Summary of the invention
In order to overcome above-mentioned prior art deficiency, the invention provides the rich seam of a kind of building in the style of the ancients concrete plate construction technology, optimized construction process, seam plate curve full-page proof is won in the science dispensing more, Mold Making and installation have been improved, improve when winning seam plate impression quality, also shortened the construction period, avoided the secondary maintenance.Process flow of the present invention is few, task difficulty is low, speed of production is fast, exploitativeness is strong.
Technical scheme of the present invention is achieved in that
Site operation amplified the sample ratio 1: 1
Take to limit the meander line revised law to carry out setting-out, gradually the meander line of emitting is modified to rich seam plate design curve, so-called limit meander line revised law, be meant according to the design axis of rich seam plate and the intersection point of rich seam plate curve, inject numerous point, when the number of point approached infinity, this point can connect into the curve of a nature automatically;
Make template
1) sets up support body, adopt three framed bents not contain outrigger, and be rigidly connected with the full hall frame of building, vertical pole ' s span 800mm, the liftoff 300mm of the first road horizon bar, all the other horizon bars are provided with apart from 1000mm between the upper and lower, with level gauge 50 lines are caused in the vertical rod, according to dispensing full-page proof size, determine rich seam plate peak, minimum point and middle the special absolute altitude in axis place;
2) template is installed
Require to make splicing according to rich seam plate drawing and drawing absolute altitude and install rich seam plate, keep somewhere a side, be convenient to reinforcing bar binding, adopt machinery to cooperate the high-altitude to install at last at the ground formwork integral;
After integral installation is reinforced and is put in place, carrying out the secondary symmetry again checks, the compound employing center line survey method of symmetry, hang a plumb bob at rich seam plate peak, measure the distance of rich seam plate minimum point and the relative ordinate of peak, measure distance to both sides measurement minimum point again, if distance equates and equals the distance of relative abscissa, then acceptance(check) is carried out the next procedure construction, otherwise need be recomputated correction;
3) form removable
Reinforced bar engineering
The reinforcement installation correct position fixes the thickness of guaranteeing reinforcement cover to cushion block or packing ring, and it is placed in the middle to increase the rich seam of positioning bar control slab muscle;
Concreting and maintenance
(1) rich seam plate thickness is 5~7cm, adopts pea gravel concreten to build;
(2) adopt plug-in type small vibrating rod to vibrate;
(3) build and to build outstanding mountain or gable and hip roof two ends rich seam board concrete earlier, build order and should build whole roofing from the bottom to top by two ends to the centre;
Invite grass, vertical fish to install
Should reject rich seam plate built-in fitting place concrete before installing earlier, during the built-in fitting welding procedure, guarantee firm welding, the even weld densification, the installation site is accurate.
Described setting-out step is as follows:
1) according to each curve slope absolute altitude intersection point of each curve at the bottom of the earlier definite axis place of the Design Requirement Drawing roof panel and rich seam plate, uses the pvc pipe pushing of good springiness, observe curve, connect each intersection point successively along sliding;
2) according to rich seam plate full-page proof node size, make rich seam plate model two covers, a cover is used for guiding construction, and the another set of Quality Inspector of being used for checks and checks, and deposits under good condition;
3) rich margin to seam, invite careless setting-out
Rich margin to seam curve is made up of forward and reverse two sections circular arcs, invites careless detail drawing to adopt the separate mesh form to determine each section intersections of complex curve, invites grass to install and is lower than rich seam plate face 2cm.
Compare with traditional construction technology: the rich seam of building in the style of the ancients board construction method has following characteristics and advantage:
1, it is cast-in-place with the roof panel while the prefabricated installation of tradition to be changed into rich seam plate, has improved structural integrity, has also simplified construction technology.
2, adopt haydite concrete to replace concrete, alleviated dead load, reduced operating expenses, reach environmental protection, energy-conservation purpose simultaneously.
