CN109839309A - A kind of delayed fracture pilot system - Google Patents

A kind of delayed fracture pilot system Download PDF

Info

Publication number
CN109839309A
CN109839309A CN201910122218.7A CN201910122218A CN109839309A CN 109839309 A CN109839309 A CN 109839309A CN 201910122218 A CN201910122218 A CN 201910122218A CN 109839309 A CN109839309 A CN 109839309A
Authority
CN
China
Prior art keywords
test specimen
load
delayed fracture
support
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910122218.7A
Other languages
Chinese (zh)
Inventor
陈成奎
李润哲
刘瑶
谭福瑞
胡悦
常连霞
李庆伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FAW Group Corp
Original Assignee
FAW Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FAW Group Corp filed Critical FAW Group Corp
Priority to CN201910122218.7A priority Critical patent/CN109839309A/en
Publication of CN109839309A publication Critical patent/CN109839309A/en
Pending legal-status Critical Current

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The present invention provides a kind of delayed fracture pilot system, including loading mechanism and control device, the loading mechanism includes fixed bottom plate, fixed top plate, elevator and support plate, the support plate is arranged on the fixed bottom plate, and the elevator is fixed between the fixed bottom plate and the fixed top plate;The support plate includes flat part and the support portion that the flat part both ends are arranged in, the support portion is used to support the both ends of test specimen, bottom interval pre-determined distance with flat part and the test specimen described in support notch compatible with the test specimen two ends shape, and it is formed with middle part notch, the center of the middle part notch is corresponding with the center of the test specimen;It is provided with pressure sensor on the elevator, load pressure head is provided on pressure sensor, and connect with the control device.The system is capable of the delayed fracture property of accurate evaluation test specimen, and simple, convenient, not only can guarantee that data were accurate, but also can use manpower and material resources sparingly, at low cost, high-efficient.

