CN101787795B - Large-size net rack suspension cable mounting platform and suspension cable construction method - Google Patents
Large-size net rack suspension cable mounting platform and suspension cable construction method Download PDFInfo
- Publication number
- CN101787795B CN101787795B CN2010101166769A CN201010116676A CN101787795B CN 101787795 B CN101787795 B CN 101787795B CN 2010101166769 A CN2010101166769 A CN 2010101166769A CN 201010116676 A CN201010116676 A CN 201010116676A CN 101787795 B CN101787795 B CN 101787795B
- Authority
- CN
- China
- Prior art keywords
- suspension cable
- cable
- assembly unit
- net rack
- mounting platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention relates to a large-size net rack suspension cable mounting platform and a suspension cable construction method. The large-size net rack suspension cable mounting platform comprises tower frames, suspension cables, pulling cables, lifting cables, windlasses I and siding seats; two groups of tower frames are respectively and relatively arranged on the left side and the right side of a building platform; top ends of two groups of left and right relative tower frames are connected by the suspension cables; the sliding seats are respectively arranged on two suspension cables and connected with the upper ends of the lifting cables; the windlasses I are respectively arranged at the top ends of the tower frames; two groups of relative windlasses I are connected by using the pulling cables; and the middle parts of the pulling cables are connected with the sliding seats. By using the large-size net rack suspension cable construction method, a large-size net rack is evenly segmented into a plurality of groups of assembling units, and each group of assembling unit is independently operated and is built at the designated position of the platform by using the suspension cable mounting platform. The invention has the advantages of being assembled on the ground, ensuring the assembling and welding quality of members and engineering period and reducing the construction measure expense.
Description
Technical field
The present invention relates to a kind of erecting device of large-size net rack, particularly a kind of type rack suspension cable mounting platform and suspension cable job practices.
Background technology
In the prior art, generally adopt high altitude bulk method, accumulation slippage method for present our job practices of large tracts of land single building.The high altitude bulk method: this method construction period is longer, and the work high above the ground quality is not easy control; The accumulation slippage method: restricted for the construction plant, expense is higher, the high-altitude welding, and construction quality is not as Ground Operation.
Summary of the invention
Purpose of the present invention is exactly the weak point in the background technology, and the large-size net rack suspension cable mounting platform that a kind of construction period is short, quality is controlled easily and expense is lower is provided.
For achieving the above object, the present invention adopts following technical scheme: large-size net rack suspension cable mounting platform, described suspension cable mounting platform comprises pylon, suspension cable, drag cable, lift cable, hoist engine I and slip base, the left and right sides of setting for this platform is provided with two groups of pylons respectively relatively, the left and right sides connects with suspension cable between the two opposite groups pylon top, be respectively equipped with slip base on two suspension cables, slip base is connected with the lift cable upper end, the pylon top is respectively equipped with hoist engine I, is connected with slip base with drag cable connection and drag cable middle part between the two opposite groups hoist engine I.
For a kind of optimization of the present invention, described slip base is made of housing, roller and hoist engine, and roller is connected with suspension cable and is positioned at the suspension cable top, and the lift cable upper end is connected with hoist engine.
Large-size net rack suspension cable job practices is evenly divided into many assembly unit with large-size net rack, and every assembly unit is operated separately, uses the suspension cable mounting platform that the assigned address of setting for this platform is built in every assembly unit, and its mounting method may further comprise the steps:
A, below the suspension cable mounting platform, be positioned at the side build-up area of setting for this platform welding is assembled in single assembly unit;
After b, the assembling welding of assembly unit unit were finished, the lift cable lower end was connected with the assembly unit unit respectively;
Hoist engine is started working in c, the slip base, the assembly unit unit is promoted to the build-up area top is higher than the position of setting for this platform;
D, the hoist engine I that is positioned on the assembly unit unit opposite side pylon start working, and the assembly unit unit is drawn to top, designated mounting position;
Hoist engine is started working in the e, slip base, the assembly unit unit is fallen to the designated mounting position and the lift cable dismounting is unclamped.
F, each working cell of suspension cable mounting platform return to initial duty, to prepare building of next assembly unit.
The present invention compares with background technology, has to carry out installation on ground, guarantees component assembly, welding quality; Guarantee the duration, reduce working measure and take.
Description of drawings
Fig. 1 is the structural representation of large-size net rack suspension cable mounting platform.
Fig. 2 is the structural representation of slip base.
Fig. 3 is first kind of working state schematic representation of large-size net rack suspension cable mounting platform.
Fig. 4 is second kind of working state schematic representation of large-size net rack suspension cable mounting platform.
Fig. 5 is the third working state schematic representation of large-size net rack suspension cable mounting platform.
Fig. 6 is the 4th a kind of working state schematic representation of large-size net rack suspension cable mounting platform.
