CN101418542A - Cable system construction method of spatial self-anchored rope-suspension bridge - Google Patents
Cable system construction method of spatial self-anchored rope-suspension bridge Download PDFInfo
- Publication number
- CN101418542A CN101418542A CNA2008102032069A CN200810203206A CN101418542A CN 101418542 A CN101418542 A CN 101418542A CN A2008102032069 A CNA2008102032069 A CN A2008102032069A CN 200810203206 A CN200810203206 A CN 200810203206A CN 101418542 A CN101418542 A CN 101418542A
- Authority
- CN
- China
- Prior art keywords
- cable
- main push
- bridge
- towing rope
- interim
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a method for constructing a cable system of a spatial self-anchoring type suspension bridge. The method is characterized in that a cat path and a main cable are arranged on the vertical surface to form a hollow cable type; and the completed bridge linearity of the main cable is formed through traversing the main cable and stretching slings. Through the proposal, the method has obvious technical characteristics: 1. the main cable is arranged on the vertical surface and is favorable for braiding the cable; 2. the cable tightening operation is carried out on the vertical surface so as to be favorable for tightening the cable and ensuring the gap rate; and 3. firstly, a temporary inhaul cable is used to traverse the main cable in order that the main cable linearity is close to a completed bridge state; and secondly, the sling is stretched and is favorable for controlling the spatial angle of a cable clip and positioning the sling in a transverse oblique anchor tube. The method has the advantages that the construction method is simple, is favorable for the braiding and molding of the main cable and the spatial positioning of the angles of the cable clip and the slings and realizes the completed bridge linearity of the main cable.
Description
Technical field:
The present invention relates to the technical field of construction of bridge, specifically a kind of cable system construction method of spatial self-anchored rope-suspension bridge.
Background technology:
Self-anchored suspension bridge is owing to will transmit the horizontal force of main push-towing rope by stiff girder, necessary first erection construction support or trestle aspect construction, on support or trestle, set up stiff girder then, set up main push-towing rope at last again, hoist cable is installed, carry out the adjustment of hoist cable power, make the deadweight of stiff girder be delivered to main push-towing rope, have the process of individual system conversion by hoist cable.
Traditional parallel rope face self-anchored suspension bridge funicular system construction is in the braided cable moulding of vertical plane, then vertical Plane Installation hoist cable, the conversion of vertical plane system.But construction is not all right for space self-anchored suspension bridge funicular system, because at empty cable state main push-towing rope is the vertical plane, becoming the bridge state but is the inclined-plane, space, exist one from the plane to the space transforming process, change bad meeting and make the angular deviation of cord clip otic placode excessive, even reversing appears in main push-towing rope, drum silk phenomenon, thereby make main push-towing rope, cord clip unbalance stress, reduce safety factor, influence workmanship.
Therefore, to adopt which kind of job practices to carry out funicular system construction be very important to the space self-anchored suspension bridge.
Summary of the invention:
An object of the present invention is to provide a kind of cable system construction method of spatial self-anchored rope-suspension bridge, so that solve the construction difficult problem of space self-anchored suspension bridge funicular system.
To achieve these goals, technical scheme of the present invention is: set up cat road and main push-towing rope at vertical guide, form empty cable type; Adopt the interim hoist cable stretch-draw of multiple spot, main push-towing rope traversing, make main push-towing rope near becoming bridge linear; Carry out the adjustment of cord clip space angle then,, form main push-towing rope and become the bridge line style, finish the system conversion by the permanent hoist cable of root stretch-draw.
Concrete steps comprise: A, set up cat road and main push-towing rope at vertical guide; B, the tight cable of vertical guide; C, interim cord clip, interim hoist cable are installed, permanent cord clip vertical guide initial alignment; D, in to stride symmetrical stretch-draw many to interim drag-line, will in stride that main push-towing rope is traversing to be flared near becoming bridge linear; E, permanent cord clip angle are accurately located, permanent hoist cable stretch-draw anchor, saddle pushing tow; F, full-bridge Suo Li adjust, and remove interim cord clip and interim hoist cable; G, main push-towing rope twine silk, protection, the ancillary works construction.For pick up speed, also dismountable interim pier support, deck paving in step G.
