CN102121312A - Construction process for concrete bargeboard in pseudo-classic architecture - Google Patents

Construction process for concrete bargeboard in pseudo-classic architecture Download PDF

Info

Publication number
CN102121312A
CN102121312A CN 201010604670 CN201010604670A CN102121312A CN 102121312 A CN102121312 A CN 102121312A CN 201010604670 CN201010604670 CN 201010604670 CN 201010604670 A CN201010604670 A CN 201010604670A CN 102121312 A CN102121312 A CN 102121312A
Authority
CN
China
Prior art keywords
rich
seam plate
rich seam
curve
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010604670
Other languages
Chinese (zh)
Other versions
CN102121312B (en
Inventor
张文琪
王奇维
聂鑫
许建峰
赵涛
邵华
孙海峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SCEGC NO.3 CONSTRUCTION ENGINEERING GROUP Co.,Ltd.
Original Assignee
SHANXI THIRD ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANXI THIRD ENGINEERING Co Ltd filed Critical SHANXI THIRD ENGINEERING Co Ltd
Priority to CN201010604670A priority Critical patent/CN102121312B/en
Publication of CN102121312A publication Critical patent/CN102121312A/en
Application granted granted Critical
Publication of CN102121312B publication Critical patent/CN102121312B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a construction process for a concrete bargeboard in a pseudo-classic architecture. In the process, the conventional precasting installation method is replaced by a method of casting the bargeboard and a roof board in place at the same time, so the integrity of a structure is improved, and the construction process is also simplified. The process comprises the following steps of: firstly, lofting a large sample of the bargeboard by a scientific 'limit meander line revising method'; secondly, pre-splicing a template on the ground, after passing the examination, performing high-altitude integral installation by matching with machines, and after completing installation and reinforcement, performing secondary coincidence correction; and finally, performing concrete pouring. The construction process has few process flows, low operating difficulty and high feasibility, and the firmness and durability of pseudo-classic structural members are ensured.