3, the template construct drawing of emitting according to " limit meander line revised law " adopts the circular arc saw to make rich seam sleeve-board plate, adopts whole pre-assembly of ground (to keep somewhere a side, be convenient to reinforcing bar binding), after the passed examination, adopt machinery to cooperate high altitude integrated installation, reinforce and verification.
The specific embodiment
The present invention adopts the setting-out of the accurately rich seam plate of scientific method, for guaranteeing structural integrity and curve smoothness, adopts ground to piece together mounting template in advance, after the passed examination, adopt machinery to cooperate high altitude integrated installation, carry out secondary after installation is reinforced and finished and check correction, carry out concreting at last.Adopt " limit meander line revised law " to carry out accurate setting-out, whole pre-assembly of template ground, machinery cooperates whole high-altitude to install, and has reduced the difficulty of outdoor work high above the ground, has improved the Mold Making precision.
Rich seam plate cast in place process flow process:
Join mould calculating, reinforcing bar blanking → scene amplification sample → bed die, inner side template making and installation (containing the brush release agent) → inspection bed die, internal mold installation quality → assembling reinforcement and built-in fitting → installation outboard template → inspection external mold and bracing reinforcement → concreting → demoulding maintenance → installation and invite grass (vertical fish)
Carry out according to the following steps:
1, site operation amplifies sample (ratio 1: 1)
Take " limit meander line revised law " to carry out setting-out, gradually the meander line of emitting is modified to rich seam plate design curve, so-called limit meander line revised law, be meant according to the design axis of rich seam plate and the intersection point of rich seam plate curve, inject numerous point, when the number of point approached infinity, this point can connect into the curve of a nature automatically;
Gradually the meander line of emitting is modified to rich seam plate design curve.Main setting-out step is as follows:
(1) according to each curve slope absolute altitude intersection point of each curve at the bottom of the earlier definite axis place of the Design Requirement Drawing roof panel and rich seam plate, uses the pvc pipe pushing of good springiness, observe curve, connect each intersection point successively along sliding.
Method is 1.: the normal of doing this camber line with this camber line intersection point, respectively get 1/2 rich seam plate in the normal top and the bottom wide, measures each point, and calculate the relative coordinate parameter of each point and peak, proofread and correct camber line with the pvc pipe pushing of good springiness again, and with this parameter as template construct and construction.
Get successively A (0, y); B
1(x
1, y
1); C
1(x
2, y
2); D
1(x
3, y
3); E
1(x
4, y
4); B
2(x
1, y
1); C
1(x
2, y
2); D
1(x
3, y
3); E
1(x
4, y
4) coordinate in length and breadth, prop up modulo n check again.
Method is 2.: eject rich seam plate place structural beams; According to rich seam plate height, eject each section line perpendicular bisector, find out mid point intersection point at the bottom of the corresponding rich seam plate of rich seam plate face mid point, calculate the relative coordinate parameter of each point and peak equally, repeat with pvc pipe pushing correction camber line.Accurately measure axis place rich seam plate face, end central point vertical distance at the bottom of the structural beams, as template construct and construction parameter.
Get successively A (0, y); B
1(x
1, y
1); C
1(x
2, y
2); D
1(x
3, y
3); E
1(x
4, y
4); B
2(x
1, y
1); C
1(x
2, y
2); D
1(x
3, y
3); E
1(x
4, y
4) coordinate in length and breadth, prop up modulo n check again.
(2) according to rich seam plate full-page proof node size, make rich seam plate model two covers, a cover is used for guiding construction, and the another set of Quality Inspector of being used for checks and checks, and deposits under good condition.
(3), rich margin to seam, invite careless setting-out
Rich margin to seam curve is made up of forward and reverse two sections circular arcs.Because wrench is less, computer AUTO CAD draws,
Invite careless detail drawing to adopt the separate mesh form to determine each section intersections of complex curve, utilization AUTO CAD computer graphics.
Invite grass to install and generally should be lower than about rich seam plate face 2cm.
2, form work engineering
(1) set up support body, adopt three framed bents (not containing outrigger), and be rigidly connected with the full hall frame of building,, vertical pole ' s span 800mm, the first road horizon bar is liftoff 300, and all the other horizon bars are provided with apart from 1000mm between the upper and lower.With level gauge 50 lines are caused in the vertical rod,, determine rich seam plate peak, minimum point and middle the special absolute altitude in axis place according to dispensing full-page proof size.
(2) template is installed
Can require to make splicing according to rich seam plate drawing and drawing absolute altitude and install rich seam plate (keep somewhere a side, be convenient to reinforcing bar binding), adopt machinery to cooperate the high-altitude to install at last at the ground formwork integral.
According to the rich seam plate model of rich seam plate drawing and making, adopt the circular arc saw to cut mirror board, for the sheet material of well cutting, carry out whole desire on ground and piece together (keep somewhere side form and be convenient to reinforcing bar binding), making it single face becomes a rigid body.And adopt model to check, the high altitude integrated installation of machinery cooperation carrying out is adopted in qualified by inspection back.Adopt the method for control highs and lows during installation, make it the mounted split pattern rigid body and install for the first time, check correction in strict accordance with the relative coordinate parameter of calculating in the past again.
After integral installation is reinforced and is put in place, carrying out the secondary symmetry again checks, the compound employing center line survey method of symmetry, hang a plumb bob at rich seam plate peak, measure the distance of rich seam plate minimum point and the relative ordinate of peak, measure distance to both sides measurement minimum point again, if distance equates and equals the distance of relative abscissa, then acceptance(check) can be carried out the next procedure construction, otherwise need recomputate correction.
(3) form removable
1. form removal condition: structure reaches the form removal intensity of standard defined with the concrete test block of condition maintenance, can form removal.
2. forbid barbarous construction during form removal, prevent to damage rich seam plate corner angle, should adopt hammer, little hair clasp to cooperate and remove.
3, reinforced bar engineering
(1) after the roofing formwork erection finishes, colligation roof girder reinforcing bar, rich seam slab muscle, cast-in-place plate muscle successively, quality meets the requirement of reinforcing bar the work items.
(2) size of reinforcing bar and putting position are wanted strict control.The reinforcing bar of vertical and horizontal is used the galvanized wire colligation, interfixes.To determine their tram.The position that these reinforcing bars bend up, length and bend up direction also should strict control.
(3) the reinforcement installation position wants correct, and cushion block or packing ring are fixed the thickness of guaranteeing reinforcement cover, and it is placed in the middle suitably to increase the rich seam of positioning bar control slab muscle.
4, concreting and maintenance
(1) concrete rich seam plate cast-in-place construction and roof panel concrete cast-in-situ once carry out, and guarantee structural integrity.Rich seam plate thickness is generally 5~7cm, for guaranteeing molding effect, should adopt pea gravel concreten to build.
(2) for guaranteeing concrete quality, should adopt 35 type plug-in type small vibrating rods to vibrate.
(3) build and to build outstanding mountain or gable and hip roof two ends rich seam board concrete earlier, build order and should build whole roofing from the bottom to top by two ends to the centre.
(4) to carry out water seasoning to concrete every day, particularly in hot weather construction, more it should be noted that and avoid rich seam plate the crack to occur.
(5) during winter construction, the intact back of concreting is used and is in time covered with plastic sheeting and cotton felt.5 invite grass (fish of hanging down) to install
After removing, rich seam template die plate can invite the grass construction.Should guarantee to invite grass (fish of hanging down) quality during installation, prevent breakage.Rich seam plate built-in fitting place concrete should be rejected before installing earlier, during the built-in fitting welding procedure, firm welding should be guaranteed, the even weld densification, the installation site is accurate.