The tangible technical characterstic that the present invention constitutes by the such scheme feature, one, vertical guide sets up main push-towing rope, helps braided cable; Its two, tight cable is operated in vertical guide to carry out, and helps tight cable, guarantees void content; Its three, earlier with the traversing main push-towing rope of interim drag-line, make the main push-towing rope line style near one-tenth bridge state, stretch-draw hoist cable again helps the control and the location of hoist cable in the lateral inclination anchor tube of cord clip space angle.The invention has the advantages that job practices is simple, be beneficial to the space orientation of moulding of main push-towing rope braided cable and cord clip, hoist cable angle, realize that main push-towing rope becomes the bridge line style.
Description of drawings:
Fig. 1 is empty cable state main push-towing rope elevational schematic view
Fig. 2 is empty cable state main push-towing rope floor map
Fig. 3 is empty cable state main push-towing rope schematic cross-sectional view
Fig. 4 is the A place enlarged drawing of Fig. 3
Fig. 5 is that interim hoist cable facade is arranged schematic diagram
Fig. 6 is for becoming bridge state elevational schematic view
Fig. 7 is for becoming bridge state plane schematic diagram
Fig. 8 is for becoming bridge state main push-towing rope schematic cross-sectional view
Fig. 9 is the B place enlarged drawing of Fig. 7
Figure 10 is a cat road general arrangement elevational schematic view
Figure 11 is a cat road general arrangement floor map
Figure 12 is cord clip, hoist cable connection diagram
Figure 13 is the B-B sectional view of Figure 12
The specific embodiment:
Below in conjunction with accompanying drawing and example the present invention is further described.
1, vertical guide sets up the cat road
As shown in Figure 10 and Figure 11, cat road 1 is made up of cat road track cable, crossbeam, manrope, veil, horizontal wind resistance steadying line 7, anchoring Adjustment System etc.Cat road track cable 1 can be striden isolating construction with three.Two end bays are respectively established a width of cloth and are merged the cat road.In stride main push-towing rope because need be through the space transfer process, so in stride the cat road and adopt two width of cloth independence cat roads.
2, vertical guide braided cable
Main push-towing rope 2 is arranged on 1 top, cat road, and main push-towing rope unit strand adopts vertical guide erection technique comparative maturity, is divided into general strand and sets up with the benchmark strand and set up two classes.Main construction sequence is: the strand traction; Carry on the strand, traversing shaping goes into saddle; The strand sag is adjusted; The anchor span tension adjustment.Setting up the benchmark strand earlier, after observing, adjusting, is that benchmark sets up general strand with the benchmark strand again.
3, the tight cable of vertical guide
Tight cable work must be carried out in two steps, i.e. pretension cable and formal tight cable.The method that binding strap on the strand adopts tight cable limit, limit to remove, unsuitable complete removal.Formal tight cable adopts special-purpose tight cable machine that main push-towing rope is made into circle.The direction of formal tight cable should be carried out to the king-post direction from span centre, and end bay is carried out to the king-post direction by anchorage.Fig. 1~Fig. 4 is the schematic diagram of empty cable state main push-towing rope.
4, interim cord clip, interim hoist cable are installed, permanent cord clip vertical guide initial alignment
In vertical guide, install many to interim cord clip and interim hoist cable 3.Interim cord clip, hoist cable and permanent cord clip, hoist cable be not all at same position, and length is also different.Consider it is interim member, the strength of materials can be considered suitable reduction.Interim cord clip is installed on the main push-towing rope 2, and interim hoist cable 3 one ends link to each other with main push-towing rope 2 by interim cord clip, and the other end links to each other with big bridge girder 4.Because the permanent hoist cable of this bridge is the Spatial Cable face, this just requires permanent cord clip accurately to locate.Carry out permanent cord clip initial alignment earlier, the three dimensional space coordinate accurate positioning, the cord clip bolt is just twisted, and tonnage is less, does not make the cord clip slippage.Permanent cord clip is only pursued to cat head by span centre and anchorage place and installs.
5, in to stride symmetrical stretch-draw many to interim drag-line, will in stride that main push-towing rope is traversing to be flared near becoming bridge linear
Adopt multipoint method, as required, in to stride symmetrical stretch-draw many to interim drag-line, will in stride that main push-towing rope is traversing to be flared near becoming bridge linear, the space angle of control cord clip and hoist cable with become the bridge angle more approaching, when guaranteeing the hoist cable installation, can penetrate in the girder anchor tube.This process is the key of cable system construction method of spatial self-anchored rope-suspension bridge.Determine some, promptly several to interim drag-line, need to obtain by analog computation.Purpose is by several stretch-draw to interim hoist cable, make main push-towing rope traversing after, the hoist cable lateral slip angle can satisfy the design required precision.According to span, between the general interim hoist cable about the about 50m of spacing.Fig. 5 is that interim hoist cable is arranged schematic diagram, and Fig. 6~Fig. 9 is into the schematic diagram of bridge state main push-towing rope.