Description

A kind of delayed fracture pilot system
Technical field
The present invention relates to a kind of delayed fracture pilot systems, and in particular to a kind of high-strength metal material delayed fracture test System.
Background technique
Delayed fracture is that one of high-intensitive part important failure forms of aerial is equipped in the mechanical engineerings such as automobile, in addition to everybody understand compared with Except more automotive high intensity bolts, as bearing permanent stress for linking after fixed, locking, clamping etc. are assembled, such as interference Delayed fracture failure can all occur for the gear of cooperation, bearing, elastic element, the high-intensitive part locked or be locked etc..Cause This delayed fracture phenomenon has popularity and multiple, effective evaluation high-strength metal material on the mechanical engineerings such as automobile equipment Anti-delayed fracture performance and Accurate Determining stress and the relationship of delayed fracture time be of great significance.
The delayed fracture property of high-strength metal material is influenced by many factors, up to the present, there is no general comment Price card is quasi-.Current test method mainly has " permanent load formula test method ", " constant strain test method " and " bolt locking examination Test " etc..
The experimental rig schematic diagram of permanent load formula test method is as shown in Figure 1.Test principle is a notched circle Shape test specimen is subject to it by lever principle constant load (counterweight).The problem of test, is that there are stress in indentation, there It concentrates, can not accurately calculate stress, and efficiency is too low, not be able to satisfy actual requirement.
Constant strain test is wedge block to be squeezed into specific shape test specimen, therefore the problem of test method is can not to measure examination Stress suffered by part.
Bolt locking delayed fracture experimental rig is shown in Fig. 2, applies bolt with different torque loads, observes rupture time, The test can not measure accurate stress there are fracture position discreteness is big.
Therefore, the method currently used for evaluating the delayed fracture property of high-strength metal material cannot accurately measure application Stress, less can display real-time the stress (due to creep etc., stress suffered by test specimen be become) of application, and cleavage Set dispersed big, low efficiency, heavy workload etc..
Summary of the invention
In view of the above technical problems, the embodiment of the present invention provides a kind of delayed fracture pilot system, which can be real-time Stress suffered by high-strength material is measured, and then measures the relationship of suffered stress and rupture time, evaluates high duty metal material The anti-delayed fracture performance of material, and it is easy to operate, and the test specimen fracture position consistency after test is good.
The technical solution adopted by the present invention are as follows:
The embodiment of the present invention provides a kind of delayed fracture pilot system, including loading mechanism and control device, the load Mechanism includes fixed bottom plate, fixed top plate, elevator and support plate, and the support plate is arranged on the fixed bottom plate, described Elevator is fixed between the fixed bottom plate and the fixed top plate;The support plate includes flat part and setting described flat The support portion at smooth portion both ends, the support portion are used to support the both ends of test specimen, have compatible with the test specimen two ends shape The bottom interval pre-determined distance of flat part and the test specimen described in notch is supported, and is formed with middle part notch, the middle part notch Center it is corresponding with the center of the test specimen;It is provided with pressure sensor on the elevator, is set on the pressure sensor It is equipped with load pressure head, and is connect with the control device;
Wherein, make middle part of the load pressure head to the test specimen being placed in the support plate by operating elevator Position is loaded, until test specimen is broken or reaches the preset time, the pressure signal of load is sent out by the pressure sensor Give the control device;
The control device is used for the load time for recording and showing on-load pressure and keep under the on-load pressure, and base The relationship between pressure and time, and the on-load pressure based on the record are obtained in the on-load pressure of record and load time The maximum tension stress being subject on the outside of calculation testing piece, the stress of the maximum tension stress characterization test specimen delayed fracture.
Optionally, the elevator includes guide post, rotary components, ring flange, guide sleeve, guide plate, the guide post One end is fixed on the fixed bottom plate, and the other end is connect with the fixed top plate, and the rotary components include screw rod and installation Rotary body outside the screw rod, described screw rod one end are connect with the fixed top plate, and the other end is connect with the ring flange, Handle is provided on the rotary body;
The guide plate is covered in the guide post by guide sleeve, and the guide plate upper end is connect with the ring flange, Lower end is connect with the pressure sensor;
By rotating the handle, the screw rod is driven to rotate, and then drive the guide plate above and below the guide post It is mobile.
Optionally, the support portion is also formed with block, and the block is formed in the end of the support notch.
Optionally, further include protection hood for preventing post-rift test specimen from splashing.
Optionally, the opening passed through for the test specimen is formed on the shield.
Optionally, the control device is computer.
