CN101844714A - Interconnecting cluster control system of elevator - Google Patents
Interconnecting cluster control system of elevator Download PDFInfo
- Publication number
- CN101844714A CN101844714A CN 201010196026 CN201010196026A CN101844714A CN 101844714 A CN101844714 A CN 101844714A CN 201010196026 CN201010196026 CN 201010196026 CN 201010196026 A CN201010196026 A CN 201010196026A CN 101844714 A CN101844714 A CN 101844714A
- Authority
- CN
- China
- Prior art keywords
- elevator
- control
- team
- bed
- destination layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Elevator Control (AREA)
Abstract
The invention discloses an interconnecting cluster control system of an elevator, which comprises at least two elevator control panels, a destination layer indicating display panel and a destination layer input device, wherein the elevator control panels are mainly used for controlling running logic corresponding to an elevator, and meanwhile, the elevator control panels form a cluster control group and are divided into a cluster control host machine and a cluster control slave machine; the cluster control host machine generates a dispatching signal and distributes a lift car of the elevator to a passenger; when the cluster control host machine can not normally work, the cluster control slave machine is automatically upgraded into the cluster control host machine; the destination layer indicating display panel is used for displaying a destination layer in which the lift car of the elevator is to arrive for informing the passenger outside a hall; and the destination layer input device is used for generating and transmitting a destination layer command signal into the cluster control group and prompting passenger distributing information. The invention prevents the generation of the condition of unavailable normal distribution of the elevator when a dispatching controller or a cluster management control device is invalid.
Description
Technical field
The present invention relates to a kind of apparatus for controlling elevator, particularly relate to a kind of group control system for elevator interconnection.
Background technology
Along with the continuous development of skyscraper, people propose more and more higher requirement to the elevator service quality, and the separate unit elevator often can not satisfy the traffic needs in the building.In order to shorten people's waiting time, reduce waste of power, need many elevators rationally to be installed and to be carried out centralized and unified control, the control system of this many elevators is exactly elevator group/group control system.
The patent No. is that 200580051572.1 Chinese patent discloses a kind of group elevator system of sending controller that has, when by the end of service of the elevator of being sent, the passenger who is assigned to the elevator that this quilt sends or is arranged in the elevator that this quilt sends given elevator reallocation indication communication by communication facilities.
The patent No. provides a kind of multiple lift control system with team control CPU (central process unit) for 01132157.1 Chinese patent, it gathers the outer calling request of elevator by team control CPU, and distribute an elevator nearby to go response, its gordian technique is to rely on team control CPU to finish dispatching algorithm, notifies certain elevator to go to respond outer calling request by the elevator car CPU that is connected with team control CPU.
The patent No. provides a kind of elevator device for 01814921.9 Chinese patent, it has the elevator lobby of being arranged on, the entrance hall operation board of input bed of interest, the group who is distributed in the car that entrance hall bed of interest that operation board is imported stops manage control device, in elevator lobby for each number elevator setting, notice institute distributes car a plurality of entrance halls lamp, reach in elevator lobby for each number elevator setting a plurality of bed of interest telltales of demonstration bed of interest.During from entrance hall operation board input bed of interest, light the cooresponding entrance hall of the car lamp that distributes with group's management control device, manage the cooresponding bed of interest telltale of car that control device is distributed with the group simultaneously and show bed of interest.
But above-mentioned patent has the following disadvantages: one, send controller, group management control apparatus or team control CPU in case lost efficacy, the outer calling request of whole elevator group can't be allocated, even can't serve outer calling request; Two, only carry out dynamic assignment and call request outward, bed of interest calling request also needs special-purpose send controller or team control CPU to realize; Three, send controller or team control CPU to need extra manufacturing cost, cost of installation and maintenance cost.
Summary of the invention
Technical matters to be solved by this invention provides a kind of group control system for elevator interconnection, it saves sends controller, group management control apparatus or team control CPU, and elevator can't normally be allocated the generation of situation when having avoided sending controller, group management control apparatus or team control CPU to lose efficacy.
The present invention solves above-mentioned technical matters by following technical proposals: a kind of group control system for elevator interconnection is characterized in that it comprises:
At least two elevator control panels, it is mainly used in the operation logic of the corresponding elevator of control, simultaneously, these elevator control panels are formed the team control group and are divided into the team control main frame and the team control slave, the team control main frame produces scheduling signals and the car of elevator is distributed to the passenger, when the team control main frame can't normal operation, a team control slave was automatically upgraded to the team control main frame;
Bed of interest indicated number plate, its bed of interest that is used to show that the car of elevator will arrive is notified passenger outside the Room;
Destination layer input device, it is used to produce the bed of interest command signal, is sent in the team control group bed of interest command signal and the prompt passengers distributed intelligence.
Preferably, described bed of interest indicated number plate, destination layer input device are connected with elevator control panel by fieldbus.
Preferably, described every elevator control panel all has a unique heading code, and the minimum and elevator control panel that bear scheduler task of heading code is called the team control main frame in the team control group, and is remaining and bear and cooperate the elevator control panel of scheduler task to be called the team control slave.
Preferably, described elevator control panel comprises interconnective transceiver and controller, and transceiver is connected with fieldbus.
Positive progressive effect of the present invention is: one, the elevator control panel of any elevator all might become the team control main frame and bear scheduler task and realize that scheduling distributes; Two, when the elevator control panel (team control main frame) of bearing scheduler task stops maybe can't to work, the elevator control panel of another normal operation (team control slave) is taken over and is stopped the elevator control panel maybe can't to work and upgrade to the team control main frame, and bears scheduler task and realize that scheduling distributes; Three, be the floor that sets out with passenger's operation layer, the floor of importing with the bed of interest command signal is a destination, distributes an elevator response passenger's input to realize the bed of interest command signal; Four, because the present invention does not send controller, group management control apparatus or team control CPU, manufacturing cost of the present invention, cost of installation and maintenance cost reduce; Five, the present invention saves scheduling controller or group management control apparatus, compares power saving like this, meets the demand for development of environmental protection; Six, the quantity of destination layer input device can reduce, and does not need the corresponding destination layer input device of every elevator.
Description of drawings
Fig. 1 is the functional block diagram of one embodiment of the invention.
Fig. 2 is the functional block diagram of elevator control panel of the present invention.
The specific embodiment
Provide preferred embodiment of the present invention below in conjunction with accompanying drawing, to describe technical scheme of the present invention in detail.
As shown in Figure 1, group control system for elevator interconnection of the present invention comprises eight elevator control panels (i.e. first elevator control panel 1, second elevator control panel, 2 to the 8th elevator control panels 8), the first bed of interest indicated number plate, 111 to the 8th bed of interest indicated number plates 811, first destination layer input device, 112 to the 8th destination layer input device 812, the first bed of interest indicated number plate 111, first destination layer input device 112 is connected with first elevator control panel 1 by fieldbus, the rest may be inferred, the 8th bed of interest indicated number plate 811, the 8th destination layer input device 812 is connected with the 8th elevator control panel 8 by fieldbus, fieldbus can be CAN (Controller Area Network, controller local area network) bus etc.
Connect and form the team control group by fieldbus between eight elevator control panels, the car of an every corresponding elevator of elevator control panel and an elevator, the quantity of elevator control panel will be at least two, such as being Liang Tai, five or ten etc.First elevator control panel 1, the first bed of interest indicated number plate 111 and first destination layer input device 112 can form the Building A elevator, second elevator control panel 2, the first bed of interest indicated number plate 211 and second destination layer input device 212 can form the Building B elevator, the rest may be inferred, and the 8th elevator control panel 8, the first bed of interest indicated number plate 811 and second destination layer input device 812 can form the Building H elevator.
The status information of each elevator control panel in the total system (as the car place floor position of elevator, service direction, call outward information such as registering signal registration place floor position) is transmitted in the team control group, and every elevator control panel all can obtain in the team control group all status informations of elevator control panels.As shown in Figure 2, elevator control panel comprises interconnective transceiver and controller, transceiver be connected and be used to receive and dispatch with fieldbus elevator control panel status information, bed of interest command signal, call registering signal and scheduling signals outward, transceiver can adopt CAN transceiver etc.; Controller is controlled the operation logic of corresponding elevator, and be used for registration and eliminate the bed of interest command signal or call signal such as registering signal outward, and according to the status information of elevator control panel calculate dynamically, the most rational elevator dispatching scheme and produce corresponding scheduling signals.Every elevator control panel all has a unique heading code (by the parameter setting), minimum and the elevator control panel that bear scheduler task (calculating and produce tasks such as scheduling signals) of heading code is called team control main frame (being first elevator control panel 1 when initial) in the team control group, and is remaining and bear and cooperate the elevator control panel of scheduler task tasks such as () operation dispatching signals to be called team control slave (second elevator control panel, 2 to eight elevator control panels 8).When the team control main frame can't normal operation, normal operation and elevator control panel that heading code is minimum (team control slave) is automatically upgraded to the team control main frame and bears scheduler task in the team control group, can't normal operation the time, then second elevator control panel 2 of normal operation be automatically upgraded to the team control main frame such as first elevator control panel 1.The team control main frame according to the various status informations of team control main frame in the team control group and team control slave calculate dynamically, the most rational elevator dispatching scheme, when in case the team control main frame finds to have outer calling registering signal or bed of interest command signal, the team control main frame in time produces scheduling signals and distributes to the most rational elevator control panel (team control slave or team control main frame), and elevator control panel (team control slave or team control main frame) is controlled the car of cooresponding elevator again and distributed to the passenger.The team control slave passes to the team control main frame with its status information, and collects at any time from the scheduling signals of team control main frame with from the status information of other team control slave.
Corresponding floor key is installed on each destination layer input device, after being pressed, floor key can produce cooresponding bed of interest command signal, the bed of interest command signal is sent in the team control group and the prompt passengers distributed intelligence, the process that the bed of interest command signal is sent in the team control group is as follows: the bed of interest command signal sends to and the elevator control panel (team control slave or team control main frame) of destination layer input device in same seat elevator by fieldbus, if send the team control slave to, then also to send the bed of interest command signal to the team control main frame by this team control slave.Wherein, the quantity of destination layer input device can suitably reduce, and such as saving first destination layer input device 112 etc., does not need the corresponding destination layer input device of every elevator; The bed of interest that the car of each bed of interest indicated number plate demonstration elevator will arrive is notified passenger outside the Room.
Lift the principle of work of two concrete situation explanation group control system for elevator interconnection below: first kind of situation, have a passenger at the Stall of Building B elevator by the floor key on the destination layer input device (such as the 4th buildings), second destination layer input device 212 produces cooresponding bed of interest command signal and is sent to second elevator control panel 2 by fieldbus, second elevator control panel 2 is sent to first elevator control panel 1 (team control main frame) by fieldbus with the bed of interest command signal, first elevator control panel 1 (team control main frame) produces scheduling signals, scheduling signals is distributed to second elevator control panel 2, second elevator control panel 2 passes to this scheduling signals ladder number and this elevator place direction of the elevator that the indication of second destination layer input device, 212, the second destination layer input device 212 distributed again; First elevator control panel 1 (team control main frame) is also distributed to scheduling signals the most rational elevator control panel (for example the 8th elevator control panel 8) simultaneously, the 8th elevator control panel 8 will be registered this bed of interest command signal, simultaneously scheduling signals is sent to the 8th bed of interest indicated number plate 811, the eight bed of interest indicated number plates 811 again and show that the bed of interest that the car of elevators will arrive notifies passenger outside the Room; After the car of the elevator that is assigned with (H elevator) arrives the floor at second destination layer input device, 212 places, the 8th elevator control panel 8 sends to the 8th command control panel 89 with the bed of interest command signal, and interior this command signal of passenger of car that notice enters the Building H elevator is registered.Second kind of situation, have a passenger at the Stall of Building H elevator by the floor key on the destination layer input device (such as the 5th buildings), the 8th destination layer input device 812 produces cooresponding bed of interest command signal and is sent to the 8th elevator control panel 8 by fieldbus, the 8th elevator control panel 8 is sent to first elevator control panel 1 (team control main frame) by fieldbus with the bed of interest command signal, first elevator control panel 1 (team control main frame) produces scheduling signals, the ladder of the elevator that 812 indications of the 8th destination layer input device are distributed number and this elevator place direction; First elevator control panel 1 (team control main frame) is also distributed to scheduling signals the most rational elevator control panel (for example first elevator control panel 1) simultaneously, first elevator control panel 1 will be registered this bed of interest command signal, simultaneously scheduling signals is sent to the first bed of interest indicated number plate, 111, the first bed of interest indicated number plates 111 again and show that the bed of interest that the car of elevators will arrive notifies passenger outside the Room; After the car of the elevator that is assigned with (A elevator) arrives the floor at the 8th destination layer input device 812 places, first elevator control panel 1 sends to first command control panel 19 with the bed of interest command signal, and interior this command signal of passenger of car that notice enters the Building A elevator is registered.
In sum, group control system for elevator interconnection of the present invention reaches following effect: one, the elevator control panel of any elevator all might become the team control main frame and bear scheduler task and realize that scheduling distributes; Two, when the elevator control panel (team control main frame) of bearing scheduler task stops maybe can't to work, the elevator control panel of another normal operation (team control slave) is taken over and is stopped the elevator control panel maybe can't to work and upgrade to the team control main frame, and bears scheduler task and realize that scheduling distributes; Three, be the floor that sets out with passenger's operation layer, the floor of importing with the bed of interest command signal is a destination, distributes an elevator response passenger's input to realize the bed of interest command signal; Four, because the present invention does not send controller or group management control apparatus, manufacturing cost of the present invention, cost of installation and maintenance cost reduce; Five, the present invention saves scheduling controller, group management control apparatus or team control CPU, compares power saving like this, meets the demand for development of environmental protection; Six, the quantity of destination layer input device can reduce, and does not need the corresponding destination layer input device of every elevator.
Though more than described the specific embodiment of the present invention, it will be understood by those of skill in the art that these only are casehistorys, under the prerequisite that does not deviate from principle of the present invention and essence, can make numerous variations or modification to these embodiments.Therefore, protection scope of the present invention is limited by appended claims.
Claims (4)
1. group control system for elevator interconnection is characterized in that it comprises:
At least two elevator control panels, it is mainly used in the operation logic of the corresponding elevator of control, simultaneously, these elevator control panels are formed the team control group and are divided into the team control main frame and the team control slave, the team control main frame produces scheduling signals and the car of elevator is distributed to the passenger, when the team control main frame can't normal operation, a team control slave was automatically upgraded to the team control main frame;
Bed of interest indicated number plate, its bed of interest that is used to show that the car of elevator will arrive is notified passenger outside the Room;
Destination layer input device, it is used to produce the bed of interest command signal, is sent in the team control group bed of interest command signal and the prompt passengers distributed intelligence.
2. group control system for elevator interconnection as claimed in claim 1 is characterized in that, described bed of interest indicated number plate, destination layer input device are connected with elevator control panel by fieldbus.
3. group control system for elevator interconnection as claimed in claim 1, it is characterized in that, described every elevator control panel all has a unique heading code, minimum and the elevator control panel that bear scheduler task of heading code is called the team control main frame in the team control group, and is remaining and bear and cooperate the elevator control panel of scheduler task to be called the team control slave.
4. group control system for elevator interconnection as claimed in claim 1 is characterized in that described elevator control panel comprises interconnective transceiver and controller, and transceiver is connected with fieldbus.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010196026 CN101844714A (en) | 2010-06-08 | 2010-06-08 | Interconnecting cluster control system of elevator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010196026 CN101844714A (en) | 2010-06-08 | 2010-06-08 | Interconnecting cluster control system of elevator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101844714A true CN101844714A (en) | 2010-09-29 |
Family
ID=42769558
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010196026 Pending CN101844714A (en) | 2010-06-08 | 2010-06-08 | Interconnecting cluster control system of elevator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101844714A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105110111A (en) * | 2015-07-24 | 2015-12-02 | 广州日滨科技发展有限公司 | System and method for generating elevator group operation curve and elevator group control system |
CN105645204A (en) * | 2016-03-02 | 2016-06-08 | 深圳市海浦蒙特科技有限公司 | Elevator group control system and setting method for group control parameters of elevator group control system |
CN112938667A (en) * | 2021-02-24 | 2021-06-11 | 永大电梯设备(中国)有限公司 | Elevator destination layer group control system with group control backup function and method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1157794A (en) * | 1995-12-28 | 1997-08-27 | Lg产电株式会社 | Apparatus and method for controlling plurality of elevator cars |
CN1198143A (en) * | 1996-10-29 | 1998-11-04 | 三菱电机株式会社 | Control device for elevators |
JP2001122548A (en) * | 1999-10-21 | 2001-05-08 | Mitsubishi Electric Corp | Group supervisory operation device and method for elevator |
CN1355764A (en) * | 2000-04-12 | 2002-06-26 | 三菱电机株式会社 | Communication control unit for elevator system |
CN201703929U (en) * | 2010-06-08 | 2011-01-12 | 上海新时达电气股份有限公司 | Elevator interconnected group control system |
-
2010
- 2010-06-08 CN CN 201010196026 patent/CN101844714A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1157794A (en) * | 1995-12-28 | 1997-08-27 | Lg产电株式会社 | Apparatus and method for controlling plurality of elevator cars |
CN1198143A (en) * | 1996-10-29 | 1998-11-04 | 三菱电机株式会社 | Control device for elevators |
JP2001122548A (en) * | 1999-10-21 | 2001-05-08 | Mitsubishi Electric Corp | Group supervisory operation device and method for elevator |
CN1355764A (en) * | 2000-04-12 | 2002-06-26 | 三菱电机株式会社 | Communication control unit for elevator system |
CN201703929U (en) * | 2010-06-08 | 2011-01-12 | 上海新时达电气股份有限公司 | Elevator interconnected group control system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105110111A (en) * | 2015-07-24 | 2015-12-02 | 广州日滨科技发展有限公司 | System and method for generating elevator group operation curve and elevator group control system |
CN105645204A (en) * | 2016-03-02 | 2016-06-08 | 深圳市海浦蒙特科技有限公司 | Elevator group control system and setting method for group control parameters of elevator group control system |
CN105645204B (en) * | 2016-03-02 | 2017-11-17 | 深圳市海浦蒙特科技有限公司 | The method to set up of multiple lift control system and its team control parameter |
CN112938667A (en) * | 2021-02-24 | 2021-06-11 | 永大电梯设备(中国)有限公司 | Elevator destination layer group control system with group control backup function and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110451367B (en) | Super high-rise elevator destination layer group control system | |
CA2704206C (en) | Elevator system | |
US7036635B2 (en) | System and display for providing information to elevator passengers | |
KR101093664B1 (en) | Elevator cross-dispatching system with inter group relative system response ?????? dispatching | |
KR20180133223A (en) | Reassignment of elevators for mobile device users | |
KR101383675B1 (en) | Elevator system with distributed dispatching | |
WO2019087249A1 (en) | Elevator operation management system, and elevator operation management method | |
EA020711B1 (en) | Method for dividing destination calls between elevator groups in elevator system | |
JP2001048431A (en) | Elevator device and car assignment control method | |
JPH11116155A (en) | Control system of elevator | |
CN101863401A (en) | Group control system for elevator interconnection | |
CN201154862Y (en) | Group control elevator control device | |
CN103930362A (en) | Elevator system | |
CN101844714A (en) | Interconnecting cluster control system of elevator | |
CN201703929U (en) | Elevator interconnected group control system | |
CN104150297B (en) | The control method of the control system of the many elevator devices of high-rise building | |
CN201703928U (en) | Interconnected group-control system for elevators | |
JPH04153169A (en) | Group control unit for elevator | |
JP2004224556A (en) | Group management control device and method for elevator | |
CN103910256B (en) | Interconnected elevator device and progress control method thereof | |
JP2016023083A (en) | Network type elevator system | |
JP3037215U (en) | Elevator group management device | |
JP2639265B2 (en) | Multi-group control system for elevators | |
CN111302170A (en) | Elevator calling method and elevator using same | |
JP7380793B1 (en) | elevator control system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20100929 |