6, permanent cord clip angle accurately locate, permanent hoist cable stretch-draw anchor, saddle pushing tow
About the permanent about 10m of hoist cable spacing, every corresponding permanent cord clip in hoist cable upper end.Main push-towing rope is traversing to be flared near after becoming bridge linear, just can carry out the accurate location adjustment of permanent cord clip.Under this state higher near the cord clip position of king-post because depth-width ratio, with the lateral angles of girder anchor point with becomes the bridge state approaching, and the cord clip position of close span centre is lower, with the lateral angles of girder anchor point with become bridge state difference distance also very big.Therefore, the tension sequence of hoist cable should carry out stretch-draw to the span centre direction from king-post 6, can make the differential seat angle between cord clip otic placode and the hoist cable satisfy required precision.For eliminating the influence of the hoist cable of stretch-draw to other hoist cable own, the accurate adjustment of cord clip angle must be carried out after a last hoist cable stretch-draw is intact simultaneously.
By the gauge point of on main push-towing rope, doing in advance, use universal bevel protractor, measure the angle that this moment, main push-towing rope reversed, according to survey data and corrected Calculation value cord clip otic placode angle is accurately adjusted.According to work progress system converting analogue result calculated, because the Space Nonlinear and the requirement of hoist cable safety factor of main push-towing rope have the part rope to need the spreading anchoring in the stretching process.Along with the stretch-draw of hoist cable, bridge is linear to be drawn close to becoming gradually for main push-towing rope linear, and the cord clip angular deviation is also more and more littler.Excessive for preventing the hoist cable lateral angles, on each permanent cord clip, be provided with stiffening ring device 8, can regulate the space angle of cord clip by drag cable, make hoist cable lateral slip angle in stretching process be controlled at ± 2 the degree in.
7, system conversion, full-bridge Suo Li adjust
In system conversion process, along with the stretch-draw of permanent hoist cable, the Suo Li of interim hoist cable is decreased to zero gradually, at this moment interim hoist cable can be removed.A permanent stage is to hang cable force and linear two control, with Suo Liwei master.Mainly solve by regulate the order and the number of times that hang cable force and the permanent rope of stretch-draw temporarily.Permanent one finish, after girder steel takes off frame, carry out the full-bridge adjustment to hanging cable force as required.The permanent two-stage is to hang cable force and linear two control, based on linear.Be accelerating construction progress this moment, can carry out the construction of the deck paving and the second bridge deck main cable protection system earlier, treats into to carry out funiculus posterior medullae spinalis power behind the bridge as required and always adjust.
8, main push-towing rope twines silk, protection, the ancillary works construction
Carry out main push-towing rope system anticorrosive coating at last, the cat road is removed.Finish space self-anchored suspension bridge funicular system construction, Cheng Qiao.
Employed technical standard and standard comprise among the present invention:
(1) " highway bridge and culvert design general specification " (JTG D60-2004)
(2) " highway bridge and culvert construction technique normalizing " (JTJ041-2000)
(3) " highway suspension bridge design specifications " (declaration original text)
Claims (2)
1, a kind of cable system construction method of spatial self-anchored rope-suspension bridge is characterized in that vertical guide sets up cat road and main push-towing rope, forms empty cable type; Adopt the interim hoist cable stretch-draw of multiple spot, main push-towing rope traversing, make main push-towing rope near becoming bridge linear; Carry out the adjustment of cord clip space angle then,, form main push-towing rope and become the bridge line style, finish the system conversion by the permanent hoist cable of root stretch-draw.