Fig. 7 is the 5th a kind of working state schematic representation of large-size net rack suspension cable mounting platform.
Fig. 8 is the 6th a kind of working state schematic representation of large-size net rack suspension cable mounting platform.
The specific embodiment
Embodiment 1: with reference to Fig. 1~8.Large-size net rack suspension cable mounting platform, described suspension cable mounting platform comprises pylon 6, suspension cable 3, drag cable 1, lift cable 4, hoist engine I 5 and slip base 2,7 left and right sides of setting for this platform are provided with two groups of pylons 6 respectively relatively, connect with suspension cable 3 between two opposite groups pylon 6 tops, the left and right sides, be respectively equipped with slip base 2 on two suspension cables 3, slip base 2 is connected with lift cable 4 upper ends, pylon 6 tops are respectively equipped with hoist engine I 5, are connected with slip base 2 with drag cable 1 connection and drag cable 1 middle part between the two opposite groups hoist engine I 5.Described slip base 2 is made of housing 2-2, roller 2-1 and hoist engine 2-3, and roller 2-1 is connected with suspension cable 3 and is positioned at suspension cable 3 tops, and lift cable 4 upper ends are connected with hoist engine 2-3.
Embodiment 2: with reference to Fig. 1~8.Large-size net rack suspension cable mounting method, large-size net rack is evenly divided into many assembly unit 8, and every assembly unit 8 operated separately, use suspension cable mounting platform 9 that 7 assigned addresses of setting for this platform are built in every assembly unit 8, its mounting method may further comprise the steps:
A, below suspension cable mounting platform 9, be positioned at the 7 one side build-up areas of setting for this platform welding is assembled in single assembly unit 8;
After b, the 8 assembling welding of assembly unit unit were finished, lift cable 4 lower ends were connected with assembly unit unit 8 respectively;
Hoist engine 2-3 start working in the c, slip base 2, assembly unit unit 8 is promoted to the build-up area top is higher than 7 the position of setting for this platform;
D, the hoist engine I 5 that is positioned on the assembly unit unit 8 opposite side pylons 6 start working, and assembly unit unit 8 is drawn to top, designated mounting position;
Hoist engine 2-3 start working in the e, slip base 2, assembly unit unit 8 is fallen to the designated mounting position and lift cable 4 dismountings are unclamped.
F, suspension cable mounting platform 9 each working cell return to initial duty, to prepare building of next assembly unit 8.
What need understand is: though the foregoing description is to the present invention's detailed explanation of contrasting; but these explanations, just to simple declaration of the present invention, rather than limitation of the present invention; any innovation and creation that do not exceed in the connotation of the present invention all fall within the scope of protection of the present invention.
Claims (3)
1. large-size net rack suspension cable mounting platform, it is characterized in that: described suspension cable mounting platform (9) comprises pylon (6), suspension cable (3), drag cable (1), lift cable (4), hoist engine I (5) and slip base (2), (7) left and right sides of setting for this platform is provided with two groups of pylons (6) respectively relatively, connect with suspension cable (3) between left and right sides two opposite groups pylon (6) top, be respectively equipped with slip base (2) on two suspension cables (3), slip base (2) is connected with lift cable (4) upper end, pylon (6) top is respectively equipped with hoist engine I (5), is connected with slip base (2) with drag cable (1) connection and drag cable (1) middle part between the two opposite groups hoist engine I (5).
2. large-size net rack suspension cable mounting platform according to claim 1, it is characterized in that: described slip base (2) is made of housing (2-2), roller (2-1) and hoist engine (2-3), roller (2-1) is connected with suspension cable (3) and is positioned at suspension cable (3) top, and lift cable (4) upper end is connected with hoist engine (2-3).
3. large-size net rack suspension cable job practices that adopts the described large-size net rack suspension cable of claim 1 mounting platform, it is characterized in that: large-size net rack is evenly divided into many assembly unit (8), and to every assembly unit (8) operation separately, use suspension cable mounting platform (9) that (7) assigned address of setting for this platform is built in every assembly unit (8), its mounting method may further comprise the steps:
A, be positioned at (7) the one side build-up areas of setting for this platform in suspension cable mounting platform (9) below welding is assembled in single assembly unit (8);
After b, assembly unit unit (8) assembling welding were finished, lift cable (4) lower end was connected with assembly unit unit (8) respectively;
C, the interior hoist engine of slip base (2) (2-3) are started working, and assembly unit unit (8) are promoted to the position that the build-up area top is higher than set for this platform (7);
D, the hoist engine I (5) that is positioned on assembly unit unit (8) the opposite side pylon (6) start working, and assembly unit unit (8) are drawn to top, designated mounting position;
E, the interior hoist engine of slip base (2) (2-3) are started working, and assembly unit unit (8) are fallen to the designated mounting position and lift cable (4) dismounting is unclamped.
F, each working cell of suspension cable mounting platform (9) return to initial duty, to prepare building of next assembly unit (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101166769A CN101787795B (en) | 2010-03-03 | 2010-03-03 | Large-size net rack suspension cable mounting platform and suspension cable construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101166769A CN101787795B (en) | 2010-03-03 | 2010-03-03 | Large-size net rack suspension cable mounting platform and suspension cable construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101787795A CN101787795A (en) | 2010-07-28 |
CN101787795B true CN101787795B (en) | 2011-09-21 |
Family
ID=42531159
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101166769A Active CN101787795B (en) | 2010-03-03 | 2010-03-03 | Large-size net rack suspension cable mounting platform and suspension cable construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101787795B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102486051B (en) * | 2010-12-06 | 2013-12-11 | 中冶天工集团有限公司 | Manual demolishing method of large-area spherical net rack |
CN102897650B (en) * | 2012-10-15 | 2014-10-15 | 中国建筑第八工程局有限公司 | Steel wire rope length controlling method for flexible net rack lifting process |
CN114412197B (en) * | 2022-03-10 | 2023-11-17 | 安徽伟宏钢结构集团股份有限公司 | Net frame assembling process |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2002084050A1 (en) * | 2001-04-03 | 2002-10-24 | Ulma C Y E, S. Coop. | Slab formwork system |
JP2006183313A (en) * | 2004-12-27 | 2006-07-13 | Nippon Rittai Chushajo Kaihatsu Kk | Slab form unit and supporting frame unit |
CN101559905A (en) * | 2009-05-12 | 2009-10-21 | 广东省长大公路工程有限公司 | Deck unit erection gantry |
CN201605799U (en) * | 2010-03-03 | 2010-10-13 | 潮峰钢构集团有限公司 | Large-scale net rack suspension cable mounting platform |
-
2010
- 2010-03-03 CN CN2010101166769A patent/CN101787795B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2002084050A1 (en) * | 2001-04-03 | 2002-10-24 | Ulma C Y E, S. Coop. | Slab formwork system |
JP2006183313A (en) * | 2004-12-27 | 2006-07-13 | Nippon Rittai Chushajo Kaihatsu Kk | Slab form unit and supporting frame unit |
CN101559905A (en) * | 2009-05-12 | 2009-10-21 | 广东省长大公路工程有限公司 | Deck unit erection gantry |
CN201605799U (en) * | 2010-03-03 | 2010-10-13 | 潮峰钢构集团有限公司 | Large-scale net rack suspension cable mounting platform |
Also Published As
Publication number | Publication date |
---|---|
CN101787795A (en) | 2010-07-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105433855B (en) | Frame-type multifunctional stretches window cleaning equipment | |
CN202248941U (en) | Integral lifting and in-place mounting device for large-sized steel members | |
CN101787795B (en) | Large-size net rack suspension cable mounting platform and suspension cable construction method | |
CN103835511A (en) | Integral lifting method for ultra-long light thin giant steel tube truss | |
CN202450762U (en) | Construction lifting platform | |
CN203247868U (en) | Large-span steel structure construction temporary supporting frame | |
CN201605799U (en) | Large-scale net rack suspension cable mounting platform | |
CN105625645A (en) | Construction method of suspension type steel-structured lighting skylight | |
CN105672665A (en) | Installation method for large-span double-layer cylindrical surface net shell | |
CN105016220A (en) | Holding rod joint adding device | |
CN205099288U (en) | Work platform of climbing certainly from climbing device and use device | |
CN203684113U (en) | Automatic beam placement platform device | |
CN204835365U (en) | Supplementary handing equipment of outdoor overhead wire | |
CN202379655U (en) | Gantry type hydraulic jacking device | |
CN202745356U (en) | Hydraulic climb material platform | |
CN208072990U (en) | building construction operation platform | |
CN201825672U (en) | Lifting device for generator stator | |
CN201882809U (en) | Door type cantilever steel frame hoisting equipment used for high hoisting | |
CN204781338U (en) | A but, novel pin -connected panel supporting box roof beam that is used for intelligent hydraulic pressure jacking die carrier | |
CN201722936U (en) | Net frame unit movable-type assembly platform | |
CN201485204U (en) | Gas tank hanging device | |
CN207794753U (en) | A kind of Electronics and Information Engineering communication tower for driving birds | |
CN106087776A (en) | A kind of second pontic erection method of split type level bridges | |
CN205968946U (en) | Prefabricated component discharging equipment | |
CN208056658U (en) | Aerial for industrialized building makes building machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Large-size net rack suspension cable mounting platform and suspension cable construction method Effective date of registration: 20180108 Granted publication date: 20110921 Pledgee: Zhejiang Xiaoshan rural commercial bank Limited by Share Ltd Jude branch Pledgor: Chao Feng Steel Structure Group Co., Ltd. Registration number: 2018330000006 |
|