh) | 一种轻钢龙骨混凝土抗裂填充墙及其施工方法 | |
CN102352660A (zh) | 石膏砌块砌体及其施工方法 | |
CN106284998A (zh) | 内墙抹灰满铺玻璃纤维网格布施工方法 | |
CN102182323A (zh) | 低纬度高原蒸压加气砼砌块干法砌筑施工工艺 | |
CN113006397A (zh) | 一种厨卫空间规方找平的施工方法 | |
CN108130992A (zh) | 毛石板、聚苯板及多孔砖复合保温装饰外墙施工工法 | |
CN106186942B (zh) | 一种自密实砂浆及其灌浆施工方法 | |
CN104695706A (zh) | Aac砌块自由加载墙施工工法 | |
CN111608280A (zh) | 一种外墙保温施工方法 | |
CN107761968A (zh) | 外墙内保温砂浆交接部位施工方法 | |
CN207194239U (zh) | 轻钢龙骨混凝土抗裂填充墙 | |
CN109057221A (zh) | 一种发泡水泥保温板外保温系统施工方法 | |
CN207553357U (zh) | 毛石板、聚苯板及多孔砖复合保温装饰外墙 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20110914 |