2, cable system construction method of spatial self-anchored rope-suspension bridge as claimed in claim 1 is characterized in that this method comprises the steps: A, sets up cat road and main push-towing rope at vertical guide; B, the tight cable of vertical guide; C, interim cord clip, interim hoist cable are installed, permanent cord clip vertical guide initial alignment; D, in to stride symmetrical stretch-draw many to interim drag-line, will in stride that main push-towing rope is traversing to be flared near becoming bridge linear; E, permanent cord clip angle are accurately located, permanent hoist cable stretch-draw anchor, saddle pushing tow; F, full-bridge Suo Li adjust, and remove interim cord clip and interim hoist cable; G, main push-towing rope twine silk, protection, the ancillary works construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200810203206 CN101418542B (en) | 2008-11-21 | 2008-11-21 | Cable system construction method of spatial self-anchored rope-suspension bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200810203206 CN101418542B (en) | 2008-11-21 | 2008-11-21 | Cable system construction method of spatial self-anchored rope-suspension bridge |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101418542A true CN101418542A (en) | 2009-04-29 |
CN101418542B CN101418542B (en) | 2013-12-25 |
Family
ID=40629529
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200810203206 Active CN101418542B (en) | 2008-11-21 | 2008-11-21 | Cable system construction method of spatial self-anchored rope-suspension bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101418542B (en) |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102021887A (en) * | 2010-09-16 | 2011-04-20 | 长沙理工大学 | Suspender tensioning method of double-tower single-span self-anchored suspension bridge with high-cross dip and spatial cable |
CN102839605A (en) * | 2012-09-25 | 2012-12-26 | 长沙理工大学 | Sag control method for small-sag datum strand |
CN103233427A (en) * | 2013-04-27 | 2013-08-07 | 长沙理工大学 | Sling tensioning and system conversion method for double-tower three-span plane main cable self-anchorage type suspension bridge |
CN103266570A (en) * | 2013-05-28 | 2013-08-28 | 中交二公局第五工程有限公司 | Method for accurately installing and positioning suspension bridge main cable anchor system |
CN104060545A (en) * | 2014-07-10 | 2014-09-24 | 中交二航局第四工程有限公司 | Overwater suspension cable trestle capable of being used for pumping concrete and construction method and application thereof |
CN105603879A (en) * | 2015-12-29 | 2016-05-25 | 四川石油天然气建设工程有限责任公司 | Construction technology for large-diameter pipeline crossing construction catwalk |
CN105780658A (en) * | 2016-03-11 | 2016-07-20 | 中国建筑第六工程局有限公司 | Transverse opposite pulling method for space cable plane structure cable system |
CN106339490A (en) * | 2016-08-31 | 2017-01-18 | 铁道第三勘察设计院集团有限公司 | System and method for managing railway bridge construction progress based on 3DGIS (Three-dimensional Geographic Information System) and engineering three-dimensional model |
CN104404873B (en) * | 2014-10-20 | 2017-04-26 | 上海市政工程设计研究总院(集团)有限公司 | Self-anchored suspension bridge main cable anchoring method |
CN107059650A (en) * | 2017-06-28 | 2017-08-18 | 四川公路桥梁建设集团有限公司 | Suspension bridge main push device |
CN108229035A (en) * | 2018-01-09 | 2018-06-29 | 安徽省交通控股集团有限公司 | A kind of design method for cable-stayed bridge sub-wire clamp-type saddle |
CN108360378A (en) * | 2018-02-08 | 2018-08-03 | 江苏法尔胜缆索有限公司 | A kind of suspension bridge strand depth partition board enters saddle device and enters saddle method |
CN108396633A (en) * | 2018-02-02 | 2018-08-14 | 中铁四局集团第二工程有限公司 | Across the valley suspension bridge pumping beam body concrete construction method of one kind and device |
CN109653077A (en) * | 2019-02-02 | 2019-04-19 | 中交公路长大桥建设国家工程研究中心有限公司 | A kind of three main push-towing rope double tower column suspension bridges |
CN110468724A (en) * | 2019-08-30 | 2019-11-19 | 西安市政设计研究院有限公司 | A kind of cable of space cable suspension bridge main cable construction auxiliary device and main cable construction method |
CN110644370A (en) * | 2019-09-30 | 2020-01-03 | 中铁大桥局第七工程有限公司 | Cable hoisting system of space self-anchored suspension bridge and construction method thereof |
