CN109821362A - A kind of partition desulfurizer of fume desulfurizing tower - Google Patents
A kind of partition desulfurizer of fume desulfurizing tower Download PDFInfo
- Publication number
- CN109821362A CN109821362A CN201910198822.8A CN201910198822A CN109821362A CN 109821362 A CN109821362 A CN 109821362A CN 201910198822 A CN201910198822 A CN 201910198822A CN 109821362 A CN109821362 A CN 109821362A
- Authority
- CN
- China
- Prior art keywords
- desulfurizer
- left end
- fixing piece
- sliding
- jacking block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Landscapes
- Treating Waste Gases (AREA)
Abstract
The invention discloses a kind of partition desulfurizers of fume desulfurizing tower, it is mounted in the tower body of desulfurizing tower, the left end and top of tower body are respectively equipped with smoke inlet, exhanst gas outlet, the inside of tower body is equipped with desulfurization chamber, fixing piece including being fixed on desulfurization chamber middle-end, the lower end of fixing piece is equipped with desulfurizer, fixing piece, the left end of tower body is equipped with absorbent pipeline, the upper end of desulfurizer is equipped with the atomizer with absorbent pipeline connection, the upper end of desulfurizer is equipped with through-hole, upper end inside fixing piece is equipped with stepper motor, the output shaft of stepper motor is successively linked with overhead cam from top to bottom, second driving gear.The present invention has the advantages that the desulfurization for being mounted on desulfurizing tower is intracavitary, desulfurization is carried out after flue gas capable of being separated again, flue gas and misty absorbent time of contact are long, and contact area is big, so that the not long desulfurization of partial fume avoided just to discharge, effectively improves desulfurization effect.
Description
Technical field
The present invention relates to a kind of desulfurizing tower more particularly to a kind of partition desulfurizers of fume desulfurizing tower.
Background technique
Desulfurizing tower is the tower equipment that desulfurization process is carried out to industrial waste gas.Existing desulfurizing tower mainly has the disadvantage that:
1, flue gas and the contact dynamics of misty absorbent are limited, and contact area is uneven, bad desulfurization effects.Not only desulfurization is not thorough,
2, during flue gas and misty absorbent contact, flue gas is in cylinder and misty absorbent contact, this way of contact, flue gas
It is limited with the contact area of misty absorbent, lead to bad desulfurization effects.
So needing a kind of partition desulfurizer of fume desulfurizing tower, the desulfurization for being mounted on desulfurizing tower is intracavitary, can be by flue gas
Desulfurization is carried out after partition again, flue gas and misty absorbent time of contact are long, and contact area is big, to avoid partial fume not long
Desulfurization is just discharged, and desulfurization effect is effectively improved.
Summary of the invention
The main purpose of the present invention is to provide a kind of partition desulfurizers of fume desulfurizing tower, are mounted on the de- of desulfurizing tower
Sulphur is intracavitary, carries out desulfurization after capable of separating flue gas again, flue gas and misty absorbent time of contact are long, and contact area is big, to keep away
Exempt from there is the not long desulfurization of partial fume just to discharge, effectively improves desulfurization effect.