Delayed fracture pilot system provided in an embodiment of the present invention, since the bottom of support plate and test specimen bottom interval are default Distance, and it is formed with median slot, the center of the central notch and the center of test specimen are corresponding, and it is enough can to guarantee that test specimen has Bending deflection, when load, load pressure head faces the intermediate position of test specimen, and both ends are supported on the both ends of support plate.Such branch Fagging structure is allowed to load test specimen by the way of three-point bending, be converted by mechanics, and cut-in pressure senses Device, computer etc. show that load value on computers and record until fracture, can guarantee that test specimen is broken consistency, that is, break Split occur among test specimen position, while at any time show and record test specimen suffered by load, can show that test specimen stress because Creep and reduced numerical value, therefore, the reduction that load manner can be adjusted as needed to make up pressure because of creep, so that it is guaranteed that examination The accuracy of part stress.This makes it possible to accurately evaluate high-strength metal material anti-delayed fracture performance;Also can be used for evaluating The influence of different disposal technique and other techniques to high-strength metal material anti-delayed fracture performance also can be used by data accumulation In high-strength metal material anti-delayed fracture performance whether He Ge evaluation.In addition, it is simple, convenient, do not need test people Member's real-time monitoring, uses manpower and material resources sparingly.
Detailed description of the invention
Fig. 1 and Fig. 2 is respectively existing delay test schematic device;
Fig. 3 is the structural schematic diagram of delayed fracture pilot system provided in an embodiment of the present invention;
Fig. 4 is the structural schematic diagram of loading mechanism of the invention;
Fig. 5 is that load pressure head of the invention applies stressed schematic diagram to test specimen;
Fig. 6 to Fig. 8 is respectively the schematic diagram for showing the technical effect of delay experimental system of the invention;
Fig. 9 and Figure 10 is respectively the exemplary diagram of test specimen of the invention.
Specific embodiment
To keep the technical problem to be solved in the present invention, technical solution and advantage clearer, below in conjunction with attached drawing and tool Body embodiment is described in detail.
Fig. 3 is the structural schematic diagram of delayed fracture pilot system provided in an embodiment of the present invention;Fig. 4 is load of the invention The structural schematic diagram of mechanism;Fig. 5 is that load pressure head of the invention applies stressed schematic diagram to test specimen;Fig. 6 to Fig. 8 is respectively to use In the schematic diagram for the technical effect for showing delay experimental system of the invention;Fig. 9 and Figure 10 is respectively showing for test specimen of the invention Example diagram.
As shown in Figures 3 to 5, delayed fracture pilot system provided in an embodiment of the present invention, including loading mechanism 1 and control Device 4, the loading mechanism include that fixed bottom plate 16, fixed top plate 3, elevator and support plate 19, the support plate 19 are arranged On the fixed bottom plate 16, the elevator is fixed between the fixed bottom plate 16 and the fixed top plate 3;The support Plate 19 includes flat part and the support portion that the flat part both ends are arranged in, and the support portion is used to support the both ends of test specimen 18, With support notch compatible with the test specimen two ends shape, the bottom interval of the flat part and the test specimen it is default away from From, and it is formed with middle part notch, the center of the middle part notch is corresponding with the center of the test specimen;It is arranged on the elevator There is pressure sensor 15, load pressure head 17 is provided on the pressure sensor 15, and connect with the control device 4;Wherein, By operating elevator the load pressure head 17 is carried out to the intermediate position for the test specimen 18 being placed in the support plate 19 Load, until test specimen is broken or reaches the preset load time, the pressure signal of load is sent out by the pressure sensor 15 Give the control device 4;The control device 4 is for recording and showing the on-load pressure and keep under the on-load pressure Load time, and the on-load pressure based on record and load time obtain the relationship between pressure and time, and based on described The maximum tension stress being subject on the outside of the on-load pressure calculation testing piece of record, the maximum tension stress characterization test specimen delayed fracture are answered Power.
Delayed fracture pilot system provided in an embodiment of the present invention, since the bottom of support plate and test specimen bottom interval are default Distance, and it is formed with middle part notch, the center of the central notch and the center of test specimen are corresponding, can guarantee that test specimen has enough Bending deflection, when load, load pressure head faces the intermediate position of test specimen, and both ends are supported on support portion.Such support Hardened structure is allowed to load test specimen by the way of three-point bending, be converted by mechanics, and cut-in pressure senses Device, computer etc. show that load value on computers and record until fracture, can guarantee that test specimen is broken consistency, that is, break Split occur among test specimen position, while at any time show and record test specimen suffered by load, can show that test specimen stress because Creep and reduced numerical value, therefore, the reduction that load manner can be adjusted as needed to make up pressure because of creep, so that it is guaranteed that examination The accuracy of part stress.This makes it possible to accurately evaluate high-strength metal material anti-delayed fracture performance;Also can be used for evaluating The influence of different disposal technique and other techniques to high-strength metal material anti-delayed fracture performance also can be used by data accumulation In high-strength metal material anti-delayed fracture performance whether He Ge evaluation.In addition, it is simple, convenient, do not need test people Member's real-time monitoring, uses manpower and material resources sparingly.
