CN109898546A - A kind of raw material mill vertical prestressing steel strand wires bellows mounting and fixing support - Google Patents
A kind of raw material mill vertical prestressing steel strand wires bellows mounting and fixing support Download PDFInfo
- Publication number
- CN109898546A CN109898546A CN201910229142.8A CN201910229142A CN109898546A CN 109898546 A CN109898546 A CN 109898546A CN 201910229142 A CN201910229142 A CN 201910229142A CN 109898546 A CN109898546 A CN 109898546A
- Authority
- CN
- China
- Prior art keywords
- strand wires
- vertical
- steel strand
- fixed
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a kind of raw materials to grind vertical prestressing steel strand wires bellows mounting and fixing support, the raw material mill includes four vertical foundation piers, each foundation pier includes the vertical prestressing steel strand wires bellows for being cast in inside concrete, bolt embedment box etc., each foundation pier is required to a fixed frame during concreting and the vertical prestressing steel strand wires bellows of inside concrete is fixed, the fixed frame includes vertical frame identical with foundation pier chamfered shape, the fixed point of multiple vertical prestressing steel strand wires is set on vertical frame, the both ends of every prestress wire are respectively mounted fixed anchorage;The bottom of vertical frame is fixed by expansion bolt.In order to ensure stabilization of the steel strand wires bellows in each concreting process, devise the fixed frame of the special fixed steel strand wires, the positioning of position based on each presstressed reinforcing steel when production, and the fixation of bolt embedment box is taken into account, fully consider the evacuation to main structure reinforcing bar and embedded part etc..
Description
Technical field
The invention belongs to required equipment part fields in cement plant raw material mill installation process, and in particular to a kind of raw material mill is perpendicular
To prestress wire bellows mounting and fixing support.
Background technique
The core equipment of cement producing line is " two one kilns of mill ", and raw material mill is then one of its " mill ", and every production line can root
Different raw material mills is configured according to demand, raw material mill designs lateral and vertical two kinds of prestress wires arrangement, prestressing force in basis
The effect of installation and the tensioning of steel strand wires directly affects grinding machine foundation structure construction quality.
There are 4 vertical foundation piers on each raw material mill grinding machine basis, and raw material grinds the direction prestress steel twist in length and breadth on grinding machine basis
Line group number is more, and there is provision of embedded box on foundation pier, therefore, just necessary when vertical prestressing steel strand wires are arranged
Guarantee the accuracy of prestress wire installation site;On some mega projects, the installation site of this prestress wire
Precision be especially difficult to guarantee, need using various methods, if the position installation of prestress wire is inaccurate, influence whether whole
The later period service condition of a device.
Summary of the invention
The technical problems to be solved by the present invention are: providing a kind of raw material mill vertical prestressing mounting and fixing support, solve
The problem of position precision is difficult to guarantee in cement plant raw material mill vertical prestressing steel strand wires installation process.
The present invention uses following technical scheme to solve above-mentioned technical problem:
A kind of raw material mill vertical prestressing steel strand wires bellows mounting and fixing support, the raw material mill include four vertical bases
Pier, each foundation pier include vertical prestressing steel strand wires bellows, the bolt embedment box for being cast in inside concrete, Mei Geji
Plinth pier is required to a fixed frame during concreting and consolidates to the vertical prestressing steel strand wires of inside concrete
Fixed, the fixed frame includes vertical frame identical with foundation pier chamfered shape, and multiple vertical prestressings are arranged on vertical frame
The fixed point of steel strand wires, the both ends of every prestress wire are respectively mounted fixed anchorage;The bottom of vertical frame passes through expanding screw
Bolt is fixed.
The vertical prestressing steel strand wires include multi beam, and every beam prestress wire is placed in vertical corrugated bushing, vertically
Corrugated bushing is mounted on vertical frame, and is fixed in each fixed point.
Multilayer transverse direction reinforced steel is set on the vertical frame, there is diagonal brace between adjacent two layers transverse direction reinforced steel,
All prestress wire fixed points are installed on lateral reinforced steel.
Steel cushion block is respectively provided with below each fixed frame, for fixed frame it is in place after be adjusted.
The quantity and installation site of the prestress wire, according to the mechanics parameter of foundation pier and bolt embedment box
Position is configured.
The top setting of four fixed frames transversely and horizontally supports relative position and overall stability to ensure fixed frame.