To achieve the above objectives, the technical solution adopted by the present invention are as follows: a kind of partition desulfurizer of fume desulfurizing tower, packet
Fixing piece is included, the lower end of the fixing piece is equipped with desulfurizer, and the fixing piece left end is equipped with absorbent pipeline, the desulfurizer
Upper end is equipped with atomizer with the absorbent pipeline connection, and the upper end of the desulfurizer is equipped with through-hole, in the fixing piece
The upper end in portion is equipped with stepper motor, and the output shaft of the stepper motor is successively linked with overhead cam, the second driving tooth from top to bottom
It takes turns, movable chamber is equipped in the fixing piece, the left end of the movable chamber is equipped with circular hole, and the left end of the circular hole is equipped with to be led to described
First board slot of hole connection, the left end of the through-hole are equipped with the second board slot, and the left end of the overhead cam is equipped with the second jacking block, described
The left end of second jacking block is equipped with connecting rod, and the left end of the connecting rod is equipped with the partition panel for opening and closing the through-hole, described
The activity of overhead cam, second jacking block is in the movable chamber, the left end of second jacking block and the left end of the movable chamber
Between be connected with the pressure spring being set in the connecting rod, second jacking block is pressed on described under the active force of the pressure spring
On the working face of overhead cam, for the connecting rod slide fit in the circular hole, the partition panel is slidingly located at described first
On board slot, second board slot, the right end of second driving gear is engaged with second be rotationally located in the fixing piece
Driven gear, second driving gear is identical as second driven gear, the lower end of second driven gear be equipped with
The transmission mechanism that second driven gear matches, the left end of the transmission mechanism are equipped with for opening and closing the desulfurizer and inciting somebody to action
The jack that the flue gas handled pushs out, the transmission mechanism are matched with the jack.
Further, the transmission mechanism include shaft and the cam path that is rotationally located in the fixing piece under it is convex
Wheel, the upper end of the shaft and second driven gear are bonded, and the lower cam is connected to the middle-end of the shaft, and described turn
The lower end of axis is linked with the disk being rotationally located in the fixing piece, and the side wall of the disk is equipped with identical first segment tooth
With second segment tooth, the left end of the disk, which is equipped with, to be cooperated with first segment tooth, second segment tooth and is rotationally located in the fixing piece
Transmission gear, the left back of the transmission gear is engaged with screw gear, and the center of the screw gear is linked with screw rod, institute
The right end for stating desulfurizer is equipped with square hole, and third sliding slot, the square hole are connected between the right end of the square hole and the cam path
Rear end be equipped with first sliding groove, screw rod rotation and be not located at movably in the first sliding groove, it is sliding in the first sliding groove
Equipped with the first sliding block, the center of first sliding block is connect with the wire rod thread, the front end of first sliding block and the receipts
Laying mechanism is fixedly connected, and the third sliding slot, the square hole, the lower cam are matched with the jack.
Further, the jack includes four pieces of folded sheets hinged between adjacent, is fixed on first sliding block
The draw runner of front end and slide fit on the square hole, the right end of the draw runner are equipped with the first jacking block, the left end of first jacking block with
The spring being set on the draw runner, work of first jacking block in the spring are connected between the left end of the third sliding slot
It is firmly pressed on down on the working face of the lower cam, pushing block, the pushing block, institute is fixed on the left of first jacking block lower end
It states the first jacking block to match with the third sliding slot, the left end of the draw runner is fixed with fixing sleeve, and the fixing sleeve is hinged on
The left end of the first piece of folded sheet in left side, the middle-end of the draw runner are arranged there are two sliding sleeve, and two sliding sleeves are respectively articulated with
The right end of the 4th piece of folded sheet, the left side folded sheet, the front and back of the 4th piece of folded sheet in left side second piece of left side
End is symmetrically arranged with the second sliding block, and the front and back side of the desulfurizer right end is symmetrically arranged with second sliding slot, and the second sliding block slide fit exists
In the second sliding slot.
Further, rubber strip is equipped between adjacent two folded sheets.
Further, the angle between first segment tooth and second segment tooth is 115 degree, and the angle of first segment tooth is 25 degree.
The present invention has the advantages that the desulfurization for being mounted on desulfurizing tower is intracavitary, desulfurization, flue gas are carried out after flue gas capable of being separated again
Long with misty absorbent time of contact, contact area is big, so that the not long desulfurization of partial fume avoided just to discharge, effectively improves
Desulfurization effect.
Detailed description of the invention
Fig. 1 is structural schematic diagram according to the present invention;
Fig. 2 is cross-sectional view when through-hole according to the present invention is closed and the under shed of desulfurizer is closed;
Fig. 3 is cross-sectional view when through-hole according to the present invention is opened and the under shed of desulfurizer is closed;
Fig. 4 is cross-sectional view when through-hole according to the present invention is opened and the complete flue gas of desulfurization is discharged;
Fig. 5 is cross-sectional view when the complete flue gas of desulfurization according to the present invention has been discharged and through-hole is closed;
Fig. 6 is cross-sectional view when through-hole according to the present invention is closed and the under shed of desulfurizer is opened;
Fig. 7 is the portion the A enlarged drawing of Fig. 1;
Fig. 8 is the B-B cross-sectional view of Fig. 2;
Fig. 9 is disk, transmission gear, screw gear when through-hole according to the present invention is closed and the under shed of desulfurizer is opened
Top view;
Figure 10 is disk, transmission gear, screw rod tooth when through-hole according to the present invention is closed and the under shed of desulfurizer is closed
The top view of wheel;
Figure 11 is disk, transmission gear, screw rod tooth when through-hole according to the present invention is opened and the under shed of desulfurizer is closed
The top view of wheel;
Figure 12 is disk, transmission gear, screw rod tooth when through-hole according to the present invention is opened and the complete flue gas of desulfurization is discharged
The top view of wheel;
Figure 13 is disk, transmission gear, screw rod tooth when the complete flue gas of desulfurization according to the present invention has been discharged and through-hole is closed
The top view of wheel;
Figure 14 is disk, transmission gear, screw rod tooth when through-hole according to the present invention is closed and the under shed of desulfurizer is opened
The top view of wheel.
Figure 15 is the portion the C enlarged drawing of Fig. 4;
Figure 16 is the top view of overhead cam according to the present invention.
Specific embodiment
It is described below for disclosing the present invention so that those skilled in the art can be realized the present invention.It is excellent in being described below
Embodiment is selected to be only used as illustrating, it may occur to persons skilled in the art that other obvious modifications.
As shown in Fig. 1 to Figure 16, a kind of partition desulfurizer of fume desulfurizing tower, to achieve the above objectives, the present invention is adopted
Technical solution are as follows: a kind of partition desulfurizer of fume desulfurizing tower is mounted in the tower body 1 of desulfurizing tower, the left end of tower body 1
It is respectively equipped with smoke inlet 2, exhanst gas outlet 3 with top, the inside of tower body 1 is equipped with desulfurization chamber, including is fixed on desulfurization chamber middle-end
Fixing piece 4, the lower end of fixing piece 4 is equipped with desulfurizer, fixing piece 4, tower body 1 left end be equipped with absorbent pipeline, desulfurizer
Upper end is equipped with the atomizer 27 with absorbent pipeline connection, and the upper end of desulfurizer is equipped with through-hole 10, the upper end inside fixing piece 4
Equipped with stepper motor 5, the output shaft of stepper motor 5 is successively linked with overhead cam 30, the second driving gear 11 from top to bottom, fixed
Movable chamber is equipped in part 4, the left end of movable chamber is equipped with circular hole, and the left end of circular hole is equipped with the first board slot being connected to through-hole 10, leads to
The left end in hole 10 is equipped with the second board slot, and the left end of overhead cam 30 is equipped with the second jacking block 31, and the left end of the second jacking block 31 is equipped with connection
Bar 32, the left end of connecting rod 32 are equipped with the partition panel 33 for opening and closing through-hole 10, and overhead cam 30, the second activity of jacking block 31 exist
In movable chamber, it is connected with the pressure spring being set in connecting rod 32 between the left end of the second jacking block 31 and the left end of movable chamber, second
Jacking block 31 is pressed on the working face of overhead cam 30 under the active force of pressure spring, and 32 slide fit of connecting rod is in circular hole, partition panel 33
Slidingly it is located at the first board slot, on the second board slot, the right end of the second driving gear 11, which is engaged with, is rotationally located at fixing piece 4
The second interior driven gear 12, the second driving gear 11 is identical as the second driven gear 12, and the lower end of the second driven gear 12 is set
There is the transmission mechanism matched with the second driven gear 12, the left end of transmission mechanism is equipped with for opening and closing desulfurizer and will handle
The jack that pushs out of flue gas, transmission mechanism matches with jack.The roundlet of the great circle and overhead cam of overhead cam
Center is consistent.
Transmission mechanism include shaft 13 and the cam path that is rotationally located in fixing piece 4 in lower cam 14, shaft 13
Upper end and the second driven gear 12 are bonded, and lower cam 14 is connected to the middle-end of shaft 13, and the lower end of shaft 13 is linked with rotationally
The side wall of the disk 15 being located in fixing piece 4, disk 15 is equipped with identical first segment tooth and second segment tooth, the left end of disk 15
Equipped with first segment tooth, second segment tooth engagement and be rotationally located at transmission gear 16 in fixing piece 4, transmission gear 16 it is left back
Side is engaged with screw gear 17, and the center of screw gear 17 is linked with screw rod 18, and the right end of desulfurizer is equipped with square hole 24, square hole 24
Right end and cam path between be connected with third sliding slot, the rear end of square hole 24 is equipped with first sliding groove 25, and screw rod 18 is rotated and do not moved
It is located in first sliding groove 25 dynamicly, the first sliding block 19, the center of the first sliding block 19 and 18 spiral shell of screw rod is equipped in first sliding groove 25
Line connection, the front end of the first sliding block 19 is fixedly connected with jack, and third sliding slot, square hole 24, lower cam 14 are and radio and tape player
Structure matches.The center of roundlet of great circle and lower cam of lower cam 14 is consistent.
Jack includes four pieces of folded sheets 23 hinged between adjacent, is fixed on 19 front end of the first sliding block and slide fit in side
Draw runner 20 on hole 24, the right end of draw runner 20 are equipped with the first jacking block 21, the left end of the left end of the first jacking block 21 and third sliding slot it
Between be connected with the spring being set on draw runner 20, the first jacking block 21 is pressed on the working face of lower cam 14 under the force of a spring
On, pushing block 22 is fixed on the left of 21 lower end of the first jacking block, pushing block 22, the first jacking block 21 are matched with third sliding slot, draw runner
20 left end is fixed with fixing sleeve, and fixing sleeve is hinged on the left end of the first piece of folded sheet 23 in left side, and the middle-end of draw runner 20 is arranged with
Two sliding sleeves 29, two sliding sleeves 29 are respectively hinged at the right end of the 4th piece of second piece of folded sheet 23 in left side, left side folded sheet 23, left
The front and back end of the 4th piece of folded sheet 23 in side is symmetrically arranged with the second sliding block 28, and the front and back side of desulfurizer right end is symmetrically arranged with second sliding slot
26,28 slide fit of the second sliding block is in second sliding slot 26.
Rubber strip is equipped between adjacent two folded sheet 23.
Angle between first segment tooth and second segment tooth is 115 degree, and the angle of first segment tooth is 25 degree.
Its working principle is that: flue gas enters desulfurization chamber from smoke inlet, and the left side of partition leads in the second board slot at this time
Hole is enclosed, the great circle of lower cam shaft right end, disk, transmission gear, screw gear position as shown in figure 9, folding
Plate is packed up, and draw runner opens desulfurizer under shed, and flue gas is ascended into desulfurizer and can not be gone out from through-hole, and stepper motor is opened
It opens, stepper motor drives the second driving gear vertical view to rotate clockwise 110 degree, and the second driving gear drives the second driven gear inverse
Hour hands rotate 110 degree, and shaft rotates 110 degree, and shaft drives lower cam and disc counter-clockwise to rotate 110 degree, and the great circle of cam turns
To the left end of shaft, make draw runner to moving to left by the first jacking block, the first jacking block and pushing block slide into third sliding slot, the left end of pushing block
The left side of the left end face contact in face and third sliding slot, draw runner is against the left side of desulfurizer, left end and fixation due to draw runner
Set is fixed, and sliding sleeve covers the middle-end in draw runner, draw runner by fixing sleeve pulling folded sheet to moving to left, and the reason of slide bar, left side the
Four pieces of folded sheet rotational angles do not move, and four pieces of folded sheets is made to be horizontally formed a whole plate, the left end of the first piece of folded sheet in left side
The under shed of the left end face contact in face and desulfurizer, desulfurizer is closed, meanwhile, stepper motor drives overhead cam to overlook clockwise turn
110 degree dynamic, the great circle of overhead cam is still withstood on the second jacking block, and partition is motionless, and the atomizer of absorbent pipeline connection sprays
Misty absorbent, misty absorbent by the fume treatment in desulfurizer, disk, transmission gear, screw gear position such as Figure 10
Shown, then stepper motor continues to rotate 110 degree, and stepper motor drives overhead cam vertical view to rotate clockwise 110 degree, overhead cam
Roundlet is withstood on the second jacking block, and the second jacking block moves to right under the action of pressure spring, and connecting rod band dynamic dividing plate moves to right, the left side of partition
At the place that keeps left of through-hole, through-hole is opened, and the atomizer of absorbent pipeline connection no longer sprays mist absorbent, in desulfurizer
Flue gas it is processed at, while stepper motor drive the second driving gear vertical view rotate clockwise 110 degree, the second driving gear band
Dynamic second driven gear rotates counterclockwise 110 degree, and shaft rotates 110 degree, and shaft drives lower cam and 110 degree of disk rotational, under
The great circle of cam is still in the left end of shaft, and the under shed of desulfurizer is still closed, the position of disk, transmission gear, screw gear
It sets as shown in figure 11, then stepper motor drives the second driving gear vertical view to rotate clockwise 25 degree, and the second driving gear drives
Second driven gear rotates counterclockwise, shaft rotation, and shaft drives lower cam and disc counter-clockwise to rotate 25 degree, lower cam it is big
Circle is still in the left end of shaft, and the under shed of desulfurizer is still closed, and the first segment tooth of disk is engaged with transmission gear, is driven and is passed
Screw gear rotation is driven while moving gear rotates, screw gear drives screw rod rotation, since sliding block slide fit is in first sliding groove
It does not rotate inside, screw rod band movable slider moves up, and sliding block drives draw runner to move up in square hole, and the first jacking block and pushing block are in third sliding slot
It moves up, folded sheet pushes up the flue gas that the processing in desulfurizer is completed, and the flue gas that draw runner completes the processing in square hole is upward
It pushes away, sliding block pushes up the flue gas that the processing in first sliding groove is completed, and pushing block and jacking block complete the processing in third sliding slot
Flue gas pushes up, and the right end of jacking block is the cambered surface for being bonded the great circle of lower cam, and flue gas, which is brought to, to go out from through-hole, top
Block top to the top of third sliding slot, first segment tooth are separated with transmission gear, the position such as figure of disk, transmission gear, screw gear
Shown in 12, while stepper motor drives overhead cam vertical view to rotate clockwise 25 degree, and the roundlet of overhead cam still withstands on the second jacking block
On, partition is motionless, and through-hole is opened, and then stepper motor continues to rotate 90 degree, and stepper motor drives overhead cam to overlook clockwise turn
90 degree dynamic, the great circle of overhead cam is withstood on the second jacking block, and connecting rod band dynamic dividing plate moves to left, and the left side of partition is in the second board slot
On, through-hole close, while stepper motor drive the second driving gear, the second driven gear, shaft rotate 90 degree, lower cam it is big
Circle is still in the left end of shaft, and the under shed of desulfurizer is still closed, and the first jacking block is in the top of third sliding slot, disk, transmission
Gear, the position of screw gear are as shown in figure 13, and then stepper motor continues to rotate 25 degree, and stepper motor drives the second driving tooth
Wheel, the rotation of the second driven gear, shaft, the great circle of lower cam go to the right end of shaft, and by the first jacking block, ejection exists spring to the right
In lower cam, move to right draw runner, desulfurizer opens opening, and folded sheet packs up, formed after flue gas and absorbent mixing absorbing liquid from
It is flowed in the folded sheet packed up in the following, the second segment tooth on disk is engaged with transmission gear, transmission gear drives while rotation
Screw gear rotation, screw gear drive screw rod rotation, and screw rod band movable slider, which moves down, returns to original position, while overhead cam rotation is replied
To original position, partition returns to original position, and through-hole is still closed, and 110+110+25+90+25=360, stepper motor has just turned one week,
The fume treatment process in a desulfurizer is completed, under the lasting rotation of stepper motor, flue gas is handled by cyclically partition.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry
Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and what is described in the above embodiment and the description is only the present invention
Principle, various changes and improvements may be made to the invention without departing from the spirit and scope of the present invention, these variation and
Improvement is both fallen in the range of claimed invention.The present invention claims protection scope by appended claims and its
Equivalent defines.
Claims (5)
1. a kind of partition desulfurizer of fume desulfurizing tower, it is characterised in that: including fixing piece (4), under the fixing piece (4)
End is equipped with desulfurizer, and fixing piece (4) left end is equipped with absorbent pipeline, and the upper end of the desulfurizer is equipped with and the absorbent
The upper end of the atomizer (27) of pipeline connection, the desulfurizer is equipped with through-hole (10), and the internal upper end of the fixing piece (4) is set
Have stepper motor (5), the output shaft of the stepper motor (5) is successively linked with overhead cam (30), the second driving tooth from top to bottom
It takes turns (11), movable chamber is equipped in the fixing piece (4), the left end of the movable chamber is equipped with circular hole, and the left end of the circular hole is equipped with
The left end of the first board slot being connected to the through-hole (10), the through-hole (10) is equipped with the second board slot, the overhead cam (30)
Left end is equipped with the second jacking block (31), and the left end of second jacking block (31) is equipped with connecting rod (32), a left side for the connecting rod (32)
End is equipped with the partition panel (33) for opening and closing the through-hole (10), and the overhead cam (30), second jacking block (31) are living
It moves in the movable chamber, is connected between the left end of second jacking block (31) and the left end of the movable chamber described in being set in
Pressure spring in connecting rod (32), second jacking block (31) are pressed on the overhead cam (30) under the active force of the pressure spring
On working face, for connecting rod (32) slide fit in the circular hole, the partition panel (33) is slidingly located at described first
On board slot, second board slot, the right end of second driving gear (11), which is engaged with, to be rotationally located in the fixing piece (4)
The second driven gear (12), second driving gear (11) is identical as the second driven gear (12), described second from
The lower end of moving gear (12) is equipped with the transmission mechanism matched with second driven gear (12), the left end of the transmission mechanism
Equipped with the jack for opening and closing the desulfurizer and pushing out the flue gas handled, the transmission mechanism and the folding and unfolding
Mechanism matches.
2. a kind of partition desulfurizer of fume desulfurizing tower as described in claim 1, it is characterised in that: the transmission mechanism packet
Include shaft (13) and the cam path that is rotationally located in the fixing piece (4) in lower cam (14), the shaft (13) it is upper
End is bonded with second driven gear (12), and the lower cam (14) is connected to the middle-end of the shaft (13), the shaft
(13) lower end is linked with the disk (15) being rotationally located in the fixing piece (4), and the side wall of the disk (15) is equipped with
Identical first segment tooth and second segment tooth, the left end of the disk (15) are equipped with and first segment tooth, the cooperation of second segment tooth and rotation
Ground is located at the transmission gear (16) in the fixing piece (4), and the left back of the transmission gear (16) is engaged with screw gear
(17), the center of the screw gear (17) is linked with screw rod (18), and the right end of the desulfurizer is equipped with square hole (24), the side
Third sliding slot is connected between the right end and the cam path in hole (24), the rear end of the square hole (24) is equipped with first sliding groove
(25), the screw rod (18) rotates and is not located at movably in the first sliding groove (25), the interior slide fit of the first sliding groove (25)
Have the first sliding block (19), the center of first sliding block (19) is threadedly coupled with the screw rod (18), first sliding block (19)
Front end be fixedly connected with the jack, the third sliding slot, the square hole (24), the lower cam (14) with it is described
Jack matches.
3. a kind of partition desulfurizer of fume desulfurizing tower as claimed in claim 2, it is characterised in that: the jack packet
It includes four pieces of folded sheets (23) hinged between adjacent, be fixed on the first sliding block (19) front end and slide fit in the square hole (24)
On draw runner (20), the right end of the draw runner (20) is equipped with the first jacking block (21), the left end of first jacking block (21) with it is described
The spring being set on the draw runner (20) is connected between the left end of third sliding slot, first jacking block (21) is in the spring
Active force under be pressed on the working face of the lower cam (14), be fixed with pushing block on the left of the first jacking block (21) lower end
(22), the pushing block (22), first jacking block (21) are matched with the third sliding slot, and the left end of the draw runner (20) is solid
Surely there is fixing sleeve, the fixing sleeve is hinged on the left end of the first piece of folded sheet (23) in left side, the middle-end of the draw runner (20)
It is arranged there are two sliding sleeve (29), two sliding sleeves (29) are respectively hinged at the second piece of folded sheet (23) in left side, left side the
The front and back end of the right end of four pieces of folded sheets (23), the 4th piece of the left side folded sheet (23) is symmetrically arranged with the second sliding block
(28), the front and back side of the desulfurizer right end is symmetrically arranged with second sliding slot (26), and the second sliding block (28) slide fit is described
On two sliding slots (26).
4. a kind of partition desulfurizer of fume desulfurizing tower as claimed in claim 3, it is characterised in that: adjacent two folding
Rubber strip is equipped between plate (23).
5. a kind of partition desulfurizer of fume desulfurizing tower as described in claim 2-4 is any, it is characterised in that: first segment tooth
Angle between second segment tooth is 115 degree, and the angle of first segment tooth is 25 degree.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910198822.8A CN109821362A (en) | 2019-03-15 | 2019-03-15 | A kind of partition desulfurizer of fume desulfurizing tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910198822.8A CN109821362A (en) | 2019-03-15 | 2019-03-15 | A kind of partition desulfurizer of fume desulfurizing tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109821362A true CN109821362A (en) | 2019-05-31 |
Family
ID=66870163
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910198822.8A Withdrawn CN109821362A (en) | 2019-03-15 | 2019-03-15 | A kind of partition desulfurizer of fume desulfurizing tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109821362A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102059054A (en) * | 2010-11-22 | 2011-05-18 | 天津泰达环保有限公司 | System and method for controlling escape of offensive odor from waste pool in incineration plant |
CN102068891A (en) * | 2010-11-29 | 2011-05-25 | 江苏紫光吉地达环境科技股份有限公司 | System for automatically purifying sulfide and nitrogen oxide in mixed gas |
CN104984627A (en) * | 2015-07-03 | 2015-10-21 | 昆山熙诚机械设备有限公司 | Washing tower and method for treating waste gas through same |
CN105126585A (en) * | 2015-08-21 | 2015-12-09 | 哈尔滨市金京锅炉有限公司 | Boiler exhaust gas desulfurization device |
KR101753542B1 (en) * | 2016-12-09 | 2017-07-04 | 정충의 | A dust collector removing air pollutants with fine dust |
JP2018086635A (en) * | 2016-11-30 | 2018-06-07 | 株式会社Ihi | Gas-liquid contactor |
CN208436645U (en) * | 2018-05-03 | 2019-01-29 | 山东乐辰节能环保科技有限公司 | A kind of energy saver for flue gas desulfurization and denitrification |
CN208482244U (en) * | 2018-04-03 | 2019-02-12 | 宿迁中油优艺环保服务有限公司 | Industrial waste high temperature incineration system for cleaning fume |
-
2019
- 2019-03-15 CN CN201910198822.8A patent/CN109821362A/en not_active Withdrawn
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102059054A (en) * | 2010-11-22 | 2011-05-18 | 天津泰达环保有限公司 | System and method for controlling escape of offensive odor from waste pool in incineration plant |
CN102068891A (en) * | 2010-11-29 | 2011-05-25 | 江苏紫光吉地达环境科技股份有限公司 | System for automatically purifying sulfide and nitrogen oxide in mixed gas |
CN104984627A (en) * | 2015-07-03 | 2015-10-21 | 昆山熙诚机械设备有限公司 | Washing tower and method for treating waste gas through same |
CN105126585A (en) * | 2015-08-21 | 2015-12-09 | 哈尔滨市金京锅炉有限公司 | Boiler exhaust gas desulfurization device |
JP2018086635A (en) * | 2016-11-30 | 2018-06-07 | 株式会社Ihi | Gas-liquid contactor |
KR101753542B1 (en) * | 2016-12-09 | 2017-07-04 | 정충의 | A dust collector removing air pollutants with fine dust |
CN208482244U (en) * | 2018-04-03 | 2019-02-12 | 宿迁中油优艺环保服务有限公司 | Industrial waste high temperature incineration system for cleaning fume |
CN208436645U (en) * | 2018-05-03 | 2019-01-29 | 山东乐辰节能环保科技有限公司 | A kind of energy saver for flue gas desulfurization and denitrification |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109363582A (en) | A kind of atomizing air clarifier | |
CN110207142B (en) | Multi-position adjustable flue gas purification environment-friendly equipment | |
CN109821362A (en) | A kind of partition desulfurizer of fume desulfurizing tower | |
CN109316822A (en) | A kind of rainwater-collecting Water purification drum | |
CN109821363A (en) | A kind of desulfurizing tower being segmented desulfurization | |
CN109821361A (en) | A kind of fume desulfurizing tower | |
CN109177608A (en) | A kind of automatic dust-absorbing blackboard brush | |
CN218501694U (en) | Desulfurizing device | |
CN216856238U (en) | Desulfurization and demisting integrated absorption tower | |
CN207050092U (en) | A kind of air purifier with rotating folding air exhausting structure | |
CN109837124A (en) | A kind of gas sweetening unit | |
CN109351110A (en) | A kind of dust-extraction unit | |
CN108339391A (en) | A kind of environment-friendly engineering dust ram | |
CN208920455U (en) | Fresh air device and air conditioner with same | |
CN206911113U (en) | A kind of spray drying process desulfurizer | |
CN207507253U (en) | A kind of dual desulphurization plant of flue gas | |
CN110280069A (en) | A kind of bendable fume desulfurizing tower catches mist device with bilayer | |
CN218249302U (en) | Coating production is with volatilizable organic waste gas treatment mechanism | |
CN219023889U (en) | Desulfurization spray set for flue gas dust remover | |
CN108714362A (en) | A kind of industrial smoke treatment process | |
CN220276677U (en) | Second-level dry desulfurization tower for treating high-concentration SO2 | |
CN208194055U (en) | A kind of burner exhaust gas cleaner | |
CN109806756A (en) | A kind of desulfurizing tower with demister | |
CN209123640U (en) | A kind of environment-friendly type desulfurizer | |
CN217773780U (en) | Desulfurization and denitrification integrated device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190531 |
|
WW01 | Invention patent application withdrawn after publication |