CN109853472A - A kind of river levee construction controlled permeability form lining - Google Patents

A kind of river levee construction controlled permeability form lining Download PDF

Info

Publication number
CN109853472A
CN109853472A CN201910273128.8A CN201910273128A CN109853472A CN 109853472 A CN109853472 A CN 109853472A CN 201910273128 A CN201910273128 A CN 201910273128A CN 109853472 A CN109853472 A CN 109853472A
Authority
CN
China
Prior art keywords
layer
adhesive
draining
cloth
liner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910273128.8A
Other languages
Chinese (zh)
Inventor
许亚民
冯瑶慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Camel Engineering Technology Co Ltd
Original Assignee
Wuxi Camel Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Camel Engineering Technology Co Ltd filed Critical Wuxi Camel Engineering Technology Co Ltd
Priority to CN201910273128.8A priority Critical patent/CN109853472A/en
Publication of CN109853472A publication Critical patent/CN109853472A/en
Pending legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

The invention proposes a kind of river levee construction controlled permeability form linings, including gasket body, lower fixing piece, lower fixing piece is adhesive with below the gasket body, the lower fixing piece both ends are inlaid with end cap, the end cap is integrated with lower fixing piece gluing, drainage hole is formed on the end cap, hot-melt adhesive paste has drainpipe on the drainage hole, the gasket body includes draining air-permeable layer and cement granules barrier layer, the draining air-permeable layer side is adhesive with cement granules barrier layer, and the draining air-permeable layer other side is adhesive with draining supporting layer.The content of air and water in concrete can be discharged when the river levee construction controlled permeability form lining use, reduce the ratio of mud of concrete surface layer, improve concrete surface layer intensity, permeability is reduced, to mention the durability of concrete structure.