It should be noted that the present invention is to the distance between support plate bottom and test specimen bottom, i.e. flat part and test specimen bottom The distance in portion is not particularly limited, and also there is no limit as long as can guarantee that test specimen stress is bent to the depth of middle part notch The interference of discord flat part, while as far as possible after the fracture of guarantee test specimen also on the supporting plate, in one example, middle part notch Depth can be 30mm.In addition, also there is no limit in one example, can be about 6mm to the depth of the support notch of support plate.
In addition, support portion is also formed with block in the embodiment of the present invention, the block is formed in the end of the support notch Portion.Test specimen is limited by the block, test specimen is directly placed into, clamping is not needed, has both guaranteed stress among test specimen Dimensional uniformity, but convenient for test specimen installation, disassembly, and avoid fracture when splashing.
Further, as shown in figure 4, the elevator may include guide post 9, rotary components, ring flange 11, guide sleeve 13, guide plate 14, described 9 one end of guide post are fixed on the fixed bottom plate 16, and the other end is connect with the fixed top plate 3, It can be specifically fixed on fixed top plate 3 by locking nut 7 and elastic washer 8.The rotary components may include screw rod 10 and peace Rotary body outside the screw rod, described 10 one end of screw rod are connect with the fixed top plate 3, the other end and the ring flange 11 connect, and are provided with handle 2 on the rotary body;The guide plate 14 passes through 13 sets of guide sleeve in the guide post 9, described 14 upper end of guide plate is connect with the ring flange 11, and lower end is connect with the pressure sensor 5;By rotating the handle 2, band It moves the screw rod 10 to rotate, and then the guide plate 14 is driven to move up and down along the guide post 9.Specifically, of the invention real It applies in example, rotary components can be existing structure, that is, handle 2 can be connect by turbine with screw rod 10, as long as can pass through rotation Any structure that handle 2 drives screw rod 10 to rotate is ok, and the present invention is not particularly limited.Between ring flange 11 and guide plate 14 It is fixed together by bolt (preferably 4 bolts), the lower end of guide plate 14 passes through bolt (preferably 4 bolts) and pressure Sensor 15 is fixed together, and load pressure head 17 is mounted on the lower part of pressure sensor 15, and 14 both ends of guide plate are formed with through-hole, Guide sleeve 13 in the through hole and is covered outside guide post 9 by interference fit installation.In this way, test specimen 18 is placed on support plate 19 After upper, by operation handle 2, screw rod 10 is rotated with it, and ring flange 11 is driven to move up and down, and then drives guide plate 14 along guiding Column 9 slides up and down, final that load pressure head 17 is driven to move up and down, and realizes the load and unloading to test specimen 18.
Further, delayed fracture pilot system provided in an embodiment of the present invention may also include shield, try for preventing It splashes after part fracture.Shield can be split type structure, including two covers, be pacified respectively from fixed 16 both ends bottom of bottom plate Dress, covers support plate, flies out to prevent the test specimen of fracture from splashing in test.It can be placed in corresponding test specimen on each cover Position is provided with aperture, so as to be put into test specimen by aperture.
In embodiments of the present invention, the control device 4 can be computer.For example, being equipped with the general of conversion program software Pressure signal can be converted to pressure with maximum stress relationship according to the pressure suffered by test specimen by logical computer, the program software Value, and at interval of after a certain period of time, pressure value and time can be recorded in Excel table simultaneously, it is automatic after fracture Stop.
In embodiments of the present invention, the test specimen 18 can be made of high-strength metal material, such as pin, bolt etc., such as Fig. 9 With shown in Figure 10.
To improve efficiency, delayed fracture pilot system provided in an embodiment of the present invention may include multiple loading mechanisms, one In example, it may include 3 groups of loading mechanisms and 1 computer and shield, every group of loading mechanism include that 1 band installs notch Support plate, 1 elevator and 1 pressure sensor, therefore every group of loading mechanism can test a test specimen.It can also be according to need N number of (N is greater than 3) loading mechanism is set, while testing N number of test specimen.
The use of [embodiment 1] delayed fracture pilot system
It is first turned on shield, test specimen is put on the notch of support plate 19, if necessary to simultaneously to three test specimens It is tested, then three test specimens is respectively put on the notch of 3 support plates 19.Shield is closed, opens and calculates Machine display 4, start delay destructive test control program, calibrate respectively to each loading mechanism, setting record pressure value Time interval rotates the handle 2 of three elevators respectively, and each elevator is connected with 1 pressure sensor, pressure sensor There are load pressure head 17 in 15 lower ends, and with the rotation of lifting cleaner handgrip, elevator belts dynamic pressure force snesor 15 and load pressure head 17 are moved It is dynamic, test specimen is laterally loaded to realize, load is shown on computer display 4, as needed can be respectively to three test specimens Apply different load, that is, the method for three-point bending is taken to apply moment of flexure, and the pressure according to suffered by test specimen and maximum to test specimen Stress relation formula (1) calculates maximum tension stress suffered by test specimen.The stress is the stress of test specimen delayed fracture.
In formula: σmaxFor maximum tension stress;MmaxFor maximal bending moment;W is bending resistant section coefficient;P is the pressure applied;L is The distance between two support portion of support plate;D is the diameter of test specimen.
After test specimen fracture, group test is terminated, and does not influence other groups of tests, and the delay according to computer record in this way is disconnected The relationship for splitting the time between the load that is laterally applied to, so that it may obtain the relationship of delayed fracture time and tensile stress.The present apparatus is each It is relatively independent between a loading mechanism, it is independent of each other, and simple, convenient.
[embodiment 2] replaces test specimen
It, should after delayed fracture occurs for one of test specimen when being tested using test delay system of the invention Test terminates, and does not influence other specimen tests.New test specimen is such as needed to change, the hand of loading mechanism where need to only rotating fracture specimen Handle 2 makes pressure sensor 15 and load pressure head 17 be raised above enough distances, removes shield, takes out fracture specimen, will be new Test specimen is put into the notch of support plate 19, closes shield.Start the corresponding program of the mechanism in computer terminal, is carried Record pressure value time interval is set as needed in lotus calibration.Rotating handle 2 loads test specimen, and the load is in Computer display It is shown on device, adjustment handle 2 makes the load applied meet test requirements document.Part completion is changed, whole process does not influence the examination of other test specimens It tests.
[embodiment 3] adjusts load
In the load initial stage, since creep occurs, load reduction is very fast, if you need to adjust load, can pass through rotation pair Loading mechanism handle 2 is answered, while observing the load value on computer display, until reaching requirement.Or due to other Reason needs to adjust load value, can all carry out according to the above method, does not influence other groups of specimen tests.
[practical application example]
Test material and technique
The selection of material: 40Cr, 35CrMo;Specification: Φ 10 × 230;
35CrMo technique: cold-drawn-annealing-blanking -100 DEG C of polishing-quenching-tempering-plating;
40Cr technique: cold-drawn-annealing-blanking -100 DEG C of polishing-quenching-tempering-heat treatment;
Material chemical composition is as shown in table 1 below:
Table 1: raw material chemical component (WT%)
Chemical component C S P Mn Si Cr Mo
40Cr 0.40 <0.005 0.015 0.77 0.21 1.06 --
35CrMo 0.37 0.007 0.019 0.80 0.20 1.07 0.18
Test result
Table 2 is the initial data of single-piece test specimen test, and record time interval is 1 minute, disconnected according to the available test specimen of table 2 The pressure of the correct time and application that split, while the pressure value of available different time points.It is disconnected to obtain pressure and delay Split the relationship of time.
The initial data of 2 single-piece test specimen of table test
Table 3 is the delay of 18 groups of 40Cr test specimens using result, it follows that the delayed fracture time and pressure relationship such as Shown in Fig. 6.It will be appreciated from fig. 6 that the delayed fracture time it is overall increase with the reduction of pressure, when pressure reduction to 3.22 (KN) with Delayed fracture will not be occurring when lower.
3 40Cr specimen test pressure of table and delayed fracture time
Pressure (KN) 3.23 3.24 3.32 3.33 3.33 3.35 3.43 3.51 3.53
Time (second) 9480 22260 2820 3420 11220 4980 9060 4620 3240
Log10T 3.98 4.35 3.45 3.53 4.05 3.70 3.96 3.66 3.51
Pressure (KN) 3.53 3.63 3.63 3.72 3.92 4.02 3.19 3.22 3.25
Time (second) 3300 3960 4200 6300 1980 4140 Do not break Do not break Do not break
Log10T 3.52 3.60 3.62 3.80 3.30 3.62 - - -
The obtained rupture time of delayed fracture test result of 18 groups of 35CrMo test specimens and the relationship of pressure are shown in Table 4 and Fig. 7. As shown in Figure 7 the delayed fracture time it is overall increase with the reduction of pressure, when pressure reduction to 4.42 (KN) below when do not exist Delayed fracture occurs.
4 35CrMo specimen test pressure of table and delayed fracture time
The relationship of delayed fracture time and pressure that 35CrMo test specimen electroplating processes and non-electroplating processes specimen test obtain Curve is shown in Fig. 8, and as shown in Figure 8, compared with not electroplating processes sample, the time of electroplated sample at very low pressures, very short is just Delayed fracture occurs, illustrates that delayed fracture is sensitive to plating.
Sample can be as shown in Figure 9 and Figure 10 after delay test device experiment of the present invention, after can be seen that test by Fig. 9 and Figure 10 Test specimen fracture position consistency is fine, that is, is broken and the position among test specimen occurs;And bolt locks delayed fracture experimental rig Sample fracture position occurs at screw thread or at the angle bolt R after test, and fracture position dispersibility is big.
Embodiment described above, only a specific embodiment of the invention, to illustrate technical solution of the present invention, rather than It is limited, scope of protection of the present invention is not limited thereto, although having carried out with reference to the foregoing embodiments to the present invention detailed Illustrate, those skilled in the art should understand that: anyone skilled in the art the invention discloses In technical scope, it can still modify to technical solution documented by previous embodiment or variation can be readily occurred in, or Person's equivalent replacement of some of the technical features;And these modifications, variation or replacement, do not make corresponding technical solution Essence is detached from the spirit and scope of technical solution of the embodiment of the present invention, should be covered by the protection scope of the present invention.Therefore, The protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (6)

1. a kind of delayed fracture pilot system, which is characterized in that including loading mechanism and control device, the loading mechanism includes Fixed bottom plate, fixed top plate, elevator and support plate, the support plate are arranged on the fixed bottom plate, and the elevator is solid It is scheduled between the fixed bottom plate and the fixed top plate;The support plate includes flat part and is arranged at the flat part both ends Support portion, the support portion is used to support the both ends of test specimen, has support notch compatible with the test specimen two ends shape The bottom interval pre-determined distance of the flat part and the test specimen, and be formed with middle part notch, the center of the middle part notch with The center of the test specimen is corresponding;It is provided with pressure sensor on the elevator, load is provided on the pressure sensor Pressure head, and connect with the control device;
Wherein, by operate elevator make the load pressure head to the intermediate position of the test specimen being placed in the support plate into Row load, until test specimen is broken or reaches the preset time, the pressure signal of load is sent to by the pressure sensor The control device;
The control device is used for the load time for recording and showing on-load pressure and keep under the on-load pressure, and based on note The on-load pressure of record and load time obtain the relationship between pressure and time, and the on-load pressure based on the record calculates The maximum tension stress being subject on the outside of test specimen, the stress of the maximum tension stress characterization test specimen delayed fracture.
2. delayed fracture pilot system according to claim 1, which is characterized in that the elevator includes guide post, rotation Turn component, ring flange, guide sleeve, guide plate, described guide post one end is fixed on the fixed bottom plate, the other end with it is described solid Determine top plate connection, the rotary components include screw rod and the rotary body that is mounted on outside the screw rod, described screw rod one end and institute Fixed top plate connection is stated, the other end is connect with the ring flange, is provided with handle on the rotary body;
The guide plate is covered in the guide post by guide sleeve, and the guide plate upper end is connect with the ring flange, lower end It is connect with the pressure sensor;
By rotating the handle, the screw rod is driven to rotate, and then the guide plate is driven to move up and down along the guide post.
3. delayed fracture pilot system according to claim 1, which is characterized in that the support portion is also formed with block, The block is formed in the end of the support notch.
4. delayed fracture pilot system according to claim 1, which is characterized in that further include for preventing post-rift examination The protection hood that part splashes.
5. delayed fracture pilot system according to claim 4, which is characterized in that be formed with described in confession on the shield The opening that test specimen passes through.
6. delayed fracture pilot system according to claim 1, which is characterized in that the control device is computer.
CN201910122218.7A 2019-02-19 2019-02-19 A kind of delayed fracture pilot system Pending CN109839309A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910122218.7A CN109839309A (en) 2019-02-19 2019-02-19 A kind of delayed fracture pilot system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910122218.7A CN109839309A (en) 2019-02-19 2019-02-19 A kind of delayed fracture pilot system

Publications (1)

Publication Number Publication Date
CN109839309A true CN109839309A (en) 2019-06-04

Family

ID=66884752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910122218.7A Pending CN109839309A (en) 2019-02-19 2019-02-19 A kind of delayed fracture pilot system

Country Status (1)

Country Link
CN (1) CN109839309A (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1032396A (en) * 1988-01-23 1989-04-12 东北工学院 A kind of rod-type device for measuring performances of feature and fragmenting due to impact
JPH06221978A (en) * 1993-01-22 1994-08-12 Sumitomo Metal Ind Ltd Delayed destruction evaluation test device for high strength steel pipe
KR20010060853A (en) * 1999-12-28 2001-07-07 이구택 Method for crack length measurement during delayed fracture
JP2005189064A (en) * 2003-12-25 2005-07-14 Toshiba Corp Small-sized fatigue tester and fatigue test method
JP2007199024A (en) * 2006-01-30 2007-08-09 Toyota Motor Corp Method for delayed fracture test on ferrous material, method for delayed fracture of bolt and fixture for delayed fracture test
JP2010243387A (en) * 2009-04-08 2010-10-28 Mitsubishi Electric Corp Delayed destructive test method and tester by indentation method
CN203965258U (en) * 2014-06-28 2014-11-26 长安大学 The test unit of the anti-cold cracking property of a kind of pitch beam
CN104251798A (en) * 2013-06-26 2014-12-31 宝山钢铁股份有限公司 High-strength bolt delayed fracture test method and apparatus thereof
CN106164319A (en) * 2013-12-11 2016-11-23 安赛乐米塔尔公司 There is martensite steel and the manufacture method of delayed fracture resistance
CN106525599A (en) * 2015-09-11 2017-03-22 肖特股份有限公司 Apparatus and method for testing the strength of sheets made of hard brittle material
CN108627402A (en) * 2018-05-09 2018-10-09 哈尔滨工业大学 A kind of test equipment and method of analysis pitch freezing crack performance
CN208366717U (en) * 2018-04-12 2019-01-11 渤海船舶职业学院 A kind of autobody sheet camber beam delayed fracture test automated watch-keeping facility
CN209992277U (en) * 2019-02-19 2020-01-24 中国第一汽车股份有限公司 Delayed fracture test system

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1032396A (en) * 1988-01-23 1989-04-12 东北工学院 A kind of rod-type device for measuring performances of feature and fragmenting due to impact
JPH06221978A (en) * 1993-01-22 1994-08-12 Sumitomo Metal Ind Ltd Delayed destruction evaluation test device for high strength steel pipe
KR20010060853A (en) * 1999-12-28 2001-07-07 이구택 Method for crack length measurement during delayed fracture
JP2005189064A (en) * 2003-12-25 2005-07-14 Toshiba Corp Small-sized fatigue tester and fatigue test method
JP2007199024A (en) * 2006-01-30 2007-08-09 Toyota Motor Corp Method for delayed fracture test on ferrous material, method for delayed fracture of bolt and fixture for delayed fracture test
JP2010243387A (en) * 2009-04-08 2010-10-28 Mitsubishi Electric Corp Delayed destructive test method and tester by indentation method
CN104251798A (en) * 2013-06-26 2014-12-31 宝山钢铁股份有限公司 High-strength bolt delayed fracture test method and apparatus thereof
CN106164319A (en) * 2013-12-11 2016-11-23 安赛乐米塔尔公司 There is martensite steel and the manufacture method of delayed fracture resistance
CN203965258U (en) * 2014-06-28 2014-11-26 长安大学 The test unit of the anti-cold cracking property of a kind of pitch beam
CN106525599A (en) * 2015-09-11 2017-03-22 肖特股份有限公司 Apparatus and method for testing the strength of sheets made of hard brittle material
CN208366717U (en) * 2018-04-12 2019-01-11 渤海船舶职业学院 A kind of autobody sheet camber beam delayed fracture test automated watch-keeping facility
CN108627402A (en) * 2018-05-09 2018-10-09 哈尔滨工业大学 A kind of test equipment and method of analysis pitch freezing crack performance
CN209992277U (en) * 2019-02-19 2020-01-24 中国第一汽车股份有限公司 Delayed fracture test system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王学双;庄厚川;曹广祥;王保男;: "高强度钢板延迟断裂试验方法研究进展", 汽车工艺与材料, no. 12 *

Similar Documents

Publication Publication Date Title
Boehler et al. A new direct biaxial testing machine for anisotropic materials
AU2012203962B2 (en) Pipe reel load simulator
CN109855963A (en) A kind of tensile shear combination ductile fracture experimental system and experimental method
CN107941610A (en) A kind of high molecular material ageing-resistant performance evaluation test method and device
CN109342219A (en) A kind of coating testing device for shear strength
KR100406154B1 (en) Apparatus for indentation test, method for measuring data of indentation test and mechanical properties using it, and record medium saving method for measuring mechanical properties
Zheng et al. Creep life prediction of small punch creep testing specimens for service-exposed Cr5Mo using the theta-projection method
CN109839309A (en) A kind of delayed fracture pilot system
CN110031281B (en) Method for determining steel type
JP5177541B2 (en) Specimen gripping device for tension / compression test of non-spindle composite and test method using the same
CN110346223A (en) Bending shear coupling test device
CN209992277U (en) Delayed fracture test system
RU179920U1 (en) Device for determining the adhesion of coatings to the substrate
CN113533674A (en) Quantitative evaluation method for creep damage microstructure evolution of heat-resistant steel
CN207066892U (en) A kind of universal testing machine of fast quick-detach
RU2413098C1 (en) Procedure for facilitating bearing capacity of metal structure with bolts of high strength
RU2624616C1 (en) Method for determining strength of coating adhesion to metal base
CN113218604B (en) Device and method for measuring local rigidity of door limiter hole
RU102801U1 (en) DEVICE FOR TESTING STRENGTH PROPERTIES OF STRUCTURAL MATERIALS
US20080141763A1 (en) Portable Magnetic Hardness Tester
RU2292028C1 (en) Method of determining residual service life of metallic structures
CN211877630U (en) Concrete uniaxial tensile testing machine
CN107588954B (en) Testing machine for testing bearing inclined loading force
JP6901433B2 (en) measuring device
Singh Accelerated Creep Testing in High-Temperature Alloys

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication