CN101644102A - Auxiliary tool for top plate drilling machinery - Google Patents
Auxiliary tool for top plate drilling machinery Download PDFInfo
- Publication number
- CN101644102A CN101644102A CN200810041518A CN200810041518A CN101644102A CN 101644102 A CN101644102 A CN 101644102A CN 200810041518 A CN200810041518 A CN 200810041518A CN 200810041518 A CN200810041518 A CN 200810041518A CN 101644102 A CN101644102 A CN 101644102A
- Authority
- CN
- China
- Prior art keywords
- construction
- platform
- scaffold
- auxiliary tool
- drill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Drilling And Boring (AREA)
Abstract
At present, in the process of constructing a ceiling project, when the clear height of a room is between 2.8 and 4m, a movable scaffold is adopted as an operating platform; and when the clear height is over 4m, steel pipes are adopted to set up a construction platform for operators to stand thereon to drill holes with a reciprocating drill. In order to overcome the defects that the construction efficiency is low and the investment of manpower and revolving materials is high when the movable scaffold is used and the scaffold construction platform is set up for construction, the invention provides a convenient and quick construction auxiliary tool. The reciprocating drill is fixed on the tool, and the operators can directly implement drilling construction on the ground, so that the construction efficiency is improved and manpower and revolving materials are saved to achieve the aims of quickening construction progress and reducing construction cost.
Description
Affiliated technical field
The present invention relates to the building operations industry, when mainly being decorations construction furred ceiling engineering, employed a kind of aid of constructing easily and efficiently.Can easily hole on the room top board when furred ceiling is constructed, thereby improve efficiency of construction, accelerating construction progress is saved artificial and circulation material expense.
Background technology
At present, when the furred ceiling engineering construction, the mobile scaffold of many employings is as operating platform during stud 2.8m to 4m, and clear height adopts steel pipe erection construction platform when 4m is above, hole with Churn drill above standing in for the operative employee.
So just need rent or buy mobile scaffold and steel pipe, fastener.And the several holes of the every brill of operative employee move to other position with mobile scaffold under needing when adopting mobile scaffold, and then hole, and have so just reduced efficiency of construction; And when adopting steel pipe erection construction platform, just need to rent (purchasing) a large amount of scaffold floor, steel pipe, fasteners, and also need a large amount of scaffolders to set up, cause time and a large amount of inputs artificial, circulation material, increase construction cost.
Summary of the invention
Efficiency of construction when constructing in order to overcome the mobile scaffold of use and to set up the scaffold operation platform is low, manually, the shortcoming that has high input of circulation material, a kind of aid of constructing easily is provided in the time of this, Churn drill is fixed on the instrument of the present invention, the operative employee can directly implement drilling construction on the ground, thereby the raising efficiency of construction is saved artificial, circulation material, reaches the purpose of accelerating construction progress, reduction construction cost.
The technical scheme that its technical problem of solution of the present invention is adopted is: a kind of jacking instrument is provided, makes directly operation on the ground of operative employee, the jacking Churn drill reaches and does not use mobile scaffold or scaffolding platform and the direct purpose of operation boring on the ground.
Chief component:
1. Churn drill fastening devices; 2. jacking pipe; 3. extension spray lance group; 4. seat tube; 5. jacking pipe movable pulley; 6. tooth bar; 7. gear; 8. rocking bar; 9. base.
Lifting principle:
The jacking pipe is through in the bearing, and seat tube props up on the ground, installs and fixes tooth bar on the jacking pipe, on seat tube, install gear and with the coaxial rocking bar of gear, during work, by operative employee's rotating rocker, driven gear leans on the wheel and rack transmission to reach the purpose of the jacking of jacking pipe, decline.
Power transmission principle: when the operative employee shakes rocking bar,, move up and down thereby drive tooth bar, owing to tooth bar is fixed on the jacking pipe, so the jacking pipe can slide up and down in seat tube by rotating with shaft driven gear.When upwards jacking is holed, the reaction force that the suffered floor of Churn drill transmits, reach the jacking pipe along fixedly impact boring device on the jacking pipe and extension spray lance, pass to tooth bar by the jacking pipe again, reach gear by tooth bar, formative gear backward rotation trend reaches rocking bar by rotating shaft, finally passes the arm in the operative employee.Simultaneously, gear hub acceptance reaches seat bar by the downward active force that gear transmits by rotating shaft, finally reaches ground.
Power supply and control principle:
This instrument itself does not need power supply, but will provide electrical source of power for the Churn drill on top, and realizes controlling on the ground the running of Churn drill/stop.
The Churn drill power supply is introduced from the interim switchbox (three grades of casees) of constructing, a gauge tap is installed on bearing, be connected to Churn drill by gauge tap, and the Churn drill its own switch is made as normally open, carry out the purpose that impact is bored control with the switch on the seat tube thereby reach on the ground.
Power line adopts single-phase three heart yearns, that is: a phase, 1, a ground connection, and phase line is controlled by gauge tap, and grounding wire reliably is connected on Churn drill shell and this tool support bar.
Description of drawings
The present invention is further described below in conjunction with drawings and Examples.
Fig. 1 is the device full figure;
Fig. 2 is the transmission device principle.
Fig. 3 is each primary clustering figure
Among Fig. 1, be auxiliary bore hole instrument overall diagram of the present invention.
Among Fig. 2, be the transmission device schematic diagram, operating personnel can be led to nearly rotating rocker driven gear and be rotated, and reach the purpose that the jacking pipe moves up and down by the wheel and rack transmission again.
Among Fig. 3, be each primary clustering figure, indicated the manufacturing materials and the preparation method of each primary clustering.
Claims (1)
1. auxiliary bore hole instrument adopts gear and tooth bar transmission, reaches jacking, decline Churn drill and reaches the instrument of the purpose of boring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200810041518A CN101644102A (en) | 2008-08-08 | 2008-08-08 | Auxiliary tool for top plate drilling machinery |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200810041518A CN101644102A (en) | 2008-08-08 | 2008-08-08 | Auxiliary tool for top plate drilling machinery |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101644102A true CN101644102A (en) | 2010-02-10 |
Family
ID=41656146
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200810041518A Pending CN101644102A (en) | 2008-08-08 | 2008-08-08 | Auxiliary tool for top plate drilling machinery |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101644102A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103104103A (en) * | 2013-01-30 | 2013-05-15 | 天津大学 | Height adjustable novel building support |
CN103291058A (en) * | 2012-03-03 | 2013-09-11 | 谷涛涛 | Multifunctional touch-stop type high-altitude drilling machine |
CN103611967A (en) * | 2013-11-21 | 2014-03-05 | 栾蓬勃 | Auxiliary supporting device for elevation type percussion drill |
CN109175467A (en) * | 2018-09-29 | 2019-01-11 | 上海二十冶建设有限公司 | A kind of cantilever vertical drilling equipment |
-
2008
- 2008-08-08 CN CN200810041518A patent/CN101644102A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103291058A (en) * | 2012-03-03 | 2013-09-11 | 谷涛涛 | Multifunctional touch-stop type high-altitude drilling machine |
CN103104103A (en) * | 2013-01-30 | 2013-05-15 | 天津大学 | Height adjustable novel building support |
CN103611967A (en) * | 2013-11-21 | 2014-03-05 | 栾蓬勃 | Auxiliary supporting device for elevation type percussion drill |
CN103611967B (en) * | 2013-11-21 | 2015-08-26 | 栾蓬勃 | A kind of elevation type percussion drill auxiliary support apparatus |
CN109175467A (en) * | 2018-09-29 | 2019-01-11 | 上海二十冶建设有限公司 | A kind of cantilever vertical drilling equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205527606U (en) | Portable rotation tile press elevating platform | |
CN107246239A (en) | A kind of decorative engineering eminence drilling equipment | |
CN101644102A (en) | Auxiliary tool for top plate drilling machinery | |
CN110608057A (en) | Device for removing duct piece in shield tunnel and using method thereof | |
CN106695356A (en) | Top plate drilling device and application method thereof | |
CN101926632A (en) | Cleaning vehicle | |
CN204531469U (en) | A kind of steel work overhanging component temporary support of tool-type and discharge mechanism | |
CN105715028B (en) | Continuous lowering or hoisting gear and the elevating scaffold containing continuous lowering or hoisting gear | |
CN102491191A (en) | Tower crane, derrick mast device and hoisting method thereof | |
CN207700666U (en) | A kind of elevator hoistway construction platform | |
JPH0616366A (en) | Outer wall installation by shiftable lifter and device therefor | |
CN104889838B (en) | Cutting machine tool and cutting method for precast concrete tower section | |
CN106944892A (en) | A kind of cast tube process equipment of high working efficiency | |
CN208150864U (en) | A kind of construction material lifting apparatus | |
CN109252684A (en) | A kind of reliable and stable equilibristat for building | |
CN206839615U (en) | A kind of boring device of top plate | |
CN214302755U (en) | Assembled building construction platform | |
CN207952708U (en) | A kind of reserved aperture apparatus of building floor | |
CN110497394B (en) | Colliery is auxiliary robot in pit | |
CN207092513U (en) | A kind of rotary type lowering or hoisting gear for tank inside construction | |
CN218494615U (en) | Hanging basket | |
CN221194978U (en) | Top and bottom coal detection device | |
CN206203763U (en) | Self-driving floor hanging apparatus | |
CN221096393U (en) | Double-liquid high-pressure grouting machine | |
CN204997106U (en) | Drilling operating device and drilling equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20100210 |