Description

A kind of river levee construction controlled permeability form lining
Technical field
The present invention relates to construction material technical fields, more particularly, to a kind of river levee construction controlled permeability template Liner.
Background technique
Hydraulic engineering is a kind of favorable to the people engineering, by water conservancy construction, can control the prevalence of river water, while passing through slow setting soil River levee is built, the intensity of river levee can be improved, reduces the possibility that river levee breaches a dyke, guarantees people life property safety.
Currently, the problem of due to concrete pouring technology, the concrete of building outermost layer (20mm) be usually quality most Difference.The performance of concrete surface layer decides its durability used.In concreting process, vibrator vibration force and Under the action of internal pressure, excessive water and air can be collected at concrete surface layer, if can not be discharged, after concrete hardening its The structure on surface layer can be relatively rough, and porosity is very big, and consolidation compactness is very low, big trachoma and slight crack easily occurs, causes to make Concrete surface layer can be penetrated easily with harmful substance in the process, internal bar construction and core part are destroyed, to reduce The use intensity and life-span of concrete.Some researches show that use controllable permeability concrete mould in concreting process Plate pads (controlled permeability formwork(CPF)), the quality of concrete surface coating can be improved And the service life.
Summary of the invention
The present invention proposes that one kind is used multiple times, the river levee construction controlled permeability mould with good air-and water-permeable performance Plate liner.
The technical scheme of the present invention is realized as follows:
A kind of river levee construction controlled permeability form lining, including gasket body, lower fixing piece, gasket body lower section glue It is stained with lower fixing piece, the lower fixing piece both ends are inlaid with end cap, and the end cap is integrated with lower fixing piece gluing, the end cap On form drainage hole, hot-melt adhesive paste has a drainpipe on the drainage hole, and the gasket body includes draining air-permeable layer and cement Particulate barrier, the draining air-permeable layer side are adhesive with cement granules barrier layer, and the draining air-permeable layer other side is adhesive with Drain supporting layer.
Further, staged boss is formed in the draining pipe outer wall, the staged boss there are twice always.
Further, the lower fixing piece is U-shaped structure, and the catch basin is molded over inside lower fixing piece, the draining Hole is communicated to bottom in catch basin.
Further, the draining air-permeable layer is made of polypropylene, and the grid of the draining air-permeable layer is square, net Lattice are having a size of 3.9*3.9mm.
Further, the draining air-permeable layer with a thickness of 1.53mm, the draining supporting layer with a thickness of 1.97mm, institute State cement granules barrier layer with a thickness of 0.51mm.
Further, hot melt is fixed with outer wear layer on the outside of the draining supporting layer, and the outer wear layer uses glass fibers Dimension is made, the outer wear layer with a thickness of one millimeter.
Further, the cement granules barrier layer includes outer rove layer of cloth, spun yarn layer of cloth and interior rove layer of cloth, described outer Rove layer of cloth, spun yarn layer of cloth and interior rove layer of cloth are successively stitched and are woven in together, and the outer rove layer of cloth is all made of geotextiles and is made, institute Interior rove layer of cloth is stated to be made of non-woven fabrics.
Further, adhesive layer is adhesive on the interior rove layer of cloth outer surface, the adhesive layer is parallel or is vertically arranged, The draining air-permeable layer is adhesive on adhesive layer.
Using above-mentioned technical proposal, the invention has the benefit that when concrete is after pouring, in vibrating spear vibration and Under the collective effect of inside concrete pressure, it can control the capillary absorption of permeability form lining draining air-permeable layer to make in addition, mix Gas and moisture in solidifying soil are rejected to outside template, and cement granules barrier layer makes cement granules be enriched in concrete table Layer, thus actually decreasing the ratio of mud of concrete surface layer, form lining only excludes excessive water and air, will not generate true Empty effect, moisture are discharged by gravity, form ideal W/C ratio in the 20mm of coating, the hydration of such cement is made With faster more completely, stomatal limiting value is less, and the cement of higher concentration and powder is as a result made to reduce the shape of surface pores and stomata At, so that obtaining is tighter closeer also more longlasting concrete surface layer, concrete surface layer intensity is improved, permeability is reduced, To mention the durability of concrete structure.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention without any creative labor, may be used also for those of ordinary skill in the art To obtain other drawings based on these drawings.
Fig. 1 is main view of the invention;
Fig. 2 is side view of the invention
Fig. 3 is sectional view of the invention;
Fig. 4 is cement granules barrier layer structure schematic diagram of the invention;
Fig. 5 is cement granules barrier layer main view of the invention.
Wherein: 1, gasket body;2, lower fixing piece;3, drainpipe;4, staged boss;5, catch basin;6, drainage hole;7, Drain air-permeable layer;8, outer wear layer;9, supporting layer is drained;10, cement granules barrier layer;11, adhesive layer;12, outer rove layer of cloth; 13, spun yarn layer of cloth;14, interior rove layer of cloth;15, end cap.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
As shown in Figs. 1-5, a kind of river levee construction controlled permeability form lining, including gasket body 1, lower fixing piece 2, Lower fixing piece 2 is adhesive with below the gasket body 1, lower 2 both ends of fixing piece are inlaid with end cap 15, and the end cap 15 is under 2 gluing of fixing piece is integrated, and drainage hole 6 is formed on the end cap 15, hot-melt adhesive paste has drainpipe 3, institute on the drainage hole 6 Stating gasket body 1 includes that draining air-permeable layer 7 and cement granules barrier layer 10,7 side of draining air-permeable layer are adhesive with cement Grain barrier layer 10,7 other side of draining air-permeable layer are adhesive with draining supporting layer 9.
Further, staged boss 4 is formed on 3 outer wall of drainpipe, the staged boss 4 has two always Road facilitates installation exterior drain.
Further, the lower fixing piece 2 is U-shaped structure, and the catch basin 5 is molded over inside lower fixing piece 2, the row Water hole 6 is communicated to bottom in catch basin 5, and the droplet that the draining air-permeable layer 7 is collected, which penetrates into catch basin 5, to be concentrated, so It is discharged afterwards from drainpipe 3.
Further, the draining air-permeable layer 7 is made of polypropylene, and the grid of the draining air-permeable layer 7 is square, Size of mesh opening is 3.9*3.9mm.
Further, the draining air-permeable layer 7 with a thickness of 1.53mm, the draining supporting layer 9 with a thickness of 1.97mm, The cement granules barrier layer 10 with a thickness of 0.51mm.
The technical parameter of the gasket body 1 are as follows:
Further, hot melt is fixed with outer wear layer 8 on the outside of the draining supporting layer 9, and the outer wear layer 8 uses glass fibre Be made, the outer wear layer 8 with a thickness of one millimeter, enhance abrasion resistance, prolong the service life, it is general one piece liner use Number is 2-10 times.
Further, the cement granules barrier layer 10 includes outer rove layer of cloth 12, spun yarn layer of cloth 13 and interior rove layer of cloth 14, the outer rove layer of cloth 12, spun yarn layer of cloth 13 and interior rove layer of cloth 14, which successively stitch, to be woven in together, and the outer rove layer of cloth 12 is It is made of geotextiles, the interior rove layer of cloth 14 is made of non-woven fabrics, improves the transmitance of water, stops cement granules logical It crosses.
Further, it is adhesive with adhesive layer 11 on interior 14 outer surface of rove layer of cloth, the adhesive layer 11 is parallel or perpendicular In line column, the draining air-permeable layer 7 are adhesive on adhesive layer 11, are conveniently fixed.
A roll liner is general 2.5 meters wide, 35 meters long, method for mounting lining:
(1) installation method in the long axis that the vertical direction of pouring is rolled up using form lining:
1. after opening and shearing, at least allowing liner is open and flat to warm 10 minutes;
2. nailing then along 25 millimeters of centers of tip edge;
3. installing setting tool in the overall length of liner in another side, liner is evened up by rotation setting tool edge, is then followed closely On;
4. liner should be smooth in vertical direction, do not fold, if it is desired, can be tensed with setting tool, in 30~50mm Heart district nails on;
It pads and checks 5. tensing, it is desirable that liner is distortionless and folds;
6. remaining liner repeats above step, until template all covers;
7. liner strip becomes increasingly thicker, careful operation reaches close connection, otherwise can use sealant in joint;
8. usable backing strips cover connector and nail;
9. using knife at template link bolt hole, some nails are used around hole;
10. evening up liner for some templates (height > 2.5m), aloft nailed in axis direction with the interval of 2.5m, then Setting tool is loaded onto, to be evened up every time;
11. clips can be used for some templates (height > 2.5 meters), there is nail to avoid centre.
(2) installation method in long axis of the direction of pouring using form lining volume:
It is general to install for higher template if liner can only be installed in this way 1. the height of template is less than 2.5 meters When by liner volume length direction it is consistent with the direction of casting;
2. installation method for example above-mentioned 4,6;
3. if it is perpendicular to the installation of casting direction, it is necessary to use setting tool, to ensure that liner is straight, tense.In corner It is careful to distort.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (9)

1. a kind of river levee construction controlled permeability form lining, it is characterised in that: including gasket body (1), lower fixing piece (2), it is adhesive with lower fixing piece (2) below the gasket body (1), lower fixing piece (2) both ends are inlaid with end cap (15), institute It states end cap (15) to be integrated with lower fixing piece (2) gluing, be formed drainage hole (6) on the end cap (15), the drainage hole (6) Upper hot-melt adhesive paste has drainpipe (3), and the gasket body (1) includes draining air-permeable layer (7) and cement granules barrier layer (10), institute It states draining air-permeable layer (7) side to be adhesive with cement granules barrier layer (10), draining air-permeable layer (7) other side is adhesive with draining Supporting layer (9).
2. a kind of river levee construction controlled permeability form lining according to claim 1, it is characterised in that: the draining It is formed staged boss (4) on pipe (3) outer wall, the staged boss (4) has twice always.
3. a kind of river levee construction controlled permeability form lining according to claim 1, it is characterised in that: described lower solid Determining part (2) is U-shaped structure, and the catch basin (5) is molded over lower fixing piece (2) inside, and the drainage hole (6) is communicated to catch basin (5) interior bottom.
4. a kind of river levee construction controlled permeability form lining according to claim 1, it is characterised in that: the draining Air-permeable layer (7) is made of polypropylene, and the grid of draining air-permeable layer (7) is square, size of mesh opening 3.9*3.9mm.
5. a kind of river levee construction controlled permeability form lining according to claim 1, it is characterised in that: the draining Air-permeable layer (7) with a thickness of 1.53mm, draining supporting layer (9) with a thickness of 1.97mm, the cement granules barrier layer (10) with a thickness of 0.51mm.
6. a kind of river levee construction controlled permeability form lining according to claim 1, it is characterised in that: the draining Hot melt is fixed with outer wear layer (8) on the outside of supporting layer (9), and the outer wear layer (8) is made of glass fibre, described outer wear-resisting Layer (8) with a thickness of one millimeter.
7. a kind of river levee construction controlled permeability form lining according to claim 1, it is characterised in that: the cement Particulate barrier (10) includes outer rove layer of cloth (12), spun yarn layer of cloth (13) and interior rove layer of cloth (14), the outer rove layer of cloth (12), spun yarn layer of cloth (13) and interior rove layer of cloth (14), which successively stitch, is woven in together, and the outer rove layer of cloth (12) is all made of geotechnique Cloth is made, and the interior rove layer of cloth (14) is made of non-woven fabrics.
8. a kind of river levee construction controlled permeability form lining according to claim 7, it is characterised in that: described interior thick It is adhesive with adhesive layer (11) on gauze layer (14) outer surface, the adhesive layer (11) is parallel or is vertically arranged, and the draining is ventilative Layer (7) is adhesive on adhesive layer (11).
9. the installation method that controlled permeability form lining is used in a kind of river levee construction, which comprises the steps of:
Step 1: at least allowing liner is open and flat to warm 10 minutes after opening and shearing liner;
Step 2: nailing then along 25 millimeters of centers of tip edge;
Step 3: installing setting tool in the overall length of liner in another side, liner is evened up by rotation setting tool edge, Then it nails on;
Step 4: liner should be smooth in vertical direction, do not fold, if it is desired, it can be tensed with setting tool, 30~ The center 50mm nails on;
It pads and checks Step 5: tensing, it is desirable that liner is distortionless and folds;
Step 6: remaining liner repeats above step, until template all covers;
Step 7: liner strip becomes increasingly thicker, careful operation reaches close connection, otherwise can use sealant in joint;
Step 8: backing strips can be used to cover connector and nail;
Step 9: using knife at template link bolt hole, some nails are used around hole;
Step 10: liner is evened up for some templates (height > 2.5m), nail is followed closely aloft with the interval of 2.5m in axis direction Son is loaded on setting tool, to even up every time;
Step 11: clips can be used for some templates (height > 2.5 meters), there is nail to avoid centre.
CN201910273128.8A 2019-04-04 2019-04-04 A kind of river levee construction controlled permeability form lining Pending CN109853472A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910273128.8A CN109853472A (en) 2019-04-04 2019-04-04 A kind of river levee construction controlled permeability form lining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910273128.8A CN109853472A (en) 2019-04-04 2019-04-04 A kind of river levee construction controlled permeability form lining

Publications (1)

Publication Number Publication Date
CN109853472A true CN109853472A (en) 2019-06-07

Family

ID=66903455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910273128.8A Pending CN109853472A (en) 2019-04-04 2019-04-04 A kind of river levee construction controlled permeability form lining

Country Status (1)

Country Link
CN (1) CN109853472A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424523A (en) * 2020-05-13 2020-07-17 成都亚佳工程新技术开发有限公司 Anti-vacuum bearings and bridges

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4012301A1 (en) * 1990-04-18 1991-10-24 Huesker Synthetic Gmbh & Co FORMWORK COVER
CN2567293Y (en) * 2002-08-21 2003-08-20 王恒涛 Concrete form lining of easy regulating permeabitity
CN2756750Y (en) * 2003-11-06 2006-02-08 陈绍华 Composite microporous film air penetration and water permeating concrete formwork cushion
CN101328761A (en) * 2008-07-29 2008-12-24 水利部交通部电力工业部南京水利科学研究院 Multifunctional concrete form book-pad
CN101929243A (en) * 2010-07-12 2010-12-29 杭州银博交通工程材料有限公司 Building template provided with water permeable device
CN202441059U (en) * 2012-01-11 2012-09-19 杭州银博交通工程材料有限公司 Composite permeable template liner
CN104314090A (en) * 2014-08-29 2015-01-28 中铁八局集团建筑工程有限公司 Deep foundation pit bedrock drainage culvert and drainage system and drainage construction method thereof
CN106643365A (en) * 2016-12-13 2017-05-10 中铁十九局集团第二工程有限公司 Tunnel waste second lining blasting demolition and repairing construction method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4012301A1 (en) * 1990-04-18 1991-10-24 Huesker Synthetic Gmbh & Co FORMWORK COVER
CN2567293Y (en) * 2002-08-21 2003-08-20 王恒涛 Concrete form lining of easy regulating permeabitity
CN2756750Y (en) * 2003-11-06 2006-02-08 陈绍华 Composite microporous film air penetration and water permeating concrete formwork cushion
CN101328761A (en) * 2008-07-29 2008-12-24 水利部交通部电力工业部南京水利科学研究院 Multifunctional concrete form book-pad
CN101929243A (en) * 2010-07-12 2010-12-29 杭州银博交通工程材料有限公司 Building template provided with water permeable device
CN202441059U (en) * 2012-01-11 2012-09-19 杭州银博交通工程材料有限公司 Composite permeable template liner
CN104314090A (en) * 2014-08-29 2015-01-28 中铁八局集团建筑工程有限公司 Deep foundation pit bedrock drainage culvert and drainage system and drainage construction method thereof
CN106643365A (en) * 2016-12-13 2017-05-10 中铁十九局集团第二工程有限公司 Tunnel waste second lining blasting demolition and repairing construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
鄢俊,钱军: "《受控渗透性模板衬垫CPF》", 《中国水利》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424523A (en) * 2020-05-13 2020-07-17 成都亚佳工程新技术开发有限公司 Anti-vacuum bearings and bridges

Similar Documents

Publication Publication Date Title
US7128497B2 (en) Horizontally draining artificial turf system
CN203546888U (en) Infiltration type rainwater filter well
CN109853472A (en) A kind of river levee construction controlled permeability form lining
JPH0835281A (en) Deck plate and floor construction method using the deck plate
ITMI20062400A1 (en) ARTIFICIAL GRASS CARPET ARTIFICIAL GRASS WEIGHT STRUCTURE INCLUDING THE CARPET AND METHOD OF MANUFACTURING THE CARPET
CN208293331U (en) The pavement structure and urban road of urban road
CN207079605U (en) The prefabricated concrete gridiron of highway slope protection
EP1918483A2 (en) Multi-layer decoupling and drainage system
EP2458109B1 (en) Cover for a drainage
DE102015100583B4 (en) Precast concrete element, use of a concrete recyclate and a viscose fiber material, production process for a self-cooling precast concrete element, methods for reducing the effect of urban heat islands, buildings and use of the precast concrete element
CN109605875A (en) A kind of composite material blanket for filling cementitious material
DE2224862A1 (en) USE OF WATER-CARRIED FULL-FIBER MATS FOR WATER DRAINAGE WITH FACILITIES IN BUILDING AND CIVIL ENGINEERING
JP5679148B2 (en) Exterior wall construction method and mortar board
EP2837752B1 (en) Floor system and fabricating method thereof
JP2012046971A (en) Water permeable concrete plate
DE102008045769A1 (en) Process for the production of plate coverings and ventilation and / or drainage material for carrying out the method
DE19528725C2 (en) Surface sealing process for earthworks in hydraulic engineering
CN207079606U (en) The anchor structure of the prefabricated concrete gridiron of highway slope protection
KR100200086B1 (en) Construction method of drainage layer for structure protection and drainage material
CN213173676U (en) Reverse filtering guide plate
CN113153073B (en) Evaporate and press waterproof windowsill of aerated concrete
KR102539623B1 (en) A making method of a composite expansion joint in road concrete structures and a construction method thereof
KR102262821B1 (en) Groung reinforcementshaving fiber and ground reinforcementshaving structure using thereof
CN213477378U (en) Wallboard heat insulation structure
RU2471920C1 (en) Method to erect tiled fixation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190607