CN113152290A (en) * | 2021-04-09 | 2021-07-23 | 中建三局集团有限公司 | System conversion device and conversion construction method of space cable surface self-anchoring suspension bridge |
CN113565023A (en) * | 2020-08-27 | 2021-10-29 | 孙德明 | Wind-resistant suspension bridge |
CN115162200A (en) * | 2022-08-23 | 2022-10-11 | 广东湾区交通建设投资有限公司 | Suspension bridge main cable strand erection and position restraining method |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109137758A (en) * | 2018-11-23 | 2019-01-04 | 中交第三航务工程局有限公司 | A kind of self-anchored suspension bridge cable construction technology |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0820910A (en) * | 1994-07-05 | 1996-01-23 | Kajima Corp | Construction method of pc cable stayed bridge |
JP2007132077A (en) * | 2005-11-10 | 2007-05-31 | Yokogawa Bridge Corp | Construction method of rigid-frame bridge with angle brace member, and rigid-frame bridge with angle brace member |
CN101177931A (en) * | 2007-12-05 | 2008-05-14 | 中铁大桥局股份有限公司 | Erection of gantry type small-cycle traction system on large-span suspension bridge main cable |
CN101187199A (en) * | 2007-12-24 | 2008-05-28 | 中铁大桥局股份有限公司 | Self-anchoring type suspension bridge system conversion construction method |
-
2008
- 2008-11-21 CN CN 200810203206 patent/CN101418542B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0820910A (en) * | 1994-07-05 | 1996-01-23 | Kajima Corp | Construction method of pc cable stayed bridge |
JP2007132077A (en) * | 2005-11-10 | 2007-05-31 | Yokogawa Bridge Corp | Construction method of rigid-frame bridge with angle brace member, and rigid-frame bridge with angle brace member |
CN101177931A (en) * | 2007-12-05 | 2008-05-14 | 中铁大桥局股份有限公司 | Erection of gantry type small-cycle traction system on large-span suspension bridge main cable |
CN101187199A (en) * | 2007-12-24 | 2008-05-28 | 中铁大桥局股份有限公司 | Self-anchoring type suspension bridge system conversion construction method |
Non-Patent Citations (1)
Title |
---|
张剑英,郝维索,戴建国,沈洋: "杭州钱塘江江东大桥总体设计", 《第十八届全国桥梁学术会议论文集(上册)》 * |
Cited By (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102021887A (en) * | 2010-09-16 | 2011-04-20 | 长沙理工大学 | Suspender tensioning method of double-tower single-span self-anchored suspension bridge with high-cross dip and spatial cable |
CN102839605A (en) * | 2012-09-25 | 2012-12-26 | 长沙理工大学 | Sag control method for small-sag datum strand |
CN103233427B (en) * | 2013-04-27 | 2015-04-22 | 长沙理工大学 | Sling tensioning and system conversion method for double-tower three-span plane main cable self-anchorage type suspension bridge |
CN103233427A (en) * | 2013-04-27 | 2013-08-07 | 长沙理工大学 | Sling tensioning and system conversion method for double-tower three-span plane main cable self-anchorage type suspension bridge |
CN103266570B (en) * | 2013-05-28 | 2015-07-15 | 中交二公局第五工程有限公司 | Method for accurately installing and positioning suspension bridge main cable anchor system |
CN103266570A (en) * | 2013-05-28 | 2013-08-28 | 中交二公局第五工程有限公司 | Method for accurately installing and positioning suspension bridge main cable anchor system |
CN104060545A (en) * | 2014-07-10 | 2014-09-24 | 中交二航局第四工程有限公司 | Overwater suspension cable trestle capable of being used for pumping concrete and construction method and application thereof |
CN104404873B (en) * | 2014-10-20 | 2017-04-26 | 上海市政工程设计研究总院(集团)有限公司 | Self-anchored suspension bridge main cable anchoring method |
CN105603879A (en) * | 2015-12-29 | 2016-05-25 | 四川石油天然气建设工程有限责任公司 | Construction technology for large-diameter pipeline crossing construction catwalk |
CN105780658A (en) * | 2016-03-11 | 2016-07-20 | 中国建筑第六工程局有限公司 | Transverse opposite pulling method for space cable plane structure cable system |
CN106339490A (en) * | 2016-08-31 | 2017-01-18 | 铁道第三勘察设计院集团有限公司 | System and method for managing railway bridge construction progress based on 3DGIS (Three-dimensional Geographic Information System) and engineering three-dimensional model |
CN107059650B (en) * | 2017-06-28 | 2019-06-28 | 四川公路桥梁建设集团有限公司 | Suspension bridge main push device |
CN107059650A (en) * | 2017-06-28 | 2017-08-18 | 四川公路桥梁建设集团有限公司 | Suspension bridge main push device |
CN108229035A (en) * | 2018-01-09 | 2018-06-29 | 安徽省交通控股集团有限公司 | A kind of design method for cable-stayed bridge sub-wire clamp-type saddle |
CN108396633A (en) * | 2018-02-02 | 2018-08-14 | 中铁四局集团第二工程有限公司 | Across the valley suspension bridge pumping beam body concrete construction method of one kind and device |
CN108360378A (en) * | 2018-02-08 | 2018-08-03 | 江苏法尔胜缆索有限公司 | A kind of suspension bridge strand depth partition board enters saddle device and enters saddle method |
CN108360378B (en) * | 2018-02-08 | 2024-03-19 | 江苏法尔胜缆索有限公司 | Saddle-entering device and saddle-entering method for suspension bridge strand deep partition plate |
CN109653077A (en) * | 2019-02-02 | 2019-04-19 | 中交公路长大桥建设国家工程研究中心有限公司 | A kind of three main push-towing rope double tower column suspension bridges |
CN109653077B (en) * | 2019-02-02 | 2024-02-02 | 中交公路长大桥建设国家工程研究中心有限公司 | Three main cable double-tower column suspension bridge |
CN110468724A (en) * | 2019-08-30 | 2019-11-19 | 西安市政设计研究院有限公司 | A kind of cable of space cable suspension bridge main cable construction auxiliary device and main cable construction method |
CN110644370A (en) * | 2019-09-30 | 2020-01-03 | 中铁大桥局第七工程有限公司 | Cable hoisting system of space self-anchored suspension bridge and construction method thereof |
CN113565023A (en) * | 2020-08-27 | 2021-10-29 | 孙德明 | Wind-resistant suspension bridge |
CN113565023B (en) * | 2020-08-27 | 2022-11-08 | 孙德明 | Wind-resistant suspension bridge |
CN113152290A (en) * | 2021-04-09 | 2021-07-23 | 中建三局集团有限公司 | System conversion device and conversion construction method of space cable surface self-anchoring suspension bridge |
CN115162200A (en) * | 2022-08-23 | 2022-10-11 | 广东湾区交通建设投资有限公司 | Suspension bridge main cable strand erection and position restraining method |
Also Published As
Publication number | Publication date |
---|---|
CN101418542B (en) | 2013-12-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101418542B (en) | Cable system construction method of spatial self-anchored rope-suspension bridge | |
CN101476293B (en) | Non-stand construction method for large bridge arch rib | |
CN102444086A (en) | Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge | |
CN103938552B (en) | Steel truss arched bridge self-balancing cantilever construction method and the spacing bearing of main pier | |
CN101838969B (en) | Method for stretching single-tower double-span self-anchored suspension bridge sling of side-span splay cable knot in supportless way | |
CN106245527B (en) | A kind of erection method of dicyclic suspender and Long span cat road track cable | |
CN104631329B (en) | A kind of suspension bridge continuous way cat road integral linear method of adjustment | |
CN104947592B (en) | The tensioning of cable-styled bridge sling and tune rope construction method | |
CN107447665B (en) | A kind of laying method of self-anchored suspension bridge construction cat road carrying rope | |
CN104846747B (en) | A kind of self-anchored suspension bridge suspender tension technique based on self equilibrium systems | |
CN101392501A (en) | Erection method for wide span steel box bridge | |
CN101446066A (en) | Erection method of stiffening girder of suspension bridge and device thereof | |
CN110593125A (en) | Suspension bridge catwalk system | |
CN202187280U (en) | Single main cable system suspension bridge | |
CN108221694B (en) | The method for installing long-span arch bridge tie-rod | |
CN112391950B (en) | Device and method for adjusting center line deviation of closure opening of high-tower and low-tower cable-stayed bridge | |
CN104060545A (en) | Overwater suspension cable trestle capable of being used for pumping concrete and construction method and application thereof | |
CN105113414A (en) | Method for quickly setting up main ropes of suspension bridge | |
CN102587293A (en) | System and method for cradle cantilever construction of variable-width section concrete girder | |
CN105586832A (en) | Suspension type catwalk surface net mounting system | |
CN203782578U (en) | Foldable support pulley device for towing catwalk top by main cable strand of suspension bridge | |
CN206346120U (en) | A kind of pin-connected panel tower with suspended cable system | |
CN211142832U (en) | Suspension bridge catwalk system | |
CN206538687U (en) | Cable-stayed bridge end bay beam section construction system | |
CN204983693U (en) | Hoist device slides in mountain area corridor truss high altitude |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |