CN109853472A - A kind of river levee construction controlled permeability form lining - Google Patents
A kind of river levee construction controlled permeability form lining Download PDFInfo
- Publication number
- CN109853472A CN109853472A CN201910273128.8A CN201910273128A CN109853472A CN 109853472 A CN109853472 A CN 109853472A CN 201910273128 A CN201910273128 A CN 201910273128A CN 109853472 A CN109853472 A CN 109853472A
- Authority
- CN
- China
- Prior art keywords
- layer
- adhesive
- draining
- cloth
- liner
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Revetment (AREA)
Abstract
The invention proposes a kind of river levee construction controlled permeability form linings, including gasket body, lower fixing piece, lower fixing piece is adhesive with below the gasket body, the lower fixing piece both ends are inlaid with end cap, the end cap is integrated with lower fixing piece gluing, drainage hole is formed on the end cap, hot-melt adhesive paste has drainpipe on the drainage hole, the gasket body includes draining air-permeable layer and cement granules barrier layer, the draining air-permeable layer side is adhesive with cement granules barrier layer, and the draining air-permeable layer other side is adhesive with draining supporting layer.The content of air and water in concrete can be discharged when the river levee construction controlled permeability form lining use, reduce the ratio of mud of concrete surface layer, improve concrete surface layer intensity, permeability is reduced, to mention the durability of concrete structure.
Description
Technical field
The present invention relates to construction material technical fields, more particularly, to a kind of river levee construction controlled permeability template
Liner.
Background technique
Hydraulic engineering is a kind of favorable to the people engineering, by water conservancy construction, can control the prevalence of river water, while passing through slow setting soil
River levee is built, the intensity of river levee can be improved, reduces the possibility that river levee breaches a dyke, guarantees people life property safety.
Currently, the problem of due to concrete pouring technology, the concrete of building outermost layer (20mm) be usually quality most
Difference.The performance of concrete surface layer decides its durability used.In concreting process, vibrator vibration force and
Under the action of internal pressure, excessive water and air can be collected at concrete surface layer, if can not be discharged, after concrete hardening its
The structure on surface layer can be relatively rough, and porosity is very big, and consolidation compactness is very low, big trachoma and slight crack easily occurs, causes to make
Concrete surface layer can be penetrated easily with harmful substance in the process, internal bar construction and core part are destroyed, to reduce
The use intensity and life-span of concrete.Some researches show that use controllable permeability concrete mould in concreting process
Plate pads (controlled permeability formwork(CPF)), the quality of concrete surface coating can be improved
And the service life.
Summary of the invention
The present invention proposes that one kind is used multiple times, the river levee construction controlled permeability mould with good air-and water-permeable performance
Plate liner.
The technical scheme of the present invention is realized as follows:
A kind of river levee construction controlled permeability form lining, including gasket body, lower fixing piece, gasket body lower section glue
It is stained with lower fixing piece, the lower fixing piece both ends are inlaid with end cap, and the end cap is integrated with lower fixing piece gluing, the end cap
On form drainage hole, hot-melt adhesive paste has a drainpipe on the drainage hole, and the gasket body includes draining air-permeable layer and cement
Particulate barrier, the draining air-permeable layer side are adhesive with cement granules barrier layer, and the draining air-permeable layer other side is adhesive with
Drain supporting layer.
Further, staged boss is formed in the draining pipe outer wall, the staged boss there are twice always.
Further, the lower fixing piece is U-shaped structure, and the catch basin is molded over inside lower fixing piece, the draining
Hole is communicated to bottom in catch basin.
Further, the draining air-permeable layer is made of polypropylene, and the grid of the draining air-permeable layer is square, net
Lattice are having a size of 3.9*3.9mm.
Further, the draining air-permeable layer with a thickness of 1.53mm, the draining supporting layer with a thickness of 1.97mm, institute
State cement granules barrier layer with a thickness of 0.51mm.
Further, hot melt is fixed with outer wear layer on the outside of the draining supporting layer, and the outer wear layer uses glass fibers
Dimension is made, the outer wear layer with a thickness of one millimeter.
Further, the cement granules barrier layer includes outer rove layer of cloth, spun yarn layer of cloth and interior rove layer of cloth, described outer
Rove layer of cloth, spun yarn layer of cloth and interior rove layer of cloth are successively stitched and are woven in together, and the outer rove layer of cloth is all made of geotextiles and is made, institute
Interior rove layer of cloth is stated to be made of non-woven fabrics.
Further, adhesive layer is adhesive on the interior rove layer of cloth outer surface, the adhesive layer is parallel or is vertically arranged,
The draining air-permeable layer is adhesive on adhesive layer.
Using above-mentioned technical proposal, the invention has the benefit that when concrete is after pouring, in vibrating spear vibration and
Under the collective effect of inside concrete pressure, it can control the capillary absorption of permeability form lining draining air-permeable layer to make in addition, mix
Gas and moisture in solidifying soil are rejected to outside template, and cement granules barrier layer makes cement granules be enriched in concrete table
Layer, thus actually decreasing the ratio of mud of concrete surface layer, form lining only excludes excessive water and air, will not generate true
Empty effect, moisture are discharged by gravity, form ideal W/C ratio in the 20mm of coating, the hydration of such cement is made
With faster more completely, stomatal limiting value is less, and the cement of higher concentration and powder is as a result made to reduce the shape of surface pores and stomata
At, so that obtaining is tighter closeer also more longlasting concrete surface layer, concrete surface layer intensity is improved, permeability is reduced,
To mention the durability of concrete structure.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention without any creative labor, may be used also for those of ordinary skill in the art
To obtain other drawings based on these drawings.
Fig. 1 is main view of the invention;
Fig. 2 is side view of the invention
Fig. 3 is sectional view of the invention;
Fig. 4 is cement granules barrier layer structure schematic diagram of the invention;
Fig. 5 is cement granules barrier layer main view of the invention.
Wherein: 1, gasket body;2, lower fixing piece;3, drainpipe;4, staged boss;5, catch basin;6, drainage hole;7,
Drain air-permeable layer;8, outer wear layer;9, supporting layer is drained;10, cement granules barrier layer;11, adhesive layer;12, outer rove layer of cloth;
13, spun yarn layer of cloth;14, interior rove layer of cloth;15, end cap.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
As shown in Figs. 1-5, a kind of river levee construction controlled permeability form lining, including gasket body 1, lower fixing piece 2,
Lower fixing piece 2 is adhesive with below the gasket body 1, lower 2 both ends of fixing piece are inlaid with end cap 15, and the end cap 15 is under
2 gluing of fixing piece is integrated, and drainage hole 6 is formed on the end cap 15, hot-melt adhesive paste has drainpipe 3, institute on the drainage hole 6
Stating gasket body 1 includes that draining air-permeable layer 7 and cement granules barrier layer 10,7 side of draining air-permeable layer are adhesive with cement
Grain barrier layer 10,7 other side of draining air-permeable layer are adhesive with draining supporting layer 9.
Further, staged boss 4 is formed on 3 outer wall of drainpipe, the staged boss 4 has two always
Road facilitates installation exterior drain.
Further, the lower fixing piece 2 is U-shaped structure, and the catch basin 5 is molded over inside lower fixing piece 2, the row
Water hole 6 is communicated to bottom in catch basin 5, and the droplet that the draining air-permeable layer 7 is collected, which penetrates into catch basin 5, to be concentrated, so
It is discharged afterwards from drainpipe 3.
Further, the draining air-permeable layer 7 is made of polypropylene, and the grid of the draining air-permeable layer 7 is square,
Size of mesh opening is 3.9*3.9mm.
Further, the draining air-permeable layer 7 with a thickness of 1.53mm, the draining supporting layer 9 with a thickness of 1.97mm,
The cement granules barrier layer 10 with a thickness of 0.51mm.
The technical parameter of the gasket body 1 are as follows:
Further, hot melt is fixed with outer wear layer 8 on the outside of the draining supporting layer 9, and the outer wear layer 8 uses glass fibre
Be made, the outer wear layer 8 with a thickness of one millimeter, enhance abrasion resistance, prolong the service life, it is general one piece liner use
Number is 2-10 times.
Further, the cement granules barrier layer 10 includes outer rove layer of cloth 12, spun yarn layer of cloth 13 and interior rove layer of cloth
14, the outer rove layer of cloth 12, spun yarn layer of cloth 13 and interior rove layer of cloth 14, which successively stitch, to be woven in together, and the outer rove layer of cloth 12 is
It is made of geotextiles, the interior rove layer of cloth 14 is made of non-woven fabrics, improves the transmitance of water, stops cement granules logical
It crosses.
Further, it is adhesive with adhesive layer 11 on interior 14 outer surface of rove layer of cloth, the adhesive layer 11 is parallel or perpendicular
In line column, the draining air-permeable layer 7 are adhesive on adhesive layer 11, are conveniently fixed.
A roll liner is general 2.5 meters wide, 35 meters long, method for mounting lining:
(1) installation method in the long axis that the vertical direction of pouring is rolled up using form lining:
1. after opening and shearing, at least allowing liner is open and flat to warm 10 minutes;
2. nailing then along 25 millimeters of centers of tip edge;
3. installing setting tool in the overall length of liner in another side, liner is evened up by rotation setting tool edge, is then followed closely
On;
4. liner should be smooth in vertical direction, do not fold, if it is desired, can be tensed with setting tool, in 30~50mm
Heart district nails on;
It pads and checks 5. tensing, it is desirable that liner is distortionless and folds;
6. remaining liner repeats above step, until template all covers;
7. liner strip becomes increasingly thicker, careful operation reaches close connection, otherwise can use sealant in joint;
8. usable backing strips cover connector and nail;
9. using knife at template link bolt hole, some nails are used around hole;
10. evening up liner for some templates (height > 2.5m), aloft nailed in axis direction with the interval of 2.5m, then
Setting tool is loaded onto, to be evened up every time;
11. clips can be used for some templates (height > 2.5 meters), there is nail to avoid centre.
(2) installation method in long axis of the direction of pouring using form lining volume:
It is general to install for higher template if liner can only be installed in this way 1. the height of template is less than 2.5 meters
When by liner volume length direction it is consistent with the direction of casting;
2. installation method for example above-mentioned 4,6;
3. if it is perpendicular to the installation of casting direction, it is necessary to use setting tool, to ensure that liner is straight, tense.In corner
It is careful to distort.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
Claims (9)
1. a kind of river levee construction controlled permeability form lining, it is characterised in that: including gasket body (1), lower fixing piece
(2), it is adhesive with lower fixing piece (2) below the gasket body (1), lower fixing piece (2) both ends are inlaid with end cap (15), institute
It states end cap (15) to be integrated with lower fixing piece (2) gluing, be formed drainage hole (6) on the end cap (15), the drainage hole (6)
Upper hot-melt adhesive paste has drainpipe (3), and the gasket body (1) includes draining air-permeable layer (7) and cement granules barrier layer (10), institute
It states draining air-permeable layer (7) side to be adhesive with cement granules barrier layer (10), draining air-permeable layer (7) other side is adhesive with draining
Supporting layer (9).
2. a kind of river levee construction controlled permeability form lining according to claim 1, it is characterised in that: the draining
It is formed staged boss (4) on pipe (3) outer wall, the staged boss (4) has twice always.
3. a kind of river levee construction controlled permeability form lining according to claim 1, it is characterised in that: described lower solid
Determining part (2) is U-shaped structure, and the catch basin (5) is molded over lower fixing piece (2) inside, and the drainage hole (6) is communicated to catch basin
(5) interior bottom.
4. a kind of river levee construction controlled permeability form lining according to claim 1, it is characterised in that: the draining
Air-permeable layer (7) is made of polypropylene, and the grid of draining air-permeable layer (7) is square, size of mesh opening 3.9*3.9mm.
5. a kind of river levee construction controlled permeability form lining according to claim 1, it is characterised in that: the draining
Air-permeable layer (7) with a thickness of 1.53mm, draining supporting layer (9) with a thickness of 1.97mm, the cement granules barrier layer
(10) with a thickness of 0.51mm.
6. a kind of river levee construction controlled permeability form lining according to claim 1, it is characterised in that: the draining
Hot melt is fixed with outer wear layer (8) on the outside of supporting layer (9), and the outer wear layer (8) is made of glass fibre, described outer wear-resisting
Layer (8) with a thickness of one millimeter.
7. a kind of river levee construction controlled permeability form lining according to claim 1, it is characterised in that: the cement
Particulate barrier (10) includes outer rove layer of cloth (12), spun yarn layer of cloth (13) and interior rove layer of cloth (14), the outer rove layer of cloth
(12), spun yarn layer of cloth (13) and interior rove layer of cloth (14), which successively stitch, is woven in together, and the outer rove layer of cloth (12) is all made of geotechnique
Cloth is made, and the interior rove layer of cloth (14) is made of non-woven fabrics.
8. a kind of river levee construction controlled permeability form lining according to claim 7, it is characterised in that: described interior thick
It is adhesive with adhesive layer (11) on gauze layer (14) outer surface, the adhesive layer (11) is parallel or is vertically arranged, and the draining is ventilative
Layer (7) is adhesive on adhesive layer (11).
9. the installation method that controlled permeability form lining is used in a kind of river levee construction, which comprises the steps of:
Step 1: at least allowing liner is open and flat to warm 10 minutes after opening and shearing liner;
Step 2: nailing then along 25 millimeters of centers of tip edge;
Step 3: installing setting tool in the overall length of liner in another side, liner is evened up by rotation setting tool edge,
Then it nails on;
Step 4: liner should be smooth in vertical direction, do not fold, if it is desired, it can be tensed with setting tool, 30~
The center 50mm nails on;
It pads and checks Step 5: tensing, it is desirable that liner is distortionless and folds;
Step 6: remaining liner repeats above step, until template all covers;
Step 7: liner strip becomes increasingly thicker, careful operation reaches close connection, otherwise can use sealant in joint;
Step 8: backing strips can be used to cover connector and nail;
Step 9: using knife at template link bolt hole, some nails are used around hole;
Step 10: liner is evened up for some templates (height > 2.5m), nail is followed closely aloft with the interval of 2.5m in axis direction
Son is loaded on setting tool, to even up every time;
Step 11: clips can be used for some templates (height > 2.5 meters), there is nail to avoid centre.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910273128.8A CN109853472A (en) | 2019-04-04 | 2019-04-04 | A kind of river levee construction controlled permeability form lining |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910273128.8A CN109853472A (en) | 2019-04-04 | 2019-04-04 | A kind of river levee construction controlled permeability form lining |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109853472A true CN109853472A (en) | 2019-06-07 |
Family
ID=66903455
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910273128.8A Pending CN109853472A (en) | 2019-04-04 | 2019-04-04 | A kind of river levee construction controlled permeability form lining |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109853472A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111424523A (en) * | 2020-05-13 | 2020-07-17 | 成都亚佳工程新技术开发有限公司 | Anti-vacuum bearings and bridges |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4012301A1 (en) * | 1990-04-18 | 1991-10-24 | Huesker Synthetic Gmbh & Co | FORMWORK COVER |
CN2567293Y (en) * | 2002-08-21 | 2003-08-20 | 王恒涛 | Concrete form lining of easy regulating permeabitity |
CN2756750Y (en) * | 2003-11-06 | 2006-02-08 | 陈绍华 | Composite microporous film air penetration and water permeating concrete formwork cushion |
CN101328761A (en) * | 2008-07-29 | 2008-12-24 | 水利部交通部电力工业部南京水利科学研究院 | Multifunctional concrete form book-pad |
CN101929243A (en) * | 2010-07-12 | 2010-12-29 | 杭州银博交通工程材料有限公司 | Building template provided with water permeable device |
CN202441059U (en) * | 2012-01-11 | 2012-09-19 | 杭州银博交通工程材料有限公司 | Composite permeable template liner |
CN104314090A (en) * | 2014-08-29 | 2015-01-28 | 中铁八局集团建筑工程有限公司 | Deep foundation pit bedrock drainage culvert and drainage system and drainage construction method thereof |
CN106643365A (en) * | 2016-12-13 | 2017-05-10 | 中铁十九局集团第二工程有限公司 | Tunnel waste second lining blasting demolition and repairing construction method |
-
2019
- 2019-04-04 CN CN201910273128.8A patent/CN109853472A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4012301A1 (en) * | 1990-04-18 | 1991-10-24 | Huesker Synthetic Gmbh & Co | FORMWORK COVER |
CN2567293Y (en) * | 2002-08-21 | 2003-08-20 | 王恒涛 | Concrete form lining of easy regulating permeabitity |
CN2756750Y (en) * | 2003-11-06 | 2006-02-08 | 陈绍华 | Composite microporous film air penetration and water permeating concrete formwork cushion |
CN101328761A (en) * | 2008-07-29 | 2008-12-24 | 水利部交通部电力工业部南京水利科学研究院 | Multifunctional concrete form book-pad |
CN101929243A (en) * | 2010-07-12 | 2010-12-29 | 杭州银博交通工程材料有限公司 | Building template provided with water permeable device |
CN202441059U (en) * | 2012-01-11 | 2012-09-19 | 杭州银博交通工程材料有限公司 | Composite permeable template liner |
CN104314090A (en) * | 2014-08-29 | 2015-01-28 | 中铁八局集团建筑工程有限公司 | Deep foundation pit bedrock drainage culvert and drainage system and drainage construction method thereof |
CN106643365A (en) * | 2016-12-13 | 2017-05-10 | 中铁十九局集团第二工程有限公司 | Tunnel waste second lining blasting demolition and repairing construction method |
Non-Patent Citations (1)
Title |
---|
鄢俊,钱军: "《受控渗透性模板衬垫CPF》", 《中国水利》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111424523A (en) * | 2020-05-13 | 2020-07-17 | 成都亚佳工程新技术开发有限公司 | Anti-vacuum bearings and bridges |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7128497B2 (en) | Horizontally draining artificial turf system | |
CN203546888U (en) | Infiltration type rainwater filter well | |
CN109853472A (en) | A kind of river levee construction controlled permeability form lining | |
JPH0835281A (en) | Deck plate and floor construction method using the deck plate | |
ITMI20062400A1 (en) | ARTIFICIAL GRASS CARPET ARTIFICIAL GRASS WEIGHT STRUCTURE INCLUDING THE CARPET AND METHOD OF MANUFACTURING THE CARPET | |
CN208293331U (en) | The pavement structure and urban road of urban road | |
CN207079605U (en) | The prefabricated concrete gridiron of highway slope protection | |
EP1918483A2 (en) | Multi-layer decoupling and drainage system | |
EP2458109B1 (en) | Cover for a drainage | |
DE102015100583B4 (en) | Precast concrete element, use of a concrete recyclate and a viscose fiber material, production process for a self-cooling precast concrete element, methods for reducing the effect of urban heat islands, buildings and use of the precast concrete element | |
CN109605875A (en) | A kind of composite material blanket for filling cementitious material | |
DE2224862A1 (en) | USE OF WATER-CARRIED FULL-FIBER MATS FOR WATER DRAINAGE WITH FACILITIES IN BUILDING AND CIVIL ENGINEERING | |
JP5679148B2 (en) | Exterior wall construction method and mortar board | |
EP2837752B1 (en) | Floor system and fabricating method thereof | |
JP2012046971A (en) | Water permeable concrete plate | |
DE102008045769A1 (en) | Process for the production of plate coverings and ventilation and / or drainage material for carrying out the method | |
DE19528725C2 (en) | Surface sealing process for earthworks in hydraulic engineering | |
CN207079606U (en) | The anchor structure of the prefabricated concrete gridiron of highway slope protection | |
KR100200086B1 (en) | Construction method of drainage layer for structure protection and drainage material | |
CN213173676U (en) | Reverse filtering guide plate | |
CN113153073B (en) | Evaporate and press waterproof windowsill of aerated concrete | |
KR102539623B1 (en) | A making method of a composite expansion joint in road concrete structures and a construction method thereof | |
KR102262821B1 (en) | Groung reinforcementshaving fiber and ground reinforcementshaving structure using thereof | |
CN213477378U (en) | Wallboard heat insulation structure | |
RU2471920C1 (en) | Method to erect tiled fixation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190607 |