Description

The rich seam of building in the style of the ancients concrete plate construction technology
Technical field
The present invention relates to building engineering field, particularly building in the style of the ancients roofing gable and hip roof and the rich seam of outstanding mountain structure plate cast-in-place construction technology.
Background technology
The rich seam of traditional building in the style of the ancients plate construction technology is to adopt the wooden construction construction, and this way is not mothproof, all be restricted at aspects such as antidetonation, service lives.Along with the application of reinforcing bar, concrete new material, rich seam plate is many in the building in the style of the ancients construction now substitutes wooden construction with reinforced concrete structure.The rich seam of concrete plate shape all is a curve, and the tradition construction all adopts common saw to carry out template construct, and construction error is big.Because the construction of rich seam plate is all in outdoor work high above the ground, difficulty of construction is big, need carry out strict quality control on construction.
Summary of the invention
In order to overcome above-mentioned prior art deficiency, the invention provides the rich seam of a kind of building in the style of the ancients concrete plate construction technology, optimized construction process, seam plate curve full-page proof is won in the science dispensing more, Mold Making and installation have been improved, improve when winning seam plate impression quality, also shortened the construction period, avoided the secondary maintenance.Process flow of the present invention is few, task difficulty is low, speed of production is fast, exploitativeness is strong.
Technical scheme of the present invention is achieved in that
Site operation amplified the sample ratio 1: 1
Take to limit the meander line revised law to carry out setting-out, gradually the meander line of emitting is modified to rich seam plate design curve, so-called limit meander line revised law, be meant according to the design axis of rich seam plate and the intersection point of rich seam plate curve, inject numerous point, when the number of point approached infinity, this point can connect into the curve of a nature automatically;
Make template
1) sets up support body, adopt three framed bents not contain outrigger, and be rigidly connected with the full hall frame of building, vertical pole ' s span 800mm, the liftoff 300mm of the first road horizon bar, all the other horizon bars are provided with apart from 1000mm between the upper and lower, with level gauge 50 lines are caused in the vertical rod, according to dispensing full-page proof size, determine rich seam plate peak, minimum point and middle the special absolute altitude in axis place;
2) template is installed
Require to make splicing according to rich seam plate drawing and drawing absolute altitude and install rich seam plate, keep somewhere a side, be convenient to reinforcing bar binding, adopt machinery to cooperate the high-altitude to install at last at the ground formwork integral;
After integral installation is reinforced and is put in place, carrying out the secondary symmetry again checks, the compound employing center line survey method of symmetry, hang a plumb bob at rich seam plate peak, measure the distance of rich seam plate minimum point and the relative ordinate of peak, measure distance to both sides measurement minimum point again, if distance equates and equals the distance of relative abscissa, then acceptance(check) is carried out the next procedure construction, otherwise need be recomputated correction;
3) form removable
Reinforced bar engineering
The reinforcement installation correct position fixes the thickness of guaranteeing reinforcement cover to cushion block or packing ring, and it is placed in the middle to increase the rich seam of positioning bar control slab muscle;
Concreting and maintenance
(1) rich seam plate thickness is 5~7cm, adopts pea gravel concreten to build;
(2) adopt plug-in type small vibrating rod to vibrate;
(3) build and to build outstanding mountain or gable and hip roof two ends rich seam board concrete earlier, build order and should build whole roofing from the bottom to top by two ends to the centre;
Invite grass, vertical fish to install
Should reject rich seam plate built-in fitting place concrete before installing earlier, during the built-in fitting welding procedure, guarantee firm welding, the even weld densification, the installation site is accurate.
Described setting-out step is as follows:
1) according to each curve slope absolute altitude intersection point of each curve at the bottom of the earlier definite axis place of the Design Requirement Drawing roof panel and rich seam plate, uses the pvc pipe pushing of good springiness, observe curve, connect each intersection point successively along sliding;
2) according to rich seam plate full-page proof node size, make rich seam plate model two covers, a cover is used for guiding construction, and the another set of Quality Inspector of being used for checks and checks, and deposits under good condition;