Compared with prior art, the invention has the following advantages:
1, the stabilization in order to ensure steel strand wires bellows in each concreting process devises the special fixed steel
The fixed frame of twisted wire, the positioning of the position based on each presstressed reinforcing steel when which makes, and take into account consolidating for bolt embedment box
It is fixed, fully consider the evacuation to main structure reinforcing bar and embedded part etc..
2, all vertical steel strand wires and prestressed anchor bottom end can first be assembled before filling fixed frame, then will assembling
After good steel strand wires harness penetrates in bellows, completes the anchorage installation of the other side and interface is sealed, very good solution
Multi beam vertical prestressing steel strand wires support and fix problem, it is ensured that the precise mounting position of steel strand wires bellows, make its not by
The influence of reinforcing bar and concrete works segmentation operation.
3, when installation, the fixed frame processed is transported, is lifted on the coordinate of telltale mark.Whole station can be used
The centre coordinate of instrument fixed frame is thrown on the bed course on basis, the position of 4 brackets of fixed frame is then divided, at 4 of steelframe
Parallels is placed on pedestal, first convenient for the adjustment after in place.
4, it is made of conventional materials such as angle steel, channel steels, can be assembled nearby, cost is saved, installation speed is fast, fixed quasi-
Really, installation accuracy is high, quality assurance, construction safety, economical and practical.
Detailed description of the invention
Fig. 1 is that raw material of the present invention grinds the overlooking structure diagram after the installation of vertical prestressing mounting and fixing support;
Fig. 2 is in Fig. 1 of the present invention along I-I sectional view;
Fig. 3 is distribution schematic diagram of the vertical prestressing steel strand wires of the present invention in each foundation base;
Fig. 4 is vertical prestressing steel strand wires fixed frame overlooking structure diagram of the present invention;
Fig. 5 is the first side structural schematic diagram of fixed frame of the present invention;
Fig. 6 is second side structural schematic diagram of the present invention;
Fig. 7 is the 3rd the 4th side structure schematic diagram of the invention;
Fig. 8 is the structural schematic diagram of suspension column of the present invention;
Fig. 9 is ripple pipe fixation structure schematic diagram of the present invention;
Figure 10 is in Fig. 9 of the present invention along A-A sectional view.
Wherein, the mark in figure are as follows: 1- vertical prestressing steel strand wires;2- column;The vertical steel frame of 3-;4- is laterally reinforced
Steel;The vertical foundation pier of 5-;The first expansion bolt of 6-;The second expansion bolt of 7-;8-10mm steel plate;9-6mm fixation steel plate;10- iron
Silk;11- ¢ 8 perforates;Steel strand beam in 12- vertical prestressing bellows.
Specific embodiment
Structure and the course of work of the invention are described further with reference to the accompanying drawing.
A kind of raw material mill vertical prestressing steel strand wires bellows mounting and fixing support, the raw material mill include four vertical bases
Pier, each foundation pier include the vertical prestressing steel strand wires for being cast in inside concrete, bolt embedment box, and each foundation pier exists
A fixed frame is required to during concreting the vertical prestressing steel strand wires of inside concrete are fixed, it is described
Fixed frame includes vertical steel frame identical with foundation pier chamfered shape, and multiple vertical prestressing steel are arranged on vertical steel frame and twist
The fixed point of line bellows, the both ends of every prestress wire are respectively mounted fixed anchorage;The bottom of vertical steel frame passes through swollen
Swollen bolt is fixed.
Specific embodiment, as shown in Figures 1 to 10:
A kind of raw material mill vertical prestressing mounting and fixing support, the raw material mill includes four vertical foundation piers 5, each basis
Pier includes the vertical prestressing steel strand wires 1 for being cast in inside concrete, bolt embedment box, and each foundation pier is in concreting
During be required to a fixed frame vertical prestressing steel strand wires bellows of inside concrete be fixed, the fixation
Frame includes vertical steel frame 3 identical with foundation pier chamfered shape, and multiple vertical prestressing steel strand wires are arranged on vertical steel frame 3
Fixed point, the both ends of every prestress wire are respectively mounted fixed anchorage;The bottom of vertical steel frame 3 by expansion bolt into
Row is fixed.
The vertical prestressing steel strand wires 1 include multi beam, and every beam prestress wire is placed in vertical corrugated bushing, vertically
Corrugated bushing is mounted on vertical steel frame, and is fixed in each fixed point.
Multilayer transverse direction reinforced steel 4 is set on the vertical steel frame, is had between adjacent two layers transverse direction reinforced steel oblique
Support, all prestress wire fixed points are installed on lateral reinforced steel.
Steel cushion block is respectively provided with below each fixed frame, for fixed frame it is in place after be adjusted.
The quantity and installation site of the prestress wire, according to the mechanics parameter of foundation pier and bolt embedment box
Position is configured.
The top setting of four fixed frames transversely and horizontally supports relative position and overall stability to ensure fixed frame.
In the following, the program is described in detail for building two daily outputs, 10,000 tons of cement producing lines:
The core equipment of cement producing line is " two one kilns of mill ", and 2 425 ton/hours of raw materials mills of every line configuration are former
It is designed in material mill basis laterally and vertical two kinds of prestressing force arrangement, the effect of prestressed installation and tensioning directly affects grinding machine knot
Structure construction quality.
The prestress wire group number of direction in length and breadth that raw material grinds grinding machine basis is more, in order to guarantee vertical prestressing steel strand wires
Position is accurate, then must assure that the accurate of corrugated bushing installation site;In order to ensure the precision of corrugated bushing installation, this is devised
Raw material grinds vertical prestressing steel strand wires corrugated bushing mounting and fixing support.
There are 4 vertical foundation piers on the grinding machine basis of each raw material mill, and each foundation pier has 11 beam vertical prestressing steel strand wires,
Totally 44 beam, every beam prestress wire include the prestress wire composition of 19 diameter 15.7mm, and steel strand wires pass through pre-buried straight
Diameter is the vertical corrugated bushing of 100mm, so that steel strand wires are mounted on design position.
Vertical prestressing steel strand wires corrugated bushing flow of installation are as follows:
Making fixed frame, --- fixed frame is installed in place, and --- fixed frame adjustment --- bellows is placed and is fixed.
Specific implementation step is as follows:
Fabrication and installation fixed frame:
The raw material mill high 8m of foundation pier that is placed of vertical prestressing steel strand wires, while having bolt embedment box etc. other interspersed are made
Industry, concreting must be completed by several times, in order to ensure stabilization of the steel strand wires bellows in each concreting process, system
Make the fixed frame of the special fixed steel strand wires.The positioning of position based on each presstressed reinforcing steel when the fixed frame makes, and take into account
The fixation of bolt embedment box etc. fully considers the evacuation to main structure reinforcing bar and embedded part etc..Using the conventional material such as angle steel, channel steel
Material production.It can be assembled nearby.
Fixed frame is installed in place:
The fixed frame processed is transported, is lifted on the coordinate of telltale mark, can be used in total station fixed frame
Heart coordinate is thrown on the bed course on basis, is then divided the position of 4 brackets of fixed frame, is first placed on 4 pedestals of steelframe
Parallels, convenient for the adjustment after in place.Parallels checks the absolute altitude at 4 angles with level after putting well, relative error controls in ± 5mm
Afterwards, fixed frame is placed to designated place.
The adjustment of fixed frame:
Vertical line is marked on the two-dimentional axis direction of fixed frame with theodolite, is adjusted and is fixed by inclined sizing block (i.e. steel cushion block)
The other side is adjusted in frame, the gradient at four angles, side again after adjusting, the deviation control at frame top and frame bottom is in ± 3mm.It adjusts
Afterwards, corresponding position drills on steel plate 8, is fixed using M10 expansion bolt, the first expansion bolt 6 is respectively set in four angles
With the second expansion bolt 7, the first expansion bolt 6 and the second expansion bolt 7 are identical parts, and attached drawing is just to distinguishing two
The restriction that the structure in face is made;Column 2 is mounted on 10mm steel plate 8, the corresponding drilling in four angles of 10mm steel plate 8, the rule of column 2
Lattice select L80*8.
Bellows is placed and is fixed:
Steel strand wires bellows 12 can be by the node diagram being pre-designed, the present embodiment such as Fig. 9, welds on lateral reinforced steel 4
Two pieces of 6mm fixation steel plates 9 disposed in parallel are respectively provided with two perforation of ¢ 8 11 on every piece of 6mm fixation steel plate 9, iron wire 10 are passed through
Threading hole fixes bellows and steel framework.
All steel strand wires can first be assembled with prestressed anchor bottom end before filling fixed frame, then by assembled steel
After twisted wire harness penetrates in bellows, anchorage and bellows seal interface, such as use adhesive tape.After fixed frame installs,
The bellows with steel wire bundle is installed on fixed frame respectively.
Above-mentioned all sizes are illustrated as specific example, and different demands can choose different sizes, cannot
As uniquely needing scheme to be protected.
It is vertically pre- that the installation method very good solution of vertical prestressing steel strand wires multi beam is installed by pre-manufactured steel fixed frame
Prestress steel strand supports and fixes problem, it is ensured that the precise mounting position of steel strand wires bellows makes it not by reinforcing bar and coagulation
The influence of geotechnological journey segmentation operation.
Mounting process feature: installation speed is fast, and fixed accurate, installation accuracy is high, quality assurance, and construction safety, economy are real
With.
Connection relationship, treating method between structure mounting means of the invention, component are merely possible to an example
Illustrate, must not believe that and only protect the scheme, it is all to the device as installed under prestressing fixed frame in the case where all
It is referred to the methods of this programme.
Those skilled in the art can make various modifications to described specific embodiment
Or supplement or be substituted in a similar manner, however, it does not deviate from the spirit of the invention or surmounts the appended claims determines
The range of justice.
Claims (6)
1. a kind of raw material grinds vertical prestressing steel strand wires bellows mounting and fixing support, the raw material mill includes four vertical bases
Pier, each foundation pier include the vertical prestressing steel strand wires for being cast in inside concrete, bolt embedment box, it is characterised in that:
Each foundation pier is required to a fixed frame to the vertical prestressing steel strand wires of inside concrete during concreting
Bellows is fixed, and the fixed frame includes vertical frame identical with foundation pier chamfered shape, and setting is more on vertical frame
The fixed point of a vertical prestressing steel strand wires bellows, the both ends of every prestress wire are respectively mounted fixed anchorage;Vertical frame
The bottom of frame is fixed by expansion bolt.
2. raw material according to claim 1 grinds vertical prestressing steel strand wires bellows mounting and fixing support, it is characterised in that: institute
Stating vertical prestressing steel strand wires includes multi beam, and every beam prestress wire is placed in vertical corrugated bushing, vertical corrugated bushing peace
It is fixed on vertical frame, and in each fixed point.
3. raw material according to claim 1 grinds vertical prestressing steel strand wires bellows mounting and fixing support, it is characterised in that: institute
Setting multilayer transverse direction reinforced steel is stated on vertical frame, there is diagonal brace between adjacent two layers transverse direction reinforced steel, it is all pre- to answer
Power steel strand wires bellows fixed point is installed on lateral reinforced steel.
4. raw material according to claim 1 grinds vertical prestressing steel strand wires bellows mounting and fixing support, it is characterised in that: every
Steel cushion block is respectively provided with below a fixed frame, for fixed frame it is in place after be adjusted.
5. raw material according to claim 1 grinds vertical prestressing steel strand wires bellows mounting and fixing support, it is characterised in that: institute
The quantity and installation site for stating prestress wire, are set according to the position of the mechanics parameter of foundation pier and bolt embedment box
It sets.
6. raw material according to claim 1 grinds vertical prestressing steel strand wires bellows mounting and fixing support, it is characterised in that: four
The top setting of a fixed frame transversely and horizontally supports relative position and overall stability to ensure fixed frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910229142.8A CN109898546A (en) | 2019-03-25 | 2019-03-25 | A kind of raw material mill vertical prestressing steel strand wires bellows mounting and fixing support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910229142.8A CN109898546A (en) | 2019-03-25 | 2019-03-25 | A kind of raw material mill vertical prestressing steel strand wires bellows mounting and fixing support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109898546A true CN109898546A (en) | 2019-06-18 |
Family
ID=66953005
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910229142.8A Pending CN109898546A (en) | 2019-03-25 | 2019-03-25 | A kind of raw material mill vertical prestressing steel strand wires bellows mounting and fixing support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109898546A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111593653A (en) * | 2020-06-18 | 2020-08-28 | 上海公路桥梁(集团)有限公司 | Prefabricated bridge stand positioner of assembling |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103132456A (en) * | 2013-03-19 | 2013-06-05 | 成军 | Construction method for large span girder with cementation pre-stress |
CN103911952A (en) * | 2014-03-28 | 2014-07-09 | 中交第一航务工程局有限公司 | Positioning construction method of prestressed steel corrugated pipe |
CN206752316U (en) * | 2017-03-19 | 2017-12-15 | 许涛 | Bellows height regulating frame at a kind of cast-in-situ box girder crossbeam |
CN107574762A (en) * | 2017-08-24 | 2018-01-12 | 中铁三局集团有限公司 | A kind of construction method for strengthening Cast-in-situ Beam 0# block construction qualities |
CN208073013U (en) * | 2018-03-29 | 2018-11-09 | 中国十七冶集团有限公司 | A kind of anti-offset positioning supporting frame of prestressing force bellows positioning |
-
2019
- 2019-03-25 CN CN201910229142.8A patent/CN109898546A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103132456A (en) * | 2013-03-19 | 2013-06-05 | 成军 | Construction method for large span girder with cementation pre-stress |
CN103911952A (en) * | 2014-03-28 | 2014-07-09 | 中交第一航务工程局有限公司 | Positioning construction method of prestressed steel corrugated pipe |
CN206752316U (en) * | 2017-03-19 | 2017-12-15 | 许涛 | Bellows height regulating frame at a kind of cast-in-situ box girder crossbeam |
CN107574762A (en) * | 2017-08-24 | 2018-01-12 | 中铁三局集团有限公司 | A kind of construction method for strengthening Cast-in-situ Beam 0# block construction qualities |
CN208073013U (en) * | 2018-03-29 | 2018-11-09 | 中国十七冶集团有限公司 | A kind of anti-offset positioning supporting frame of prestressing force bellows positioning |
Non-Patent Citations (2)
Title |
---|
吴贻起: "《复合地基渠系工程施工新技术》", 30 September 2014, 黄河水利出版社 * |
李继业: "《建设工程施工实用技术手册》", 30 April 2007, 中国建材工业出版社 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111593653A (en) * | 2020-06-18 | 2020-08-28 | 上海公路桥梁(集团)有限公司 | Prefabricated bridge stand positioner of assembling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8375678B1 (en) | Methods for construction of pre-fabricated modular reinforcement cages for concrete structures | |
CN206986916U (en) | A kind of pre-buried fixing device of foundation bolt | |
CN104695557A (en) | Steel structure building construction method for one-step pre-burying of foundation bolts | |
CN102619235B (en) | Concrete foundation embedded bolt bracket and embedding method for concrete foundation embedded bolts | |
CN204920239U (en) | A child die carrier for making square framework of steel reinforcement | |
CN110397335A (en) | A kind of self-supporting tower tower seat method for correcting error | |
CN212104166U (en) | Accurate positioning device for embedded bolt of safety injection box of nuclear power station | |
CN109898546A (en) | A kind of raw material mill vertical prestressing steel strand wires bellows mounting and fixing support | |
CN105317052A (en) | Tower crane foundation bolt fixing method | |
CN106988340B (en) | Reserved steel bar in cast-in-place concrete bottom plate is accurately positioned, the construction method of installation | |
CN112458905A (en) | Splicing adjustment method for prefabricated capping beam and prefabricated stand column | |
CN217461468U (en) | Concrete frame post template reinforced structure | |
CN106759943A (en) | A kind of pre-assembled Anchor Bolts in Steel Column Bases structure | |
CN107059913A (en) | A kind of reactor built-in fitting supporting construction and method for embedding | |
JP2011074632A (en) | Unit structure of anchor bolt used for construction of foundation for equipment, and method of construction of foundation for equipment using the unit structure | |
CN105735228A (en) | Construction method and installation accuracy control method of rack systems of high-lift rack climbing type ship lift | |
CN111155549A (en) | Construction method of steel structure combined embedded part | |
CN206448177U (en) | A kind of bridge pinner fixture components | |
CN115262778A (en) | A new construction method for connecting box-shaped steel columns and reinforced concrete beams | |
CN109235483A (en) | A kind of large equipment base foundation bolt positioning device and its application method | |
CN113186971B (en) | Device and method for embedding and fixing foundation bolts of rolling line | |
JP7209509B2 (en) | waterway lining structure | |
CN105735227B (en) | High-lift tooth climbs formula ship lift Nut column system construction method and installation accuracy control method | |
CN106498975B (en) | Wet type paper machine room anchor bolt installation method | |
CN214462568U (en) | Correcting device for verticality and flatness of beam mold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||