3) rich margin to seam, invite careless setting-out
Rich margin to seam curve is made up of forward and reverse two sections circular arcs, invites careless detail drawing to adopt the separate mesh form to determine each section intersections of complex curve, invites grass to install and is lower than rich seam plate face 2cm.
Compare with traditional construction technology: the rich seam of building in the style of the ancients board construction method has following characteristics and advantage:
1, it is cast-in-place with the roof panel while the prefabricated installation of tradition to be changed into rich seam plate, has improved structural integrity, has also simplified construction technology.
2, adopt haydite concrete to replace concrete, alleviated dead load, reduced operating expenses, reach environmental protection, energy-conservation purpose simultaneously.
3, the template construct drawing of emitting according to " limit meander line revised law " adopts the circular arc saw to make rich seam sleeve-board plate, adopts whole pre-assembly of ground (to keep somewhere a side, be convenient to reinforcing bar binding), after the passed examination, adopt machinery to cooperate high altitude integrated installation, reinforce and verification.
The specific embodiment
The present invention adopts the setting-out of the accurately rich seam plate of scientific method, for guaranteeing structural integrity and curve smoothness, adopts ground to piece together mounting template in advance, after the passed examination, adopt machinery to cooperate high altitude integrated installation, carry out secondary after installation is reinforced and finished and check correction, carry out concreting at last.Adopt " limit meander line revised law " to carry out accurate setting-out, whole pre-assembly of template ground, machinery cooperates whole high-altitude to install, and has reduced the difficulty of outdoor work high above the ground, has improved the Mold Making precision.
Rich seam plate cast in place process flow process:
Join mould calculating, reinforcing bar blanking → scene amplification sample → bed die, inner side template making and installation (containing the brush release agent) → inspection bed die, internal mold installation quality → assembling reinforcement and built-in fitting → installation outboard template → inspection external mold and bracing reinforcement → concreting → demoulding maintenance → installation and invite grass (vertical fish)
Carry out according to the following steps:
1, site operation amplifies sample (ratio 1: 1)
Take " limit meander line revised law " to carry out setting-out, gradually the meander line of emitting is modified to rich seam plate design curve, so-called limit meander line revised law, be meant according to the design axis of rich seam plate and the intersection point of rich seam plate curve, inject numerous point, when the number of point approached infinity, this point can connect into the curve of a nature automatically;
Gradually the meander line of emitting is modified to rich seam plate design curve.Main setting-out step is as follows:
(1) according to each curve slope absolute altitude intersection point of each curve at the bottom of the earlier definite axis place of the Design Requirement Drawing roof panel and rich seam plate, uses the pvc pipe pushing of good springiness, observe curve, connect each intersection point successively along sliding.
Method is 1.: the normal of doing this camber line with this camber line intersection point, respectively get 1/2 rich seam plate in the normal top and the bottom wide, measures each point, and calculate the relative coordinate parameter of each point and peak, proofread and correct camber line with the pvc pipe pushing of good springiness again, and with this parameter as template construct and construction.
Get successively A (0, y); B 1(x 1, y 1); C 1(x 2, y 2); D 1(x 3, y 3); E 1(x 4, y 4); B 2(x 1, y 1); C 1(x 2, y 2); D 1(x 3, y 3); E 1(x 4, y 4) coordinate in length and breadth, prop up modulo n check again.
Method is 2.: eject rich seam plate place structural beams; According to rich seam plate height, eject each section line perpendicular bisector, find out mid point intersection point at the bottom of the corresponding rich seam plate of rich seam plate face mid point, calculate the relative coordinate parameter of each point and peak equally, repeat with pvc pipe pushing correction camber line.Accurately measure axis place rich seam plate face, end central point vertical distance at the bottom of the structural beams, as template construct and construction parameter.
Get successively A (0, y); B 1(x 1, y 1); C 1(x 2, y 2); D 1(x 3, y 3); E 1(x 4, y 4); B 2(x 1, y 1); C 1(x 2, y 2); D 1(x 3, y 3); E 1(x 4, y 4) coordinate in length and breadth, prop up modulo n check again.
(2) according to rich seam plate full-page proof node size, make rich seam plate model two covers, a cover is used for guiding construction, and the another set of Quality Inspector of being used for checks and checks, and deposits under good condition.
(3), rich margin to seam, invite careless setting-out
Rich margin to seam curve is made up of forward and reverse two sections circular arcs.Because wrench is less, computer AUTO CAD draws,
Invite careless detail drawing to adopt the separate mesh form to determine each section intersections of complex curve, utilization AUTO CAD computer graphics.
Invite grass to install and generally should be lower than about rich seam plate face 2cm.
2, form work engineering
(1) set up support body, adopt three framed bents (not containing outrigger), and be rigidly connected with the full hall frame of building,, vertical pole ' s span 800mm, the first road horizon bar is liftoff 300, and all the other horizon bars are provided with apart from 1000mm between the upper and lower.With level gauge 50 lines are caused in the vertical rod,, determine rich seam plate peak, minimum point and middle the special absolute altitude in axis place according to dispensing full-page proof size.
(2) template is installed
Can require to make splicing according to rich seam plate drawing and drawing absolute altitude and install rich seam plate (keep somewhere a side, be convenient to reinforcing bar binding), adopt machinery to cooperate the high-altitude to install at last at the ground formwork integral.
According to the rich seam plate model of rich seam plate drawing and making, adopt the circular arc saw to cut mirror board, for the sheet material of well cutting, carry out whole desire on ground and piece together (keep somewhere side form and be convenient to reinforcing bar binding), making it single face becomes a rigid body.And adopt model to check, the high altitude integrated installation of machinery cooperation carrying out is adopted in qualified by inspection back.Adopt the method for control highs and lows during installation, make it the mounted split pattern rigid body and install for the first time, check correction in strict accordance with the relative coordinate parameter of calculating in the past again.
After integral installation is reinforced and is put in place, carrying out the secondary symmetry again checks, the compound employing center line survey method of symmetry, hang a plumb bob at rich seam plate peak, measure the distance of rich seam plate minimum point and the relative ordinate of peak, measure distance to both sides measurement minimum point again, if distance equates and equals the distance of relative abscissa, then acceptance(check) can be carried out the next procedure construction, otherwise need recomputate correction.
(3) form removable
1. form removal condition: structure reaches the form removal intensity of standard defined with the concrete test block of condition maintenance, can form removal.
2. forbid barbarous construction during form removal, prevent to damage rich seam plate corner angle, should adopt hammer, little hair clasp to cooperate and remove.
3, reinforced bar engineering
(1) after the roofing formwork erection finishes, colligation roof girder reinforcing bar, rich seam slab muscle, cast-in-place plate muscle successively, quality meets the requirement of reinforcing bar the work items.
(2) size of reinforcing bar and putting position are wanted strict control.The reinforcing bar of vertical and horizontal is used the galvanized wire colligation, interfixes.To determine their tram.The position that these reinforcing bars bend up, length and bend up direction also should strict control.
(3) the reinforcement installation position wants correct, and cushion block or packing ring are fixed the thickness of guaranteeing reinforcement cover, and it is placed in the middle suitably to increase the rich seam of positioning bar control slab muscle.
4, concreting and maintenance
(1) concrete rich seam plate cast-in-place construction and roof panel concrete cast-in-situ once carry out, and guarantee structural integrity.Rich seam plate thickness is generally 5~7cm, for guaranteeing molding effect, should adopt pea gravel concreten to build.
(2) for guaranteeing concrete quality, should adopt 35 type plug-in type small vibrating rods to vibrate.
(3) build and to build outstanding mountain or gable and hip roof two ends rich seam board concrete earlier, build order and should build whole roofing from the bottom to top by two ends to the centre.
(4) to carry out water seasoning to concrete every day, particularly in hot weather construction, more it should be noted that and avoid rich seam plate the crack to occur.
(5) during winter construction, the intact back of concreting is used and is in time covered with plastic sheeting and cotton felt.5 invite grass (fish of hanging down) to install
After removing, rich seam template die plate can invite the grass construction.Should guarantee to invite grass (fish of hanging down) quality during installation, prevent breakage.Rich seam plate built-in fitting place concrete should be rejected before installing earlier, during the built-in fitting welding procedure, firm welding should be guaranteed, the even weld densification, the installation site is accurate.

Claims (2)

1. the rich seam of building in the style of the ancients plate construction technology is characterized in that, carries out according to the following steps:
Site operation amplified the sample ratio 1: 1
Take to limit the meander line revised law to carry out setting-out, gradually the meander line of emitting is modified to rich seam plate design curve, so-called limit meander line revised law, be meant according to the design axis of rich seam plate and the intersection point of rich seam plate curve, inject numerous point, when the number of point approached infinity, this point can connect into the curve of a nature automatically;
Make template
1) sets up support body, adopt three framed bents not contain outrigger, and be rigidly connected with the full hall frame of building, vertical pole ' s span 800mm, the liftoff 300mm of the first road horizon bar, all the other horizon bars are provided with apart from 1000mm between the upper and lower, with level gauge 50 lines are caused in the vertical rod, according to dispensing full-page proof size, determine rich seam plate peak, minimum point and middle the special absolute altitude in axis place;
2) template is installed
Require to make splicing according to rich seam plate drawing and drawing absolute altitude and install rich seam plate, keep somewhere a side, be convenient to reinforcing bar binding, adopt machinery to cooperate the high-altitude to install at last at the ground formwork integral;
After integral installation is reinforced and is put in place, carrying out the secondary symmetry again checks, the compound employing center line survey method of symmetry, hang a plumb bob at rich seam plate peak, measure the distance of rich seam plate minimum point and the relative ordinate of peak, measure distance to both sides measurement minimum point again, if distance equates and equals the distance of relative abscissa, then acceptance(check) is carried out the next procedure construction, otherwise need be recomputated correction;
3) form removable
Reinforced bar engineering
The reinforcement installation correct position fixes the thickness of guaranteeing reinforcement cover to cushion block or packing ring, and it is placed in the middle to increase the rich seam of positioning bar control slab muscle;
Concreting and maintenance
(1) rich seam plate thickness is 5~7cm, adopts pea gravel concreten to build;
(2) adopt plug-in type small vibrating rod to vibrate;
(3) build and to build outstanding mountain or gable and hip roof two ends rich seam board concrete earlier, build order and should build whole roofing from the bottom to top by two ends to the centre;
Invite grass, vertical fish to install
Should reject rich seam plate built-in fitting place concrete before installing earlier, during the built-in fitting welding procedure, guarantee firm welding, the even weld densification, the installation site is accurate.
2. the rich seam of building in the style of the ancients concrete according to claim 1 plate construction technology is characterized in that described setting-out step is as follows:
1) according to each curve slope absolute altitude intersection point of each curve at the bottom of the earlier definite axis place of the Design Requirement Drawing roof panel and rich seam plate, uses the pvc pipe pushing of good springiness, observe curve, connect each intersection point successively along sliding;
2) according to rich seam plate full-page proof node size, make rich seam plate model two covers, a cover is used for guiding construction, and the another set of Quality Inspector of being used for checks and checks, and deposits under good condition;
3) rich margin to seam, invite careless setting-out
Rich margin to seam curve is made up of forward and reverse two sections circular arcs, invites careless detail drawing to adopt the separate mesh form to determine each section intersections of complex curve, invites grass to install and is lower than rich seam plate face 2cm.
CN201010604670A 2010-12-24 2010-12-24 Construction process for concrete bargeboard in pseudo-classic architecture Active CN102121312B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010604670A CN102121312B (en) 2010-12-24 2010-12-24 Construction process for concrete bargeboard in pseudo-classic architecture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010604670A CN102121312B (en) 2010-12-24 2010-12-24 Construction process for concrete bargeboard in pseudo-classic architecture

Publications (2)

Publication Number Publication Date
CN102121312A true CN102121312A (en) 2011-07-13
CN102121312B CN102121312B (en) 2012-09-26

Family

ID=44249962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010604670A Active CN102121312B (en) 2010-12-24 2010-12-24 Construction process for concrete bargeboard in pseudo-classic architecture

Country Status (1)

Country Link
CN (1) CN102121312B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587662A (en) * 2012-03-27 2012-07-18 李建民 Chinese-style Ming and Qing archaized arch building method by means of reinforced concrete pouring
CN111982045A (en) * 2020-08-30 2020-11-24 青岛市建筑工程质量检测中心有限公司 Inspection and detection method for cast-in-situ large-span concrete hollow slab
CN112177330A (en) * 2019-07-05 2021-01-05 晟通科技集团有限公司 Building template arranging method
CN113323131A (en) * 2021-06-01 2021-08-31 重庆建工住宅建设有限公司 Assembly type construction method for archaized building

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2915997Y (en) * 2006-06-16 2007-06-27 刘彤 Pan head members
CN201401041Y (en) * 2009-04-14 2010-02-10 北京通宜仿古商亭厂 Assembly type archaizing Chinese round-ridge gallery
CN201486366U (en) * 2009-04-14 2010-05-26 北京通宜仿古商亭厂 Antique festoon gate

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2915997Y (en) * 2006-06-16 2007-06-27 刘彤 Pan head members
CN201401041Y (en) * 2009-04-14 2010-02-10 北京通宜仿古商亭厂 Assembly type archaizing Chinese round-ridge gallery
CN201486366U (en) * 2009-04-14 2010-05-26 北京通宜仿古商亭厂 Antique festoon gate

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587662A (en) * 2012-03-27 2012-07-18 李建民 Chinese-style Ming and Qing archaized arch building method by means of reinforced concrete pouring
CN112177330A (en) * 2019-07-05 2021-01-05 晟通科技集团有限公司 Building template arranging method
CN112177330B (en) * 2019-07-05 2022-05-13 晟通科技集团有限公司 Building template arranging method
CN111982045A (en) * 2020-08-30 2020-11-24 青岛市建筑工程质量检测中心有限公司 Inspection and detection method for cast-in-situ large-span concrete hollow slab
CN113323131A (en) * 2021-06-01 2021-08-31 重庆建工住宅建设有限公司 Assembly type construction method for archaized building

Also Published As

Publication number Publication date
CN102121312B (en) 2012-09-26

Similar Documents

Publication Publication Date Title
CN107190981B (en) A kind of construction method of abnormity circular arc camber concrete cast-in-situ roofing
CN103410269B (en) Prestressing without bondn cast-in-place reinforced concrete hollow slab constructing structure and construction method
CN103669865A (en) Stair construction method through shaped supports
CN203213585U (en) Scaffold tool for pouring concrete slab provided with saddle-shaped double curved surfaces
CN103195247B (en) Saddle-shaped hyperboloidal concrete slab construction method
CN101560803B (en) Construction method of reinforced concrete truss conversion layer structure
CN105544887B (en) A kind of construction method of tang style simulation building wing angle cornice
CN102121312B (en) Construction process for concrete bargeboard in pseudo-classic architecture
CN109853944A (en) Building frame structure square column circumference button formwork and its construction method
CN105568854A (en) Construction method of overwater curved fish-bellied cast-in-place reinforced concrete box girder
CN103590486A (en) Anti-seismic energy saving three-dimensional mortise and tenon joint net fixing one-piece cast building structure and construction method
CN106113230B (en) The non-type prefabricated for bench, template system and its construction method can be had enough to meet the need
CN108518029A (en) A kind of assembly construction technology of steel skeleton light-duty roofing
CN203742153U (en) Formwork structure for manufacturing special-shaped thin shell of concrete structure
CN104929295A (en) Seamless steel tube construction method for double-curvature arc-shaped roof
CN204919605U (en) Prefabricated assembled reinforced concrete utility tunnel and production mould thereof
CN203640278U (en) Stair construction die shelf
CN110130477A (en) A kind of housing construction method
CN110409800B (en) High-precision formwork construction method for cast-in-situ bare concrete wind tunnel
CN102912914B (en) Theater type building seat ventilation hole cambered arrangement hollow inclined plate and construction method thereof
CN209686866U (en) A kind of building frame structure square column circumference button formwork
CN109252444A (en) Special construction method for lower cross beam under low lower tower column condition
CN210049579U (en) Formwork system of concrete thin-shell dome structure
CN217438712U (en) Special-shaped curve structure steel-concrete combined tower segment
CN116498061A (en) High formwork construction method for arc-shaped structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 710054 No. 68 Anton street, Shaanxi, Xi'an

Patentee after: SHAANXI CONSTRUCTION ENGINEERING GROUP NO.3 BUILDING ENGINEERING Co.,Ltd.

Address before: 710054 No. 68 Anton street, Shaanxi, Xi'an

Patentee before: SHAANXI CONSTRUCTION ENGINEERING GROUP THIRD ENGINEERING Co.,Ltd.

Address after: 710054 No. 68 Anton street, Shaanxi, Xi'an

Patentee after: SCEGC NO.3 CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Address before: 710054 No. 68 Anton street, Shaanxi, Xi'an

Patentee before: SHAANXI CONSTRUCTION ENGINEERING GROUP NO.3 BUILDING ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder